I N S T A L L A T I O N I N S T R U C T I O N S

Instrucciones de instalación

Installationsanleitung

Instruções de Instalação

Istruzioni di installazione

Installatie-instructies

Instructions d´installation

SMART-LIFT™ Electric Ceiling Lift

This device complies with part 15 of the FCC rules. Operation is subject to the following 2 conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

This equipment has been tested and found to comply with the limits of a Class B digital device, pursuant to Part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy, and if not installed and used in accordance with the instructions, may cause harmful interference to radio or television communications. However, there is no guarantee that the interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one of the following measures:

Reorient or relocate the receiving antenna

Increase the separation between the equipment and receiver

• Connect the equipment to an outlet on a circuit other than that to which the receiver is connected

Consult the dealer or and experienced radio/TV technician for help

SL236

2

SL236

DISCLAIMER

Milestone AV Technologies, and its affiliated corporations and subsidiaries (collectively, "Milestone"), intend to make this manual accurate and complete. However, Milestone makes no claim that the information contained herein covers all details, conditions or variations, nor does it provide for every possible contingency in connection with the installation or use of this product. The information contained in this document is subject to change without notice or obligation of any kind. Milestone makes no representation of warranty, expressed or implied, regarding the information contained herein. Milestone assumes no responsibility for accuracy, completeness or sufficiency of the information contained in this document.

Chief® is a registered trademark of Milestone AV Technologies.

All rights reserved.

IMPORTANT SAFETY INSTRUCTIONS

WARNING

serious injury or death if you do not follow the instructions.

CAUTION

alerts you to the possibility of alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions.

WARNING

:

FAILURE TO READ AND

FOLLOW THE FOLLOWING INSTRUCTIONS CAN RESULT

IN SERIOUS PERSONAL INJURY, DAMAGE TO EQUIPMENT

OR VOIDING OF FACTORY WARRANTY. It is the installer’s responsibility to make sure all components are properly assembled and installed using the instructions provided.

IMPORTANT ! : Model SL236 is suitable for use in Other

Environmental Air Space in Accordance with Section 300.22(C) of the National Electrical Code.

When using an electrical mounting system, basic precautions should always be followed, including the following:

READ ALL INSTRUCTIONS BEFORE USING THIS

PRODUCT!!!!

DANGER:

TO REDUCE THE RISK OF

ELECTRIC SHOCK:

1.

Always turn off power at source before cleaning.

Installation Instructions

WARNING:

TO REDUCE THE RISK OF

BURNS, FIRE, ELECTRIC SHOCK, OR INJURY TO

PERSONS:

• Always turn off power at source before putting on or taking off parts.

• Use this mounting system only for its intended use as described in these instructions. Do NOT use attachments not recommended by the manufacturer.

• Never operate this mounting system if it has a damaged test cord or test plug. If it is not working properly during testing, return the mounting system to a service center for examination and repair.

• Keep the test power cord away from heated surfaces.

• Never operate the mounting system with the air openings blocked. Keep the air openings free of lint, hair, and the like.

• Never drop or insert any object into any opening.

• Do not use outdoors unless marked for outdoor use.

• Route cords and cables as shown in the installation instructions.

• To disconnect, turn all controls to the off position, then turn off power at source.

WARNING

:

RISK OF ELECTRIC SHOCK!

Connect this mounting system to a properly grounded outlet only. See Grounding Instructions.

CAUTION:

Changes or modifications to this unit not expressly approved by the manufacturer can void the units FCC compliance rating and make the unit illegal to operate.

WARNING

:

Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment! It is the installer’s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equipment. Reinforce the structure as required before installing the component.

WARNING

:

Exceeding the weight capacity can result in serious personal injury or damage to equipment! It is the installer’s responsibility to make sure the weight of all components attached to the SL236 does not exceed 35 lbs

(15.9 kg).

WARNING

:

RISK OF INJURY! Do not place video equipment such as televisions or computer monitors on the ceiling panel of the SL236. The total weight of any objects on the ceiling panel must not exceed 5 lbs (2.3 kg).

NOTE: This system has no user serviceable parts.

--SAVE THESE INSTRUCTIONS--

Installation Instructions

TOOLS REQUIRED FOR INSTALLATION

SL236

PARTS

I/M x1

A (1)

[Ceiling Lift]

(SL236FD Shown)

B (1)

[Push Button Assembly]

F (5)

[Cable Tie

Mount]

C (5)

[Cable Tie]

D (1)

[External Terminal

Cover Plate]

G (4)

6-32 x 3/16

E (1)

[Jumper Wire]

H (2)

[Rubber Grommet]

3

SL236

LEGEND

Tighten Fastener

Apretar elemento de fijación

Befestigungsteil festziehen

Apertar fixador

Serrare il fissaggio

Bevestiging vastdraaien

Serrez les fixations

Loosen Fastener

Aflojar elemento de fijación

Befestigungsteil lösen

Desapertar fixador

Allentare il fissaggio

Bevestiging losdraaien

Desserrez les fixations

TABLE OF CONTENTS

Disclaimer..................................................... 2

Tools Required For Installation......................3

Parts..............................................................3

Legend.......................................................... 4

Dimensions................................................... 5

Installation Requirements..............................6

Power Requirements.................................... 6

Pre-test Lift Before Installation...................... 6

Power Requirements And Wiring.................. 7

Grounding Instructions.................................. 7

Installing In Ceiling........................................ 7

Installing In A Suspended Ceiling (SL236SP) 7

Installing In A Wood Framework (Joists)....... 9

Installing Projector On SL236....................... 9

Adjustments................................................ 10

Routing Cables........................................... 11

Connecting Control Wiring.......................... 11

Connecting To Power Supply..................... 12

Wiring Options............................................ 12

4

Installation Instructions

Phillips Screwdriver

Marcar con lápiz

Stiftmarkierung

Marcar com lápis

Segno a matita

Potloodmerkteken

Marquage au crayon

Adjust

Perforar

Bohrloch

Fazer furo

Praticare un foro

Gat boren

Percez un trou

Table 1: Wiring Table...................................13

Table 2: Internal Terminal Descriptions........14

Internal/External Wiring Terminal

Descriptions.....................................15

Installation Instructions

DIMENSIONS

[520.7]

20.50

[260.4]

10.25

[584.2]

23.00

[635.0] 25.00

[669.3]

26.35

[698.5]

27.50

[732.8]

28.85

MAXIMUM AVAILABLE SPACE FOR

PROJECTOR AND EQUIPMENT

HxWxD = 9.25 x 20.50 x 22.75 INCHES

[235.0 x 520.7 x 577.9mm]

[19.1] .75

.65

[16.5]

[280.9]

11.06

1.06

[26.9]

[914.4]

36.00

MAX

SL236

SL-236FD

[606.3]

23.87

[260.4]

10.25

[76.2]

3.00

[520.7]

20.50

[584.2]

23.00

[110.2]

4.34

[700.0]

27.56

[719.1]

28.31

[606.3]

23.87

DIMENSIONS: [MILLIMETERS]

INCHES

SL-236SP

[638.0]

25.12

MAXIMUM AVAILABLE SPACE FOR

PROJECTOR AND EQUIPMENT

HxWxD = 9.25 x 20.50 x 22.75 INCHES

[235.0 x 520.7 x 577.9mm]

[311.2]

12.25

[282.4]

11.12

.65 [16.5]

1.06 [26.9]

1.07 [27.2]

.41 [10.4]

[606.6]

23.88

[914.4]

36.00

MAX

CURRENT 9.26 [235.2]

MAX 9.91 [251.7]

MIN 7.78 [197.6]

REMEMBER TO ADD .375” TO 1.00”

[9.5 TO 25.4mm] TO THE MAX

9.91” [251.7mm] OF YOUR PROJECTOR

HEIGHT TO ALLOW FOR THE ROOM THE

SLB BRACKET WILL CONSUME.

[606.6]

23.88

[633.5]

24.94

DIMENSIONS: [MILLIMETERS]

INCHES

5

SL236

INSTALLATION REQUIREMENTS

The SL236 has been designed to be mounted recessed into a ceiling.

Power Requirements

The SL236 requires 120VAC, 60 Hz and 12 amps power to operate.

IMPORTANT ! : Installation and maintenance of this product must be completed by a qualified service technician.

Pre-Test Lift before Installation

1.

Carefully inspect the SL236 for any shipping damage. If any damage is apparent, do NOT continue with the installation.

Instead, contact Chief for further instructions.

2.

Attach supports (not provided) to the top of lift.

(See Figure 1)

Supports

External wiring terminal

5

Installation Instructions

4

Electrical

Cover x 2

Test

Cord

Figure 2

6.

Place the jumper wire (E) on the external wiring terminal contacts labeled 2 and 5, and wire the push button assembly (B) to contacts 1 (red) and 6 (black). (See

Figure 3).

7.

Plug in the SL236 test cord. (See Figure 2)

Place jumper wire (E) (2 and 5)

Figure 1

3.

Suspend the lift at least 3-1/2 ft. above a surface from a suitable structure such as saw horses, ladders or tables.

4.

Remove and save two screws holding side electrical cover in place. (See Figure 2)

5.

Remove electrical cover. (See Figure 2)

Wire push button assembly (B) (1-red, 6-black)

Figure 3

NOTE: (See Figure 2) for location of external wiring terminal.

(See Figure 4) for location of internal wiring terminal.

6

Installation Instructions

Internal wiring terminal

SL236

INSTALLING IN CEILING

WARNING: IMPROPER INSTALLATION CAN LEAD TO

LIFT FALLING CAUSING SEVERE PERSONAL INJURY OR

DAMAGE TO EQUIPMENT! It is the installers responsibility to make certain the structure to which the lift is being mounted is capable of supporting five times the weight of the lift and all attached equipment. Reinforce the structure as required before installing the lift.

[Some parts not shown for clarity]

Figure 4

Power Requirements and Wiring

The SL236 requires 120VAC, 60 Hz and 12 amps power to operate.

IMPORTANT ! : This product must be grounded. If it should malfunction or break down, grounding provides a path of least resistance for electric current to reduce the risk of electric shock.

Grounding Instructions

This product is equipped with a test cord having an equipmentgrounding conductor and a grounding plug. The plug must be plugged into an appropriate outlet that is properly installed and grounded in accordance with all local codes and ordinances.

WARNING: The following instructions assume a suitable mounting structure and surface exists prior to installation and all power and signal wires and cables have been properly installed.

Installing in a Suspended Ceiling (SL236SP)

NOTE: The SL236SP may be suspended from three 3/8 in.

diameter x 8 in. length (minimum) Grade 2 or better threaded rods (not provided) which are secured to a

1-5/8" x 1-5/8" 12 ga metal framing channel (spanning a maximum of 5 feet--not provided) by Grade 2 or better 3/8" channel nuts (not provided).

1.

Remove the ceiling panel from bottom of lift by removing the four screws in the ceiling panel bottom. (See Figure 5)

WARNING: RISK OF ELECTROCUTION! All electrical wiring required for installation should be installed by a qualified electrician.

Ceiling

Panel x 4

WARNING: PINCH HAZARD! FINGERS OR HANDS

BETWEEN MOVING PARTS CAN LEAD TO SEVERE

PERSONAL INJURY! Keep fingers and hands away from mount when operating.

8.

Press the push button to test the SL236 while it is still in the pre-test position.

• Press when the lift is at its top position and it will move down.

• Press when the lift is at its bottom position and it will move up.

• Press while the lift is moving and it will stop.

• Leave SL236 in the closed position.

Figure 5

2.

Install the SMA651 at this time, if applicable, following instructions included with the kit.

3.

Cut the ceiling grid to fit the perimeter of the SL236SP.

7

SL236

4.

Place SL236SP onto threaded rods, inserting the rods into the three slots on top of the SL236SP housing.

(See Figure 6)

5.

Secure the threaded rods to the SL236SP with Grade 2 or better 3/8 in. jam nuts (not provided) and washers (one of each on inside and one of each on outside--not provided).

(Top view of SL236)

Installation Instructions

CAUTION: The lift MUST be installed square and parallel.

Do NOT stress or bend the lift during installation.

Insert rods into 3 slots

Ceiling

Panel x 4

Figure 6

6.

Install the SMA-620 to the SL236SP, if applicable, following instructions included with the kit.

7.

Insert the ceiling grid edge surrounding the SL236SP into the side channel of the SL236SP. (See Figure 7)

NOTE: The side channel of the lift will support the weight of the grid and ceiling tiles.

Figure 8

8.

Use the provided push button (B) to operate the SL236SP up and down, ensuring that all clearances are adequate.

9.

Replace surrounding ceiling tile.

10. Remove four screws and the ceiling tile retainer from the ceiling panel. (See Figure 9)

Ceiling

Panel

Side

Channel

Figure 7

Ceiling

Tile

Retainer

10 15 x 4 x

Figure 9

11. Cut ceiling tile to fit inside ceiling tile retainer, including grid pieces if necessary.

12. Line up holes in ceiling panel with holes in SL236.

13. Re-install four screws removed in Step 1 of Installing in a

Suspended Ceiling section (See Figure 8)

14. Install ceiling tile and grid by sliding it into the open end of the ceiling tile retainer.

8

Installation Instructions

CAUTION: Do NOT allow parts of ceiling tile or grid to protrude from the ceiling panel. Ensure that all parts assemble easily when installing ceiling tile into ceiling panel.

Any protruding parts may cause damage to the lift and/or ceiling.

15. Re-install ceiling tile retainer to ceiling panel and secure with four screws removed in Step 10. (See Figure )

16. Use the provided push button (B) to operate the SL236SP up and down, ensuring that all clearances are adequate after the ceiling has been finished.

Installing in a Wood Framework (Joists)

1.

Use 1/4" x 1" (minimum) Grade 2 lag screws (not provided) to secure SL236 to the joists or wood framework, using the mounting tabs located on the sides of the SL236 housing.

(See Figure 10).

NOTE: There are three mounting tabs on each side and two mounting tabs on the front of the SL236. There are three mounting holes in the back of the SL236. The

SL236 must be installed using the back mounting holes

AND the front two mounting tabs on both sides, OR by using the back mounting holes AND the front mounting tabs.

IMPORTANT ! : Wood framework must be constructed of nothing larger than 2x6 wood studs across the rear of the

SL236. There are no size limitations for the wood framework on the other three sides of the SL236.

SL236

Installing Projector on SL236

NOTE: The projector is secured from the top by an SLB bracket (a Listed accessory).

1.

Attach the SLB bracket to the projector following the instructions included with the bracket.

2.

Press in end tabs on both ends of yaw adjustment bracket and lock into place. (See Figure 11)

3.

Remove the yaw adjustment bracket from the SL236 by lifting up. (See Figure 11)

2

3

Yaw Adjustment

Bracket

2

Mounting

Tabs

Figure 11

4.

Place the yaw adjustment bracket over the studs on the

SLB bracket, selecting the set of holes that best centers the projector weight. (See Figure 12)

5.

Install thumb nuts to secure yaw adjustment bracket to SLB bracket with projector.

Mounting

Tabs

Figure 10

CAUTION: The lift MUST be installed square and parallel.

Do NOT stress or bend the lift during installation.

2.

Use the provided push button (B) to operate the SL236 up and down, ensuring that all clearances are adequate.

9

SL236

6.

Reinstall yaw adjustment bracket with projector to SL236 by setting it in place, and releasing tabs at each end of yaw adjustment bracket. (See Figure 12)

SLB Bracket

(appearance varies)

6

Thumb nuts

Installation Instructions

1

Travel adjust access hole

Adjustments

Figure 12

1.

TRAVEL (SHOW ADJUSTMENT)

CAUTION: Do not overadjust (exceed maximum) travel length.

• To adjust the travel of the lift mechanism, insert a

Phillips screwdriver into the access hole.

NOTE: The access hole may be covered by ceiling tile in the

SL236SP model.

• Shorten travel by turning adjustment screw clockwise one or two turns. Check for desired travel, and repeat as necessary. (See Figure 13)

• Lengthen travel by turning the adjustment screw counter-clockwise one or two turns. Check for desired travel, and repeat as necessary. (See Figure 13)

Figure 13

2.

FORWARD/BACKWARD and PITCH

• To shift projector backward or forward (or up or down), loosen the nuts on each end of the yaw adjustment bracket. (See Figure 14)

• Move mounting bracket forward or backward (or up or down) as required. The bracket must be adjusted forward/backward equally.

• Tighten nuts. (See Figure 14)

2

Figure 14

10

Installation Instructions

3.

YAW (Rotation)

• Adjust one or the other side of the yaw adjustment bracket backward or forward by loosening two nuts on each side. (See Figure 15)

• Adjust bracket as required.

• Tighten nuts. (See Figure 15)

3

Routing Cables

SL236

CAUTION: Do NOT attach cables to lower lifting arms or sides of projector bracket. Damage may result when lift is raised.

1.

Lower SL236 to service position.

2.

Route and secure electrical and video cables using supplied mounting tabs (F) and cable ties (C). (See Figure 17)

IMPORTANT ! : Leave slack between securing points.

Connects to projector

Figure 15

Figure 17

Connecting Control Wiring

4.

ROLL (Horizontal Tilt)

• Shift bracket up or down in the side holes on one side or the other by loosening nuts.

• Adjust and tighten nuts on bracket. (See Figure 16)

4

Figure 16

WARNING: All wiring should be performed by a licensed electrician following all local codes and ordinances.

1.

Unplug the SL236’s power cord (used for testing).

2.

Remove the jumper wire and supplied push button wiring

(previously installed in the Pre-Test Lift before Installation section) from the external terminal block. (See Figure 3)

3.

Connect control wiring following instructions included with the controller and information in Table 1: Wiring Table.

NOTE: Any knockouts removed in the SL236 must be replaced with a supplied rubber grommet (H).

4.

Feed the video and/or communications cables through the knockout in the rear or top of the lift and connect it to the projector.

NOTE: Ensure there is enough slack in the cables to allow for up and down movement of the lift.

5.

Secure cables as necessary using supplied mounting pads

(F) and cable ties (C).

CAUTION: KEEP SL236 OPEN WHILE PROJECTOR IS

RUNNING OR IN COOLING MODE! Premature bulb failure or damage to electrical components may occur if lift closes.

NOTE: If SL236 is cycled up and down repeatedly the motor’s thermal overload protection will stop operation.

Operation will resume when the thermal overload resets (usually within 3 to 5 minutes).

11

SL236

Connecting to Power Supply

IMPORTANT ! : This product must be connected to a grounded metal, permanent wiring system, or an equipmentgrounding conductor must be run with the circuit conductors and connected to the equipment-grounding terminal or lead on the product.

WARNING: FAILURE TO

DISCONNECT AND TERMINATE POWER

LEADS PROPERLY MAY RESULT IN

PERSONAL INJURY OR EQUIPMENT

DAMAGE!! Licensed electrician must disconnect and terminate the leads to the power cord receptacle, and must hard wire the SL236 to a 12-amp power source.

1.

Disconnect and remove power inlet from interior junction box.

2.

Hardwire unit to a 120V 60Hz 12-amp power source.

NOTE: This unit was designed to have conduit run directly into the back of the interior junction box.

NOTE: If installing the SL236 in a drywall ceiling, remove the outside terminal block and cover with plate (D), using four 6-32 x 3/16" Phillips pan head screws (G).

Wiring Options

NOTE: Refer to the Table 1: Wiring Table and (See Figure 18) for information on all wiring options.

NOTE: Refer to Table 2: InternalTerminal Descriptions and

(See Figure 19) for terminal descriptions, functions and wiring options.

Installation Instructions

12

Installation Instructions

Table 1: WIRING TABLE

SL236

EXTERNAL WIRING INTERNAL WIRING

Figure 18

NOTE: The numbers listed in the SL236 Internal and SL236 External columns refer to the corresponding numbers located where indicated in the wiring pictures. (See Figure 18)

13

SL236

Table 2: INTERNAL TERMINAL DESCRIPTIONS

Installation Instructions

14

Installation Instructions SL236

Figure 19

15

SL236 Installation Instructions

Chief Manufacturing, a products division of Milestone AV Technologies

8820-002008 Rev02

2010 Milestone AV Technologies, a

Duchossois Group Company www.chiefmfg.com

04/10

USA/International A 8401 Eagle Creek Parkway, Savage, MN 55378

P 800.582.6480 / 952.894.6280

Europe

F 877.894.6918 / 952.894.6918

A Fellenoord 130 5611 ZB EINDHOVEN, The Netherlands

P +31 (0)40 2668620

Asia Pacific

F +31 (0)40 2668615

A Office No. 1 on 12/F, Shatin Galleria

18-24 Shan Mei Street

Fotan, Shatin, Hong Kong

P 852 2145 4099

F 852 2145 4477

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals