Surface Water Pro - Farm Equipment Sales

GreenStar 2 SurfaceWater Pro
™
™
General Setup
Quick Reference Guide
General Setup (cont)
Implement Setup (cont)
GreenStar 2
Pro
Menu
(*Include the Menu
C
GreenStar2 Pro
GreenStar2 Pro
buttons.)
D
D
Distance (D) is measured
when implement is in the
FULLY RAISED position.
C
Setup Client, Farm, Field*
C. Vertical distance from the GPS receiver to the cutting edge-measure accurately.
Input Client, Farm and Field
D. Vertical distance from the GPS receiver to the ground with the implement in the fully raised
position-measure accurately.
R/C
StarFire iTC Setup (SurfaceWater Pro is not compatible with Original GreenStar Receivers.)
Machine Setup*
Equipment
Machine
GPS
Offsets
Machine
GPS Offsets
Input Machine Type, Model, Name and Connection Point.
Implement Setup*
Implement
StarFire iTC
Implement
s/n:030166
StarFire iTC
Machine
s/n: 031672
Menu
Starfire iTC
Starfire iTC
Survey
Implement 1
GPS
Offsets
Implement
GPS Offsets
Setup Survey Information
GreenStar 2
Pro
Input Implement Type, Model, Name
A
B
B
A
Menu
A. In-line distance from connection point to GPS receiver.
B. Lateral distance from implement center to GPS receiver.
Implement Width is tied to cut volume so set this value equal to blade width.
PF13413
Or
1. Set Height equal to GPS offset “D” for
Setup
selected receiver (Machine or Implement).
2. Calibrate Receiver
Setup
IMPORTANT:
Input distances in drop-down boxes (A-D) and Non Steering Location.
Incorrect dimensions could lead to poor performance.
Equipment
Vehicle
GreenStar2 Pro
Setup
SWM
Setup
Input Survey Mode, Survey Receiver Source and Survey Interval.
Survey Interval can not be changed on the fly. You must stop recording survey points,
change setting, then begin recording again.
Optional
Benchmark
Settings
Create Benchmark settings for calibrating after a
24 hour period or a shutdown. Benchmarks are primarily
used for Quick Survey RTK mode and SF2 mode operations.
1
GreenStar 2 SurfaceWater Pro
™
™
Survey (cont)
Quick Reference Guide
Ditching
GreenStar 2
Pro
GreenStar 2
Pro
Menu
(*Include the Menu
GreenStar2 Pro
GreenStar2 Pro
buttons.)
Menu
(*Include the Menu
Setup Boundaries-REQUIRED*
Set Operation to Ditch*
Water
Management
Boundaries
Mapping
Type drop-down
menu
Set Guidance to Ditch Track*
Survey a field*
B
B
Set up Auto Trac
Using AutoTrac or Parallel tracking is optional but helpful when surveying.
Setup
SWM
Survey
SWM
Survey
Record
Survey is not allowed with SwathControl Pro
• Record an external boundary
• Set up straight track for your survey
• Select Record button
Tracking Mode
drop-down menu
Set Up For Ditching*
View
Guidance
Ditch Track
Guidance Settings
Guidance
View
Tracking Mode
Guidance
Settings
Setup AutoTrac - Optional
PF13413
Ditch
Water Management
Documentation
Boundaries
Record external boundaries.
GreenStar2 Pro
GreenStar2 Pro
buttons.)
• Light will blink
• Select Record button again to stop
Setup
Survey Receiver Source-Allows user to select receiver for vertical information during
ditch recording. If you have an implement receiver, we suggest using it instead of the
machine receiver.
Optional
Benchmark
Settings
Create Benchmark settings for calibrating after a
24 hour period or a shutdown. Benchmarks are primarily
used for Quick Survey RTK mode and SF2 mode operations.
Input Value for Vertical Accuracy Bar step size and check Auto-Name Ditch Tracks if you want the tracks
automatically named.
2
GreenStar 2 SurfaceWater Pro
™
™
Ditching (cont)
Quick Reference Guide
Ditching (cont)
Cut/Clean Ditch Track**
GreenStar 2
Pro
Menu
(**Include the Menu
GreenStar2 Pro
Ditch
Overhead View
Profile View
Ditch
Overhead View
Profile View
SWM
GreenStar2 Pro
SWM
Ditch
buttons.)
Turn machine and scraper around and return to end or beginning of ditch and begin ditch.
Acquire Ditch Track with AT guidance system.
Record a Ditch**
Engage AT system (Resume button).
Begin ditching operation by manipulating cutting blade with hydraulic controls.
Overhead View
New
Overhead View
New
The system will display the current position of the blade by drawing a red profile on the screen.
The blue and/or black drain design line will not be removed, as it is there for your reference.
Levee
Record
Go to the high point in desired Ditch Track (Start of the Ditch). Place selected survey receiver
on beginning position for Ditch Track A. Select NEW button. Enter desired name and press
Accept button. Select A to begin recording ditch track. Drive the ditch track to the lowpoint.
Stop the survey receiver at the position where drain water will exit. Select B to stop recording
the ditch track. Select PROFILE VIEW. View recorded drain profile.
GreenStar 2
Pro
Menu
(*Include the Menu
Create Best Fit or Linear Drain Design** (requires SurfaceWater Pro Plus activation)
Profile View
Edit Drain
Generate Drain
Profile View
Edit Drain
Generate Drain
GreenStar2 Pro
GreenStar2 Pro
buttons.)
Set Operation to Levee*
Water
Management
Accept
View the recorded drain profile by utilizing the zoom functions.
The drain file just recorded will be blue.
Documentation
Water Management
Levee
Type drop-down
menu
Set Guidance to Levee Track*
The drain generated will be a black line. The system will return the operator to the Profile View.
Note: For SurfaceWater Pro Plus both a machine and implement receiver are required for operation.
You can not perform drain designs of vertical guidance with only an implement receiver.
B
Guidance
PF13413
Guidance
Settings
Guidance Settings
Tracking Mode
Levee Track
Tracking Mode
drop-down menu
3
GreenStar 2 SurfaceWater Pro
™
™
Quick Reference Guide
Levee (cont)
Set Elevation and Mark Path
GreenStar 2 Pro – Water Management
Survey
Elevation
Drop
0.2 ft
Levee
Ditch
Setup
0
(in)
Dial View
Set the desired amount of elevation drop between levees in the
ELEVATION DROP input box.
(ft.)
Elevation
982.14
(ft.)
VD OP
GreenStar 2
Pro
Menu
8.000000
Signal Type
RTK
GreenStar2 Pro
Recording...
Levee Track Name
1
SWM
Levee
Dial View
Set
Elevation
Levee
Dial View
Set Elevation
Map View
Select SET ELEVATION button.
VD OP
This acts as a starting point/high point in the field. Use Up/down Arrows to select
target elevation.
8.000000
Drive up or down hill to target elevation.
Signal Type
RTK
Mark Levee by driving to 0 and keeping green bar at 0 as much as possible.
New
+ 0.20
Starting
Elevation
+ 0.15
(ft)
After the levee has been marked for that elevation, select up/down arrows to make the
next levee at a higher/lower elevation.
+ 0.05
0
982.33
Target
Elevation
982.13
(ft)
- 0.05
Speed
- 0.15
(mi/h)
- 0.20
9.2
Set
Elevation
+ 0.10
- 0.10
Drive along and mark constant elevation line using the elevation dial.
Modify
Elevation
Drop
0.20
(ft)
Elevation
982.12
(ft)
Levee Track Name
----
Set Levee track
New
Set A
Select NEW button.
Select SET A button.
PF13413
New
Modify
Set B
At the end of the track select SET B button.
Note: Tracks can not cross themselves.
4
Download PDF