Honeywell for Ex-Or Dual Mount Simple Fit Whitecroft VALH Instruction

VALH 360° Dual Mount PIR installation and operating instructions
WALK TESTING
1
2
!
3
warm up
20-50 SEC
Only suitably qualified personnel should install this equipment
•To prevent electrocution, do not work on any appliance live. Turn off mains before commencing work, lock-out tag-out must be followed.
•The current editions of the IEE Wiring Regulations (BS7671) and Buildings Regulations must be followed for installation.
•Ensure all terminal screws are fully tightened and product is securely fixed to its mounting box prior to turning on the mains supply.
PACK CONTENTS
Around
10 second
MIN. SUN.
x1
MANUAL OVERRIDE OPERATION
Activate Manual Override Operation
5
SEC
5
DAWN
OFF
4mm
Hrs
SEC
Lamp turn on
when reach Lux
setting level.
ON
ON
OFF
ON
Auto Mode
dusk to dawn
ON
x1
x1
x1
x1
x1
Lamp turn off when
dusk to dawn.
1
2
3
230V
0FF
4
Max 120W
Max 500W
Max 110W
OR
TECHNICAL SPECIFICATIONS
Time On Adjustment:
Dusk Level Adjustment:
Operating temperature:
Environment Protection:
50.8mm or 60mm
6
CAUTION:
50.8mm
Max 75W
Max 400W
5
φ 5mm
Max 1440W
60mm
7
Detection Angle:
Power Supply:
Maximum Switchable Load:
x1
Surface Mount
SWITCHABLE LOAD
Up to 6 metres diameter (3m Radius)
at mounting height of 2.5m
360°
220 ~ 240 VAC / 50 Hz
Max load current 6A
Incandescent / Halogen Max 1440W
Flourescent lamp (magnetic) Max 500W
Flourescent lamp (electronic ballast) Max 400W
Low energy (CFL) Max 120W
LED lamp Max 110W
Fan Max 75W
5 seconds - 15 minutes
Day & night or night only operation
0 to 40°C
For ceiling mount - IP44
For flush mount - IP44 (at sensor portion only)
- IP20 (ceiling board onwards)
x2
Hole saw size:
Ф75mm - 80mm
Auto Mode
Detection Range:
x2
MOUNTING/ INSTALLATION STEPS
OR
2 Auto deactivation when
x4
x2
x2
3mm
Ф5mm
1 time within 1 second
2 times within 2 seconds
x1
No 2
Phillips
1 SEC
DUSK
x1
M3 x 15mm
(For cable clamps
installation)
REQUIRED (Warning: Use only VDE Certified Tools)
Deactivate Manual Override Operation
1 Manual deactivation before dawn
2 SEC
ON
x1
M3 x 20mm
(For ceiling mout
installation)
M4 x 14mm
(For Euro conduit box
installation)
Cable entry
capability at
terminal block
1 x 2.5mm²
2 x 1.0mm²
2 x 1.5mm²
8
N
L
R R
Option1 (live out)
Option2 (volt-free)
L
N
Brown
Live
Blue
Neutral
Earth
Green / Yellow
Brown
R Switched Live
Load
N L R
GUARANTEE
L
N
R
R
Brown
Live
Blue
Neutral
Earth
Green / Yellow
Volt-Free
Brown
Relay contact
N L R
R
R
µ
µ
The company undertake to replace or repair, at its discretion should it become defective within a period
of 1 year after delivery, solely as a result of faulty materials and/or workmanship. Understandably, if
the product has not been installed, maintained or used appropriately, or if an attempt has been made to
rectify, dismantle or alter the product in any way, the guarantee will be invalidated.This guarantee states
the company's entire liability. It does not extend to cover consequential loss or damage or installation
cost arising from the defective product.This guarantee does not restrict or infringe the normal statuary
rights of the customer.
* Remark: R terminals are Volt-Free output
(when link is removed)
N
L
N
L
Note: Remove the external link
R
R
COMPLIANCE WITH E.U. DIRECTIVES
Apart from meeting the appropriate British standards, products are
manufactured in accordance with BS EN ISO 9002 and comply
with the LV (72/23/EEC) Directive.
At the end of their useful life the
packaging and product should
be disposed of via a suitable
recycling centre.
Do not dispose of with normal
household waste. Do not burn.
9
FURTHER INFORMATION CONTACT
TECHNICAL SUPPORT
Telephone: 0161 331 5700
E-mail: technical@whitecroftlight.com
http://www.whitecroftlighting.com
‘CLICK’
OR
‘CLICK’
‘CLICK’
Cut out
here
The device needs
20-50 seconds to
warm up.
MOTION SENSOR DETECTION
MOUNTING/ INSTALLATION STEPS
Flush Mount
2
When mounting
at 2.5m height
3
3 METRE
1
230V
0FF
5
N
L
R R
Option1 (live out)
Option2 (volt-free)
Brown
Live
Blue
Neutral
Earth
Green / Yellow
Volt-Free
Brown
Relay contact
R
R
Load
N L R
N L R
R
RE
Power wire
L
N
ET
Ceiling board
thickness
5mm-20mm
M
Brown
Live
Blue
Neutral
Earth
Green / Yellow
Brown
R Switched Live
.6
L
N
ia
Opening hole
75mm~80mm diameter
D
R
TOP VIEW
µ
µ
Cable entry
capability at
terminal block
1 x 2.5mm²
2 x 1.0mm²
2 x 1.5mm²
* Remark: R terminals are Volt-Free output
(when link is removed)
N
L
N
L
Note: Remove the external link
6
7
°C
°C
40
30
20
10
40
R
R
PERSPECTIVE VIEW
8
40
30
20
10
40
2.5 M
4
3 METRE
3 METRE
3 METRE
°C
40
30
20
10
‘CLICK’
3 METRE
3 METRE
1M
40
SIDE VIEW
9
LENS MASK
Ceiling board
The device need
20-50 seconds to
warm up.
Restrict
short
detection
REMOVING
Restrict
detection
directly
under
sensor
Surface Mount
Lens mask
sticker
Restrict
long
detection
TESTING & OPERATION
Adjustment
-Can be adjusted by flat head screwdriver.
REMOVING
LUX
Flush Mount
ON-TIME
‘CLICK’
15 MIN
5 SEC
15
SEC
MIN
Download PDF