software reprogramming - DICKEY-john

OPERATOR’S MANUAL
SOFTWARE REPROGRAMMING
VT AND WSMT
The following instructions update the Virtual Terminal (VT) and Working Set
Master (WSMT) to a new software version.
VERIFY 10” VT SOFTWARE VERSION
1. Check the DICKEY-john VT part number found on the back of the
terminal. The current software version is indicated in Figure 1.
Figure 1
VT Software Version
NOTE: Terminal p/n 467980503 has a
second connector under the
large circular connector.
Virtual Terminal
Software Version
467980502
467980502A
1.6.4
467980503
1.6.9
2. Power on the VT.
3. Select the VT icon located on the left side of screen.
4. Verify the terminal software is the latest version per Figure 1.
Figure 2
VT Software Information Screen
1.69
1.6.9.dj
5.06
blob-2.0.5-WE28
5. If the software is current, proceed to WSMT Reprogramming.
6. If the software is not current, proceed to VT Reprogramming.
Reprogramming VT and WSMT
11001-1507B-201103
SOFTWARE REPROGRAMMING / 1
OPERATOR’S MANUAL
10” VT REPROGRAMMING PREPARATION
To reprogram VT and WSMT software on an IntelliAg system with a 10” VT,
a FAT32 formatted SD card is required. If the card is already FAT32
formatted, proceed to Downloading the SD Card Image.
Formatting an SD card to FAT32 in Windows:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Connect the SD card reader if using an external SD card reader.
Insert the SD card into the reader.
Close the SD card Explorer window (if applicable).
Go to My Computer and double click the icon.
Select the card reader drive.
Right click on the card reader drive.
Select Format.
Select a File System format of FAT32.
Click on Start.
Click OK to the new card warning. If it is not a new card, verify that the
data has been saved and click OK. If the data has not been saved,
click Cancel, save the data, and go back to step 3 in case the card is
not FAT32.
The card will now be formatted and a Format Complete prompt will
appear.
Click OK.
Close the format window (if applicable).
The card is ready for use on the IntelliAg system.
VT REPROGRAMMING
NOTE: Contact Great Plains Service
for Extranet login information.
The latest VT software is available for download at the DICKEY-john
website (www.DICKEY-john.com/Extranet) (located at the bottom of the
home page).
Computer:
1. From the extranet site, select the appropriate VT software and
download to a known location on the computer.
2. Extract downloaded files to a known location on the computer.
3. Insert an SD card into the card reader. SD card cannot be larger than
2G.
4. Copy defaults and SDCardImg folders and the 13 files that were
extracted from the zip folder.
5. Paste the defaults and SDCardImg folders and the 13 files to the blank
SD card.
6. After save, remove the SD card from the computer.
2 / SOFTWARE REPROGRAMMING
Reprogramming VT and WSMT
11001-1507B-201103
OPERATOR’S MANUAL
VT:
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Disconnect the terminal harness from the back of the terminal.
Insert the SD card into the VT.
Reconnect the terminal harness to the back of the terminal.
Turn the ignition ON.
The system will power up with the DICKEY-john Corporation splash
screen for approximately 8 seconds.
The screen will turn white momentarily and then gray.
An Install Confirmation screen appears to select ‘Yes to install the
software’ or ‘No to not install the software’.
– If No, system reboots and returns to the previous version software.
– If Yes, new software begins install.
Several messages will appear during the reprogramming phase. The
reprogramming phase will take approximately 2 minutes to complete.
An instruction box will appear.
Follow the instructions on the display.
– Remove the SD card from the VT.
– Press the Reboot button on the VT.
The screen will momentarily turn blue, then black, and take up to 5
minutes to complete the software install.
A DICKEY-john Corporation splash screen will appear and the light
indicator at the top of the VT will flash.
The screen will turn gray for approximately 8 seconds and the VT icon
will appear as the first button on the left side of the display.
The other ISO 11783 devices will login on and their respective buttons
appear.
All object pools will begin loading. A bar graph will appear at the
bottom of the screen. This bar graph represents the uploading of the
new object pool.
After all object pools upload, the IntelliAg Work screen loads and
buttons will appear on the left side of the display for each device
connected.
Press the VT button to verify that the system constants are correct on
the VT Information screen and that the system has been successfully
updated and ready to operate.
IMPORTANT: If issues occur during the reprogramming phase and the
ignition has to be turned OFF, the VT stays in a sleep
mode for 2 hours. Turning the ignition ON before the 2
hour window has expired will NOT force the VT to read
the SD card and start the reprogramming process again.
To avoid sleep mode, disconnect the connector on the
back of the VT and reconnect. This will force the VT to
read the SD card when the unit powers back on.
Reprogramming VT and WSMT
11001-1507B-201103
SOFTWARE REPROGRAMMING / 3
OPERATOR’S MANUAL
WSMT REPROGRAMMING (10” VT)
Some constants may reset to factory default settings during software
reprogramming. A configuration export should be performed before
reprogramming to prevent loss of data. Refer to Setup Constant Verification
for further instruction.
IMPORTANT: Do NOT remove power during the reprogramming
process.
Computer:
1. Insert an empty SD card into the SD card reader. The SD card cannot
be larger than a 2G.
2. Verify SD card is formatted as FAT32.
3. Select the zip file with the new software version. Software is available
through Great Plains Service.
4. Save the zip file to computer in a known location.
5. Extract the files from the zip folder to a known location.
6. Copy the SD CardImg folder and the 8 files that were extracted from
the zip folder.
7. Paste the SD CardImg and the 8 files to the blank SD card.
8. Remove the SD card from the computer.
VT (Record Setup Constants)
A few setup constants may reset to factory defaults after reprogramming
from versions older than 4.0 and it is recommended that the following
constants be recorded:
•
•
•
•
•
•
Hopper Assignment
RPM Assignment
Gear Ratio
Row Assignment
Row Pattern
Population Filter
VT (Record Module Addresses and Serial #):
Before reprogramming, record module addresses and serial numbers found
at the Module Configuration screen. This information is required before
loading the config file back once programming is complete at step 31.
1.
2.
3.
4.
4 / SOFTWARE REPROGRAMMING
Press the IntelliAg button.
Press the Next Page button.
Press the Module Configuration button.
Record all module serial numbers, module types, and addresses.
Reprogramming VT and WSMT
11001-1507B-201103
OPERATOR’S MANUAL
Figure 3
Module Configuration Screen
If the WSMT is a recent production unit, the configuration file can be
exported before reprogramming.
To Verify WSMT:
1. Power ON the VT.
2. Verify the Task Controller button appears on the left of screen
(Figure 4).
3. If the Task Controller button does not appear, press the VT button.
4. Press the Applications button.
5. Press the Task Controller input box to enable. A check mark will
appear.
6. Return to the IntelliAg Work screen by pressing the IntelliAg button.
7. The object pool will load and the Task Controller button will appear.
Figure 4
Task Controller Icon
Virtual
Terminal
Task
Controller
Applications
8. At the IntelliAg Work screen, press the Next Page button until the
Config button appears.
– If the Config button does not appear, ALL setup constants should
be recorded and re-entered after reprogramming.
Reprogramming VT and WSMT
11001-1507B-201103
SOFTWARE REPROGRAMMING / 5
OPERATOR’S MANUAL
Figure 5
IntelliAg Work Screen
Configuration
NOTE: Remember the file name as it is
required to re-enter as an exact
match once WSMT
programming is complete.
IMPORTANT: Before performing an export, record all module
addresses and serial numbers and setup constants
stated on page 4.
9. Insert a blank SD card and press the Config button to display the
Configuration screen.
Figure 6
Export Screen
Export Data Success
10. Enter an Export file name and press the Export button.
11. Wait for Export Data Success to appear on the display.
12. After complete, press the Task Controller button to display the Task
Controller screen.
13. Press the SD Eject button to save.
14. Remove the SD card.
15. Turn OFF the ignition.
16. Disconnect the terminal harness from the back of the terminal.
6 / SOFTWARE REPROGRAMMING
Reprogramming VT and WSMT
11001-1507B-201103
OPERATOR’S MANUAL
17. For systems using Autopilot, disconnect the 2-pin P2 power cable
connection from the Autopilot harness connector.
18. Insert the SD card with the new version of software reprogramming
files into the terminal.
19. Reconnect the terminal harness to the terminal.
20. Verify that the WSMT is also connected along with the hitch connector.
21. Turn ON the ignition.
22. The system will power up with the DICKEY-john Corporation splash
screen for approximately 8 seconds.
23. The screen will turn white momentarily and then gray.
24. Several messages will appear during the reprogramming phase:
– Update all software! and J1939 CAN Node Programmer
– Target: Dj ISO Planter Monit
– Initializing and Establishing Communications
– Verifying Checksum and PROGRAM COMPLET
The reprogramming phase will take approximately 2 minutes to complete.
Communications will then be re-established and the system will indicate the
remote upgrade as successful.
25. Approximately 10 seconds later an instruction box will appear.
26. Follow the instructions on the display.
– Remove the SD card from the VT.
– Press the Reboot button on the VT.
27. The screen will turn blue with a yellow flashing cursor in the upper left
corner for approximately 15 seconds; the display will momentarily fade
to black.
28. A DICKEY-john Corporation splash screen will appear for
approximately 8 seconds.
29. The screen will turn gray for approximately 8 seconds and the VT icon
will appear as the first button on the left hand side of the display.
30. The other ISO11783 devices will log on and their respective buttons
will appear.
31. If the object pool of the new software is different than what is stored in
the VT, a bargraph will appear at the bottom of the screen. This
bargraph represents the uploading of the new object pool. The
uploading of the object pool will take approximately 90 seconds.
32. After the object pool uploads, the IntelliAg Work screen will display and
the IntelliAg button will appear on the left side of the display.
33. To verify the software is loaded, press the Diagnostics button.
34. Press the Information button.
35. On the Information screen, the APP line should have four digits that
reflect the software version number. If the version number does not
match, repeat the Reprogramming WSMT section (Figure 7).
36. Reconnect the power cable to the Autopilot harness.
Figure 7
Information Screen
04. 00 09 02 23 14
Reprogramming VT and WSMT
11001-1507B-201103
SOFTWARE REPROGRAMMING / 7
OPERATOR’S MANUAL
RESETTING MODULE ADDRESSES
Before importing configuration files, the module addresses must be reset.
The system must be in Access Level 2 status to reset.
To Reset:
1. At the IntelliAg Work screen, press the Next Page button to view the
Summary button.
2. Press the Summary button to access the Summary screen.
3. Press the Password button to access the Password screen.
4. Enter the 6 digit Level 2 password (2 followed by WSMT serial
number). Example: WSMT-PDC serial number 10155. Level 2 access
is 210155. (Serial # of WSMT previously recorded at the VT Record
Module Addresses and Serial # section).
5. Press the OK button to automatically reset and change to Level 2.
“Dealer screens on” will appear at screen bottom.
6. Press the Work Screen button to return to the Work screen.
7. Press the Next Page button to access the Module Configuration
button.
8. Press the Module Configuration button to display the Module
Configuration screen.
9. Change the module addresses to match the list recorded earlier.
Figure 8
Changing Module Addresses
10. Proceed to Importing Configuration Files.
IMPORTING CONFIGURATION FILES
1. Insert the SD card with the configuration file.
2. At the IntelliAg Work Screen, press the Next Page button to access
the Config button.
3. Press the Config button to access the Config screen.
4. Enter the exact file name into the Import File Name input box.
5. Press the Import button.
8 / SOFTWARE REPROGRAMMING
Reprogramming VT and WSMT
11001-1507B-201103
OPERATOR’S MANUAL
Figure 9
Importing Config Files
6. Once the import completes, a Power Down button will appear.
7. Remove the SD card.
8. Wait for Import Data Success message and then press the Power
Down button. The system will automatically restart and load the
IntelliAg Work screen.
Figure 10
Power Down
Reprogramming VT and WSMT
11001-1507B-201103
SOFTWARE REPROGRAMMING / 9
OPERATOR’S MANUAL
SETUP CONSTANT VERIFICATION
A few setup constants may have reset to factory defaults after
reprogramming and it is recommended that the following be verified:
•
•
•
•
•
•
Hopper Assignment
RPM Assignment
Gear Ratio
Row Assignment
Row Pattern
Population Filter
To Verify Setup Constants:
NOTE: After power down, the system
automatically resets to Access
Level 1 and will need to be
changed to Access Level 2.
Refer to Resetting Module
Addresses steps 1-6 for
password instructions.
1. At the IntelliAg Work screen, press the Next Page button to access the
Summary button.
2. At the Summary screen, press inside the appropriate boxes to change
setup constants.
Figure 11
Summary Screen
Gear Ratio
Row Assignment
Population Filter
Row Pattern
Auto Config
Press inside box to
access Control Setup
screen.
Hopper/Pressure/
RPM Sensors
To Configure Sensors:
3. Press the Module Configuration box to access the Module
Configuration screen.
4. Press the Auto Config button to automatically configure hopper and
pressure sensors, if any.
5. Press the Hopper Assignment button to verify/add # of Hoppers, if
required.
6. Press the Accessory Assignment button to verify pressure sensors
and to manually enter number of RPM sensors, if required.
To Assign Rows and Patterns:
7. Press the Row Assignment button to access the Row Assignment
screen and verify/enter # of rows.
8. Press the Row I/O button to enter patterns.
10 / SOFTWARE REPROGRAMMING
Reprogramming VT and WSMT
11001-1507B-201103
OPERATOR’S MANUAL
Figure 12
Module Configuration Screen
9. Press the Work Screen button to return to Main Work screen.
10. Press the Next Page button to access the Summary button.
To Set Gear Ratio and # of Seed Rows:
11. At the Summary screen, press inside the Control Channel area to
access to the Channel Setup screen.
12. Change Gear Ratio to the correct manufacturing setting that was
previously recorded on page 4, if required.
13. Enter/verify # of Seed Rows, if required.
Figure 13
Channel Setup Screen
1.900
Reprogramming VT and WSMT
11001-1507B-201103
SOFTWARE REPROGRAMMING / 11
OPERATOR’S MANUAL
To Set Population Filter:
14. At the Summary screen, press inside the Row Monitor screen.
15. Change Population Filter to 50%.
16. The system is ready to operate.
Figure 14
Row Monitor Screen
50.0
12 / SOFTWARE REPROGRAMMING
Reprogramming VT and WSMT
11001-1507B-201103
OPERATOR’S MANUAL
WSMT REPROGRAMMING (5” VT)
To reprogram WSMT software on an IntelliAg system with a 5” VT, a FAT
formatted SD card is required.
Computer:
1. Insert an empty SD card into the card reader. The SD card cannot be
larger than 2G.
2. Verify SD card is formatted as FAT using Windows Explorer.
3. If formatted correctly, select the zip file with the new software version.
Software is available through Great Plains Service.
4. Save the zip file to computer in a known location.
5. Extract the files from the zip folder to a known location.
6. Copy the 4 files that were extracted from the zip folder.
7. Paste 4 files to the blank SD card.
8. Remove the SD card from the computer.
VT:
1.
2.
3.
4.
5.
6.
7.
At the VT, disconnect the terminal harness from the back.
Insert the SD card with the files into the VT.
Reconnect the terminal harness to the back of the terminal.
Verify that the WSMT is also connected along with the hitch connector.
Power ON the VT. The screen will indicate files are copying to RAM.
When complete, press the 1 button to accept the new software update.
To select an ECU, turn the knob and select the line starting with 80 (or
81 if 80 does not appear).
8. Press the 1 button to start programming.
IMPORTANT: Do not turn power off while reprogramming.
9.
10.
11.
12.
13.
14.
15.
16.
17.
Reprogramming VT and WSMT
11001-1507B-201103
The screen will indicate data is transferring and the * will flash.
“Finished transfer” will appear when complete.
Remove the SD card.
Turn the knob to select Reset and press the 1 button. The VT will
reset.
The system will restart and a new object pool will begin transferring.
After transfer completion, the IntelliAg Work screen will display.
To verify software is loaded, press the Diagnostics button.
Press the Information button.
On the Information screen, the APP line should have the first four digits
that reflect the loaded software version. If the version number does
not match, repeat the reprogramming WSMT section.
SOFTWARE REPROGRAMMING / 13
OPERATOR’S MANUAL
14 / SOFTWARE REPROGRAMMING
Reprogramming VT and WSMT
11001-1507B-201103
Download PDF