VelociRack™ PXR-INT42U
Installation Instructions
VelociRack server option also contains:
Product Description

Monitor, keyboard, mouse console
Siemens' VelociRack™ is a factory-assembled,
high-density, integrated automation solution.
With a pre-engineered design and innovative
approach to construction and factory witnessed
testing, the VelociRack delivers a significant
reduction in the build cycle and helps minimize
potential time delays and capital outlays during
construction.

KVM Switch with three cables
VelociRack no-server option consists of:

VelociRack enclosure

Automation enclosure, PXA-ENC25U.1 with
PXC Modular Controllers and TX-I/O

Automatic transfer switch and A/B power
distribution units

Uninterruptible Power System with four
external battery cabinets and enclosure
temperature and humidity sensor network

Power over Ethernet (PoE) network switch

Cameras for viewing front and rear doors of
the rack

Card access readers, controllers, and door
contact sensors for front and rear doors

5U rack space for site-specific servers
Siemens Industry, Inc.
Product Numbers

PXR-INT42U.1NS Rack Solution no-server
option

PXR-INT42U.1S: Rack Solution, server
enabled option
Caution Notations
Notation
CAUTION
Symbol
Meaning
Indicates that
equipment damage,
or loss of data may
occur if you do not
follow a procedure
as specified.
Page 1 of 13
Receiving and Unpacking the VelociRack
Inspect and report any damage before receiving the shipment.
The VelociRack is shipped with a shock sensor (Figure 1). If the sensor indicates rough handling, check if
the shock sensor was activated on the receiving documents. Inspect the rack for any visual damage and
note those items on the receiving documents. Thoroughly evaluate and report concealed damage to the
shipment within five days of the delivery date.
Figure 1: Shock Sensor Warning.
Unpack the VelociRack by carefully removing the outer packaging carton and corners. Avoid damaging
the rack when removing packaging.
Use extra caution when removing the VelociRack from the pallet. Also, be sure you have
enough service personnel. Do not attempt to move racks by yourself.
1. Unpack the ramps.
 After removing the wrapping from the cabinet, you should have two ramps (Figure 2). A
small hardware back wrapped to the outside of one ramp will contain four wood screws.
Siemens Industry, Inc.
Page 2 of 13
Figure 2. Rack Pallet Detail.
2. Locate the proper end of the pallet.
 One end of the pallet will be cut to accommodate the ramps. Pilot holes drilled into this
end of the pallet will be used to attach the ramps with the supplied wood screws (Figure
3).
Figure 3. Pilot Holes Used to Attach the Ramps.
3. Secure ramps to pallet.
4. Insert the wood screws into the pilot holes and tighten them (Figure 3).
Siemens Industry, Inc.
Page 3 of 13
Figure 4: Ramps Attached to the Pallet.
5. With several people, carefully and slowly roll the VelociRack down the ramps and off the pallet.
Be careful when moving racks before installation. Sudden stops and starts, excessive
force, obstructed routes, and uneven floor surfaces may cause the rack to topple
over.
6. Move the VelociRack to the installation location.
Siemens Industry, Inc.
Page 4 of 13
Installing the VelociRack
This section provides information for installing the VelociRack.
Leveling the VelociRack
After the VelociRack has been moved to the installation location, the leveling feet can be lowered for
additional stability.
Leveling feet are installed at the factory. They are easily accessible in the front and rear of the rack’s
frame. Figure 5 illustrates how to adjust the leveling feet from beneath the VelociRack using a 3/4-inch
open-end wrench. Leveling feet can also be adjusted from inside the rack using a 5/16 socket.
Figure 5: Leveling-Feet Adjustment Detail.
Connecting the VelociRack Power
The VelociRack power connection is made using one of three forms of data center power as recorded on
a submittal drawing in power diagram.
Verify each data center power distribution for the rack has a NEMA 5-15R outlet run to
dedicated 120 Vac 15-amp branch circuit located in the overhead busway or below the floor
within reach of the PDU 10-foot power cord.
NOTE
PDU A is located at the rear of the rack’s enclosure, at bottom left, and PDU B is located at
the rear of the rack’s enclosure, at bottom right. If necessary, relocate the PDU higher in the
rack’s enclosure to reach an overhead outlet. The PDU power cords in the horizontal wire
management are at the bottom rear of the rack.
Siemens Industry, Inc.
Page 5 of 13

Standard A/B power: Plug PDU A into the outlet for service A and PDU B into the outlet for
service B.

Optional emergency power: Plug PDU A into the outlet for building service and PDU B into the
outlet for the emergency service.

Optional no backup power: Plug PDU A into the outlet for building service and leave PDU B
unplugged with the cord remaining in wire management.
VelociRack Factory-Installed Power Distribution Wiring
Figure 6: VelociRack Factory-Installed Power Distribution Wiring.
Do not plug in additional equipment to the UPS unless a current load calculation is done to
ensure maximum load is not exceeded.
Siemens Industry, Inc.
Page 6 of 13
Power Distribution
Ensure the power distribution is configured as follows:

VelociRack 120 Vac single supply devices are plugged into the UPS.

Four battery cabinets are plugged into UPS.

ATS is plugged into UPS, PDU A, and PDU B.

Dual supply servers are added to the rack plug directly into open PDU A and B outlets.

Power to PDU A and B is plugged into the data center outlets.
Field Wiring Termination
NOTE
Refer to A6V101101269, VelociRack Application Guide for detailed field wiring terminations.
FLN Field Termination Wiring
The following information applies to Controller Floor Level Network ports on Drawer 1 & 2, Rail A and Rail
B, and Drawer 3 Rail A.

Each of the PXC100-E96.A Modular Controllers is associated with one FLN.

Terminate the FLN cable as follows:
-
white wire to + non-inverting terminal (internal EOL terminator)
-
black wire to - inverting terminal (internal EOL terminator)
-
yellow wire to ↓ reference terminal (internal referenced to ground)
-
shield drain wire to S terminal (internal grounded)

Plug identification tags do not include the drawer number, which is located only on the back of the
top rack shelf of the automation enclosure.

The plug identification tags are color-coded blue for communication signal.

See Figure 20 for typical FLN plug wiring detail.
Figure 7: Typical FLN Plug Wiring Detail.
Factory-Installed Drawer Interconnect Area
 Factory-installed wiring from Drawer 3 XFMR 1 - 8 plugs to (8) TX-I/O bus plugs on
Drawers 1 & 2.
-
D3 XFMR 1 to D1 RA TX-I/O bus 1
-
D3 XFMR 2 to D1 RA TX-I/O bus 2
-
D3 XFMR 3 to D1 RB TX-I/O bus 1
Siemens Industry, Inc.
Page 7 of 13

-
D3 XFMR 4 to D1 RB TX-I/O bus 2
-
D3 XFMR 5 to D2 RA TX-I/O bus 1
-
D3 XFMR 6 to D2 RA TX-I/O bus 2
-
D3 XFMR 7 to D2 RB TX-I/O bus 1
-
D3 XFMR 8 to D2 RB TX-I/O bus 2
Cables (8) are 2C 14 AWG.
-
Red wire between ~ terminals on each plug set.
-
Black wire between ┴ terminals on each plug set.
CS and CD terminals may be used to link TX-I/O bus between rails in alternate configurations.

Plug identification tags do not include the drawer number, which is located only on the back of the
top rack shelf of the automation enclosure.

Plug identification tags are color-coded for Class 2 power.
-
White for Class 2 power output on XFMR tags.
-
Yellow for Class 2 power input and bus signal on TX-I/O bus tags.
Figure 8: Factory-Installed TX-I/O Bus Wiring Area in middle of PXA-ENC25U.1.
Siemens Industry, Inc.
Page 8 of 13
Figure 9: Typical Class 2 Transformer Plug.
Figure 10: Typical TX-I/O Bus Plug.
Figure 11: Typical Factory Installed TXIO BUS Power Wiring.
Factory-Installed Modular Controller Ethernet Cables
The following information applies to Controller Ethernet ports (Figure 12) on Drawers 1 and 2, Rail A and
Rail B, and Drawer 33 Rail A.
Each of the PXC100-E96.A Modular Controllers is associated with one BACnet IP.

Factory-installed CAT5e Ethernet cables connect to the network switch.

Plug identification tags do not include the drawer number, which is located only on the back of the
top rack shelf of the automation enclosure.

Plug identification tags are color-coded blue for communication signal.
Figure 12: Typical Ethernet Jack.
Automation Enclosure Factory-Installed Power Connection
This power connection applies to the Drawer 3 Power Panel.

A single IEC C14 Power Inlet (Figure 13: Automation Enclosure IEC C14 Power Inlet.Figure 13)
provides 120 Vac to all transformers.
Siemens Industry, Inc.
Page 9 of 13

The factory- installed power cord is 10-foot, 3C 18 AWG IEC C13 to NEMA 5-15P.

The power cord plugs into the top UPS non-switched outlet and must remain connected while
automation enclosure is operating.
Figure 13: Automation Enclosure IEC C14 Power Inlet.
Network Connection
The network switch has several spare Ethernet ports that can be used to connect the rack to the
building’s network where redundant fiber backbone is not used. Update the switch configuration to match
the job site requirements. See Figure 14 for wiring information.

Factory-installed automation enclosure controllers and UPS

Factory-installed PoE cameras and door access controllers

Server option, factory-installed LRA Console KVM Switch

Server option, factory-installed servers

Field-installed 100/1000X Fiber SFP ports (25-28) to fiber building network
Siemens Industry, Inc.
Page 10 of 13
Figure 14: Network Connections for Factory Installed Devices and Field Installed Servers.
Card Access
Access Without Power
You can power the Mechatronic Lock for Racks (MLR) externally using the battery pack (Figure 15).
1. Connect the cable to the battery, and toggle the onswitch.
 If the blue LED does not illuminate, charge the Battery Pack.
2. Locate the rubber cover on the underside of the MLR, and pull the cover open.
3. Insert the battery pack plug into the MLR battery backup port firmly.
 Within 3 to 5 seconds, the upper LED turns blue.
Siemens Industry, Inc.
Page 11 of 13
Figure 15: Card Access with Battery Pack.
Figure 16: Card Access with Green LED.
4. Hold one of the included MiFARE cards below the silver handle.
 The upper LED turns static green (Figure 16), indicating the solenoid is now active.
5. Press the lower portion of the silver handle to eject the handle.
6. Rotate the handle to unlock and open the door.
7. Once opened, the battery pack is no longer necessary; however, it should be stored for
emergency backup use.
Standalone Mode
In stand-alone mode, you can add additional user cards by doing the following.
1. Hold the General Card below the silver handle.
 The top LED flashes red/green.
2. Hold the Group Card below the silver handle.
 The Group Card is now programmed. It is not necessary to show the General Card again.
 The top LED turns static blue.
3. Hold the Group Card below the silver handle.
 The top LED flashes red/green.
Siemens Industry, Inc.
Page 12 of 13
4. Hold the new User Card below the silver handle.
 The top LED turns blue.
 The new User Card now has access to the handle.
NOTE
Refer to A6V101101269, VelociRack Application Guide for complete details about the rack.
The installation is now complete.
Information in this document is based on specifications believed correct at the time of publication. The right is
reserved to make changes as design improvements are introduced. VelociRack is a trademark of Siemens Industry,
Inc. Desigo® and Desigo® CC™ are registered trademarks of Siemens Schweiz AG. Other product or company
names mentioned herein may be the trademarks of their respective owners. ©2017 Siemens Industry, Inc.
Siemens Industry, Inc.
Building Technologies Division
1000 Deerfield Parkway
Buffalo Grove, IL 60089-4513
USA
Tel. 1 + 847-215-1000
Your feedback is important to us. If you
have comments about this document,
please send them to
SBT_technical.editor.us.sbt@siemens.com
Document No. A6V101101278
Printed in the USA
Page 13 of 13
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising