heating and cooling permit application

heating and cooling permit application
HEATING AND COOLING
PERMIT APPLICATION
Residential
PROJECT ADDRESS
Commercial
Parcel Number
PROJECT VALUATION:
(if Commercial)
APPLICANT
Phone
Email address
Phone
Email address
Phone
Email address
Exp Date
UBI#
Address (Street, City, State, Zip)
PROPERTY OWNER
Address (Street, City, State, Zip)
CONTRACTOR
Address (Street, City, State, Zip)
Contractor License #
Has a Current Fircrest Business License

PROJECT DESCRIPTION
Quantity
Quantity
Air conditioner
Air handler
Built-up system
Chilled water
Chillers
Commercial hoods
Compressed air
Cooling towers
Quantity
Duct work
Exhaust fan
Exhaust system
Fireplace/stove
Furnace
Gas piping
Heat exchanger
Heat pump
Heated water
Make-up air
Package system
Refrigeration
Smoke removal
Split system
Unit heaters
Whole house vents
Other
I hereby certify that the information provided is correct and that the construction on the above-described property, the occupancy,
and use will be in accordance with the laws, rules, and regulations of the state of Washington and the Fircrest Municipal Code.
Print Name: ___________________________________________

Owner

Agent/Other (specify)
Signature: ____________________________________________ Date: ___________________________
MECHANICAL FEE SCHEDULE
Commercial Buildings
Tenant improvement fees shall be based upon fixtures installed per the Unit Fee Schedule listed below up to an
estimated value of $5,000.00. Values greater than $5,000.00 may be determined by the stated value.
New Commercial Structure Fees shall be calculated for all mechanical systems and fixtures using the following table.
Valuation is determined based on the prevailing fair market value of the materials, labor, and equipment needed to
complete the work. The mechanical permit fee is due at issuance.
Commercial Mechanical Permit Fee based on the following valuation table:
Total Valuation
Fee
Up to $1,000.00 ............................................... $30.00
$1,001 to $100,000 .......................................... $30.00 for the first $1,000.00 plus $17.00 for each additional
$1,000.00, or fraction thereof, to and including $100,000
$100,001 and above ........................................ $1,713.00 for the first $100,000 plus $12.50 for each additional
$1,000.00 thereafter and fraction thereof
Commercial Mechanical Plan Review Fees
When plans and/or specifications for the mechanical installation are reviewed by the Building Official, the fee
is 50 percent (50%) of the fee calculated for the Mechanical Permit Fee based on the table above. The
Mechanical Plan Review Fee Permit Fee is due at issuance and is in addition to the Mechanical Permit Fee.
Residential and Unit Fee Schedule
New Single Family Residence / Duplex / Condo – whole building
Base fee for the issuance of each mechanical permit in addition to the unit fee listed below:
Furnaces –up to and including 100,000 Btu/h (29.3 kW)
Furnaces –over 100,000 Btu/h (29.3 kW)
HVAC, Heat Pumps, or other system providing heating and/or cooling
Appliance Vents.
Repairs and Additions. F
Roof top unit
Air Handler – for each air-handling unit to and including 10,000 cubic feet per minute
Evaporative Coolers – for each evaporative cooler other than the portable type
Ventilation and Exhaust – for each ventilation fan connected to a single duct
For each ventilation system which is not a portion of a heating or air conditioning system
authorized by a permit
For the installation of each hood which is served by a mechanical exhaust, including the ducts for
such a hood
Incinerators
Domestic
Commercial/Industrial
Gas pipe system outlet
1 to 4, each
Each Additional
$250.00
$30.00
$17.00
$21.00
$17.00
$10.00
$16.00
$100.00
$13.00
$13.00
$10.00
$13.00
$13.00
$21.00
$71.00
$10.00
$5.00
Plan Review, Conferences and Inspections
Inspection fees outside normal inspection hours
Re-inspection fee per inspection (each and every instance where a requested and scheduled
inspection was not ready)
Inspection for which no fee is specifically indicated (minimum charge – one half hour)
Additional plan review required by changes, additions, or revisions to plans or to plans for which an
initial review has been completed (minimum charge – one half hour)
For use of outside consultants for plan checking, inspection or other review, including preapplication conferences
$170.00
$85.00 per hour
$85.00 per hour
$85.00 per hour
Actual cost
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising