Development and Implementation of a Test Sequence for

Development and Implementation of a Test Sequence for
 Development and Implementation
of a Test Sequence for a Functional
Tester
Petter Erikslund
Examensarbete för ingenjör (YH)-examen
Utbildningsprogrammet Elektroteknik
Vaasa 2017
BACHELOR’S THESIS
Author:
Degree Programme:
Specialization:
Supervisors:
Petter Erikslund
Electrical Engineering, Vasa
Automation
Matts Nickull
Title: Development and Implementation of a Test Sequence for a Functional Tester
_________________________________________________________________________
Date May 26 2017
Number of pages 32
_________________________________________________________________________
Abstract
The purpose of this thesis is to develop and implement a test sequence for a final functional tester. The assignment was commissioned by Ampner Oy. The company produces products and services such as solutions for connecting renewable power sources to the grid and automated test systems. Testing in electronics manufacturing is explained and the development environments NI LabVIEW and NI Teststand are introduced. The methods for developing the test sequence, such as sequence structure and test duration optimisation are documented and areas for further development are suggested. The test sequence developed in this thesis is automatic and only requires the operator to place the DUT in the test fixture and start the test. The sequence starts by loading test limits from a file and initiating the instruments. The test cases are then executed sequentially. If the test is a pass, a sticker with identification information is printed and attached to the tested device. _________________________________________________________________________
Language: english
Key words: FCT, Teststand, Automatic test equipment
__________________________________________________________________________ EXAMENSARBETE
Författare:
Utbildning och ort:
Inriktningsalternativ:
Handledare:
Petter Erikslund
Elektroteknik, Vasa
Automationsteknik
Matts Nickull
Titel: Utveckling och implementering av en testsekvens för en funktionell testare
_________________________________________________________________________
Datum 26.5.2017
Sidantal 32
_________________________________________________________________________
Abstrakt
Målet med detta examensarbete var att utveckla och implementera en testsekvens för en
slutlig funktionell testare. Arbetet beställdes av Ampner Oy. Företaget producerar
produkter och tjänster såsom lösningar för anslutning av förnybara energikällor till elnätet
och automatiserade testsystem.
Testning inom elektroniktillverkning förklaras och utvecklingsmiljöerna NI LabVIEW och
NI Teststand introduceras. Metoderna för att utveckla programvaran för testsekvensen,
såsom sekvensstruktur och tidsoptimering dokumenteras och områden lämpliga för
vidareutveckling föreslås.
Testsekvensen är automatisk. Operatören placerar apparaten som ska testas i testfixturen
och startar testsekvensen. Testsekvensen börjar med att ladda in testets gränsvärden från en
fil och initierar mätinstrumenten. De individuella testfallen utförs sedan i löpande ordning.
Om testet är godkänt förses apparaten med en etikett med identifikation för den testade
apparaten.
_________________________________________________________________________
Språk: engelska
Nyckelord: FCT, Teststand, Automatiserad testutrustning
_________________________________________________________________________
OPINNÄYTETYÖ
Tekijä:
Koulutus ja paikkakunta:
Suuntautumisvaihtoehto:
Ohjaaja:
Petter Erikslund
Sähkötekniikka, Vaasa
Automaatiotekniikka
Matts Nickull
Nimike: Toimintatesterin testisekvenssin kehittäminen ja toteutus
_________________________________________________________________________
Päivämäärä 26.5.2017
Sivumäärä 32
_________________________________________________________________________
Tiivistelmä
Tämän opinnäytetyön tarkoituksena oli kehittää ja toteuttaa testisekvenssi toiminnallista
lopputesteriä varten. Työ on toteutettu Ampner Oy:n toimeksiannosta. Ampner tuottaa
tuotteita ja palveluja uusiutuvien energialähteiden sähköverkkoon yhdistämiseksi ja
automaattisia testausjärjestelmiä teollisuuslaitteille.
Työssä kerrotaan elektroniikan tuotantotestauksesta ja esitellään NI LabVIEW- ja NI
Teststand -kehitysympäristöt. Työssä on dokumentoitu menetelmiä testisekvenssin
kehittämiseksi, kuten sekvenssirakenteen ja testin keston optimointi. Lisäksi ehdotetaan
aiheita jatkokehitykselle.
Tässä työssä kehitetty testisekvenssi on automaattinen ja vaatii operaattorilta ainoastaan
tuotteen sijoittamisen testeriin ja testin käynnistyksen. Testisekvenssi aloitetaan lataamalla
testin rajat tiedostosta sekä alustamalla mittalaitteet. Tämän jälkeen testit suoritetaan
peräkkäin. Jos testi menee läpi, tulostetaan tuotteen tunnistetiedot sisältävä tuotetarra ja
liimataan se tuotteeseen.
_________________________________________________________________________
Kieli: englanti
Avainsanat: FCT, Teststand, automaattinen testauslaitteisto
_________________________________________________________________________
Table of Contents
1 2 3 Introduction .......................................................................................................................................... 1 1.1 The company ............................................................................................................................... 1 1.2 Purpose and goals ..................................................................................................................... 2 Testing in electronics manufacturing ........................................................................................ 3 2.1 Electronics manufacturing .................................................................................................... 3 2.2 Quality management ................................................................................................................ 4 2.3 Design for Testability .............................................................................................................. 4 2.4 Testing techniques and strategies ..................................................................................... 5 2.4.1 Automated test equipment -­‐‑ ATE ............................................................................. 5 2.4.2 PCB visual inspection ..................................................................................................... 6 2.4.3 In-­‐‑circuit test – ICT ......................................................................................................... 6 2.4.4 JTAG -­‐‑ Boundary scan .................................................................................................... 7 2.4.5 Burn in .................................................................................................................................. 8 2.4.6 FCT – Functional testing ............................................................................................... 8 2.5 NI LabVIEW .................................................................................................................................. 9 2.6 NI Teststand ............................................................................................................................. 10 2.6.1 Software components ................................................................................................. 10 2.6.2 Building blocks .............................................................................................................. 11 2.6.3 Sequence editor GUI overview ............................................................................... 14 Development of the functional tester ...................................................................................... 14 3.1 Device Under Test .................................................................................................................. 15 3.2 Tester hardware ..................................................................................................................... 15 3.3 Tester software ....................................................................................................................... 18 3.3.1 Instrument drivers ....................................................................................................... 18 3.3.2 Sequential structure in Teststand ......................................................................... 19 3.3.3 Timing of tests and test duration optimisation ............................................... 19 3.3.4 Optional structures ...................................................................................................... 20 3.3.5 Data acquisition ............................................................................................................. 20 3.3.6 Report generation and the property loader ..................................................... 21 3.4 4 Implementation and commissioning ............................................................................. 21 Result ..................................................................................................................................................... 23 4.1.1 Operating the tester .................................................................................................... 25 4.1.2 Test duration .................................................................................................................. 25 4.2 Unresolved issues/DUT functions not tested ............................................................ 25 4.2.1 5 Customer approval ...................................................................................................... 27 Conclusion ........................................................................................................................................... 27 6 5.1 Lessons learnt .......................................................................................................................... 27 5.2 Pros and cons using Teststand as a test sequencer ................................................. 29 5.3 Further development ............................................................................................................ 30 5.4 Comments .................................................................................................................................. 30 References ........................................................................................................................................... 31 List of abbreviations
API – Application Programming Interface
ATE – Automated Test Equipment
DFT – Design For Testing/Design For Testability
DMM – Digital Multi Meter
DUT – Device Under Test
FCT - Functional Testing
GPIO – General Purpose Input/Output
GUI – Graphical User Interface
ICT – In-circuit Testing
NI – National Instruments
PCB - Printed Circuit Board
PCBA – Printed Circuit Board Assembly
QA – Quality Assurance
QC – Quality Control
R&D – Research and Development
UUT – Unit Under Test
1 1 Introduction
This thesis was made for Ampner Oy, in Vasa during the autumn of 2016 as part of a
customer order. The goal of the thesis was to develop and implement a test sequence for a
final functional tester for an embedded electronic device. Due to the nature of the work the
thesis will not go into detail about the DUT. The focus of the thesis will be on electronics
testing in general and it will explain the processes involved in developing tester software.
As electronics manufacturing is a highly automated process and the products being produced
are becoming more and more complex quality control and quality assurance is a prominent
part of the electronics manufacturing business. There are almost as many tester types and
testing techniques as there are different types of electronic products. This thesis will make
an attempt to introduce the reader to techniques used to test PCBs, PCBAs and assembled
devices. The test sequence developed as a part of this thesis is used to test a fully assembled
device as part of quality control right before it is approved to be delivered to the customer.
NI LabVIEW and NI Teststand were used as the development environment. Teststand is not
usually used as the test sequencer at the company, thus a thesis was natural and benefited
both the author and the company. When the thesis work started the hardware design was
already done. The goal for the thesis work was to develop the software and implement and
test the system.
After a week of reading up on Teststand the work transitioned into implementing and
customizing instrument drivers to work with Teststand. The instruments and DUT were
tested individually and manually to ensure that communication and test concepts worked.
Each test case was individually developed and tested according to the test specification
delivered by the customer. As soon as the tester hardware was assembled implementation
and testing of the software continued on the tester itself. The tester specification
continuously evolved during the process as the DUT itself was still under development.
1.1 The company
Ampner Oy is an engineering company that produces products and services such as solutions
for connecting renewable power sources to the grid and automated production and test
systems. Today Ampner Oy has almost 2 million euros in revenue and employs 19 people.
The company is located in Vaasa, Finland.
2 Testcom Solutions is a department at Ampner Oy that designs and produces automated
production and test systems and test equipment for the electronics industry. The Testcom
brand has been supplying testing products and services to the industry for over a decade.
Some of the services Testcom Solutions offer are production and test requirements planning,
Design for Automation (DFA), Design for Testability (DFT) and system commissioning and
after sales services. The Testcom brand also comprises products like quality control
software, power supplies and various I/O modules.
Ampner Power offer design and consultation services of power converters and grid
connections. So far, over 5000 MW of renewable energy have been connected to the grid
using solutions and know how delivered by Ampner. (Ampner 2017).
The company was founded in 2012 by Pasi Törmänen and Mika Jantunen, who have
extensive experience from the energy industry. In 2015 Ampner became the majority owner
of the company Testcom, which led Ampner into a new industry. New capital from private
and local investors was brought into Ampner in 2016 and the company is expanding into
new international markets. (Stenbacka 2016).
1.2 Purpose and goals
This thesis is made as a part of a customer order which means that the scope of thesis is
naturally defined. The thesis practical part consists of development and implementation of a
test sequence for a final functional tester. A functional tester tests that all the functions of
the Device Under Test (DUT) meets the specified requirements. The DUT in this case is a
customer’s tailor made diagnostic and communication device. The goal of this thesis is to
develop software for a pilot test station according to the end customer’s test requirement
specification. Commissioning and verification testing of the complete system is also
included.
Instrument drivers and some of the test functions are developed using National Instruments
LabVIEW and the test sequence is implemented in NI Teststand. The goal of the test
sequence is to first download and flash software to the DUT and then test all functionality
of the DUT. All sequence functionality must be automatic. The operator will place the DUT
in the fixture, press start, and scan the DUT information from the DUT. Depending on the
outcome of the tests a sticker is printed automatically and placed on the DUT by the operator.
3 To help the reader to get a better understanding of the practical part of the thesis, an overview
of electronics manufacturing and testing is also a part of the thesis. Throughout the thesis
focus lays on testing in electronics manufacturing on the assembly levels PCB and PCBA or
unit. Testing brought up in this thesis is concerned with the question; have we built our
product right? Design validation and testing on chip and component assembly levels are not
included.
2 Testing in electronics manufacturing
Electronics manufacturing is highly automated and all automated processes needs to be
monitored to ensure that they are working as they are supposed to. One way of monitoring
the behaviour is to examine the output. It is possible to assure that the process is producing
quality products by testing the electronic products at different stages throughout the
manufacturing process. Because the scope of this thesis is defined by the development and
implementation of a tester, the theory brought up is kept limited to the background and the
theory relevant to the specific tester.
2.1 Electronics manufacturing
The major stages in the manufacturing of an electronic product are:
1. 2. 3. 4. 5. 6. Chip in wafer Chip diced and tested Chip-­‐‑level interconnection and packaging Package soldered to PCB PCB assembled into a PCBA or unit PCBA or unit implemented into final system This thesis scope include testing from 4. Package soldered to PCB to 5. PCB assembled into
a PCBA or unit. According to Edwards (1991, 13) companies in the electronics industry can
be divided into similar groups depending on what they produce:
1. 2. 3. 4. 5. Component manufacturers Semiconductor device manufacturers PCB bare board manufacturers PCB assemblers for third parties High volume assembly of PCBs and final assembly of PCBs into complete systems 4 6. Low volume assembly of PCBs and final assembly of PCBs into complete systems 7. Assembly-­‐‑only companies which build complete systems according to customer specifications These company types do not indicate the complexity of the actual company. An actual
company may operate on several of the suggested types.
2.2 Quality management
All companies who produces something has an interest in assuring that the product has the
desired properties and functionality when it is delivered to the customer. The strive for a
quality output is the aim of quality management. Quality assurance and quality control are
parts of quality management. The terms are sometimes used interchangeably but can be
defined as follows: Quality assurance (QA) focuses on preventing defects and consists of
activities and processes that ensures that the products developed have desired qualities.
Quality control (QC) focuses on detecting defects in the product and correcting them.
Validation and verification are tasks performed by conducting tests as a part of QA and QC.
Validation aims to confirm that the product will perform its intended functions desired by
the customer. It asks the question; Are we creating the right product? Verification aims to
confirm that the finished product meets the given requirements. It asks the question; Have
we created the product right? Validation and verification might need to be performed on
many different levels from system level down to component level. (ISO 9000:2015).
It becomes less time consuming and less expensive to correct a fault if is detected as soon as
possible in the manufacturing. If a faulty component is changed before it is soldered to a
board it is cheaper and quicker to fix the issue than detecting the fault when the device is
fully assembled. Thus, testing is an important part of quality management and the
manufacturing process.
2.3 Design for Testability
Because electronic devices become increasingly more complex, testing them has become
very expensive and time consuming. Because of this it is important to take testability into
account at an early stage in the product design process. Otherwise it is very likely that the
product will be unnecessarily hard or even impossible to test. For example, if there are no
way to access critical signals for testing on a PCB, it may be impossible to test the product
5 in production or during development. The only solution might then be to go back to the
drawing board and redo the design.
Design for testability or design for test (DFT) aims to maximise test efficiency and economy.
DFT comprises of design techniques that adds testability features to the designed product.
Even though most of the focus of DFT lies on digital circuits it is also applied to
analog/mixed-signal circuits. Testing is not only needed in manufacturing but may also be
beneficial in the design phase and in system maintenance. Design modifications that can be
linked to DFT are for example improved controllability and observability of internal nodes
in the circuit. This would be done to allow the test engineer to get access to critical signals
during a test. Adding features like built-in-tests (BIT) are also a common technique. BIT
means that the product has the ability to perform a test on itself and report the results. BIT
can be used both in production testing and system maintenance. (Koenemann 2006, 21-1).
2.4 Testing techniques and strategies
As mentioned in Chapter 2.1, there are many assembly levels in electronics manufacturing.
Each one uses different procedures and techniques. The testing techniques and solutions
brought up here are used for testing populated PCBs and PCBAs or units. The factors that
affect the implemented test strategy can for example be complexity of the DUT, type of
faults detected, production volume and already invested test infrastructure.
2.4.1 Automated test equipment - ATE
One of the first questions that need to be answered when developing a tester is if it should
be manual, semi-automated or automated. There are advantages to all of them but in
electronics manufacturing automated testers are the most common due to the large
production volumes. A more manual testing setup can be preferred for example in R&D
related testing. Automated test equipment can be configured into a larger test system to
automatically perform a test on a DUT without any need for the operator to intervene. (Poole,
a). Table 1 compares the two different approaches.
6 Table 1. Comparison of manual and automated test equipment (Agilent Technologies 2013).
Throughput
Development cost
Operator experience
Flexibility
Manual
Low
Low
High
High
Automated
High
High
Low
Low
2.4.2 PCB visual inspection
When the PCB has been populated with components like resistors, capacitors, diodes and
integrated circuits, it is visually inspected. This is done to confirm that all components have
been properly assembled to the board. Features that are inspected are for example missing
and wrong components, fillet size or shape, component skew, component polarity, height
defects and solder joints. There are three different techniques used to perform visual
inspection. They all have different abilities to detect defects.
- MVI – Manual Visual Inspection can be practical for low volumes and if the
complexity of the board is low. If the volumes or complexity is higher an
automated solution is preferred.
- AOI – Automated Optical Inspection equipment works by letting a camera
automatically scan the board and compare it to a known good sample.
- AXI – Automated X-ray Inspection is similar to AOI but uses X-rays as its source
instead of visible light. That way it is possible to detect defects hidden from view.
(Poole, a)
2.4.3 In-circuit test – ICT
ICT refers to testing techniques where connections are made directly to points on the PCB
and then connections, component values and sometimes even some DUT functionality are
tested. An in-circuit tester can be very expensive to invest in, depending on the type, but can
be beneficial at large quantities. It is often possible to test that the PCB is correctly made
and that no faulty components have been installed with an in-circuit tester. Reasons for not
gaining complete coverage of the PCB can for example be not enough test points or low
value capacitors on the PCB. If low value capacitors are present on the board it might be
7 impossible for the tester to measure them accurately due to the spurious capacitance of the
tester itself.
Standard in-circuit testers connect to the DUT through a bed of nails as seen in Figure 1. The
fixture containing the bed of nails is specific for different products being tested and can
easily be changed out when a product with other connections is to be tested. (Poole, b)
Figure 1. Connection to DUT in ICT (Tarr).
A different type of in-circuit tester is the flying probe tester which does not use a bed of
nails. Instead it uses a set of probes that can move around to connect to various point of the
board. By doing this it is possible to test much smaller quantities by not needing to invest in
as much different testing hardware for each DUT model. (Poole, b)
Wiring testers also use ICT techniques. They use a bed of nails to test the wiring of a PCB
or cable connectors to test cables. A wiring tester can often also test some component values
and polarity.
2.4.4 JTAG - Boundary scan
One of the problems with ICT, especially testing large integrated circuits, is getting access
to all test critical signals on the board. In 1985 a group of electronic manufacturers formed
the Joint Test Action Group (JTAG) to establish a solution to the testing problem. The
solution became IEEE Std 1149.1-1990, IEEE Standard Test Access Port and BoundaryScan Architecture, which allows test instructions and data to be serially loaded into a device
and test results to be serially read out.
8 Boundary scan works through four, or more, extra pins on the DUT. Two pins are needed
for control and one each for input and output of serial test data. These connect to chosen
integrated circuits on the DUT to form a chain, thus making it possible to test several
integrated circuits with four pins at once. When a chip is set to boundary scan mode, it is
possible to set and read all pins on the chip. This also makes it possible to test other
components and wiring externally on the PCB. (Texas Instruments Inc. 1997)
2.4.5 Burn in
The highest failure rate for electrical devices is in their early life after production and at the
end of life. Burn in ovens are used on components and devices to accelerate the aging past
the initial failure prone age. This procedure is done so that one can be confident that the
product works under varying conditions in accordance with the requirements and that it will
maintain the performance. Burn in ovens usually test batches of products at once and can
monitor their behaviour during a longer period of time in harsh temperature conditions.
2.4.6 FCT – Functional testing
The purpose of a functional test is to verify that the functional requirements of the DUT are
met by simulating real world scenarios and checking how the product behaves. FCT is done
as a last step of verification on each different level in the manufacturing chain. For example,
when a PCB has been populated with components and the assembly has been verified to be
correct by an in-circuit tester, the functionality of the PCB is verified by a functional tester.
When the PCB has been assembled into the final device it is tested in a burn in oven. The
device’s functionality is tested again on a functional tester to verify that it is ready to be
installed into the final system.
It is often not practical to test all possible functionality due to the complexity of the product
and time restrictions. If two different companies where to develop a functional tester for the
same product, the resulting testers might look very different from each other. It is important
to balance out what needs to be tested by weighting testing accuracy, time and financial
restrictions against each other.
A functional tester uses the connectors on the PCB or device to test its functionality, so there
is usually no verification of what happens on the inside. If there is a need for verification of
internal signals, a tester can use several testing methods at the same time. For example, a
9 functional tester might use boundary scan to verify some internal functions not visible to the
outside world. (Cort 2002).
2.5 NI LabVIEW
LabVIEW is a development environment from National Instruments that is extensively used
in electronics testing. It uses a graphical programming language called G. The programming
language is one of the major differences from many other development environments. G
uses a dataflow model instead of sequential lines of text code. This makes the thought
process of writing code quite different from conventional scripting languages and usually
needs some time getting used to. LabVIEW is the preferred development environment in the
testing industry as it provides technology for acquiring data and processing signals,
instrument control and for developing custom interfaces.
One of the key benefits of working with LabVIEW is the extensive library of pre-made
functions, which makes getting started with new projects and code faster and more straight
forward. In a testing environment where customisation and adaptability is important this is
a tremendous advantage.
LabVIEW programs are called Virtual Instruments, or Vis, and consists of a front panel,
block diagram and a connector panel. The front panel represents the user interface and is tied
to the block diagram where the code is written. The connector panel is where input and
output data are routed to and from the VI when the VI is called from another VI. Figure 2
shows the basic development environment of LabVIEW.
10 Figure 2. The front panel and block diagram in LabVIEW (National Instruments 2013).
Furthermore, like in other software development environments, there is functionality for
debugging code by executing the code using breakpoints for example. If there are broken
wires, one can use an error list showing the missing connections. When executing code, it is
also possible to do a highlighted execution, which means that the data flow of the executing
code is displayed. Another function for debugging is the probe tool which let you probe
values in the code as it runs. (National Instruments 2013).
2.6 NI Teststand
Teststand is a test management software for test automation made by National Instruments.
It includes a ready-to-run sequence engine that supports multiple test code languages, result
reporting and parallel or multithreaded tests. (National Instruments 2016a).
One of the strengths of Teststand is the pre-built functionality and the ability for
customization. It is used in all industries where automated testing is needed.
2.6.1 Software components
The Teststand engine is as the name suggests what drives the test system. It consists of a set
of DLL files that exports an ActiveX Automation server API for other software components
11 to communicate with the engine. Other applications, acting as ActiveX clients, can get or set
properties and invoke methods on the server to control the engine through the API.
The sequence editor is the application in which the sequence and test system development is
done. In the sequence editor it is possible to create, edit, execute, and debug sequences. Other
features that can be accessed through the sequence editor are process models and station
settings. As in any other application development environment such as LabVIEW and
Microsoft Visual Studio it is possible to set breakpoints, trace through program executions
and monitor variables for debugging purposes.
The user interface is an application which is used on the deployed system. It is used by the
end user to control and monitor the tester. Teststand is shipped with pre-built user interfaces
developed in all the supported test code languages. The source codes for the pre-built user
interfaces are available so they are fully customizable. It is also possible to create a user
interface from scratch containing only the desired functions.
The deployment utility creates an image and an installation file of the developed system
containing all the necessary files for a functional deployment of the test system on another
computer. Through a simplified GUI the developer can select all the files that need to be
included and the deployment utility takes care of the rest.
2.6.2 Building blocks
Steps
A step is much like a line in a scripting language. They are individual elements of a test
sequence that call a code module or perform some other operation. For example, a step can
call a code module that initializes an instrument, makes a measurement, call a subsequence
or jump to another step. Steps include properties which for example can specify what
parameters to send to code modules and where to store parameters received from code
modules. There are many pre-defined steps in Teststand to accommodate for the most
frequently used tasks. The users can also store their own template steps.
Sequences
A sequence file contains a main sequence with a series of test steps. One of these steps can
be a call for a subsequence. Other properties that sets a main sequence from a subsequence
is that a main sequence includes sequence file global variables.
12 All sequences contain a setup, a main and a clean-up section which are called step groups.
Steps are placed into the step groups to create a test. There is no significant difference
between the sections but the clean-up section can be used for steps that needs to be executed
in all scenarios. For example, if a step fails in the main section it is possible to configure the
sequence to jump straight to the clean-up section. In general, the setup section is used for
test setup functions like initializing instruments. The main section is used for the actual test
steps like measuring a voltage and checking it against limits. The clean-up section is for
example where steps that close communication with instruments are positioned.
Code modules
Code modules are program modules developed in an application development environment
like LabVIEW or other programming language. The called code module performs a test or
other action.
Properties
Properties consists of values that can be a number, string, Boolean, .NET object reference,
or ActiveX object reference. For example, sequence properties and step properties can be
modified programmatically each time a sequence is run with a property loader step. This
means that limits for measurements and other properties in the sequence can easily be
changed on the deployed Teststand system.
Variables
Variables are properties freely definable in a certain context. A variable can be global for
the whole test station or local only for a specific subsequence and everything in between.
Variables can be used to share data between steps and sequences and can be accessed through
the Teststand API from code modules.
Expressions
Expressions are formulas that van calculate new values from one or more variables and
properties. One can insert an expression as a separate expression step, before or after a step
has executed, or as a property or variable. Expression operators and syntax that Teststand
supports are the same as in C, C++, Java, and Visual Basic .NET.
13 A simple example of an expression:
Locals.Humidity = Step.Measurment * 100
Here the relative humidity is measured by a sensor that outputs a voltage between 0 and 1
volts. By multiplying a DMM measurement the scaled humidity value is acquired.
Process models
The process model is a sequence file that specifies certain aspects of how the testing process
works on a certain Teststand system. For example, in addition to the test sequence the testing
process may include DUT identification, result indication, result logging and report
generation. Teststand is shipped with built-in sequential, parallel and batch process models.
These process models can be customized for specific test platform needs.
Callback sequences
Callback sequences are used to define the behaviour of a test station when a specific event
occurs. Callbacks are divided into three groups: model callbacks, engine callbacks and frontend callbacks. The groups are defined by the software component that invokes the callback
and where the callbacks are defined. Model and engine callbacks are implemented in a test
sequence by adding them through the Sequence File Callbacks dialog box. Front-end
callbacks are called from the user interface and are located in FrontEndCallbacks.seq file.
Model callbacks are used to override the current process model’s behaviour. For example,
one can define a model callback to change how Teststand generates the report for that
specific test sequence. Engine callbacks are used to invoke a callback at specific points
during a test. For example, it is possible to define an engine callback to log to a database
after every step in a test sequence. Front-end callbacks are used to run a specific sequence
when a certain action is triggered by a user through the user interface. Features that do not
depend on the process model are implemented as front-end callbacks. (National Instruments,
2016b).
14 2.6.3 Sequence editor GUI overview
The sequence editor is the main software component that is used during development of a
Teststand system. Figure 3 shows the GUI of the sequence editor.
Figure 3. Teststand GUI of the sequence editor.
The steps pane is located in the middle of the screen in Figure 3. This is where the individual
steps for the selected sequence are displayed. The sequence pane is located in the top right
corner and shows all the sequences of the sequence file. The insertion palette is located to
the left in the screen. The insertion palette is divided into two windows: step types list and
templates list.
3 Development of the functional tester
As stated earlier, the tester hardware was already done when the thesis work commenced.
Online resources where extensively used for information and guidance where given by
colleagues at Ampner throughout the work. The work of developing and implementing the
tester software could be divided into three main parts: instrument drivers, development of
test sequence and commissioning.
15 3.1 Device Under Test
When developing a test or a tester it is important to understand the DUT as well as possible.
A short explanation of the DUT will be given, but specific details about the DUT will not be
included in this thesis due to the nature of the work. The DUT is a diagnostics and
communication device. All the functions of the device are to be tested plus a button and all
the LEDs on the device. Functions of the device are:
-­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ 3G modem
Bluetooth
USB
Ethernet interface
digital GPIO
accelerometer
magnetometer
temperature
relative humidity
air pressure
sound
analog inputs and outputs
When the device is ready for final testing it will be fully assembled except an identification
label, which will be added when testing is finished. All connections to the device will be
done through the existing connectors on the device.
The device’s software is a Linux operating system which can be accessed via the Ethernet
port by SSH connection during testing. Several test programs are available on the device to
simplify sensor reading and control of functions. After testing the ability to connect to the
DUT are restricted for security reasons.
3.2 Tester hardware
The tester hardware is based on a Testcom product called CUBE. It is a modular 19-inch
rack with a removable fixture on top. The scope of this thesis does not include the tester
hardware but some of it will be explained for a better understanding of the tester software.
Many devices and mechanical solutions where implemented so that the test would be
automatic and require minimal actions from the operator. A mechanical drawing of the test
station is shown in Figure 4.
16 Figure 4. CUBE test station (Ampner 2016).
The modular tester hardware is divided into three main parts: test station, test fixture and test
cassette. The reason for the modular design is to allow for easy maintenance and the
possibility of testing several different products on the same test station. The test station is
the main part of the tester and includes most of the instruments and testing devices. The test
fixture, shown in Figure 5, connects to the test station through a connector interface which
allows for removing the test fixture in a matter of seconds. The test fixture includes DUT
specific test equipment.
Figure 5. Test fixture (Ampner 2016).
Inside the test fixture is the test cassette, shown in Figure 6, which includes the connectors
and mechanics for connecting to the DUT. On this specific final functional tester, the DUT
17 connectors are located on the side of the device. The test connectors need to push in towards
the device to connect. This is accomplished by having the connectors sliding on radial
bearings when the lid of the fixture is closed.
Figure 6. Test cassette (Ampner, 2016).
The instruments performing the measurements and control of the test are:
-­‐‑ NI PXI-­‐‑1033 – MXI Express controller o NI PXI-­‐‑4065 – 6 1⁄2-­‐‑Digit PXI DMM o NI PXI-­‐‑2527 – 64-­‐‑Channel 300V CAT I Multiplexer o NI PXI-­‐‑6229 – 32AI, 48DIO, 4AO DAQ -­‐‑ Agilent N6700B – Modular Power System Mainframe, with N6745B and N6743B installed -­‐‑ Feasa 10F – LED analyser Other devices in the tester are:
-­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ -­‐‑ PC 3D barcode reader Label printer Bluetooth Sensor Tag Signal multiplexers and relay cards Humidity and temperature probe for reference Barometric pressure transducer for reference Buzzer Solenoid for pressing DUT button USB flash drives 18 3.3 Tester software
All the hardware on the tester is controlled by software on a Windows PC located in the
testers frame. The test sequence is controlled and monitored through NI Teststand. As this
was a pilot tester the development took place on the actual final PC. Normally test
development would be done on a separate PC and then deployed to the tester.
SSH communication with the DUT is done through a command-line interpreter program
called ExtraPuTTY. Other software used in the test sequence consists of executable scripts
for sending data to the sticker printer and sending ping requests to the DUT.
The tester requirements were used as a basis for the development of the tester software.
Among other things it specified a set of functional test cases that needed to be performed by
the tester. The purpose, procedure and expected results were specified in the short test case
specifications.
3.3.1 Instrument drivers
The instrument drivers had to be written or modified to work with the tester. All drivers,
except the printer driver, were implemented in G code. Most of the drivers had been used in
other projects and only needed minor adjustments so that they would be executable from
within Teststand.
The purpose of an instrument driver is to simplify the development of a test sequence. The
instruments may have different interfaces to the tester PC. An instrument driver is a piece of
code that takes commands and values as inputs and returns one or several results from the
instrument. If all instrument drivers in a tester have similar input and formats it simplifies
the sequence development.
As an example, a power supply might be connected to the computer through a serial
interface. To set the voltage of one of the channels one would have to initialize a serial
connection, send the command, wait for a response and close the connection. Different
protocols and commands might be needed for each instrument. Making the instrument
drivers behave like each other, means that the test sequence development becomes easier.
19 3.3.2 Sequential structure in Teststand
In this case a sequential process model and a mostly sequential sequence structure were
implemented. With a parallel process model, it is possible to execute tests on several DUTs
at once. The reason for the sequential process model in this case, was the added cost of
hardware for connecting several DUTs to the tester at once. The decision was made to go
with a sequential sequence structure as this seemed to inflict less problems with the DUT
communication.
When running a test, it is possible to let the user interface trace the steps currently executing.
But the user interface that comes with Teststand can only show one thread at a time. This
may be a problem when using several threads in the sequence execution, meaning that the
sequence is executing several steps in parallel. This might be perceived as a confusing
feature for the operator. And thus, another reason why the sequential sequence structure was
chosen. Figure 7 shows the two different execution structures considered for this project.
Figure 7. Sequential and parallel execution structure.
3.3.3 Timing of tests and test duration optimisation
Because the tester will be used to test a high volume of devices it is desirable to keep the test
duration as short as possible. The desired complete test duration was one minute. With
Teststand there are many ways to get the test duration down. But there is always a risk that
20 the test becomes more unreliable if the sequence is over optimized for time. For example,
some data was lost when multithreading was used while communicating with the DUT. This
over optimization likely increased the workload of the tester and DUT. The sequence was
modified to look out for the data loss to prevent the issue.
Further the test duration was optimized by arranging the order of the test cases so that it
suited the DUTs boot up procedure. The test cases that did not need the DUT to be fully
booted was set to be performed during boot up. The modem in the DUT used during the 3G
test took around 45 seconds to be ready after the power had been applied to the DUT. This
meant that the 3G test was performed at the end of the sequence to avoid having the sequence
waiting on the modem to be ready.
3.3.4 Optional structures
Multithreading means that a CPU or a single core are used to run tasks concurrently.
Multithreading in Teststand can be done in many ways but one way that was investigated
and used in this thesis was to call subsequences and configuring the call to be started in a
new thread. This means that the called subsequence is executed in parallel with the sequence
that called it.
Some of the test cases required no instrument use, for example the USB functionality tests,
Bluetooth test and 3G test. It was investigated if these could be run in parallel to the rest of
the test cases to get a shorter test duration. But as mentioned earlier, this created some
reliability issues to the test sequence. Multithreading functionality was only used for a short
push button test on the pilot tester.
3.3.5 Data acquisition
The majority of the tester functionality depend on acquiring data from instruments, sensors
and the DUT. The data is then handled in LabVIEW VIs and in the sequence. One of the
more trivial measurements in this particular tester is acquiring data from a pair of reference
sensors to be compared with the DUT environmental sensors. The reference sensors give out
a voltage value with the sensor reading. This value is measured with the DMM in the tester
and then it is scaled in the sequence so that it can be compared with the DUT output.
There are many occasions when a request is sent to the DUT to return data. This can be
modem identification parameters or test data from one of the many built in test programs on
21 the DUT. Two different approaches where used. Either the program or command was
executed and the result printed directly to the command-line and recorded into the sequence.
Another approach used was to run the test program as a background process on the DUT and
save the result as a .txt file which data was copied into the sequence at a convenient time.
In the sequence variables and parameters were kept as local as possible. For example, if a
variable in a subsequence were not needed in a higher-level sequence, it only existed in that
subsequence. But some variables and parameters were needed in a subsequent sequence and
then they needed to be transferred between the sequences. This was done by changing the
settings of the sequence call.
3.3.6 Report generation and the property loader
Teststand has built in report generation, so it is easy to create a basic test report. Result
collection, which collects step results and relevant data, is performed automatically during
the execution of a sequence. Teststand then automatically generates a report file at the end
of the sequence. The standard test report can be modified in many different ways. It is for
example possible to choose which step data should be included in the report. It is also
possible to change the layout, design, format and at what conditions reports are generated.
For this pilot tester, the contents of the report were still not clear during the work on the
thesis so the test report was only used and modified to aid the development process. The
database logging was later implemented by the customer using their own customised
solution.
The absolute first step in the sequence is a property loader step. This step lets the user change
limits and other properties of a test easily by editing a .csv file on the tester PC. This feature
is critical during commissioning and when the tester is used in production. If the limits set
during development of the test turns out to be wrong or just slightly off from the DUTs
current specifications, it is much simpler to be able to edit one .csv file on a server instead
of ten different sequence files in ten different locations.
3.4 Implementation and commissioning
By running the sequence in small parts on the assembled tester it was possible to identify
issues and solve them one by one. Because the DUT itself was still being developed
communication with the DUT developers where critical to ensure that both the DUT and the
tester were working as they were intended to.
22 To get the test sequence work as a whole the structure was modified slightly until it worked
with the DUT boot up procedure. Other aspects that where considered when modifying the
sequence at this state were test duration optimisation, limitations of the DUT and limitations
of the tester.
The reliability and accuracy of the test sequence was tested by doing large numbers of test
runs. Modifications were made when problems were encountered and the sequence was
tested again.
When enough confidence had been gained in the reliability and functionality of the tester it
was shipped to the customer. The customer then continued to implement their own solutions
on the test station. Some modifications where requested to deal with issues raised after
commissioning. This meant travelling to the customer’s location and performing minor
mechanical modifications. During this meeting, the tester was reviewed and issues that
needed to be followed up on when the tester was taken into use in production were pointed
out.
23 4 Result
The developed test sequence consists of one sequence file containing 23 sub sequences. In
Figure 8 the complete test sequence hierarchy is shown.
Figure 8. Sequence hierarchy.
The sequences starting with a number, e.g. 4.1, are test cases specified in the tester
requirements specification. The other sequences are for housekeeping and other required
functionality. All sub sequences are executed sequentially except 4.12.1 and 4.12.2. These
two sequences are executed as new threads. This was done so that it is possible to push the
button and read the button state on the DUT, both at the same time. The subsequence 4.12
is shown in Figure 9.
24 Figure 9. Button test sequence including execution in new thread of subsequence 4.12.1 and 4.12.2.
The 4.5 Sensors Test is shown in Figure 10. It was written to first start the test program on
the DUT. The test program continuously outputs humidity, temperature and air pressure to
a .txt file. When the test program has been started, the tester measures the voltage output of
the reference sensors located close to the DUT in the test cassette. The voltages are scaled
to represent the same units as the DUT readings. This process is timed so that enough
readings from the DUT can be acquired. The difference between the reference and DUT
sensors are tested against expected values.
Figure 10. 4.5 Sensors Test sequence.
25 4.1.1 Operating the tester
The steps involved with operating the pilot functional tester are:
1. The test station is powered on and the Teststand user interface is started. 2. The user logs in to Teststand with user credentials. 3. The sequence can be started in two different modes, either running a series of multiple tests or just a single pass. If a series of multiple tests is chosen steps four to eight are looped. 4. The barcode reader is used to scan the batch and serial number of the DUT and the DUT is then placed in the fixture. 5. After this point the test sequence is automatic and the operator does not have to intervene. 6. The test result is showed clearly on screen and a result sticker is printed. 7. The test data is loaded to a database in the background. 8. The sticker is attached to the DUT and the DUT is placed into the correct location according to the test result. 4.1.2 Test duration
In early sequence development, the duration of the different stages of the test sequence were
estimated to be:
-­‐‑ -­‐‑ -­‐‑ -­‐‑ 30 seconds for device flashing 15 seconds for booting the device 45 seconds for testing 90 seconds in total The shipped sequence had longer times in every category. Most of the time added to the test
duration was delays in the code to make sure that no errors occurred. The test duration was
longer than desired when the tester was delivered to the customer due to SSH and USB
communication reliability issues. At the end of the thesis work the actual times were around:
-­‐‑ -­‐‑ -­‐‑ -­‐‑ 40 seconds for device flashing 30 seconds for booting the device 70 seconds for testing 130 seconds in total The test duration was deemed sufficient for the moment and were to be optimized after
further development.
4.2 Unresolved issues/DUT functions not tested
The hysteresis function of the digital GPIO input was tested in the GPIO test. This was done
by incrementally increasing and then decreasing the voltage applied to the input between 1
and 5 volts, as shown in Table 2.
26 Table 2. GPIO Hysteresis test.
Step Applied voltage Expected value 1 0 0 2 2 0 3 5 1 4 1 1 5 0 0 But during a couple of percent of test executions, the recorded value in the sequence on steps
3 or 4, were 0 instead of the expected 1. This issue was examined by the tester developers
and the DUT developers to understand what the reason for the sporadic failures was. The
issue remained unresolved during the thesis work and was set to be followed up as the tester
was applied in production.
The other unresolved issue was interference in the high-speed USB signals in the tester.
Because of the limited number of USB ports on the DUT, USB signals needed to be switched
through relay cards when changing the connections. During implementation of the test
sequence it became apparent that the connections between relay cards, tester PC, USB
memory devices and the DUT were not sufficient in keeping the communication confidently
stable. The USB test connectors were of the type in Figure 11, which are of high quality and
made to withstand a high number of mating cycles, but they do not connect the shield of the
USB cable. Neither the USB multiplexers in the tester had the shields connected resulting in
hard to trace errors during device flashing and USB functionality tests.
Figure 11. UBS test connector (Engmatec 2013).
The issue was reduced by changing cabling. The issue was tolerable on the commissioned
tester, but further investigation into alternative connectors and USB multiplexers will be
done in the future.
27 4.3 Customer approval
To verify that a stable process works according to specifications the process capability can
be analysed. The customer used Cp and Cpk when verifying the tester. Cp and Cpk are statistical
indices that indicate how well the output of the process sits inside the specified limits. Gage
R&R analysis was also performed to assess the measurement precision of the tester. Gage
R&R gives statistics like repeatability, reproducibility and residual or pure error for the
process. (NIST/SEMATECH 2012). The tester was approved by the customer and taken into
use in production at the end customer.
5 Conclusion
The thesis work resulted in a tester with hardware and software functioning according to the
tester requirements specification. The issues that arose and that where not resolved during
the work were not critical and improvements will be made in the future to resolve these
issues.
Throughout the development and implementation process of the tester the scope of the thesis
work was redefined slightly. This was possible because it was a pilot tester and the customer
had some resources themselves to continue the development process after it had been
commissioned. The reason for this flexible arrangement was the tight timeframe of the
project. Although every wish the customer mentioned was not implemented, the delivered
tester was successfully produced according to the customer’s tester specifications in the
defined timeframe.
5.1 Lessons learnt
Even though the thesis work was seen as a success there is always things that could have
been done differently and lessons learnt. To communicate with the DUT a software called
ExtraPuTTY was used as a SSH client. Secure Shell (SSH) is a protocol between a server
and clients for IP networks. ExtraPuTTY was chosen because of its stated ability to work
together with NI Teststand. When installing ExtraPuTTY .dll files are copied into Teststand
folders so that ExtraPuTTY can be called with steps from Teststand. For this project
ExtraPuTTY has been sufficient but not without many aggravating moments. The
documentation of using ExtraPuTTY together with Teststand is very limited and most of the
28 support has been found on forums online. The installation process was very complicated and
unclear. Help for the installation of ExtraPuTTY can be found in the (NI forum 2013) link
in the bibliography. ExtraPuTTY also had problems communicating with the DUT reliably.
Sometimes the SSH client did not wait for the end of line character from the DUT resulting
in sequence errors.
Another unexplainable incident involving ExtraPuTTY happened when the tester had been
delivered to the customer. A report from ExtraPuTTY popped up after each test execution.
This feature was finally turned off by setting a new file path for the reports and turning of
ExtraPuTTY report generation in test steps. In ExtraPuTTYs defence it is a free software
and most of the work is done for you but I would definitely suggest that investigation of
alternatives would be beneficial if a SSH client with Teststand API is needed in the future.
Some of the test data was transferred from the DUT to the test sequence through the SSH
connection by reading the print out in the terminal on the PC to the sequence. An alternative
way was to let the Linux command be run in the background and save the print out into a
.txt file on the DUT. The data was then transferred to the sequence at a later stage. The
advantages of the second approach are that it frees up the terminal for other tasks and there
is a smaller risk of ExtraPuTTY not waiting for the end of line character. It would have
shortened the test duration and probably made the sequence more reliable if all tests using
data from the DUT would have used the second approach, but due to time limitations the
changes could not be made during the thesis work.
There are many different specification documents used in hardware testing. As in most areas
of engineering, the quality of the specification documents often corresponds with the
resulting product. To the word specification more words are added to specify the purpose of
the document. The names of these documents are sometimes used interchangeably, which
may cause confusion.
It could be argued that in this specific project the specifications was not comprehensive
enough. The test requirements specification and the tester requirements specification were
combined into one document. The functions to be tested were documented, but function
specific measurements were not yet clearly defined because the DUT was still in
development. I can imagine that, in general, the DUT is often not a finished product at the
time of writing the tester requirement specification. But the development and commissioning
of the tester can be done much faster and cheaper with clear specifications. On a functional
29 tester like this at least all the required measurements and acceptable values should be clearly
defined.
Another issue linked to the fact that the DUT was still in the development phase was the
number of devices present during development of the tester. We only had one device
available in the beginning of tester software development. This meant that it was critical for
the project that the device did not break. Later a new version of the device was available as
well. The second device helped in testing the tester but it would have definitely been
preferable to have had a few copies of the same version of the device during the
implementation and testing phase of the tester.
5.2 Pros and cons using Teststand as a test sequencer
There are several alternatives to using NI Teststand as the test sequencer. Ampner has
developed and sustained a LabVIEW based test sequencer for many years. The advantages
of using a test sequencer programmed in house are that it is independent and completely
customizable. A deployed system does not necessarily need any NI licences to run, so it is
possible to cut costs. It is also possible to include any imaginable feature that the customer
wants. A LabVIEW based test sequences normally uses text based test scripts. It can be
argued that it is easier to read and develop text based scripts than Teststand sequences.
A Teststand sequence can be strenuous to read especially when using many expressions. My
personal experience of using Teststand has been very positive. The online forum support has
been very helpful. As with other NI products, the manuals are quite extensive. A Teststand
deployment needs a runtime licence to run. However, in regards to costing, the costs of
developing and maintaining a completely customizable test sequencer also needs to be
considered.
Other advantages of Teststand are the features already built in and the wide use of the
software in the industry. Because it is well known the processes of marketing, sales,
production and after sales can be aided by the fact that the customers are familiar with the
development environment. With the free extensive support online it gives the customer the
chance to problem solve and further develop the system if they so wish. All these advantages
result in shorter development times and better competitiveness compared to a test sequencer
built in house.
30 5.3 Further development
The tester developed in this thesis will be further tested in the production line at the end
customer. A second copy, with improvements, of the tester has been commissioned. Because
of this, the tester will continue to be further developed after the thesis work. As mentioned
in Chapter 5.1, there are several areas that could be improved upon that will be investigated.
In relation to the topic of this thesis, the areas that seem to be mostly beneficial to further
development are the USB connections in the tester, the self-test programs on the DUT, and
the sequence structure. The USB connections need to be changed so that the connections are
reliable without the interference earlier mentioned. The self-test programs could be modified
and new programs could be implemented to aid the sequence, thus making the test faster and
more reliable. For example, test results could automatically be written to a .txt file. The
sequence structure could be adapted to the new DUT self-tests and multithreading could be
used to shorten test duration. However, if the structure is changed and extensive
multithreading functionality is introduced further development of the user interface will also
be needed.
5.4 Comments
As expected time is always an issue. If a project does not have a deadline, it most likely will
never be completed. This thesis work was no different. Throughout the project finding time
to handle less than critical issues was hard. Extensive knowledge of testing hardware and
LabVIEW coding were accessible in-house, but Teststand was completely new for me and
had not been used as the primary test sequencer at the company. So, a great deal of precious
time went to figuring out and learning the development environment. In hindsight, this was
probably the fastest and most valuable way to move from and academic environment into
the working life of an engineer.
31 6 References
Agilent Technologies, 2013. Test-System Development Guide [Online]
http://cp.literature.agilent.com/litweb/pdf/5989-5367EN.pdf [Retrieved: November 8,
2016].
Ampner, 2016. Internal document. [Retrieved: January 10, 2017]. Ampner, 2017. The Power Systems Architects in Renewables. [Online] https://wordpress-­‐‑ampner.appcloud.jubic.net/wp-­‐‑
content/uploads/2017/03/Ampner-­‐‑The-­‐‑Power-­‐‑System-­‐‑Architects-­‐‑in-­‐‑
Renewables_web.pdf [Retrieved: May 14, 2017]. Cort, A., 2002. Functional Testing of PCBs. [Online] http://www.assemblymag.com/articles/83988-­‐‑functional-­‐‑testing-­‐‑of-­‐‑pcbs [Retrieved: May 14, 2017]. Edwards, P.R., 1991. Manufacturing Technology in the Electronics Industry. Suffolk: St
Edmundsbury Press.
Engmatec, 2013. Testing plugs. [Online]
https://www.engmatec.de/fileadmin/content/ENGLISCH/PDF-­‐‑Medien/Testing-­‐‑
Plugs_2013.pdf [Retrieved: May 14, 2017].
ISO 9000:2015. Quality management systems — Fundamentals and vocabulary. [Online] https://www.iso.org/obp/ui/#iso:std:iso:9000:ed-­‐‑4:v1:en [Retrieved: May 14, 2017]. Koenemann, B., 2006. Design-­‐‑For-­‐‑Test. in: L. Lavagno, G. Martin & L. Scheffer ed. Electronic Design Automation for Integrated Circuits Handbook. Vol 2 21-­‐‑1-­‐‑21-­‐‑35. New York: Taylor & Francis. National Instruments, 2013. Getting Started With TestStand. [Online]
http://www.ni.com/pdf/manuals/373436f.pdf [Retrieved: November 8, 2016].
National Instruments, 2016a. What is Teststand. [Online] http://www.ni.com/teststand/
[Retrieved: November 15, 2016].
National Instruments, 2016b. Using Callbacks in NI Teststand. [Online]
http://www.ni.com/product-documentation/6605/en/ [Retrieved: November 16, 2016].
NI forum, 2013. Starting TestStand with ExtraPuTTY installed. [Online]
http://forums.ni.com/t5/NI-TestStand/Starting-TestStand-with-ExtraPuTTY-installed/tdp/2596877 [Retrieved: October 25, 2016].
NIST/SEMATECH, 2012. E-­‐‑Handbook of Statistical Methods. [Online] http://www.itl.nist.gov/div898/handbook [Retrieved: May 14, 2017].
Poole, I., n.d. a Automatic test equipment ATE. [Online] http://www.radioelectronics.com/info/t_and_m/ate/automatic-test-equipment-basics.php [Retrieved: May
14, 2017].
Poole, I., n.d. b ICT, In Circuit Test Tutorial. [Online] http://www.radioelectronics.com/info/t_and_m/ate/ict-in-circuit-test-tutorial.php [Retrieved: May 14,
2017]. 32 Stenbacka, B., Ampner – nytt Vasaföretag som växer. Vasabladet, 20.12.2016, page 1 & 9.
Tarr, M., n.d. ICT Fixtures. [Online]
http://www.mtarr.co.uk/courses/topics/0251_fixt/index.html [Retrieved: April 13, 2017].
Texas Instruments Inc., 1997. IEEE Std 1149.1 (JTAG) Testability Primer. [Online] http://www.ti.com/lit/an/ssya002c/ssya002c.pdf [Retrieved: May 14, 2017].