LINEAR LIGHTING INTEGRATION Suspension System Layout

LINEAR LIGHTING INTEGRATION Suspension System Layout
LINEAR LIGHTING INTEGRATION
Suspension System Layout & Installation
Instructions for XAL LENO Lighting Fixture
IN ST ALL AT ION O V ER V I EW
The following installation instructions & drawings
provide general guidance on the layout and construction of
“On-Center” linear lighting for continuous or discontinuous
runs of 4" wide zero plenum lights from XAL:
Hanger Wire
Electrical Connection
(By others)
Item LCB4-4"
Lighting
Connector
Bracket
(Armstrong)
Main Beam
• 9/16" face Silhouette® 1/4", Silhouette 1/8", Suprafine®, and
Interlude® suspension systems
• Standard and FastSize™ Optima®, Ultima®,
and Calla™ ceiling panels with a tegular edge detail.
Cross Tee
Below is an overview of the ceiling system components
required to complete one of the described on-center ceiling
layouts.
Note: Not all of these components are required in every
on-center linear lighting layout illustrated below.
1. Grid adapters
2.Non-standard cross tees with special rout hole
spacing.
(NOTE: Cross tee length is dependent on the on center
space of the ceiling grid opening for lighting)
3.Non-standard length main beams.
(NOTE: Main beam length is dependent on the length
of the linear lighting)
4. Pre-engineered special length cross tees.
5. Lighting connector bracket
6. Standard 12' main beams
7. Standard 2' and 4' cross tees
8. Standard wall angle molding
9. STAC clips
10. Ceiling tiles (FastSize and Standard Sizes)
XAL LENO
Luminaire
(By others)
Pop Rivet
NOTE: Pop-rivets, screws and hardware required for
attaching to structure are purchased from other manufactures.
Most building codes require non-structural building
components to be restrained. Armstrong also recommends
restraint in accordance with local building code requirements.
Please consult with the building code professional having
jurisdiction over the project to determine appropriate restraint
requirements for this installation.
Study the layout of the ceiling and verify that all of the ceiling
gird components are available on site for the installation. Note
that some ceiling grid components may be unidirectional.
Contact your local Armstrong distributor to request
replacement, additional or missing ceiling grid components.
1. INST ALL AT ION M AI N B EA M S
1.1 Install standard 12' main beams at a predetermined on
center spacing as shown on the RCP (most likely an 8' or 10'
on center spacing, the on center spacing of the mainbeam will
be driven by the on-center layout of the lights).
1.3 If applicable connect these 12' main beams to other 12'
main beams located on 4' centers in non-linear lighting areas.
1.2 At this time, do NOT install the non-standard main beams,
grid adapters, or cross tees located adjacent to the lighting
fixture ceiling opening.
Wall Angle Molding
Standard Main Beams
Standard Cross Tee
Non Linear
Lighting Area
Standard
Main Beams
Future
Location
of Light
Fixtures
Length of
the Linear
Lighting Run
Connections
Of Two 12'
Standard Mains
Non Linear
Lighting Area
Special On-Center Spacing
of Linear Lighting
2
2. IN S T AL L IN S IDE C R O S S T E ES
2.1 Install one pre-engineered special length cross tee at either
end of the future lighting opening.
2.3 Please note the special rout hole spacing and the
unidirectionality of these pre-engineered, special length
cross tees and be mindful of the miter locations on these grid
components when working with Silhouette grid.
2.2 Pre-engineered, special length cross tees should be
installed perpendicular to and intersect with the 12' long main
beams installed in step 1.
Wall Angle Molding
Pre-Engineered
Special Length Cross Tees
Standard
Main Beams
Future
Location
of Light
Fixtures
Length of
the Linear
Lighting Run
Cross Tee Installation
3
3. INST ALL OU T S ID E CR O S S T E ES A N D S Q UA R I N G THE CEIL ING
3.1 At this point perimeter cross tees can be installed outside
of the “big box”, created in steps 1 and 2, and attached or
temporarily secured to the wall or perimeter angle molding to
verify the ceiling is square.
3.2 The “big box” or a connected standard ceiling will have to
be used to square up the ceiling.
3.3 Make any and all necessary adjustment to square up the
ceiling structure.
Pre-Engineered
Special Length Cross Tees
Standard
Main Beams
Standard
Cross Tee
Cut to Size
for Install
Length of
the Linear
Lighting Run
“Big Box”
Future
Location
of Light
Fixtures
Wall Angle
Molding
Wall Angle Molding
Standard Main Beams
Standard Cross Tee
Non Linear
Lighting Area
Standard
Main Beams
4
4. IN S T AL L AT ION M A I N B EA M S & L I G H T I N G B R ACING
4.1 Install pre-engineered special length main beams, cross
tees and suspension adapter components to create the
continuous linear lighting opening.
4.2 Please note the special rout hole spacing of these preengineered special length main beams, and cross tees and be
mindful of the miter locations on these grid components when
working with Silhouette® grid.
Pre-Engineered
Special Length Cross Tees
Grid Adapter
Standard
Main Beams
Standard
Cross Tee
Cut to Size
for Install
Special
Length
Main Beams
Length of
the Linear
Lighting Run
Wall Angle
Molding
Grid Adapter
Main Beam Cross Tee Adapter
Grid Adapter
Cross Tee
EndEnd
Detail
Cross
Tee
Detail
Beam
EndDetail
Detail
Main Main
Beam
End
Lighting
Connector
Wall Angle Molding
Bracket
Main Beam
Pre-Engineered
Special Length Cross Tees
STAC
Grid
Adapter
Main Beam
Grid
Adapter
Grid
Adapter
5
Standard
Main Beams
5. BRAC K E T S FOR LIG H T I N G I N T EG R A T I O N
5.5 NOTE: When black iron is used to support/suspend the
ceiling, Channel Beam Splice (CBS hangers) shall be used
to support the ceiling system. Install CBS hangers on the
suspension system components running parallel to the lighting,
and connect to black iron, spacing of the CBS hangers shall
be as required by local code. Lighting connector brackets may
still be used to connect to the cross tees running perpendicular
to the lighting fixture, but no hanger wire is needed on the LCB
when using the CBS hangers.
5.1 The lighting connector bracket is installed every 4 feet
starting 2 feet in from the end of the linear lighting opening.
5.2 The lighting connector brackets installs through the rout
holes on the special length main beams or cross tees running
parallel to the continuous linear lighting opening and connects
with the special length cross tees being installed perpendicular
to the continuous linear lighting opening.
5.3 The lighting connector bracket is hung from a standard
hanger wire and gets connected to the perpendicular special
length cross tees via one 1/8" pop rivet.
5.6 The special length main beams being installed
perpendicular to the continuous linear lighting opening which
do not intersect with the lighting connector bracket need to be
secured with an STAC clip and single pop rivet.
5.4 Proper installation requires the rivet to be installed through
the hole in the special length cross tee first and then into the
lighting connector bracket.
5.7 Proper installation requires the rivet to be installed through
the hole in the special length cross tee first and then into the
STAC clip.
Pre-Engineered
Special Length Cross Tees
Grid Adapter
Stac Clips,
Installed With
Pop Rivets
Standard
Main Beams
Special length
Main Beams
Special
Length
Cross Tee
Lighting
Connector
Bracket,
Installed with
Pop Rivets
Standard
Cross Tee
Cut to Size
for Install
Length of
the Linear
Lighting Run
Grid Adaptor
Wall Angle
Molding
STAC – Single Tee
Adapter Clip
Optional CBS –
Channel Beam Splice
to Suspend Main
Beams – to Black Iron
Item LCB4-4"
Lighting
Connector
Bracket
STAC Clip
Pre-Engineered
Special Length Cross Tees
6
6. IN S T AL L RE M A I N I N G C R O S S T E ES
6.1 Install the remaining standard length cross tee to complete
the ceiling layout and ceiling tile openings.
Pre-Engineered
Special Length Cross Tees
Grid Adapter
Standard
Main Beams
Special Length
Cross Tee
STAC Clips,
Installed with
Pop Rivets
Standard
Cross Tee
Cut to Size
for Install
Special length
Main Beams
Lighting
Connector
Bracket,
Installed with
Pop Rivets
Length of
the Linear
Lighting Run
Wall Angle
Molding
Grid Adaptor
Standard
Cross Tee
7. IN S T AL L C E ILING T I L E S
9 . S EIS MIC INS T AL L AT ION
7.1 Install ceiling tiles. Some ceiling tiles will not be of the
standard 24" x 24" or 30" x 30" size, specifically the ceiling
tiles located adjacent to the continuous linear lighting opening.
Armstrong has these special size ceiling tiles available for
purchase.
9.1 Other lighting fixture installed in an Armstrong ceiling
in accordance with these installation instructions does not
need to be independently restrained or supported to the
structure. Testing was conducted at the Structural Engineering
Earthquake
Simulation Laboratory located at the State
Pre-Engineered
University
ofLength
New Cross
York Tees
– Buffalo campus where the lighting
Special
fixture was held in place by the door latching mechanisms and
the lighting connector bracket and satisfactory results were
produced.
Grid Adapter
7.2 Please contact your local Armstrong Distributor or local
Armstrong sales rep for assistance.
7.3 Coordinate the installation of the ceiling tile with the
electrical contractors as they will need to install an electrical
drop(s) for the lighting fixtures.
Standard
Main Beams
8. IN S T AL L LIGHT F I X T UR ES
8.1 The electrical contractor will install the continuous linear
lighting fixtures and make all required electrical connections.
Standard
Cross Tee
Cut to Size
for Install
Special
Length
Main Beams
Length of
the Linear
Lighting Run
7
Wall Angle
Molding
M ORE IN FORM AT I O N
For more information, or for an Armstrong representative, call 1 877 ARMSTRONG.
For complete technical information, detail drawings, CAD design assistance, installation information, and many other
technical services, call TechLineSM at 1 877 ARMSTRONG or FAX 1 800 572 TECH.
For the latest product selection and specification data, visit armstrong.com/xallighting.
All trademarks used herein are the property of AWI Licensing Company and/or its affiliates
© 2015 AWI Licensing Company • Printed in the United States of America
BPLA-298046-215
8