advertisement
PC PSU
FSP500-60GHN(85)
DESCRIPTION
This is the specification of Model FSP500-60GHN(85); AC line powered switching power supply with active PFC
(Power Factor C orrection) circuit, meet EN61000-3-2 and with Full Range Input features. Also, +5Vsb power is less than 0.5Winput at power off mode (PS_ON input at high state) which is comply with ErP Lot 6 year 2013 requirement.
APPLICATION
Desktop
W ATTAGE
Wattage: 500W
DIMENSION
Dimension: 140mm(L) x 150mm(W) x
86mm(H)
PRODUCT HIGHLIGHT
Efficiency Lev el:
Erp Lot:
Input Voltage:
80PLUS Bronze
<0.5W
100~240Vac
INPUT SPECIFICATION
Input Range:
Input F requency :
Input Current:
100-240 Vac
47-63 Hz
115V@ < 7 Amps - rms 230V@
< 3.5 Amps - rms
OUTPUT SPECIFICATION
Output Rise Time: + 3.3Vdc : 20ms Maximum
+ 5Vdc : 20ms Maximum
+ 12Vdc : 20ms Maximum
+ 5Vsb : 20ms Maximum
- 12Vdc : 20ms Maximum
*Output Voltage and C urrent Rating
+3.3V
Ripple-Noise(R-P) mV 50mV
Regulation Load %
Output Max.(A)
Output Min.(A)
±5%
24A
0.1A
+5V
50mV
±5%
24A
0.2A
SAFETY STANDARD APPAOVAL
GENERAL SPECIFICATION
Efficiency : 82%@ 20% load; 85%@ 50% load;
82%@ 100% load
PWOK Delay Time: 500ms > PWOK > 100ms
EMC Performance: EN55022 class B
EN55024
EN 61000-3-2
EN 61000-3-3
ENVIRONMENTAL SPECIFICATION
TEMP.Range:
MTBF :
Operating Temperature:10°C to
+40°C
Storage Temperature: -20°C to +
80 ℃
The power supply reliability,when calculated by MIL-HDBK-217;latest revision, are exceed 100,000 hours with all output at maximum load and an ambient temperature of 25 ℃ .
+12V1
120mV
±5%
18A
0.1A
+12V2
120mV
±5%
18A
0.5A
-12V
120mV
±10%
0.5A
0A
+5Vsb
50mV
±5%
2.5A
0A
NOTES
( 1 ) +3.3V & +5V total output not exceed 123W.
( 2 ) Maximum combined current for the +12V outputs shall be 36A .
( 3 ) +12V2 peak current is 18A (less then 10m Sec.) , minimum voltage during peak is >11.0Vdc.
( 4 ) +5Vsb peak current is 3.5A(less then 500m Sec.) , minimum voltage during peak is > 4.5Vdc.
T his co nte nt is subje ct to cha nge , ple a se re fe r to spe cifica tio n fo r m o re de ta il.
FSP re se rve the right to cha nge the co nte nt witho ut prio r no tice
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project