CLIFTON & YORK EXPOSED SHOWER KITS
INSTALLATION & AFTERCARE INSTRUCTIONS
Customer Services
Laura Ashley Bathrooms, Brassmill Lane Trading Estate, Bath BA1 3JF
Tel: 01225 303 900 | Fax: 01225 448 877
Email: sales@lauraashleybathrooms.co.uk Web: www.lauraashleybathrooms.co.uk
Manufactured under license for Laura Ashley Ltd.
RETAIN FOR FUTURE REFERENCE
INTRODUCTION
Your exposed shower valve is a thermostatic mixer which incorporates a thermo-regulating cartridge to assure users
of consistent showering temperatures. The valve has been designed & manufactured to comply with BS EN 1111:1999.
This valve complies with the requirements of the above regulations and installation should be carried out in strict
compliance with them.
OPERATING CONDITIONS OF USE
Before installation the operating conditions of use must be checked. The table below contains details of the necessary
conditions of operation. This valve is suitable for use with the following systems
•
•
•
•
•
Gravity fed Hot & Cold (balanced pressures)
Gravity fed Hot & mains Cold (balanced pressures)
Unvented systems
Gas combination boiler
Pumped system
Note: On gravity systems the minimum Vertical distance (drop) from the underside of the cold water storage tank to
the shower valve must be 2 metres. If water supply is fed by gravity then supply pressure should be verified to ensure
the conditions of use are appropriate for the valve
Maximum Static Pressure - BAR
Flow Pressure, Hot & Cold - BAR
10
0.2 to 5
Hot Supply Temperature - °C
55 to 65
Cold Supply Temperature - °C
Equal to or less than 25°C
Recommended outlet temperatures
The BuildCert TMV scheme recommends the following set maximum mixed water outlet temperatures for use in all
premises:
41°C for showers;
The mixed water temperatures must never exceed 46°C.
The maximum mixed water temperature can be 2°C above the recommended maximum set outlet temperatures.
Note: 46°C is the maximum mixed water temperature from the bath tap. The maximum temperature takes account
of the allowable temperature tolerances inherent in thermostatic mixing valves and temperature losses in metal baths.
It is not a safe bathing temperature for adults or children.
The British Burns Association recommends 37 to 37.5°C as a comfortable bathing temperature for children. In
premises covered by the Care Standards Act 2000, the maximum mixed water outlet temperature is 43°C.
The thermostatic mixing valve will be installed in such a position that maintenance of the TMV and its valves and the
commissioning and testing of the TMV can be undertaken.
The fitting of strainers is recommended as close as is practicable to the water supply inlets of the thermostatic mixing
valve.
2
11
MAINTENANCE
VALVE INSTALLATION GUIDELINES AND COMPLIANCE
We advise that the valves, check valves and filters be regularly serviced particularly in hard water areas. The check
valves along with the filters are contained in the retaining nut. The water supplies must be isolated remotely from the
valve before removal.
The valve must be installed so that it is readily accessible for commissioning and maintenance. The valve must be
installed with isolation valves on both the hot and cold water systems as close as possible to the valve; so as to allow
the valve to be commissioned and tested correctly. The valve is fitted with integral check valve cartridges which
command the water supply, therefore the thermostatic valve is protected against cross-flow due to unbalanced line
pressures as required by the Water Supply (Water Fittings) Regulations 1999.
Valves should be tested against the original set temperature results once a year. When testing is due the following
performance checks shall be carried out.
1.
2.
Measure the mixed water temperature at the outlet.
Carry out the cold fail-safe shut off test by isolating the cold water supply to the TMV, wait for 5 seconds if water
is still flowing check that the temperature is below 46 degrees C.
3. If there is no significant change to the set outlet temperature (+/- 2°C or less change from the original setting)
and the fail safe shut off is functioning, then the valve is working correctly and no further service work is required.
If further maintenance should be required contact Roper Rhodes for details. Please see contact details on the back
page of this document.
Most problems associated with the operation of thermostatic shower valves are caused by debris in the new pipe
work getting into the thermostat. These problems are easily avoided by thoroughly flushing the pipe work BEFORE the
shower valve is fitted
GENERAL DIMENSIONS
200
Dual Function
Adjustable
148mm - 155mm
10-YEAR GUARANTEE
We have complete confidence in this Roper Rhodes product and as such it is offered with a 10-year guarantee against defects in
manufacture. This valve must be fitted by a competent installer. If in doubt seek advice from a qualified professional. The guarantee
requires that this product be used in the manner for which it was intended and that it is installed & maintained in accordance with the
fitting instructions and local water bylaws. The guarantee covers products in domestic use only. Always ensure this product is fully tested
before concealing valves into the wall. On installation ensure that the valve and valve inlet threads can be removed or serviced in
accordance with UK regulations. The guarantee is invalidated should the valve be damaged by water borne debris. Make sure that supply
pipes are clear of any debris prior to installation, this is particularly important on new plumbing installations. In the unlikely event that this
product should fail during the guarantee period we will either replace the faulty part or the complete unit as appropriate. This guarantee
excludes normal wear and tear. This guarantee covers failure of the thermostatic cartridge within the first 2 years of purchase only.
Replacement cartridges are available to purchase by contacting the Roper Rhodes Customer Service team. Failure to follow the terms
outlined above will invalidate this guarantee. Proof of purchase will be required to validate any guarantee claims.
148
340
150
Single Function
Adjustable
148mm - 155mm
200
215
148
150
10
3
PRODUCT COMPONENTS
SETTING TEMPERATURE (CONTINUED)
Should you require any replacement components for this product please contact Roper Rhodes using the contact details
on the back page of this instruction document
Plastic Block
Limit Stop
Trim Cover
Flow Control Handle
5. Turn on the water
6. Slowly turn the spindle by hand until the required max
temperature is achieved
TROUBLE-SHOOTING
Fixing Screw
PROBLEM
SOLUTION
Shower will not run hot enough when first installed
Check for debris
Check hot water temperature and boiler function
Cold water running back through the valve into the hot
water system.
Check the filters and check valves are functioning correctly.
Shower only runs cold.
Compression Nut
Hot Inlet Elbow
4
7. Without rotating the temperature spindle, replace the
limit stop so that its arm is positioned to the right of the
wall of the plastic block inside the valve.
8. Replace the trim cover and refit and tighten the handle.
Make sure the arm of limit stop is
positioned to the right of the plastic
block
Cartridge
Cover Plate
Cold Inlet Elbow
Flow Control Handle
Temperature Control Handle
Grub Screw
Check hot and cold pipework is installed to correct inlet on
the valve
If you require further assistance beyond the guide below contact the help line on 01225 787 870
AFTERCARE INSTRUCTIONS
Whilst this item has a high quality durable finish, it should nevertheless be treated with care. Surfaces should be
cleaned using only a soft damp cloth and clean water & dried using a soft cotton cloth. Bath / shower cleaning
products, even non-scratch ones could damage the finished surface.
9
VALVE INSTALLATION
COMMISSIONING
It is important that incoming water supplies conform to the requirements specified for pressure and temperature.
Assure that supply water conditions satisfy any guidance information for the control of bacteria and that the
designation of the supplied valve suits the application. Do not continue commissioning until supplies are correct and
stable considering variation caused by other service users.
Use a calibrated thermometer for testing incoming and mixed water.
1.
2.
3.
4.
5.
Record temperature of the incoming hot and cold supply.
Record temperature of mixed discharge at maximum draw off rate.
Record temperature of mixed discharge at minimum draw off rate.
Isolate the cold water supply and measure the mixed water temperature as the cold water failure device reacts.
This should deviate by no more than + 2°C of the initial maximum set point. Restore the cold supply and
measure the stabilised mixed water temperature. This must not deviate by more than + / - 2°C of the initial set
recorded result. Record these findings.
Record the measuring equipment used for the measurements.
The above records must be retained and updated during the service life of the valve.
If there is a residual flow during the commissioning or the annual verification (cold water supply isolation test),
then this is acceptable providing the temperature of the water seeping from the valve is no more than 2˚C
above the designated maximum mixed water outlet temperature setting of the valve.
Temperature readings should be taken at the normal flow rate after allowing for the system to stabilise.
The sensing part of the thermometer probe must be fully submerged in the water that is to be tested.
Any TMV that has been adjusted or serviced must be re-commissioned and re-tested in accordance with the
manufacturers' instructions.
1. Select the valve position considering the overall height of the system including the rigid riser rail and head
2. Prepare the water pipes at 150mm centres
3. The ends of the pipe should be cut 20-35mm out from the wall face
4. Remove the compression nuts and the cover plates from the inlet elbows of the valve
5. Line up the valve with the hot and cold inlet pipes ensuring hot inlet is on the left and cold inlet os on the right
6. Whilst holding the valve in position, mark the drill hole positions through the back plate of the valve body
7. Remove the valve and drill 4X8mm holes into the wall to a depth of 45mm and insert wall plugs.
8. Slide the cover plates over the pipes to cover the hole around the pipework
9. Secure the valve to the wall with the fixings supplied and connect the valve to the pipework using the compression
fitting and PTFE tape if required
10. Test for leaks
Cover Plate
Hot Inlet Pipe
Compression Nut
The installation of thermostatic mixing valves must comply with the requirements of the Water Supply (Water
Fittings) Regulations 1999.
Backplate
SETTING TEMPERATURE
The temperature control handles on this product are factory set and should require no adjustment. However, if for
any reason the handles and/or the cartridge is removed it is important the following procedure is followed.
Limit Stop
Handle
Trim Cover
Ceramic Indices
and metal cap
1. Remove the handle by unscrewing the metal cap and
the internal screw holding the handle in place.
Grub Screw
Cold Inlet Pipe
2. Turn off the water
3. By hand remove the trim covers from the valve body
4. Remove Limit Stop by unscrewing the grub screw
8
5
with the water bye-laws. For further details
refer to the latest copy of Water Bye-laws
guide or your local water authority.
ACCESSORY INSTALLATION
1. Prepare the water supply pipes (hot on the
Please
plugsatsupplied
are only suitable for solid stone / brick walls. For plasterboard walls use
left
andnote
coldthat
onthe
thewall
right)
the identified
specialist
walla plugs.
height
with
width of 150mm centers.
2. Make the ends of pipes 20-25mm out from
the face of wall.
3. Remove the compression nuts and the back
plates from the inlet elbows of valve.
4. Line up the valve with the hot and cold
inlet pipes making sure the correct elbow
meet the correct pipe (refer to diagram)
5. Whilst holding the valve in position, mark
where the holes are on the wall.
6. Remove the valve and drill 4X8mm holes
into the wall where you marked to a depth of
45mm and insert wall plugs.
7. Slide the cover plates under the
compression nuts and position each pipe with
the cover plate and nuts against the wall.
8. Push the valve over each pipe and make
them into the back plate.
9. Tighten the two nuts on both inlets.
1. This rail can be adjusted in height by
cutting the rail tube to the preferred
length. Do so BEFORE assembly.
Compression
Nut
Wall plug
Compression
Washer
Screw
Compression
Nut
Arm
Compression
Washer and
Nut
4. The arm can also be adjusted in length by dissassembling
the elbow fixing and cutting the arm to the preferred
length.
5. Re-insert the arm and screw the backplate tight
to the wall (WITH DUAL FUNCTION VALVE
MAKE SURE HANDSET HOLDER IS PUT ONTO
THE RAIL BEFORE FIXING IN PLACE)
OPERATING
1. Turn the water flow control handle to
increase/decrease the flow and turn on/off.
2. Turn the temperature control handle to
increase/decrease the water temperature
3. The temperature control knob is pre-set to auto
stop at above 44°C to avoid scalding. However, if
for any reason the setting is removed it is
important to follow “Temperature Setting”
procedure to reset.
Mark on Wall
Compression
Washer
Arm
45°
45°
Shower Head Flow
Control Handle
Temperature Control
Handle
Backplate
Rail
2. Secure the rail to the valve using the
compression fitting at the valve body
3. Assemble the rail to the wall bracket
fixing and mark up the fixing holes for wall
attachment
Handset Flow Control
Handle
45°
6
7
45°