Valve Only Installation Guidelines

Valve Only Installation Guidelines
PBTS-RGH
PBTS-RGH
Installation Instructions
Replacement Parts
NO. Description
1
2
3
Part No.
1
Diverter Assembly
9Q1153NT
2
Sleeve
5L0C0861NT
3
Stop Valve
9Q1152NT
4
Pressure Balance Cartridge
5D0M0262PL
5
Cartridge Nut
5T1C0216NT
6
Stem & Threaded Nipple
9Q1173NT
4
VALVE ONLY
For Pressure Balance Tub & Shower
with Internal Diverter
No Finish
5
6
1
Applicable Standards/Codes
IAPMO certified to meet or exceed the following:
• ASME A112.18.1/CSA B125.1
• Uniform Plumbing Code
• National Plumbing Code of Canada
• ASSE 1016
Installation Dimensions
2 7/8"- 3 7/8"
1 13/16"- 2 13/16"
2 15/16"
1/2"-14 NPT
2"
5 1/2"- 5 7/8"
1 1/4"
2 3/16"
5 3/8"
1/2"-14 NPT
1/2"-14 NPT
1 11/16"
1 13/16"
1/2"-14 NPT
11/16"
15121421-A
5 1/4"
5"
4
For easy installation of your faucet you will need:
● To read all the installation completely before beginning.
● To read all warnings, care, and maintenance information.
15121421-A
PBTS-RGH
29
Installation Instructions
21
2
3
2 7/8"- 3 7/8"
2 7/8"-3 7/8"
3
Mounting
hole
Turn the water on. Test the diverter.
10
a
2
b
c
d
Mounting hole
This valve is designed to fit into a
wall that is 2 7/8"to 3 7/8"from
finished wall to the back of the valve.
Extensions are shipped with the trim.
4
Back valve
Red
Turn off the water supplies.Install the
valve so the finished wall will fit
between the markers on the mud
guard.
Back valve
Blue
5
Blue
Blue
Using mounting holes secure the
valve making sure the “UP” label
outlet is on top.
6
Pin
Red
Valve
Cartridge
Red
Right
Hot
Cold
Left
If you are making a back-to-back
installation (hot on right and cold on
the left) ,install the back valve body
as described in steps #5 – #6. If
not, go to step #7. NOTE: Notice
that the back valve has hot and cold
indicators that will be opposite of the
incoming supply lines.
7
Warning
Pin
Cartridge
Rotate 180°
Pin
Remove the cartridge and stem
assembly. Notice that the pin is at
the top. Rotate the cartridge 180°.
The pin should be on the bottom.
Diverter
Align the pins on the bottom of the
cartridge and push the cartridge into
the valve. Make sure the cartridge is
firmly installed into the valve body.
Reinstall stem assembly with mud
guard.
1.Pressure test and flush the valve.
a. Prior to testing, remove mud guard, stem assembly, bonnet, cartridge as stops as shown.
b. Plug the shower outlet and check for leaks.
c. After testing, flush system.
d. Remove shower outlet plug.Re-install the stops, cartridge, bonnet, stem assembly and mud guard.
2.Check for leaks.
11
8
Stops
Pressure Balance
Cartridge
Installation completed.
Connect valve body to water supplies using the proper fittings (copper tubing
or pex). Warning: avoid soldering at high temperature. Exposure to high
temperature may damage the cartridge. Be sure diverter, stops and pressure
balance cartridge are removed before soldering.
15121421-A
2
Connect the valve body to the outlets
with the proper fitting Note: it is
suggested that you anchor all water
lines.
3
15121421-A
PBTS-RGH
29
Installation Instructions
21
2
3
2 7/8"- 3 7/8"
2 7/8"-3 7/8"
3
Mounting
hole
Turn the water on. Test the diverter.
10
a
2
b
c
d
Mounting hole
This valve is designed to fit into a
wall that is 2 7/8"to 3 7/8"from
finished wall to the back of the valve.
Extensions are shipped with the trim.
4
Back valve
Red
Turn off the water supplies.Install the
valve so the finished wall will fit
between the markers on the mud
guard.
Back valve
Blue
5
Blue
Blue
Using mounting holes secure the
valve making sure the “UP” label
outlet is on top.
6
Pin
Red
Valve
Cartridge
Red
Right
Hot
Cold
Left
If you are making a back-to-back
installation (hot on right and cold on
the left) ,install the back valve body
as described in steps #5 – #6. If
not, go to step #7. NOTE: Notice
that the back valve has hot and cold
indicators that will be opposite of the
incoming supply lines.
7
Warning
Pin
Cartridge
Rotate 180°
Pin
Remove the cartridge and stem
assembly. Notice that the pin is at
the top. Rotate the cartridge 180°.
The pin should be on the bottom.
Diverter
Align the pins on the bottom of the
cartridge and push the cartridge into
the valve. Make sure the cartridge is
firmly installed into the valve body.
Reinstall stem assembly with mud
guard.
1.Pressure test and flush the valve.
a. Prior to testing, remove mud guard, stem assembly, bonnet, cartridge as stops as shown.
b. Plug the shower outlet and check for leaks.
c. After testing, flush system.
d. Remove shower outlet plug.Re-install the stops, cartridge, bonnet, stem assembly and mud guard.
2.Check for leaks.
11
8
Stops
Pressure Balance
Cartridge
Installation completed.
Connect valve body to water supplies using the proper fittings (copper tubing
or pex). Warning: avoid soldering at high temperature. Exposure to high
temperature may damage the cartridge. Be sure diverter, stops and pressure
balance cartridge are removed before soldering.
15121421-A
2
Connect the valve body to the outlets
with the proper fitting Note: it is
suggested that you anchor all water
lines.
3
15121421-A
PBTS-RGH
PBTS-RGH
Installation Instructions
Replacement Parts
NO. Description
1
2
3
Part No.
1
Diverter Assembly
9Q1153NT
2
Sleeve
5L0C0861NT
3
Stop Valve
9Q1152NT
4
Pressure Balance Cartridge
5D0M0262PL
5
Cartridge Nut
5T1C0216NT
6
Stem & Threaded Nipple
9Q1173NT
4
VALVE ONLY
For Pressure Balance Tub & Shower
with Internal Diverter
No Finish
5
6
1
Applicable Standards/Codes
IAPMO certified to meet or exceed the following:
• ASME A112.18.1/CSA B125.1
• Uniform Plumbing Code
• National Plumbing Code of Canada
• ASSE 1016
Installation Dimensions
2 7/8"- 3 7/8"
1 13/16"- 2 13/16"
2 15/16"
1/2"-14 NPT
2"
5 1/2"- 5 7/8"
1 1/4"
2 3/16"
5 3/8"
1/2"-14 NPT
1/2"-14 NPT
1 11/16"
1 13/16"
1/2"-14 NPT
11/16"
15121421-A
5 1/4"
5"
4
For easy installation of your faucet you will need:
● To read all the installation completely before beginning.
● To read all warnings, care, and maintenance information.
15121421-A
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement