- Computers & electronics
- TVs & monitors
- Flat panel accessories
- Steelcraft
- Frame Elevations
- Manual
- 24 Pages
Steelcraft Frame Elevations Manual
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
K. D. FRAME ASSEMBLY FOR MASONRY WALLS . . . . . . . . . . . . . . . . . . . . . . . . . . .Ins 2
FRAME INSTALLATION DETAILS FOR MASONRY WALLS . . . . . . . . . . . . . . . . . . . . . .Ins 3
INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME . . . . . . . . . . . . . . . . . .Ins 4
INSTALLING FRAMES EQUIPPED WITH EMA’S . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Ins 5
K. D. FRAME ASSEMBLY FOR WOOD STUD WALLS . . . . . . . . . . . . . . . . . . . . . . . . . .Ins 6
FRAME INSTALLATION DETAILS FOR WOOD STUD WALLS . . . . . . . . . . . . . . . . . . . . .Ins 7
K. D. FRAME ASSEMBLY FOR OPEN STEEL STUD WALLS . . . . . . . . . . . . . . . . . . . . .Ins 8
FRAME INSTALLATION DETAILS FOR OPEN STEEL STUD WALLS . . . . . . . . . . . . . . . . .Ins 9
K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS . . . . . . . . . . . . . . . . . . . .Ins 10
FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS . . . . . . . . . . . . . . .Ins 11
UNIVERSAL ANCHOR INSTALLATION FOR F SERIES FRAMES . . . . . . . . . . . . . . . . . . .Ins 12
UNIVERSAL ANCHOR INSTALLATION FOR MU SERIES FRAMES . . . . . . . . . . . . . . . . .Ins 13
1 FACE KD FRAME ASSEMBLY FOR STEEL OR WOOD STUD WALLS . . . . . . . . . . . . . .Ins 14
1 FACE KD FRAME INSTALLATION DETAILS FOR STEEL OR WOOD STUD WALLS . . . . . .Ins 15
MU SERIES FRAME ASSEMBLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Ins 16
MU SERIES FRAME INSTALLATION DETAILS FOR STUD WALLS . . . . . . . . . . . . . . . . .Ins 17
3-HOUR FIRE RATED FRAMES IN DRYWALL CONSTRUCTION - F & MU SERIES . . . . . .Ins 18
EASY SET ® DW SERIES DRYWALL FRAMES INSTALLATION DETAILS . . . . . . . . . . . . . .Ins 19
ADDITIONAL STEPS FOR EASY SET ® DW SERIES FIRE RATED FRAMES . . . . . . . . . . . .Ins 20
ADDITIONAL STEPS FOR 4 FACE HEADS
SECURITY STUD ANCHOR INSTALLATION
EASY SET ® DW SERIES BORROWED LITE FRAMES INSTALLATION . . . . . . . . . . . . . . . .Ins 21
PS 074™ SURFACE APPLIED WEATHERSTRIP INSTALLATION . . . . . . . . . . . . . . . . . . .Ins 22
CLOSER REINFORCEMENT KIT INSTALLATION (SLEEVES) . . . . . . . . . . . . . . . . . . . . .Ins 23
TEMPORARY SPREADER BARS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Ins 24
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
INSTALLATION
Ins 1
1
INSTALLATION
K.D. FRAME ASSEMBLY FOR MASONRY WALLS
2
3
Layout heads and jambs. For 4” (102 mm) face frames
(See Step 5).
4
Slide head on jambs, engaging jamb tabs in head slots.
5
Bend tabs within head first (see Steps 4 and 5).
Install No.
8 x 2 1/2” drywall screws
4” HEADS ONLY
Bend top portion of corner tab as shown. Assemble head to jambs
(see Step 2) and bend rabbet tabs flat against the head. Install #8 x 2 1/2”
(63 mm) long drywall screw through head into corner tab.
Bend inside tabs
6
Bend tabs in direction of corresponding arrows (away from the center of the head). For 2” (50 mm) face frames bend all tabs flat against head. For 4” (102 mm) face frames (see Step 5).
Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required
Ins 2
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
INSTALLATION
STEEL FRAME INSTALLATION DETAILS FOR MASONRY WALLS
Wire Masonry Anchor
1 2
Adjust anchor to fit tight within jambs
Wire anchors for masonry construction
(3) per jamb through 7’6” high
(4) per jamb 7’7” to 12’0” high
(1) base anchor per jamb
Locate frame.
Spreader bar length
= Door width
30” (2’6” door)
32” (2’8” door)
36” (3’0” door)
Place a wood spreader at base of frame. If frame has threshold installed spreader bar is not needed.
3 4 5
Support frame.
6
Fasten base anchors to the floor with nails.
7 8
Level head.
9
Plumb jambs. Square corners.
Place and support a wood spreader at the center of frame. See Step 4 for spreader size
See Step 2 above.
An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb.
Place wire anchor in jamb and wall equally spaced, as wall is erected.
Check frame during wall erection to keep frame plumb and square.
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 3
INSTALLATION
EXISTING MASONRY WALL ANCHOR INSTALLATION
EXISTING MASONRY WALL ANCHOR
INSTALLATION DETAILS:
Details are for non-label and label frames unless otherwise noted.
B. LOCK IN ANCHOR
1. Press anchor toward dimpled hole so that wings can be hooked under jamb backbends.
2. Spread anchor wings to lock in place.
Note: Use a hammer to place the anchor in the frame.
ANCHOR SPACING:
• Non-label frames: one anchor must be provided for each 30” of jamb height.
• Label frames: anchors must be located a maximum of 6” from each end of jamb and a maximum of 26” on center.
INSTRUCTIONS:
A. PLACE ANCHOR IN FRAME.
If frame anchors are already welded-in, proceed to installing frame as shown on page Ins 5. Welded-in anchors may be the same design as shown on this instruction sheet or may be tube/strap, channel/strap, or hat shaped design.
1. Flex anchor wings to fit anchor through throat of frame.
2. Nest anchor tube over dimpled hole.
Caution: Keep anchor wings turned upward.
Existing Masonry Wall Anchor
Tube/Shop
Keep anchor wings turned upward
Channel Strap
Hat Shaped
Ins 4
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
INSTALLING THE FRAME:
Details are for frames using a combination shield and screw supplied by Steelcraft.
If using a combination shield and screw not supplied by Steelcraft, or, if you are using separate expansion shields and machine screw, please see the instructions accompanying the fasteners.
Rough Opening
The rough opening instructions shown at the left should give you adequate clearance to install the frame (See page Ins 4).
Install Frame
1. Place frame in opening. Roughly check frame for squareness and plumbness.
2. Using frame as a template*, drill 3/8” dia. x 2 1/2” deep hole in wall.
Alternate method: using frame as a template, mark wall through holes in jambs. Remove frame and drill 3/8” dia. x 2 1/2” deep holes at marks*. Replace frame in opening.
3. Install anchors (combination shield and screw) and tighten as required.
4. Shim jambs behind anchors above screws to obtain proper door opening width. Make shims from 16 and/or 12 gage galvanized steel. Shims should be 2” wide x frame jamb depth minus (-) 1/8”.
*Hole specified is for shield supplied by Steelcraft. If another fastener is being used, drill wall as specified for that shield.
Alternate with separate expansion shield and machine screws.
1. Place frame in opening. Roughly check frame for squareness and plumbness.
2. Using frame as a template mark wall through holes in jambs.
3. Remove frame and drill holes at marks on wall (hole dia. and hole depth as specified for fastener).
4. Install expansion shields in wall.
5. Replace frame in opening and anchor to wall with machine screws through dimpled holes.
6. Shim jambs behind anchors as described above.
General Notes:
Methods of sealing opening (gap) between frame and wall.
1. Apply bead of caulking. Label frames may require listed caulking.
2. Grout gap with mortar.
INSTALLATION
INSTALLING FRAMES WITH EMA ANCHORS
1/4” greater than frame
Place frame in opening
Shim
Fill gap with approved caulking
Shim jambs behind anchors above screws
An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb.
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 5
1
INSTALLATION
K.D. FRAME ASSEMBLY FOR WOOD STUD WALLS
2
3
Layout heads and jambs. For 4” (102 mm) face frames see Step 5.
4
Slide head on jambs, engaging jamb tabs in head slots.
5
Bend tabs within head first (see Steps 4 and 5).
Install No.
8 x 2 1/2” drywall screws
4” HEADS ONLY
Bend top portion of corner tab as shown. Assemble head to jambs
(see Step 2) and bend rabbet tabs flat against the head. Install #8 x 2 1/2”
(63 mm) long drywall screw through head into corner tab.
Bend inside tabs
6
Bend tabs in direction of corresponding arrows (away from the center of the head). For 2” (50 mm) face frames bend all tabs flat against head. For 4” (102 mm) face frames see Step 5.
Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required
Ins 6
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
INSTALLATION
STEEL FRAME INSTALLATION DETAILS FOR WOOD STUD WALLS
1
1/4” greater than frame
2
Jamb anchors
Insert
Twist
Attach base anchors with
S.M. screws
3
Anchor for Wood Stud Construction
Assemble frame per details on page Ins 4
1/2” greater than frame
Build rough opening.
4
Install anchors.
5
6
Place frame in rough opening.
Support frame.
7 8
Level head.
9
Bend base anchor tabs around wood studs. Attach base anchors to floor plate.
Place and support wood spreader at center of frame.
10
Square corners.
An anchor must be used for each
30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb.
Plumb jambs.
Bend jamb anchor tabs around wood studs. Attach jamb anchors to wood studs.
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 7
1
INSTALLATION
K.D. FRAME ASSEMBLY FOR OPEN STEEL STUD WALLS
2
3
Layout heads and jambs. For 4” (102 mm) face frames see Step 5.
4
Slide head on jambs, engaging jamb tabs in head slots.
5
Bend tabs within head first (see Steps 4 and 5).
Install No.
8 x 2 1/2” drywall screws
4” HEADS ONLY
Bend top portion of corner tab as shown. Assemble head to jambs
(see Step 2) and bend rabbet tabs flat against the head. Install #8 x 2 1/2”
(63 mm) long drywall screw through head into corner tab.
Bend inside tabs
6
Bend tabs in direction of corresponding arrows (away from the center of the head). For 2” (50 mm) face frames bend all tabs flat against head. For 4” (102 mm) face frames see Step 5.
Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required
Ins 8
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
3
INSTALLATION
STEEL FRAME INSTALLATION DETAILS FOR OPEN STEEL STUD WALLS
1
Jamb anchors
2
Insert
Twist
Attach base anchors with
S.M. screws
Anchor for Open Steel
Stud Construction
Assemble frame per details on page Ins 8
Install anchors.
4 5
Locate frame.
Spreader bar length
= Door width
30” (2’6” door)
32” (2’8” door)
36” (3’0” door)
6
Place a wood spreader at base of frame.
Fasten base anchors to the floor.
7
Set floor channels and install steel stud channels.
8
9
Place and support wood spreader at center of frame.
Plumb jambs.
Level head.
An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb.
Plumb jambs.
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 9
1
INSTALLATION
K.D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS
2
3
Layout heads and jambs. For 4” (102 mm) face frames see Step 5.
4
Slide head on jambs, engaging jamb tabs in head slots.
5
Bend tabs within head first (see Steps 4 and 5).
Install No.
8 x 2 1/2” drywall screws
4” HEADS ONLY
Bend top portion of corner tab as shown. Assemble head to jambs
(see Step 2) and bend rabbet tabs flat against the head. Install #8 x 2 1/2”
(63 mm) long drywall screw through head into corner tab.
Bend inside tabs
6
Bend tabs in direction of corresponding arrows (away from the center of the head). For 2” (50 mm) face frames bend all tabs flat against head. For 4” (102 mm) face frames see Step 5.
Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required
Ins 10
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
3
INSTALLATION
STEEL FRAME INSTALLATION DETAILS FOR OPEN STEEL STUD WALLS
1
Jamb anchors
2
Insert
Twist
Attach base anchors with
S.M. screws
Anchor for Closed Steel
Stud Construction
Assemble frame per details on page Ins 10
Install anchors.
4
Locate frame.
5
Spreader bar length
= Door width
30” (2’6” door)
32” (2’8” door)
36” (3’0” door)
6
Place a wood spreader at base of frame.
Fasten base anchors to the floor.
7
Set floor channels and install steel stud channels.
8
Place and support wood spreader at center of frame.
9
Plumb jambs.
10
Wall framework is now ready for wall finish.
Level head.
An anchor must be used for each
30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement.
On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb.
Plumb jambs.
Details are subject to change without prior notice
Gypsum Board
Some typical wall conditions.
Shop Manual
•
Effective September, 2004
Ins 11
TYPICAL ANCHOR
INSTALLATION
UNIVERSAL ANCHOR INSTALLATION - F SERIES FRAMES
Steelcraft supplies an adjustable Universal anchor with their frames. The anchor is designed to work in the F and MU series frames, and the same anchor can be used in a wood stud or steel stud partition.
ADJUSTING ANCHOR
The anchor can be adjustable to work in other jamb depths by bending the outside flanges of the anchor.
To bend a flange, engage one ear of an anchor with another and bend the ear in or out as required.
INSTALLATION INTO F SERIES FRAME
The anchor as supplied, adjusted for the jamb depth, can be installed into a F series frame without modification.
The installation of the anchor into a F frame is as illustrated below.
Place anchor into the throat opening of the frame.
Rotate the anchor, locking it into a horizontal position between the frame faces. A hammer will aid in this operation.
Install the frame in accordance with “Steelcraft Frame Installation Instructions”.
Ins 12
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
INSTALLATION
UNIVERSAL ANCHOR INSTALLATION - MU SERIES FRAMES
The Universal Anchor will not fit into a MU series frame without pre-forming. The pre-forming will allow the anchor to be inserted into the throat opening. Determine the type stud condition, wood or steel and pre-form the anchoring straps as shown below.
WOOD STUD STEEL STUD
The universal anchor will not fit into
MU series frames without pre-forming.
Anchoring straps formed for wood stud condition.
Anchoring straps formed for steel stud condition.
Place anchor into jamb as shown.
Rotate the anchor so it is in a horizontal position. A hammer will be required to rotate the anchor.
Install the frame in accordance with
“Steelcraft Frame Installation Instructions.”
Using a hammer, rotate the anchor so that the attaching ears are extending out of the frame throat opening. This is done by striking the anchor on the back leg. Do not strike the anchor on the flat portion. Rotate the anchor until it is firmly locked into place with the flat portion of the anchor parallel to the bottom of the frame.
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 13
1
INSTALLATION
1” FACE K.D. FRAME ASSEMBLY FOR STEEL OR WOOD STUD WALLS
2
3
Layout heads and jambs.
5
Bend tabs within head first (see Steps 4 and 5).
4
Slide head on jambs, engaging jamb tabs in head slots.
Bend tabs in direction of corresponding arrows (away from the center of the head). For 2” (50 mm) face frames bend all tabs flat against head.
Special Wood Stud strap anchor is to be welded in to the base of the frame.
Ins 14
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
INSTALLATION
1” FACE K.D. FRAME INSTALLATION DETAILS FOR STEEL OR WOOD STUD WALLS
1 2
Special Anchor for Steel or Wood
Stud Construction
Assemble frame per details on page Ins 14.
Jamb anchors are welded in
3
Spreader bar length
= Door width
30” (2’6” door)
32” (2’8” door)
36” (3’0” door)
Place a wood spreader at base of frame.
6
4
Note:
Special Anchors must be ordered separately - they do not ship automatically
Jamb anchors are used as base anchors.
7
5
Locate frame.
Set floor channels (or floor plate) and install steel stud channels (or wood studs).
8
Place and support wood spreader at center of frame.
9
Plumb jambs.
Level head.
An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb.
Plumb jambs.
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 15
1
INSTALLATION
FRAME ASSEMBLY FOR MU SERIES FRAMES
2
3
Layout heads and jambs.
4
Slide head on jambs, engaging jamb tabs in head slots and interlock head under corner tab.
Connect jamb and head together using sheet metal screws provided.
Attach adjustable base anchors with sheet metal screws provided. If frame is not to be set directly on slab, adjust base anchors upward as required.
Ins 16
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
MU Series frame
Adjustable Anchor
INSTALLATION
MU SERIES STEEL FRAME INSTALLATION DETAILS FOR STUD WALLS
Universal
Anchor
1
Jamb anchors
2
Wood Stud
Steel Stud
Install anchors.
Insert
Twist
Attach base anchors with
S.M. screws
1/2” greater than frame
Place frame in rough opening.
1/4” greater than frame
3
4 5
Wood Stud
6
Steel Stud
Steel Stud
Spreader bar length = Door width
30” (2’6” door)
32” (2’8” door)
36” (3’0” door)
Place a wood spreader at base of frame.
Level head.
Bend base anchor tabs around wood studs
Fasten base anchors
Fasten base anchors to the floor
Set floor channels and install steel stud channels.
7 8 9
Wood Stud
Steel Stud
Sheet metal screws
Bend jamb anchor tabs around wood studs.
Attach jamb anchors.
10
Wood Stud
Gypsum Board
Steel Stud
Gypsum Board
Wall framework is now ready for wall finish.
Place and support wood spreader at center of frame.
Square and plumb frame.
An anchor must be used for each 30 inches (762 mm) of jamb height or fraction thereof. On the hinge jamb, each anchor must be located immediately above or below each hinge reinforcement. On the strike jamb, the anchors must be located directly opposite anchors on the hinge jamb.
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 17
INSTALLATION
ADDITIONAL STEPS FOR 3 HOUR FIRE RATED FRAMES
IN DRYWALL CONSTRUCTION - F and MU SERIES
Set horizontal runner inside head and attach runner to vertical steel stud framing members.
INFORMATION:
Quantity of “Z” Spacers
1. One (1) spacer for door openings 3’6” (1067 mm) wide and less.
2. Two (2) spacers for door openings over 3’6” (1067 mm) wide up to and including 5’6” (1676 mm) wide.
3. Three (3) Spacers for door openings over 5’6” (1676 mm) wide up to and including 8’0” (2438 mm).
Section AA
“Z” Spacers in head of frame.
Do not attach “Z” spacers to steel stud framing system.
A
A
Vertical studs are to be centered over each welded-in
‘Z’ spacer and attach vertical studs to horizontal runners (see Section A-A)
Vertical studs not to exceed 24” (610 mm) on center.
Ins 18
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
PREPARE ROUGH OPENING
INSTALLATION
EASY SET
®
DRYWALL FRAME INSTALLATION INSTRUCTIONS
Steel Stud
Wood Block
Opening Height
2” Face: door opening size plus min.
1/2”, max. 1”.
4” Face: door opening size plus min.
2 1/2”, max. 3”
1
Notch gypsum for base anchor attachment (DW
Series frames only)
Steel Track
2
Opening Width: door opening size plus min. 1 1/2”, max. 2”
Not required for K
Series
3
Twist base anchors into strap at base of jamb. (See Steps 6A and 6B)
Notch drywall at base for attachment of base anchor.
4 5
Install frame head. Center in rough opening.
6
A. Base anchors can be installed at this time following directions in
Step1.
B. For K-Series frames, attach base of jamb to the wall with drywall screws through holes in jambs.
Insert tab on jamb in slot in head.
Pivot jamb into place. This will engage corner clips.
7
Wood spreader bar
Repeat Step 4 with other jamb.
8
Place spreader bar between jambs at base.
This will insure proper opening width at base of frame. Level head. Screw base anchors to floor runner or studs.
Plumb frame by adjusting anchors at top of jambs. Make certain anchors are pressed tightly against rough opening.
9
Frame is now ready to receive a door
(baseboard is attached after frame is installed).
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 19
INSTALLATION
ADDITIONAL STEPS FOR FIRE RATED EASY SET
®
FRAMES ONLY
All fire rated frames
After installing frame, connect jamb and head using sheet metal screws supplied.
ADDITIONAL STEPS FOR 4” (102 MM) FACE HEADS
#8 x 2 1/2” (63 mm) drywall screws
2 screws per frame corner
Install the frame following Steps 1 through 8 shown on Page Ins 19.
After installing the frame, connect jamb and head using #8 x 2 1/2” (63 mm) long drywall screws.
SECURITY STUD ANCHOR INSTALLATION
A
Elevation
Press base of anchor towards face of frame until anchor snaps into position shown.
Section A
Pre-assembly of anchor in frame
1. Locate security anchor immediately above or below strike reinforcement, and/or above or below hinge reinforcement.
2. For additional security, use security anchor on both sides of the jamb.
3. Security anchors cannot be used with Vinyl Throat Filler.
Drywall screws by others
Anchor assembled in frame.
(2) studs recommended for proper anchoring
Security anchor
Frame installed in opening - leg of security anchor is to fit between gypsum and studs. Mark the centerline of anchor on outside face of gypsum board before installing frame in opening. Install self drilling drywall screw through gypsum board, at mark, into security anchor and stud.
Ins 20
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
INSTALLATION
EASY SET
®
K.D. DRYWALL BORROWED LITE FRAME INSTALLATION INSTRUCTIONS
NOTES:
1. Frames are equipped with compression anchors in the head and sill sections only.
2. After completing the installation of the Borrowed Lite frame, attach the cut-to-length glazing bead using self-drilling screws or oval head sheet metal screws.
1
Rough opening: finished opening plus
2 3/4” (70 mm (+ 1/4” [16 mm]).
Rough opening: finished opening plus 2 3/4” (70 mm (+ 1/4”
[16 mm]).
Make rough opening finished opening plus
2 3/4” (70 mm (+ 1/4” [16 mm]) wider and
2 3/4” (70 mm (+ 1/4” [16 mm]) higher than finished opening.
2 3 4
Tab
Slot
Install jambs tightly against edges of opening making width, or opening, as wide as possible.
Retract anchors all the way within sill.
Insert mitered end of sill into corner of opening and pivot to horizontal position.
Repeat same operation for head.
5
6
Assemble frame by pushing jamb tabs into sill slots. Push head slots down into jamb tabs.
CAUTION:
Raise and level sill to desired height with adjusting anchors.
Square corners and adjust anchors in head tightly against rough openings. Glaze and install glazing in standard manner.
When borrowed lite frames are located near 3-sided frames, locate the top of the borrowed lite rough opening 1/2” (3 mm) above the top of the 3-sided frame rough opening.
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 21
INSTALLATION
PS 074™ SURFACE APPLIED WEATHERSTRIP INSTALLATION
SURFACE PREPARATION:
Thoroughly clean surfaces of frame where weatherstrip is to be applied. Use a solvent cleaner such as mineral spirits or a detergent cleaner. Remove any irregularities or loose paint from the surface area.
It is recommended that the weatherstrip be applied after finish painting door and frame. Do not paint weatherstrip. Paint will not hurt the weatherstrip, but could leave it with a non-acceptable appearance.
HELPFUL HINTS:
1. The best tool to use in cutting weatherstrip is a pair of scissors.
2. Ideal temperature range to apply weatherstripping is 70° to 90°F
(21° to 32°C). Weatherstripping should not be applied when temperature is below 50°F or above 100° F (10° to 38°C).
3. To remove paper liner, fold one end of liner back against itself and peel liner down weatherstrip. This will help eliminate danger of pulling the adhesive film from the weatherstrip.
Put paper liner parallel with weatherstrip
INSTALLATION:
1. Determine position that weatherstrip is to be applied on the strike jamb, head and hinge jamb. See Fig 1.
2. Install head weatherstrip first.
a. Measure head width (rabbet to rabbet) and cut weatherstrip to that dimension.
b. Remove paper liner (see Helpful Hint 3).
c. Install head weatherstrip. Start at one end and work to the other end. Align and press strip to head while working from one end to the other.
3. Install strike jamb weatherstrip (see Fig. 2).
a. Fold paper liner back at top end (approx. 2”). Lap top end of weatherstrip about 1/8” over back leg of head strip and stick in place. See corner detail in Fig. 2 b. Peel paper liner loose (see Helpful Hint 3). Align and press strip on jam as you remove liner.
c. Cut off excess weatherstrip at bottom of jamb.
4. Install hinge jamb weatherstrip.
a. Fold paper liner back at top end (about 2”). Butt strip to head rabbet and stick in place.
b. Peel paper liner loose (see Helpful Hint 3). Align and press strip on jamb as you remove liner.
c. Cut off excess weatherstrip at bottom of jamb.
5. After installation of the weatherstrip is complete, run a finger back over the base strip to make sure that it is pressed tight against the frame.
4. Storage: do not store weatherstrip in high temperature areas.
Use weatherstrip within a year after receipt. If weatherstrip is stored for continuous use, stock should be rotated upon receipt of new material.
Fig. 1
Fig. 2
Butt here
Hinge Jamb
Butt here
Head and Strike Jamb
Approx. 1/8” lap
Ins 22
Strike Corner Weatherstrip Detail
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
CLOSER REINFORCEMENTS:
Closer reinforcements can be added to Steelcraft frames using one of the following sleeves. Sleeves provide reinforcement for regular arm, parallel arm and top jamb mounted closers.
FULL CLOSER SLEEVE:
Installation
1. Install sleeve in head.
2. Slide sleeve to position required. See closer manufacturer’s template for location.
3. Bend tab over end of head. If tab will not extend far enough to bend, tackweld sleeve into position.
Note: Sleeves can be used in label frames.
HALF CLOSER SLEEVE:
Installation:
1. Hook sleeve under backbend.
2. Slide sleeve to position required. See closer manufacturer’s template for location.
3. Push down into soffit, locking sleeve into position. A screw driver and hammer can be used to put sleeve into position.
Note: Sleeves can be used in label frames.
INSTALLATION
FRAME KIT INSTALLATION DETAILS
Full Closer Sleeve
16”
14 gage
Typical Installation
8”
Half Closer Sleeve
Install in head prior to assembling the head to the jamb.
14 gage
Hook Sleeve
Push and lock sleeve into position
Sleeve can be installed before or after assembling the frame
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
Ins 23
INSTALLATION
TEMPORARY SPREADER BARS
The temporary installation of the spreader bars shown below is designed to snap into position and establish the proper door opening width at the bottom and center of the frame.
IT IS RECOMMENDED THAT A TEMPORARY SPREADED BAR BE USED IN BOTH RABBETS
TO PREVENT FRAME TWISTING. After the frame has been properly anchored, the temporary spreader bars can be removed and reused in the installation of another opening.
Overall Frame Width
Nominal
Door Size
Spreader
Bars
Bottom of
Frame
Spreader
Bars
Typical Frame
NOTES:
1. Temporary spreader bars can be fabricated from 16 gage galvannealed steel.
2. DO NOT Paint the spreader bars.
3. These units are designed to be used with 2” face frames only, and can be used on both 1 15/16” and 1 9/16” rabbets.
4. When using to square a frame in an opening, avoid all hardware preparations where possible.
5. It is recommend to use temporary spreader bars on frames being installed in both masonry and drywall applications.
Ins 24
Typical Jamb
Details are subject to change without prior notice
Shop Manual
•
Effective September, 2004
advertisement