APC SBPSU10K15F-WP Datasheet | Manualzz
Caution: Operation and maintenance must only be
performed by qualified personnel.
Note: APC strongly recommends mounting the MBP to a
minimum 20 mm (3/4 in) thick plywood board or similar
solid backing that has approximate dimensions.
Product Overview
Installation
Note: Ensure that the wall area you selected to install the
MBP is structurally sound and able to support the size and
weight of the unit.
Front view (interior)
MGE™ Galaxy™ 3500 and Smart-UPS® VT
System Maintenance Bypass Panel
Wall Mount
10-15 kVA 208 V, 10-30 kVA 208 V
Site Planning
N

Note: Protect the MBP at all times from excessive moisture,
construction dirt, corrosive elements, or other contaminants.

N

Note: When choosing a location to mount the MBP, consider
the need for easy access to all breakers and internal
components.

Space requirements

Refer to the following figure to determine the space requirements for
installing the MBP. Consult local codes for any additional
requirements. Ideally, install the MBP in a location close to the UPS.




PE/G
Minimum front
clearance
559 mm
(22 in)


IMPORTANT SAFETY INSTRUCTIONS
- SAVE THESE INSTRUCTIONS
Warning: ALL safety instructions in the Safety Sheet
(990-2940) must be read, understood and followed when
installing the UPS system. Failure to do so could result in
equipment damage, serious injury, or death.
Heavy: APC recommends that two people mount the
Maintenance Bypass Panel (MBP) to the wall—one person
to lift and hold the enclosure, and a second person to secure
it to the wall.
Caution: All electrical power and power control wiring
must be installed by a qualified electrician, and must comply
with local and national regulations for maximum power
rating.
990-3603A-001
*990-3603A-
3/2010

Q1 input breaker

Output neutral busbar

Q3 bypass breaker. A
Philips screwdriver is
required to unlock Q3.

PE/ground busbar

Q2 output breaker

Mains input

Knockouts for conduits

Critical load

Control terminal block

Input neutral busbar
457 mm
(18 in)
Minimum floor clearance
Prepare for cables
Note: All external cable connections with the UPS and mains
must be made on-site. External cables are not supplied with
the equipment.
Note: All control wire connections between the UPS and the
MBP must be made on-site. Control wires are not supplied
with the equipment.
Create knockouts for cable access
Note: You can create knockouts for cable access either
before or after you have mounted the MBP to the wall. APC
recommends creating all necessary knockouts prior to
mounting the MBP to the wall.
Connect Power Cables
Connect Communication Cables
See Also: For information on grounding, see manual 9903606.
 Connect a copper wire between the UPS (J106 port 5) and the MBP
(X010 port 7 on the control terminal block).
 Open the front door.
 Use a knockout
punch to create

Input N
appropriate-sized
holes for two inch
and one inch cable
conduits in either
the top or bottom
plate of the MBP.
Mains
input


L1
L2
L3
Q1

UPS input
L1
L1 L2 L3
X001
PE/G
N
L3

UPS output
L1 L2 L3
X004
1......8

X010
 Route the cables through the top or the bottom of the MBP.
Mount the MBP to the wall
 Mount the plywood
(or other backing) to
hole locations on the
wall.
 Drill holes in each of
the four marked
457 mm (18 in)


508 mm (20 in)
 Measure and mark
the four mounting

6) and the MBP (X010 port
8 on the control terminal
block).


Q2
N

 Connect a copper wire
between the UPS (J106 port
Critical
load
L3
L2
Output N
Q3
L2
L1
the wall by using
appropriate
hardware for the
type of wall used.
Note: For the connection of a Q3 auxiliary signal, use a 11.5 mm2 (18-16 AWG) copper wire.
 Connect the mains input cables ( L1, L2, L3, N, G) to the mains input
terminals (X001), the input neutral, and the ground busbar.
 Connect the UPS input cables (L1, L2, L3, N, G) to the right side of
the Q1 breaker, the input neutral, and the ground busbar.
 Connect the UPS output cables (L1, L2, L3, N) to the left side of the
Q2 breaker, the output neutral, and the ground busbar.
 Connect the cables from the critical load (L1, L2, L3, N, G) to the
critical load terminals (X004), the output neutral, and the ground
Specifications
Electrical
SBPSU10K15F-WP
10-15 kVA
SBPSU20K30F-WP
20-30 kVA
Nom. input voltage
208/220V 4W+GND
208/220V 4W+GND
Nom. output voltage
208/220V 4W+GND
208/220V 4W+GND
Circuit breaker rating
60A
125A
Wiring (only use copper conductors suitable for at least 75°C)
Maximum cable size
50 mm2 (1/0 AWG)
150 mm2 (300 Kcmil)
System output/ UPS
output cable
25 mm2 (4 AWG)
50 mm2 (1 AWG)
System input/UPS
input cable
25 mm2 (4 AWG)
50 mm2 (1 AWG)
Dimensions
(H × W × D)
617 x 561 x 216 mm
(24.3 x 22.1 x 8.5 in)
617 x 561 x 216 mm
(24.3 x 22.1 x 8.5 in)
Shipping dimensions
(H × W × D)
719 x 667 x 330 mm
(28.3 x 26.25 x 13 in)
719 x 667 x 330 mm
(28.3 x 26.25 x 13 in)
Weight
23.6 kg (52 lbs)
28.1 kg (62 lbs)
Shipping weight
25.9 kg (57 lbs)
30.4 kg (67 lbs)
Physical
busbar.

locations.
 Lift the MBP, position it against the backing and line it up with the four
mounting holes. Secure the MBP with four M8 (3/8 in) bolts and flat
washers.
2
Appendix
Environmental
MBP diagram
Operating environment
Indoor use only, protect from water and conductive
contaminates
Operating temperature
0° to 40°C (32° to 104°F)
Humidity
0 to 95%, non-condensing
Torque value
Terminal blocks
(M6 x 15 stud)
6.89 Nm (61 lbs in)
Busbars M6
11.3 Nm (100 lbs in)
Breaker T1
5 Nm (45 lbs in)
Breaker T3
9 Nm (80 lbs in)
Contact Information
For local, country-specific centers: go to www.apc.com/support/
contact.
3
Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Download PDF

advertisement