Triax CSE 2800 Assembly Instruction Manual


Add to my manuals
24 Pages

advertisement

Triax CSE 2800 Assembly Instruction Manual | Manualzz

Assembly Instruction

CSE 2800

Model

CSE 2800

Version

10

Date

04/2016

Item no.

325001

EN

C ontents

1 Notes about safety and hazards.........................................................................3

2 General information ..........................................................................................4

2.1 Scope of delivery ............................................................................... 4

2.2 Available accessories .......................................................................... 4

2.3 Meaning of the symbols used ............................................................... 5

2.4 Technical data.................................................................................... 5

2.5 Description ........................................................................................ 6

3 Overview ..........................................................................................................7

3.1 Front cover ........................................................................................ 7

3.2 Front view (without front cover) ............................................................ 7

3.3 Rear view .......................................................................................... 8

3.4 Control panel ..................................................................................... 9

4 Assembly ........................................................................................................10

4.1 Remove front cover ........................................................................... 10

4.2 Remove base plate ........................................................................... 10

4.3 Making an earth connection .............................................................. 11

4.4 Installing F terminals ......................................................................... 12

4.5 Installing an additional fan ................................................................ 12

4.6 Mounting ........................................................................................ 13

Wall mounting ............................................................................ 14

Upright mounting ........................................................................ 15

Mounting inside a 19" cabinet ..................................................... 16

5 Installing modules ............................................................................................17

6 Connecting the head-end station ...................................................................... 18

6.1 Potential equalisation (PE) .................................................................. 18

6.2 Mains connection ............................................................................. 18

6.3 LNB Power supply connections ........................................................... 19

6.4 RF connections ................................................................................. 19

7 Settings ...........................................................................................................20

7.1 Contrast of the display ...................................................................... 20

7.2 Settings in the menu .......................................................................... 20

Setting the output level of a retrofitted RF output collector ................. 20

Setting the standard of the output signal ......................................... 20

8 Final procedures ..............................................................................................23

- 2 - CSE 2800

1 n otes about safet y and hazards

• The head-end station is subject to the regulations of protection class I.

• Never operate the device without a protective earth connection, earth connection to the device and potential equalisation!

• The standards EN/DIN EN 50083 resp. IEC/EN/DIN EN 60728 must be observed.

• Observe the relevant country-specific standards, regulations and guidelines on the installation and operation of antenna systems.

• Replace mains cable and power supply unit only by original spare parts.

• Do not perform installation and service work during thunderstorms.

• Assembly, installation and servicing must be carried out by an authorised electrician.

• Switch off the operating voltage of the system before beginning with assembly or service work or pull out mains plug.

The device should only be installed in a room where the permissible am-

bient temperature range of 0°C…+50°C can be maintained, even during fluctuations in climatic conditions.

To avoid too strong heating of the head-end station it is not admissible to

mount them one upon the other without using thermic precautions (e.g. permanently air recirculation, ventilation, heat deflectors etc.).

• Do not install the device in cabinets or recesses which are not ventilated.

• If additional fans are to be used to circulate the air, ensure that the system will be shut down (disconnected from mains) should any one of the fans fail.

• In case of the formation of condensation wait until the system is completely dried.

• Do not cover the ventilation openings!

• During installation, observe a minimum distance of

- 500 mm above/below and 75 mm behind the device at wall mounting,

- 500 mm above and 75 mm below/behind the device at upright mounting,

- 200 mm above/below and 100 mm behind the device at mounting in a

19" cabinet.

• Install the system …

- on a vibration-free wall or floor construction

- In a dry, dust-free environment

- In such a manner that it is protected from moisture, fumes, splashing water and dampness

- Where it is protected from direct exposure to sunlight

- Not within the immediate vicinity of heat sources

• Do not place any vessels containing liquids on the device.

• Do not place anything on the head-end station which could initiate fires

(e.g. candles).

- 3 - CSE 2800

• Due to the risk of fires caused by lightning strikes, we recommend that all mechanical parts (e.g. distributor, equipotential bonding rail, etc.) be mounted on a non-combustible base. Wood panelling, wooden beams, plastic covered panels and plastic panels are all examples of combustible bases.

• Avoid short circuits!

• To ensure electromagnetic compatibility, make sure all connections are tight and that the covers are screwed on securely.

• No liability is accepted for damage caused by faulty connections or inappropriate handling of the device.

Take precautions to prevent static discharge when working on the device and the modules!

Electronic devices should never be disposed of in the household rubbish. In accordance with directive 2002/96/EC of the European Parliament and the

European Council from January 27, 2003 which addresses old electronic and electrical devices, such devices must be disposed of at a designated collection facility. At the end of its service life, please take your device to one of these public collection facilities for proper disposal.

2 G ener al information

2.1 s

Cope of delivery

1 CSE 2800 head-end station (without modules)

1 Power cord

1 Ferrite sleeve

1 CD (assembly instructions)

1 Brief assembly instructions

1 RF connection cable

(RF output when retrofitting a RF output collector)

1 Ribbon cable (for retrofitting a RF output collector)

Mounting material

2.2 a vail able aCCessories

Modules and accessories see website "www.triax.com".

- 4 - CSE 2800

2.3 m eaninG of the symbols used

—>

Important note

Danger by electrical shock

General note

– /

– / Optional use of the buttons

Performing works

2.4 t eChniCal data

The requirements of the following EU directives are met:

2011/65/EU, 2014/30/EU, 2014/35/EU

The product fulfils the guidelines and standards for CE labelling.

Unless otherwise noted all values are specified as "typical".

General

Slots (unoccupied): .......................................8 modules, 8 add-on modules

Permissible ambient temperature: .........................................0 °C … +50 °C

Dimensions (W x H x D) [cm]: ..................44.3 (19") x 35.5 (8 HU) x 22.8

Weight: ..................................................... approx. 20 kg (fully equipped)

LNB power supply: ...........................................+ 12 V / max. 800 mA

(short-circuit proof/multi-fused)

Mains unit

Mains voltage: .................................................... 220–240V~, 50/60 Hz

Power consumption: ......................................210 W max.; fully occupied, incl. LNB power supply

- 5 - CSE 2800

2.5 d esCription

Proper installation of the mounting bracket enables the CSE 2800 head-end station to be installed in a 19" cabinet as well as on a wall or upright standing.

The head-end station is modular in design and can be equipped with 8 standard plug-in modules and 8 add-on modules. A current list of the standard and add-on modules can be found on the website "www.triax.com". This head-end station is designed exclusively for use with these modules.

The various expansion options for the head-end station allow for the installation of a wide range of broadband cable systems.

Input SAT IF distributors and an output collector can be upgraded to offer the highest degree of flexibility for the distribution of the signals.

The power supply in the CSE 2800 head-end station is designed to supply power to components (e.g. LNB) connected upstream.

All RF output signals from the modules are combined via the inputs of a retrofitted active RF output collector and prepared for distribution through the RF output socket.

When the head-end station is shipped from the factory, the default setting for the control voltage for a RF output collector is maximum. If necessary please set the master output level to the value required for the respective cable system.

When the head-end station is switched on, the two-line LC display shows the

"SETUP" menu and the software version of the control unit. The head-end station output level can be adjusted in submenu "OUTPUT", the output standard can be adjusted in submenu "NORM".

The operating software for the control unit and modules can be updated via the 9-pin SUB-D socket of the head-end station using a PC or notebook and the software "BE-Flash". Current versions of the software can be found on the website "www.triax.com".

- 6 - CSE 2800

3 o verview

3.1 f ront Cover

2 1 2

1

1

2 1 2

Fig. 1

1 Locking screws (incl. with delivery in a separate package)

2

Fastening screws

3.2 f ront view

( without front Cover

)

2

1

Fig. 2

1

Knock-outs for upgrading a RF output collector

2

Knock-outs for the SAT IF input distributors

3

Control panel

4

Knock-outs for F terminals

- 7 -

3

4

CSE 2800

3.3 r ear view

1 2 3 7 4 5 4 6

Fig. 4

1

Power cord socket

2 Main power switch

3

Earth connection terminal

4 SAT IF inputs

5

Knock-outs for additional F terminals

6 Knock-out for the optional installation of the earth connection terminal

7

RF output

- 8 - CSE 2800

3.4 C ontrol panel

1

2

3

4

5

6

4

S

M

8

9

5

Fig. 5

1 LC display

2

Button to adjust the contrast of the display

3 Mode indicator

4

– To adjust values and functions

5 – Moves the cursor, adjusts functions

6

– Stores the programmed data

7 – To adjust values and functions

8

– To switch to the next menu

9 9-pin SUB-D socket for updating the operating software of the modules and the head-end station

0 – Moves the cursor, adjusts functions

- 9 - CSE 2800

4 a ssembly

4.1 r emove front Cover

2 1 2

1

1

2 1 2

Fig. 6

• Loosen 4 fastening screws

2

.

• Remove 6 locking screws 1 (not required for initial assembly).

• Slide the front cover upwards and remove it from the head-end station.

4.2 r emove base pl ate

2 2

2

1

Fig. 7

• Remove the locking screw

1

.

• Remove the fastening screws 2 .

• If applicable, unscrew the nuts of retrofitted F terminals (not required for initial assembly).

• Push the base plate in direction of the arrow and remove it.

- 10 - CSE 2800

4.3 m akinG a potential equalisation

(pe)

The pre-installed PE connection terminal in position position

2

(fig. 8).

1 can be relocated to

1 2

Fig. 8

• Dismount the PE connection terminal so that it can be moved.

• Mount the PE connection terminal (according to fig. 9) in position shown in fig. 8.

2

as

Housing

Fig. 9

Caution

Tighten the nut until the teeth on the lock washer have penetrated the exterior coating and a good connection is made between the housing and PE connection terminal.

- 11 - CSE 2800

4.4 i nstallinG

f ter minals

Fig. 10

• Insert the required number of standard F terminals in the openings pro-

vided (knock-outs) in the front (page 7, fig. 2,

4

) and/or rear panel (page

8, fig. 4, 6

).

Caution

Tighten the nuts until the teeth on the lock washers have penetrated the exterior coating and a good connection is made between the housing and F terminals.

4.5 i nstallinG an additional fan

If environmental conditions require the use of an additional fan, one can be screwed to the inside of the base plate (hole spacing: 82 x 82 mm).

82 mm

82 mm

Fig. 11

• Remove base plate (page 10).

• Mount the fan (12 V / 1 A max.) in position

1

or

2

(fig. 11) to the inside of the base plate with screws.

• Make the electrical connection as shown in fig. 12.

- 12 - CSE 2800

+ 12 V / 1 A

Fig. 12: Power supply for additional fan

4.6 m ountinG

Install the head-end station vibration-free.

Avoid, for example, mounting the head-end station onto a lift shaft or any other wall or floor construction that vibrates in a similar way.

To avoid too strong heating of the head-end stations it is not admissible

to mount them one upon the other without using thermic precautions (e.g. permanently air recirculation, ventilation, heat deflectors etc.).

– Using the supplied mounting brackets, the head-end station can be mounted to a wall, upright standing, or in a 19" cabinet. Before proceeding, ensure that the minimum distance requirements (500 mm above/below and 75 mm behind the device at wall mounting / 500 mm above and 75 mm below/behind the device at upright mounting / 200 mm above/below and

100 mm behind the device at mounting in a 19" cabinet) will be met.

– If mounting to a wall or on a shelf, ensure that ...

- The wall or the shelf can support the weight of the head-end station

- There is adequate air conditioning

- The permissible ambient temperature will be maintained

– If mounting inside a 19" cabinet, ensure that ...

- there is adequate air conditioning.

- the permissible ambient temperature will be maintained.

- the mounting rack in the cabinet can support the weight of the head-end station.

Note:

To maintain an ambient temperature of < 50 °C, use an additional fan or a safety temperature limiter with reclosing interlock if necessary.

- 13 - CSE 2800

w all mountinG

1

1

2

1

1

75 mm

4

3

4

Fig. 13

• Align the studs

1

on the mounting bracket

3

with the hole matrix on the housing and snap it into place. The distance between the back side of the housing and the back edge of the mounting bracket is approx. 75 mm.

• Screw in the 6 thread-forming countersunk screws

2

that were supplied.

• Attach the mounting bracket to the other side of the housing in the same way.

• Insert wall plugs suitable for the wall properties into the wall so that they correspond to the dimensions in the following illustration (fig. 14,

!

).

465 mm

!

!

!

Fig. 14

• Mount the head-end station and screw it tightly.

- 14 -

!

CSE 2800

u priGht mountinG

1 1

2

1 1

3

75 mm

Fig. 15

• Align the studs

1

on the mounting bracket

3

with the hole matrix on the head-end station housing and snap it into place. The distance between the underside of the head-end station and the lower edge of the mounting bracket is approx. 75 mm.

• Screw in the 6 thread-forming countersunk screws

2

that were supplied.

• Attach the mounting bracket to the other side of the housing in the same manner.

- 15 - CSE 2800

m ountinG inside a

19"

Cabinet

5

1

2

1

3

1

2

1

5

Fig. 16

• Align the studs

1

on the mounting bracket

3

with the hole matrix on the housing so that it is flush with the front edge of the head-end station and snap it into place.

• Screw in the 4 thread-forming countersunk screws 2 that were supplied.

• Attach the mounting bracket to the other side of the housing in the same manner.

• Install the support elements into the 19" cabinet. The total installation height of the head-end station is 8 HU (8 height units, approx. 356 mm).

• Fit the 4 prestole nuts into the frame of the rack system according to the distance of the holes 5 in the mounting bracket 3 (approx. 190 mm).

• Connect the head-end station according to chapter 6 (page 18) .

• Put the head-end station onto the support elements, push it into the 19" cabinet.

• Fasten the head-end station to the prestole nuts of the 19" cabinet using the holes

5

in the mounting brackets

3

and appropriate screws.

To avoid too strong heating of the head-end stations it is not admissible to mount them one upon the other without using thermic precautions (e.g. permanently air recirculation, ventilation, heat deflectors etc.). Minimum distance above/below is 200 mm. If necessary fit additional fans on the base plates of

the head-end stations (see chapter 4.5, page 12).

- 16 - CSE 2800

5 i nstallinG modules

Caution

– Always position modules which belong together next to each other.

– When installing modules, make sure that they are inserted in the long numbered grooves in front of the contact strip on the board at the rear wall of the housing.

The shorter grooves without a contact strip on the board at the rear wall of

the housing are for add-on modules only.

• Open the locking device 1 in the direction of the arrow (fig. 17).

1

Fig. 17

2

1

3

Fig. 18

• Insert a module in grooves 1 and 2 of an open slot (fig. 18) and gently slide it into the head-end station until it makes contact with the board on the rear wall.

• After installing a module close the locking device

3

in the direction of the arrow (fig. 18).

- 17 - CSE 2800

6 C onneCtinG the head

end station

6.1 p otential equalisation

(pe)

Make the potential equalisation of the SAT receiver system in accordance with

DIN EN 60728-11.

Fig. 19

A

Housing

B

• Put the PE wire (Cu 4 - 20 mm

2

) into the hole

A

of the PE connection terminal on the back side of the head-end station and fasten the PE wire with the screw B

(fig. 19) securely (see also page 8, fig. 4).

• Connect the PE connection terminal to a potential equalisation rail (supplied by customer) using the PE wire.

6.2 m ains ConneCtion

Never operate the device without a protective earth connection, earth connection to the device and potential equalisation!

To maintain compliance with current EMC regulations (electromagnetic compatibility), it is necessary to route the power cord through the supplied ferrite sleeve.

• Open the ferrite sleeve.

• Make a loop in the power cord and lay the loop inside the ferrite sleeve as shown in fig. 20.

• Close the ferrite sleeve (fig. 21).

Fig. 20 Fig. 21

• Connect the power cord to the power socket

1

(page 8, fig. 4) on the

head-end station and plug the other end into an earthed mains socket.

- 18 - CSE 2800

6.3 lnb p ower supply ConneCtions

• Connect the DC cable tacts

% of a retrofitted input distributor to one of the con-

^

(12V/800 mA total).

%

^

6.4 rf

ConneCtions

To comply with the current EMC regulations, it is necessary to connect the lines leading in and out of the head-end station using F terminals.

Note:

The F terminal at the rear panel are intended to use for RF input and RF output.

The following connection example shows a possible connection scheme.

• Connect the SAT IF cables coming from the LNBs to the relevant F terminals

(fig. 23,

4

).

1 2 3 7 4 5

Fig. 22

4 6

- 19 - CSE 2800

7 s ettinGs

7.1 C ontr ast of the displ ay

1

2

3

4

5

6

4

S

M

8

9

5

Fig. 24

• Using the main power switch, (page 8, fig. 4, 2 ) switch on the head-end station.

—> The mode indicator

3

(fig. 24) is activated.

• Adjust the contrast of the display using the button 2 (fig. 24).

7.2 s et tinGs in the menu s et tinG the output level of a retrofit ted

rf output ColleCtor s et tinG the standard of the output siGnal

After the output levels of the modulator modules or the modulators have been set, check the master output level of the RF output collector and adjust it accordingly based on the requirements of the cable system. Afterwards set the standard of the output signal required.

Setting the output level of a retrofitted RF output collector

• Connect the RF outputs of the modulators to the RF inputs of the RF output collector.

• Connect the antenna test receiver to the output of the RF output collector.

- 20 - CSE 2800

• After switching on the head-end station the "Select module / channel strip"

– "SETUP BE160" menu appears in the display. Activate this menu by repeatedly pressing if needed.

Ein/On

SETUP

BE160

V 10

Bx 1A

TWIN-SAT

DVBT

C 69

M

• Press the button.

—> The "Set output level" – "OUTPUT Level" menu is activated.

SETUP

Level 0

OUTPUT

• Using the system.

buttons, set the RF output level as required for the cable

—> The control voltage for a retrofittable active output collector is set.

• Press the button.

—> The "Standard of the output signal" – "NORM" menu is activated.

Standard of the output signal

SETUP

PAL BG

NORM

• Using the system.

buttons, set the output standard as required for the cable

—> Always all modulator modules are set. Mixed operation is not possible!

—> The used modulator modules must support the selected standard.

• Press the button.

- 21 - CSE 2800

—> The "Store data" – "MEMORY" menu is activated.

SETUP MEMORY

S => STORE

S

M

CANCEL

A

• All programmed data is saved by pressing the button. You will be returned to the menu item "Select module / channel strip".

—> By pressing the button, you will be returned to the menu item

"Select module / channel strip" without saving the programmed data.

- 22 - CSE 2800

8 f inal proCedures

After installing the head-end station, upgrading accessories or installing modules it is necessary to tighten all cable connections, F terminals and cover screws in order to maintain compliance with current EMC regulations.

• Securely tighten the cable connections (F connector) using an open-ended spanner (spanner width 11 mm).

2 2

2

1

Fig. 26

• Position the breakthroughs in the base plate above the fastening screws

2

(fig. 26).

• Push the base plate in direction of the arrow and lock it with the locking screw 1 (fig. 26).

• Tighten the fastening screws

2

.

• Tighten the nuts of retrofitted F terminals if applicable.

• Hang the front cover on the fastening screws

2

(page 10, fig. 6).

• Secure the front cover using the 4 locking screws which were supplied for the initial installation.

1

(page 10, fig. 6)

• Tighten the fastening screws 2

(page 10, fig. 6).

2 1 2

1

1

2 1

Abb. 27

- 23 -

2

CSE 2800

For further information and updated manuals go to

Copyright © 2016 TRIAX. All rights reserved. The TRIAX Logo and TRIAX, TRIAX Multimedia are registered trademarks or trademarks of the TRIAX Company or its affiliates.

All specifications in this guide are subject to change without further notice.

TRIAX A/S | Bjørnkærvej 3 | DK-8783 Hornsyld | Denmark

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

advertisement