General Services Administration Division Cell, HO, 5, Sansad Marg

General Services Administration Division Cell, HO, 5, Sansad Marg
General Services Administration Division Cell, HO, 5, Sansad Marg New Delhi
Phone: 011-23721491 Board No.011-23710021 Ext.410
Tender for “Supply, Installation, Testing and Commissioning of Fire fighting
equipments(Jockey & Diesel Pumps) & synchronization with main electrical pump
and automization for wet riser system at HO, 5, Sansad Marg- New Delhi”.
Part I
Name of the tenderer __________________________________________
Address
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
Due date of submission 1400 hours; 11/02/2015
General Services Administration Division Cell, HO, 5, Sansad Marg New Delhi
Phone: 011-23721491 Board No.011-23710021 Ext.410
Supply, Installation, Testing and Commissioning of Fire fighting equipments (Jockey & Diesel
pumps) & synchronization with main electrical fire pump.
Index
1
Eligibility Criteria
2.
Notice Inviting Tender
3
Form of tender
4
5
Appendix Referred to General Condition
General Instructions & special conditions to the contractors
6
Articles of Agreement
7
Safety code
8
Special Condition Of Contract
9
Technical Specifications
10
Maintenance Clause During Defect Liability Period
11
Technical Data to be furnished by the contractor
12
List of Approved makes
13
Annex I
14
Annex II
15
Bill of quantity
General Services Administration Division Cell, HO, 5, Sansad Marg New Delhi
Phone: 011-23721491 Board No.011-23710021 Ext.410
Supply, Installation, Testing and Commissioning of Fire fighting equipments(Jockey &
Diesel Pumps) & synchronization with main electrical fire pump for wet riser system at
HO, 5, Sansad Marg- New Delhi
Eligibility Criteria
The contractors who fulfill the following pre-qualification criteria will be eligible to participate in the
tender for the work:
1. Only those contractors who have minimum 3 years experience in this field of undertaking
similar work© and having executed a minimum of one similar work individually costing not less
than Rs. 16,00,000/- or more, or two similar works individually costing not less than Rs.
10,00,000/- or more, or three similar works individually costing not less than Rs. 8,00,000/- or
more during last 5 years.
© Similar work means work executed for Supply, Installation, Testing and Commissioning of Fire
fighting equipments (Specially Jockey & Diesel Pumps).
2. Should have a minimum yearly turnover of Rs. 20 Lacs during last three financial years ending
31st March 2014.
2a) Audit Balance Sheet along with Trading Profit & Loss Account statement for the last 3
years, i.e. 2011-12, 2012-13 & 2013-14.
3. Power of Attorney, if applicable.
Detail of above eligibility requirement is as under:
Composition of the firm
Full particulars (whether contractor is an individual, or
a partnership firm, or a company etc) of the
composition of the firm of contractors in detail should
be submitted along with name(s) and address(es) of
the proprietor/partners/Directors, copy of the Articles
of Association/ Power of Attorney/ any other relevant
documents.
Work experience &
Copies of the detailed work orders indicating date of
Completion of similar works of specified award, value of awarded work, time given for
value during the last 3 years
completing the work etc and the corresponding
completion certificates indicating actual date of
completion and actual value of executed similar works
should be enclosed in proof for the work experience.
The details along with documentary evidence of
previous experience, if any, of carrying out works for
should also be given.
Credit worthiness of the contractor & Copies of Income Tax Clearance Certificates/ Income
their Turn over during the specified Tax Assessment Orders along with the latest final
period
accounts of the business of the contractor duly
certified by a Chartered Accountant should be
enclosed in proof of their creditworthiness and turn
over for last three years.
Name(s) and address(es) of the Bankers Written information about the name(s) and address
and
(es) of their Bankers along with full details like names
their present contact executives
Addresses, e-mail IDs, telephone (landline and
mobile) nos., fax nos, etc, of the contact executives
(i.e. the persons who can be contacted at the office of
their bankers by the Bank in case it is so needed)
should be furnished.
Details of Bank accounts
Full particulars of their bank accounts, like account
no., type, etc., should be given. Should furnish
solvency certificate issued by the applicant’s Banker
for Rs. 20 Lacs.
Name(s) and address (es) of the Clients Written information about the names and addresses
and their present contact executives
of their clients along with full details, like names,
postal addresses, e-mail IDs, telephone (landline and
mobile) nos., fax nos., etc of contact executives (i.e.
the persons who can be contacted at the office of
their clients by the Bank in case it is so needed)
should be furnished.
Details of completed works during last The client-wise names of work(s), year(s) of
five years
execution of work(s), awarded and the actual cost(s)
of executed work(s), starting and finishing time of the
contract(s) and actual time taken to complete the
work(s), name(s) and full contact-details of the
officers/ authorities/ departments under whom the
work(s) was/ were executed should be furnished.
4. In the event of intending Tenderers’ failure to satisfy the Bank, the Bank reserves the right to
cancellation of tender forms/ documents to them.
5. Duly sealed consisting the bidder’s application along with supported documents stated under
Eligibility Criteria as mentioned above.
General Services Administration Division Cell, HO, 5, Sansad Marg New Delhi
Phone: 011-23721491 Board No.011-23710021 Ext.410
Notice Inviting Tender
Reg: Supply, Installation, Testing and Commissioning of Fire fighting equipments(Jockey
& Diesel Pumps) & synchronization with main electrical fire pump for wet riser system at
HO, 5, Sansad Marg- New Delhi
Online tenders are invited on item rate basis on behalf of Punjab National Bank from Fire Fighting
/ Electrical contractors who fulfil the eligibility criteria mentioned in the tender documents for
Supply, Installation, Testing and Commissioning of Fire fighting equipments(Jockey & Diesel
Pumps) & synchronization with main electrical fire pump for wet riser system at HO, 5, Sansad
Marg- New Delhi, against Payment of Rs. 1000/- (non refundable towards cost of tender), in two
envelope system containing (1) E.M.D (Refundable) Rs. 15,000/- (Rs. Fifteen thousand only)
and Tender cost Rs. 1000/- (Rs. One thousand only) in the form of DD separately in favour
Punjab National Bank, New Delhi in envelope (1) the envelope shall be super scribed as
“EMD & Tender cost for “Supply, Installation, Testing and Commissioning of Fire fighting
equipments(Jockey & Diesel Pumps)for wet riser system at HO, 5, Sansad Marg- New
Delhi”.
(2) Duly signed Technical bid with all supporting documents in Envelope (2) the envelope shall
be super scribed as “Technical bid for “Supply, Installation, Testing and Commissioning of
Fire fighting equipments(Jockey & Diesel Pumps)for wet riser system at HO, 5, Sansad
Marg- New Delhi”. Both the envelope will be placed in one big envelope Super scribed as
“Tender for
Supply, Installation, Testing and Commissioning of Fire fighting
equipments(Jockey & Diesel Pumps)for wet riser system at HO, 5, Sansad Marg- New
Delhi”. Price bid will not be submitted in physical form. It will be submitted online only.
The Bidders intending to participate in this Tender are required to get enrolled on the banks
website i.e. www.pnbindia.biz Enrolment on the above mentioned website is mandatory.
As the bids of the Bidders have to be digitally signed by the Digital Certificate of the respective
Bidder before submitting the bids online, the bidders are advised to obtain Digital Certificates in
order to bid for the tender.
Bidders may contact over the phone no. which is given on the home page of the above
mentioned portal, for obtaining Class - II Digital Signature Certificates.
The Tender Documents containing detailed terms & conditions can be downloaded online
directly from the portal www.pnbindia.biz as per tender schedule attached and shall be
submitted online.
All the bidders are required to submit Demand Draft/ Pay Order in favour of Punjab National
Bank, Delhi of Rs. 1000/- towards the cost of tender document in physical shape along with EMD
in Envelope 1
Bidders may submit their queries regarding any technical clarification on the tendering “VIEW
QUERY” button which is available after entering on the particular tender, before 28.01.2015 up
to 17:00Hrs. Thereafter pre bid conference (if needed) shall be held at conference room 2nd floor
PNB, HO:5- Sansad Marg. New Delhi on 29.01.2015 at 3.00PM. Reply to queries if any may be
downloaded from the “Corrigendum / Addendums” section
of the above-mentioned portal
from 30.01.2015, 15:01 Hrs to 11 .02.2015 up to 14:00 Hrs. No deviation on the above will be
entertained by the bank there after.
Based on the clarification of conditions by the bank, the intending bidder will submit
their unconditional acceptance on the prescribed format along with tender document.
Price bid of only those bidders shall be opened who bring their tender in line with requirements
of tender documents and are acceptable to the bank and the bidder who do not submit the EMD
in the form of Pay order /Bank draft their tenders will be summarily rejected.
First E.M.D. Envelope will be opened, and if the hard copy of the same is received on time only
then technical bid will be opened online. Hard copy i.e. the Demand Draft / Pay Order in favour
of Punjab National Bank, Delhi for an amount of Rs. 15,000/- towards EMD is to be submitted
physical form.
The price bid of technically eligible bidder who meets the eligibility criteria stipulated in tender
documents will be opened online in the presence of participated or representatives of
participated bidders as per the schedule attached. Date for opening of commercial bids will be
intimated later.
The Tenders shall be valid for a period of not less than 90 days after the date of opening of
Commercial bid (Online).
For any further information on the tender the office of Chief Manager, GSAD Cell, PNB Head
Office, 5-Sansad Marg, Delhi may be contacted.
All disputes arising out of or in connection with this agreement shall deem to have arisen in Delhi
and only the courts of Delhi shall have the jurisdiction to determine the same.
Last date for downloading the tender document (as per tender schedule).
Last date for Bid Preparation and Hash Submission (as per tender schedule).
Last date for Bid Submission (as per tender schedule).
Please note that bid preparation and hash submission and bid submission is compulsory activity,
failing which bidder will not be able to submit the bids online.
For any Queries please contact Chief Manager, GSAD Cell, PNB Head Office, 5-Sansad Marg,
Delhi
over
phone
no:
011-23716066
& Email
:
[email protected] &
[email protected]
The Bank reserves the right to accept/reject any or all the offers submitted in response to this
advertisement without assigning any reason whatsoever.
The bank will not be bound to accept the lowest tender and reserves the right to accept or reject
any or all the tenders without assigning any reasons whatsoever.
Please Note that, on tendering procedure through the electronic tendering system refer to the
Instructions for Using the Electronic Tendering System document available along with the tender
documents on www.pnbindia.biz.
CHIEF MANAGER
BID DETAIL
1
2
Tender Enquiry No.
Nature of Work
3
4
5
6
7
8
9
Date of commencement of Bidding Process
Last date and time for receipt of queries from
vendors for Clarifications
Last date and time submission
Date and Time of Opening of Technical Bid
Date and Time of Opening of Commercial Bid
Place of opening of Bids
10
Address for communication
11
12
EMD
Cost of RFP
PNB/SM/DFP/BASEMENT
Supply, Installation, Testing and
Commissioning of Fire fighting
equipments(Jockey
&
Diesel
Pumps) & synchronization with
main electrical fire pump for wet
riser system at HO, 5, Sansad
Marg- New Delhi
21.01.2015 from 12.00 AM
28.01.2015 up to 17:00Hrs
29.01.2015 at 3.00PM
11.02.2015 up to 1400Hrs.
11.02.2015 at 1600 Hrs
Informed later.
GSAD Cell, PNB, 5, Sansad Marg,
New Delhi
GSAD Cell, PNB, 5, Sansad Marg,
New Delhi
Rs. 15000/Rs. 1000/-
Section I
Form of Tender
Place___________
Date __________
To,
NAME OF WORK: Supply, Installation, Testing and Commissioning of Fire fighting
equipments (Jockey & Diesel pumps) & synchronization with main electrical fire pump at
HO5 at Sansad Marg, New Delhi.
Sir
1. Having visited the site and examined the conditions of contract, General terms &
conditions and nature of the job, schedule of quantities for the above named works,
we submit our offer for the above job in terms the conditions of contract,
specifications and bill of quantities for the sum stated in bill of quantities of this
Tender Document or such other sum as may be ascertained in accordance with the
said conditions of contract.
2. We have independently considered the amount of penalty to be levied in case of
loss of any kind due to laxity on our part shown in the general terms & condition
hereto and agree that it represents a fair estimate of the loss likely to be suffered
3. We agree to abide by this tender for the period of 90 days from opening of
commercial bid or extension there of as required by the Bank from the date fixed for
receiving the same and it shall remain binding upon us and may be accepted at any
time before the expiry of that period.
4. We confirm the rates as referred in the agreement or general conditions of
contract given or summarized in the appendix hereto, to which we give our consent
and agree to abide by the same.
5.
If this tender is accepted, we undertake to enter into and execute at our cost,
when called upon by the Bank to do so, a contract agreement & non disclosure
agreement in the prescribed form. Unless and until a formal agreement is prepared
and executed this tender together with your written acceptance thereof, shall
constitute a binding contract between us.
6. We understand that if our tender is accepted, we are to be jointly and severally
responsible for the due performance of the contract.
7. We understand that you are not bound to accept the lowest or any tender you
may receive and may reject all or any tender, accept or entrust the entire work to the
Contractor without assigning any reason or giving any explanation whatsoever.
Dated this …………….. day of ……….201_ Signature……………… in the capacity of
……………..Duly authorized to sign tenders for and on behalf of. (IN BLOCK CAPITALS).
Signature :
Name:
Witness:
Signature
Address
APPENDIX REFERRED TO IN THE GENERAL CONDITIONS
1.
Defect liability period
:
Twelve months from the date of completion
of work but after obtaining approval from
local authority.
2.
Date of Commencement
:
From the date of acceptance of award
letter or 7th day of issue of award letter
whichever is earlier
3.
Stipulation
completion
of
:
2 months (60 Days)
4.
Minimum value of work
done for Interim payment
:
16% of contract amount
5.
Retention Money for defect
liability period
:
8% of the total value of work (including the
earnest money deposit)
6
Liquidated damages for
non-completion of work
within stipulated period
:
Rs. 2000/- per day subject to a maximum
amount of security deposit.
7.
The retention money shall be refunded after the completion of defects liability period.
The retention money shall not carry any interest and shall be retained interest free by
the Bank.
period
GENERAL INSTRUCTIONS TO CONTRACTORS & GENERAL CONDITIONS
GENERAL CONDITIONS
1.
The tender shall be addressed to Chief Manager, GAD cell , HO5, Sansad Marg, New
Delhi and super scribed “Supply, Installation, Testing and Commissioning of Fire fighting
equipments(Jockey & Diesel Pumps) & synchronization with main electrical pump at HO, 5,
Sansad Marg- New Delhi” and should reach the Bank before 3 p.m. on 11/02/2015.
The bidders in their own interest are advised to inspect and examine the site and its
surroundings and satisfy themselves before submitting their tenders, in respect of the site
conditions including but not restricting to the following which may influence or effect the work or
cost thereof under the contract.
a) The bidders should note that site is in busy commercial area and they should also
take care for adjoining building, parking facility etc.
b) The Nature of work is renovation and up gradation of existing fire fighting system of our
running office building, so Contractor will ensure that during the execution of above said
work, Minimum shutdown will be available during synchronising the system. Before
shutdown or any work required in existing system, prior approval required from the Bank.
c) Site conditions including access to the site, existing and required roads and other
means of transport / communication for use by him in connection with the work.
d) Requirement and availability of land and other facilities for his enabling works, stores
and workshops.
e) Ground condition including those bearing upon transportation, disposal, handling and
storage or materials required for the work or obtained there from local authority.
f) Source and extent of availability of suitable materials including water etc. and labour
(Skilled and unskilled) required for work and laws and Regulations governing
their use and employment.
g) Geological, Metrological, Topographical and other general figures of the site and
its surroundings as are pertaining to and needed for the performance of the work.
h) The type of equipment and facilities needed preliminary for and in the performance of
the work and for successful completion of work.
i) All other information pertaining to and needed for the work including information as to
the risks, contingencies and other circumstances which may influence or effect the work
or the cost thereof under this contract
2.
The tenders will be opened as per schedule given earlier.
3.
The tenders will remain valid for a period of 90 days from the date of opening of tenders
i.e. price bid. Bank reserves the right to accept or reject any or all the tenders without assigning
any reason what so ever.
4.
At the time of submission, every tender must be accompanied by Demand Draft / Pay
Order, in favour of Punjab National Bank, New Delhi for an amount of Rs 15000/- as earnest
money. No interest will be paid on earnest money. Any tender, which is not accompanied by
the earnest money, shall be summarily rejected.
5.
The earnest money deposit (EMD) of unsuccessful tenderers will be returned after the
tender is decided.
6.
The earnest money of the successful tender shall be adjusted in the security deposit. The
Contractor whose tender is accepted will be required to d e p o s i t an initial security deposit,
a further sum to make up 2 % of the value of the accepted tender including the E a r n e s t
Money furnish b e f o r e b y w a y of security deposit for the due fulfilment of his contract,
such sum which will amount to apart from the initial security deposit made as
above,
retention money shall be deducted from the progressive running bills at 8% of the gross value
of each running bill.
7.
The bank reserves the right to reject any or all the tenders, without assigning any reason
or giving any explanation.
8.
Joint tenders shall not be considered.
9.
On receipt of information from the Bank on the acceptance of his tender, the tenderer
within 7 days should submit his acceptance of the work order. If the successful tenderer fail to
accept the work order, the earnest money deposited by him will be forfeited and acceptance of
his tender may be withdrawn.
10.
The rates quoted in the tender shall include all charges of scaffolding, lift for all height,
any tools and plants, freight, labour, conditions and fluctuation in the rates, Excise duty, VAT,
Service Tax, Octroi and any other taxes or expenditure for carrying out the work.
11.
The water and electricity shall be provided by the bank for completing the work free of
cost at one point.
12.
No escalation in rates will be allowed under any circumstances. However IEEMA price
variation based on RBI Indices will be admissible on submission of documentary proof. No other
variation including statutory variation in taxes and duties will be admissible under any
circumstances.
13.
The successful tenderer is bound to carry out entire work within the period stipulated in
the Appendix. The tenderer will have to pay liquidated damages for non-completion of job within
stipulated period at the rate of Rs. 2000/- per day after expiry of period of completion subject to
maximum of amount of security deposit. After award of work, the contractor is required to submit
the bar chart showing various activities to complete the work with in stipulated completion
period.
14.
The Contractor shall not be entitled to any compensation for any loss suffered by him on
account of delays in commencing or executing of the work, whatever the cause of delays may
be, including delays arising out of modifications to the work entrusted to him The Employer does
not accept liability for any sum besides the tender amount, subject to such variations as are
provided for herein
15.
The liquidated damages as mentioned above may not be enforced if the contractor
applies for extension of time mentioning the reasons for extension. Extension of time in days
will be granted by the bank if it is proved that contractor is not at fault for extending the work
beyond stipulated date of completion.
16.
The successful tenderer is bound to carry out all items of work necessary for satisfactory
completion of job. The security deposit of the successful tenderer will be forfeited if he fails to
comply with any of the conditions of the Contract.
17.
The contractor must co-operate with other contractors if any appointed by the bank so
that entire work proceeds smoothly and to the satisfaction of the bank.
18.
The contractor shall clean the installed/worked area at his own cost and hand over the
Diesel fire pump and Jockey Pump in proper manner and complete system in auto mode and
charged on the completion of work.
19.
The tenderer shall acquaint himself with the site conditions, making his own arrangement
for storing of material at site at his own cost.
20.
Eight percent of the value of work done shall be deducted as security deposit from the
running bills of the contractor and will be retained for defects liability period (as mentioned in the
Appendix) and shall be released after the defects liability period, provided no defects are
noticed during the period. The security deposit includes earnest money deposited by the
contractor along with the tender. The security deposit can be released at the time of final bill
payment if the contractor submits Bank Guarantee (as per bank’s approved format) of
equivalent amount of a bank other than PNB.
21.
The contractor shall attend to all defects noticed during defect liability period. If the
contractor fails to attend the defects, these defects will be rectified by the bank and the
expenditure incurred on this account will be recovered from their security deposit.
22.
The contractor shall make adequate arrangement for watch and ward of his material and
shall ensure the safety, breakage and any theft of material fixed or unfixed by him or subcontractors.
23.
The work executed should be got approved by the bank and the contractor shall rectify
any bad workmanship pointed out at any stage and remove from site all the rejected materials,
immediately.
24.
The contractor shall be responsible for implementing labour laws, compensation for injury
and accident to person whether employed by him or by his sub-contractor.
25.
The contractor will take necessary precautions for carrying out the work avoiding any
damage to structures/decorative parts of the property. The contractor will rectify any damages
done at his cost.
26.
The contractor shall ensure that workmen employed by him for execution of work are
suitable covered against Workman's Compensation Act and that all liabilities arising out of
Workman's Compensation Act, ESI and other legislative enactments applicable to such works
and workmen shall be to the contractor's account.
27.
The enclosed drawing with the tender is for reference only. After Award of work,
Contactor study the site condition and prepare the drawing and specifications as per Delhi Fire
Services / local body norms which will be approved by the Bank within 2 week times. The works
will be carried out as per approved drawings/specifications and to the entire satisfaction of the
bank.
28.
The contractor shall give due notice to the bank to check measurements of any work,
which is likely to be hidden before covering the same.
29.
The contractor will submit running bills for the value of work done not less than interim
payment (as mentioned in the Appendix) mentioning full nomenclatures of items, rates, amount,
measurement sheets, reasons for part rates claimed, if any.
30.
In case of non-completion or delay in completion of work or non-removal of defects in
time, the bank shall be free to appoint another agency to get the job done at contractor's risk
and cost.
31.
The contractor must include in their tender prices quoted for all Duties, Royalties, VAT,
Service Tax or any other Taxes or Local Charges, if applicable. Further, if any Tax levied by
virtue of Law in force after date of submission of price bid, will be borne by the Contractor. No
claims whatsoever on this account shall be entertained.
32.
TDS, VAT as applicable will be deducted at source from the Contractor's bill and will be
deposited with the ITO/Sales Tax Department, as per rules.TDS certificate for tax deducted wil
be issued as per rule.
33.
The bank may delay the progress of work, without in any way, vitiating the contract and
grant such extension of time for the commencement/completion of the contract as it may think
proper and sufficient in consequence of such delay and the contractor shall not make claim for
compensation or damage in relation thereto.
34.
The contractor will not execute any extra item without bank's permission in writing.
35.
Conditional tender quoted by the tenderer is liable to be rejected.
36.
The bank has a right to alter the nature of work and to add or omit any item of work or to
have the opinion of the same carried out departmentally or otherwise and such alteration or
variations shall be carried out without prejudice to this contract.
37.
The bank has right to terminate the contract, if the contractor abandons the work or fails
to commence and complete the work in time or fails to abide by the contract conditions.
38.
Substitution:- Should the contractor desire to substitute any materials and workmanship,
he/they must obtain the approval of the Bank in writing for any such substitution well in advance.
Materials designated in the specification identified by such term as "Equal" or "Other approved"
etc. specific approval of the Bank to be obtained in writing.
39.
Concealed Work:- The contractor shall give due notice to the Bank whenever any work
is to be buried in the earth, concrete or concealed or otherwise, becoming inaccessible later on,
in order that the work may be inspected and correct dimensions taken before such burial, in
default whereof the same shall, at the opinion of the Bank be either opened up for measurement
at the contractor's expense or no payment may be made for such materials, should any dispute
or difference arise after the execution of any work as to measurements etc. or other matters
which cannot be conveniently tested or checked, the notes of the Bank shall be accepted as
correct and binding on the Contractor.
40.
The successful tenderer is bound to carry out all items of work necessary for satisfactory
completion of job.
Advance Payment and Secured Advance:41.
Advance payment for works actually executed but not measured and billed for, should
not be made generally. Payment should only be made after the detailed measurements of the
work are taken and recorded and the contractor's bill for the same is approved by the
Competent Authority.
42.
However, advance payments on the running bills to the extent of 75% of the Banks
engineers certified amount may be made wherever found necessary. In such cases, it shall be
ensured that the test checking of the measurements & scrutiny of bills are completed before
payment of the next running bill.
43.
Secured advance against the security of materials brought to site may be made to the
contractors whose contract is for finished work. In such cases, the Competent Authority may
sanction advances up to an amount not exceeding 75% of the value (invoiced/assessed value)
of such materials, subject to maximum 60% of quoted rates provided that they are of a
durable/non-fragile nature and that an Indemnity Bond is drawn up with the, contractor under
which the Bank secures a lien on the materials and is safeguarded against looses due to the
contractor postponing the execution of work or to the shortage or misuse of the materials, and
against the expense entailed, if any, for their proper watch and safe custody. Recoveries of
advances so made should not be postponed until the whole of the work entrusted to the
contractor is completed. They should be made from his bills for works done as the materials are
used, the necessary deductions being made whenever the item of work in which they are used
are billed for. The remaining stages of the payment shall as under:
a)
85% of contract value against installation after adjustment of secured advance as
mentioned above.
b)
95% of contract value against testing, commissioning and approval of local Bodies
after adjustment of a) as mentioned above.
c)
100% of contract value against handing over the pump and completion of entire works
after adjustment of b) as mentioned above
A.
Arbitration :- In case of any dispute between Bank and Contractor, the decision taken by
the Sole Arbitrator who will be appointed by the Bank, will be final. The venue of Arbitration shall
be Delhi only.
B.
The contractor shall obtain marine-cum - erection insurance policy/CAR policy including
third party & workmen insurance for duration of the contract period, before the commencement
of work at site.
C.
Considering the existing occupied and functional building if any changes are warranted
before or during execution of work the same shall have to be done as per site condition. Hence
the tenderer must inspect the site before submitting the tender thoroughly.
D.
RIGHTS OF TECHNICAL SCRUTINY BY CHIEF TECHNICAL EXAMINAR.
The work is liable to be technically audited by the Chief Technical Examiner of the Central
vigilance commission Government of India from time to time. Any defects, improvements or
testing etc. pointed out by the chief Technical Examiner should be carried out by the contractor
at his own cost and any deduction of payment suggested by the CTE will be effected.
The Employer shall have a right to cause technical examination and audit of works and the final
bill of contractor including all supporting vouchers, abstract etc. is to be made at the time of
payment of the final bill. If as a result of this examination or otherwise any sum is found to have
been over paid in respect of any work done by the contractor under the contract the contractor
shall be liable to return the amount of over payment and it shall be lawful for the employer to
recover the same from him from any sum or sums due to him and in any other manner legally
permissible and if it is found that the contractor was paid less then what was due to him under
the contract in respect of any work executed by him under it, the amount of such under payment
shall be duly paid by the Employer .
Any sum of money due and payable to the contractor (Including Security Deposit returnable to
him) under this contract may be appropriated by the employer and set off against any claim of
the Employer of the payment of a sum of money arising out of or under any other contract made
by the contractor with employer.”
E. The work permit shall be issued for round the clock work including Sundays and holidays but
the should be executed during non – office hours. However the same is to be completed with in
the stipulated period. If the contractor works during office hours, the contractor is to ensure that
there is no hindrance or inconvenience to the normal functioning of the bank.
If the contractor does the work during non – office hours. Including Sundays the holidays, the
responsible person of the contractor shall remain present at all times at the work place. Special
precautions should be taken while executing the work at VIP/sensitive area.
F. The contractor will taken all necessary precautions for carrying out the work to avoid any
damage to the building and existing installation. If any damage is occurred during the execution
of the work, the same shall have to be rectified by the contractor at this own cost In case of
failure the bank shall be at the liberty to get the rectification done the risk & cost of the
contractor.
The Contractor shall shift the office furniture/cabinets if required for execution of work and rearrange the same as per the direction of the bank.
G. It will be the responsibility of the contractor to remove malba on daily basis positively and
dispose of the same at his own cost. In case of failure the bank shall be at the liberty to get the
malba removed at the risk & cost of the contractor. The contractor should also adhere to the all
rules and regulation of the local body in this regard.
H. The contractor must inspect the site before tendering acquaint of all equipment at site,
availability of existing space for installation of equipment. There after no claim whatsoever shall
be entertained under any circumstance. In case if any equipment is not possible to install in its
original condition and it is to be taken in parts the same shall have to be done by contractor
including restoring to the original position without any extra charges. It shall also include
breaking of wall etc if required and restoring the same to its original position.
BANK
CONTRACTOR
(TO BE STAMPED AS AGREEMENT)
Articles of Agreement
This agreement made at New Delhi on ___ Day of ________ between Punjab National Bank,
GSAD CELL, 5 Sansad Marg, New Delhi a body corporate (constituted under Banking
Companies Acquisition and Transfer of undertakings Act, 1970) having its Head Office at 7,
Bhikhaiji Cama Place, New Delhi-110066 (here in after called the Employer which expression
shall include his heir's, executors, administrators and assigns) of the first part and M/s --------------------------------------------------------------- (hereinafter called the Contractor which expression
shall include his heirs, executors, administrators and assigns) of the other part.
Whereas the Employer is desirous of getting executed certain works viz. “Supply, Installation,
Testing and Commissioning of Fire fighting equipments(Jockey & Diesel Pumps) &
synchronization with main electrical pump at HO, 5, Sansad Marg- New Delhi” for which the
Contractor have submitted their offer for the professional services to be rendered by the
contractor described in the conditions set forth (here in after referred to “as the said conditions”)
Now it is hereby agreed as under: 1. In Consideration of payments being made by employer, the Electrical Consultant shall
subject to the said condition render professional services.
2. The Employer shall pay to the Electrical Consultant such sums as shall become payable
hereunder at the times and manner specified in the said conditions forming part of this
agreement.
3. Following documents shall be read and constitute as part of this agreement;
a) Copy of the advertisement given in press/uploaded on bank’s web site
b) The said conditions of agreement.
c) Time schedule.
d) Schedule of payment
e) Letter of acceptance
f)
g)
4.
All disputes arising out of or in connection with this agreement shall deem to have
arisen in Delhi and only the courts of Delhi shall have the jurisdiction to determine
the same.
5.
The aforesaid documents shall be taken as complementary and mutually
explanatory of one another but in the case of ambiguity or discrepancies, (The
documents shall take precedence in the order set out above).
6.
The several parts of this agreement have been read to us and fully understood by
us. As witness hands the day, month and year mentioned above.
Employer/Bank
Signed by the said in the presence of
1.
2.
Contractor
Signed by the said in the presence of
1.
2.
SAFETY CODE
Following safety codes are to be strictly followed by the contractor
1. There shall be maintained in a readily accessible place first aid appliances
including adequate supply of sterilized dressings and cotton wool.
2. An injured person shall be taken to a public hospital without loss of time, in cases
where the injury necessitates hospitalization.
3. Suitable and strong scaffolds should be provided for workmen for all works that
cannot safely be done from ground.
4. No portable single ladder shall be over 8 meters in length. The width between the
side rails shall not be less than 30cm. (clear) and the distance between two adjacent
rungs shall not be more than 30 cm. When a ladder is used an extra mazdoor shall
be engaged for holding the ladder. Ladder should be metallic with rubber shoe and
should be of good strength.
5. The excavated material shall not be placed within 1.5 metres of the edge of the
trench or half of the depth of trench whichever is more. All trenches and excavations
shall be provided with necessary fencing and lighting.
6. Every opening in the floor of building or in a working platform shall be provided
with suitable means to prevent the fall of persons or materials by providing suitable
fencing or railing whose minimum height shall be one meter.
7. No floor, roof or other part of the structure shall be so overloaded with debris or
materials as to render it unsafe.
8. Workers employed on mixing and handling materials such as asphalt, cement
mortar, concrete and lime mortar shall be provided with protective footwear and
rubber hand-gloves.
9. Those engaged in welding works shall be provided with welder’s protective eyeshields and gloves.
10. i) No paint containing lead or lead products shall be used except in the form of
paste or readymade paints.
(ii) Suitable facemasks should be supplied for use by the workers when the paint is
applied in the form of spray or surface having lead paint is dry rubbed and scrapped.
11. Overalls shall be supplied by the Contractor to the painters and adequate
facilities shall be provided to enable the working painters to wash during the periods
of cessation of work.
12. Hoisting machines and tackle used in the works, including their attachments,
anchorage and supports shall be in perfect condition.
13. The ropes used in hoisting or lowering material or as a means of suspension
shall be of durable quality and adequate strength and free from defects.
14. Welding machines, Gas cutter and all equipment used to execute job should be
fitted with standard safety devices.
SPECIAL CONDITION OF CONTRACT
i)
The Employer may reserve the right to provide certain materials as mentioned for
the work at the time of awarding contract or during the progress of the work and
these shall be jointly inspected by the Engineer and the Contractor before issue
of materials. Suitability and sufficiency of the material shall be checked by the
Contractor.
ii)
After the materials are received, the Contractor shall not decline to accept
responsibility for the proper quality, safety and sufficiency of the resulting work or
structure by alleging defects of materials received from the Employer.
iii)
The value of materials provided by the Employer shall be calculated at the
prevalent market rates / invoice rates including all taxes, duties transportation,
labour and other incidentals by the Engineer and the amounts shall be deducted in
full from the interim Bill of the Contractor as and where applicable.
iv)
For all materials, issued free of cost to the Contractor, the rates for such
complete, items shall be suitably modified / varied by the Engineer, unless
otherwise provided for in the contract.
v)
Wastage of extra quantity of materials used by the Contractor over and above
the allowed quantity as determined by the Engineer shall be taken as unnecessary and unauthorized and such use / wastage shall be at the cost of the
Contractor.
The Employer will not be bound to take back such materials found surplus with
or either before or after the completion of work or on an earlier termination of
the contract, unless Otherwise provided for in the contract.
v)
On loss or damage of any such materials, it shall be replaced by the
Contractor with the same quality / brand with the approval of Engineer or the
value of such material would be recovered from interim bill of the Contractor at
the prevalent market rate, as would be appropriate in the opinion of the
Engineer.
2. The Contractor’s will be liable to pay all taxes levied by the Central and / or
State Governments on such of their salaries as are chargeable there with under
the laws for the time being in force and the Contractor shall confirm such duties
in regard to the deduction thereof as may be lawfully imposed on him.
3. Regarding all factory made products for which I.S.I. marked products are
available, only products bearing I.S.I. marks shall be used in the work unless
otherwise
mentioned in the list of approved make of material in the tender.
4. DRAWINGS :The tender drawings indicate the extent and general
arrangement of various equipment and are essentially diagrammatic. The data
given in the documents and drawings are approximate & their complete accuracy
is not guaranteed. The drawings and data furnished are meant for guidance &
assistance to the contractor. The exact dimension, location, distance and levels,
etc., will be governed by the space conditions. He shall not be entitled to any
extras for omissions or defects in electrical drawings or when they conflict with
other work.
5. As mentioned that the said work is to be done in existing functional building the
contractor is required to take care of the following:
a) The work permit shall be issued for round the clock including Sundays
and Holidays. However the same is to be completed within the stipulated
period. If the contractor works during office hours, the contractor is to
ensure that there is no hindrance or inconvenience to the normal
functioning of the bank. Necessary precautions should be taken to avoid dust
nuisance.
b) If the contractor does the work during non – office hours including
Sundays and Holidays, the responsible person of the contractor shall
remain present at all times at the work place. Special precautions
should be taken while executing the work at VIP/ sensitive area.
6. INSPECTION & APPROVAL OF THE WORK BY LOCAL AUTHORITY
On completion of this work, the contractor shall obtain and deliver to the owners
the certificates of
inspection
and
approval
by
Local
Administration / Delhi Fire Services if applicable. The fees paid for inspection will
be reimbursed on production of challan/receipt. The contractor shall include in his
rates all charges necessary for getting the installation approved by the state
government or/ and from any other authority required for this job.
7. The electricity supply for execution of work will be given free of cost at one
point. All further arrangement/extension will be made by contractor at his own
cost. The contractor can use the water as available for drinking consumption and
other minor consumption free of cost.
8. Being the existing occupied building open space for storage purpose will be
given as available. However contractor is required to make his own security
arrangement for safety of material at his own cost. The contractor can use the site
at Basement for small materials but it should not be a hindrance for other agency
work progress.
9. The necessary permission/approval/NOC required for installation of Exhaust pipes
of Diesel fire pump will be obtained by contractor from all concerned statutory
authorities NDMC including pollution Deptt., Electrical Inspector as applicable to
the works. It will be deemed to be part of this tender and contractor is required
to do the same within their quoted rates.
10. The contractor shall prepare & submit all detailed shop drawings within two weeks
from the date of award of contract for approval of Bank. The contractor shall furnish
required numbers of shop drawings to the Bank. All drawings in triplicate such
as, Main electrical panel with Single Line Drawings and its foundation drawings,
Drawings of fire fighting related work, etc. shall be furnished for approval to the
Bank. On completion of the job, the contractor shall give three such sets & original
comprehend drawn. All CD (soft copy) a s “AS BUILT” drawings to the bank with in
two week of completion without extra cost.
11. TESTING EQUIPMENTS:
All testing instruments digital type, measuring steel
tapes, tools, scaffolding and ladders etc., that may be required for execution of
work / for taking measurements shall be arranged by contractor at his own cost.
12. The work related for end termination of new cables in the new/ existing panels at
basement is inclusive of making / modifying holes in the panels, dis
connecting existing cable glands/ end termination
and re connection of
the same and removing existing cables /wires, handing over the same to
bank shall have to be done by the contractor and restoring to original position
including required material at no extra cost to the bank.
13. INSPECTION OF MATERIALS:
The owners shall have access to the
manufacturer’s premises for inspection of any items of the tender for which
contractor has made arrangement with manufacturer/ suppliers. All such inspection
shall not need any prior intimation by the owners.
14. ENGINEER/ SUPERVISOR
The contractor shall employ a competent, licensed, qualified full time electrical engineer /
Mechanical Engineer/ Fire Engineer who will be supervisor to direct the work of all
installations in accordance with the drawings and specifications. The engineer /
supervisor shall be available at all times at times at the site to receive instructions
from the employers in any day to day activities throughout the duration of the
contract. The engineer & supervisor shall correlate the progress of the work in
conjunction with all the relevant requirements of the supply authority. The skilled
workers employed for the work should have requisite qualifications and
should
possess competency
certificate
from the of Local Administration.
TECHNICAL SPECIFICATIONS
GENERAL SPECIFICATION FOR ELECTRICAL WORK:
1
SCOPE
In general, the contractor shall supply, store, erect, test and commission
all the equipment required for Electrical Installation. The contractor shall
furnish all the materials, labour, tools and equipments for the electrical work,
as shown in the accompanying sketch/SLD drawings and in the bill of
quantities and specifications hereinafter described.
2.
CONTRACTOR
The Contractor shall be a licenced electrical contractor, possessing a valid
electrical contractor’s license in the state, employing qualified / licensed
supervisors and skilled workers having valid permits as per the Regulation of
Indian Electricity Rules and Local Electrical Inspector’s requirements.
3.
DEFINITIONS
The following abbreviations used in the bill of quantities specifications and
drawings represents :
ISS
IER
BS
BSCP
GI
MS
CI
PVC
XLPE
HT
LT
A-Amp
KV
CT
MCCB
MCB
DB
KVA
KVAR
NC
NO
SWG
-
Indian Standard specification.
Indian Electricity Rules, 1956.
British Standard (where specifically called for)
British Standard Code of Practice (if called for).
Galvanised Iron
Mild Steel
Cast Iron.
Polyvinyl Chloride.
Cross Linked Polyethylene.
High Tension.
Low Tension.
Ampere.
Kilo Volts.
Current Transformers.
Moulded Case Circuit Breaker.
Miniature Circuit Breaker
Distribution Board
Kilo Volts Ampere.
Kilo Volts Ampere - Reactive.
Normally Close
Normally open
Standard Wire Gauge.
4. REGULATION & STANDARDS
The installation shall conform in all respects to Indian standard Code of
Practice for Electrical Wiring Installation I.S. - 732 and ‘National Electrical
Code’. It shall be in conformity with the current I.E Rules and Regulations and
requirements of the local Electric Supply Authority in-so-far as these become
applicable to the installation. Wherever this specification calls for a higher
standard of materials and/or workmanship then those required by any of the
above regulations, this specifications shall take precedence over the said
regulations and standards.
In general, the materials, equipments and workmanship not covered by the above,
shall conform to the following Indian Standards (Latest Edition) unless otherwise
called for:
5.
SWITCHGEAR & CABLES
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
Description
Switches
and
Switch Isolator above 1000V But
Not Exceeding 1.1 KV
Markings & arrangements for switchgear
bus-bars, main connection &
auxiliary
wiring
Specification f o r normal duty air break switches
& composites unit for air break switches
and
fuses for
voltage not exceeding 1000
Volts
Heavy duty air-break switches and composite units of
air-break switches and fuses for voltages not
exceeding 1000 Volts
Specification for miniature circuit breakers.
Specification for enclosed distribution, fuse
boards and cut-outs for voltage not exceeding
1000 Volts
Installation and maintenance of switchgear.
sheathed cables
Specification for XLPE insulated (Heavy
Duty) electric cables Part-I for Voltage upto
1100 Volts
Specification for PVC insulated cables (for voltage
upto
1100V) with Aluminium conductors.
Specification for rigid steel conduit for electrical
wiring
Specifications for
rigid non
metallic conduits
for electrical installations
Specifications for accessories for rigid steel conduits
Standard
IS 4710
IS 375
IS 4064
IS 4047
IS8828
IS 2675
IS 3072 (Part I)
IS 692
IS 7098
IS 694 (Part-II)
IS 9537
IS 9537
IS 3837
18
for Electrical wiring
Adhesive insulating tapes for Electrical purposes
(Part- I & II)
Code of Practices for earthing
Glossary of terms for electrical cable and conductors
Code of Practice for buildings (General)
Electrical installation
Current Transformers
19
20
21
22
Direct acting electrical indicating instruments
Digital Meter
Factory assembled switchgear
Rating for Cable
23
24
Structure Construction (IP-54)
LV Switchgear and control gear ( part1 to part5)
14
15
16
17
IS 2448
IS 3043
IS 1885
IS 1646
IS 2705 (Part-I
to III)
IS 1248
IS 13779
IS 8623
IS 3961 (Part –
II)
IS 2147
IS 13947
Testing
The contractor shall arrange to test the entire system as per the procedures enumerated
under particular specifications, after the erection is completed. If the results of the test are
not found to be satisfactory by the Engineer-in charge, necessary rectification shall be done
until the test results are found to be satisfactory. The installation shall be deemed to be
completed only after the successful completion of the tests.
6. PUMPS, MOTORS, CONTROLS AND ALLIED ELECTRICAL WORKS
6.1 Pumps
6.1.1 GENERAL
Pumps required for water circulation shall be of capacities indicated in the schedule of
equipment. Pumps shall be of horizontal, enclosed impeller, centrifugal type. The
construction of the pumps shall be as follows;
Sr.No
1
Description
Pump
Material / Type of Construction
Horizontal Centrifugal
2
Casing
Cast Iron/Cast Steel
3
Impeller
Bronze/Gun metal
4
Shaft
Steel/Stainless steel
5
Bearing
Heavy duty ball/ Roller bearing
6
Base Plate
Cast iron/Fabricated MS
7
Flanges
As per ASA Specifications of IS
specifications.
8
Parking
Shaft Seals
9
Maximum Speed
2900 RPM
The drive motor shall be provided with starter confirming to IS:1822. The starters shall be
of totally enclosed metal clad and dust proof construction. The motors of 7.5 HP and below
shall be provided with DOL starters while those above 7.5 HP shall be provided with
automatic star delta starters. The starter shall have thermal overloads on all the phases,
under voltage and single phasing protection. Suitable number of extra contracts shall be
provided for interlocking and indicating lamps. Suitable ammeter with CTS shall be
provided with for starter for motors above 7.5 HP.
b) Pumps shall be installed as per the manufacturer's instructions. Pump sets shall be
installed on concrete block which in turn is mounted on 75 mm thick isolation cork or any
other vibration isolation, the static deflection in the spring shall not be less than 25mm with
additional travel to solid of not less than 15mm.
c) The contractor shall submit performance curves for pumps supplied by him. The capacity
of each pump shall be checked with respect to the contractor's piping equipment layout.
Tests shall be conducted on each pump set, after completion of the installation w.r.t. to
delivery head, flow and BHO. The tests results shall correspond to the performance curves.
The equipment, instruments and labour required fortesting shall be furnished by the
contractor.
7. Motors
7.1 General
The motor installation, wiring, control shall be carried out strictly in accordance with the
specification hereinafter laid down.
7.2
Rating
The ratings of the motors shall be as indicated in schedule of equipment and schedule of
quantities. The rating shall be on the basis of ambient temperature and allowable maximum
temperature rise as specified.
7.3
Standards
All motors shall comply with IS:325, IEC 34, IEC 34-1 or BS:2313 in respect of general
requirements and performance. Motors shall also conform to IS: 1231, IEC 72.1 for 72.1 for
foot mounted motors and IS:2223 and IEC 72.2 flange-mounted motors.
a. In general all the motors above 1 HP shall be 3 phase unless otherwise specified,
motors of 1 HP or below shall be either 3 phase or single phase as required.
b. Motors shall run at all loads without appreciable noise or hum. Motors shall be of the
following design as specified.
c. Drip proof squirrel cage induction motor pumps.
d. Windings of motors shall be class B insulated and fully tropicalized. The insulating
materials used shall not be liable for action of fungi or microbes. The insulation shall
afford adequate protection against chemically aggressive gases and vapour as well
as against conductive dust.
e. Motors shall be rated for continuous duty as defined in IS:325. All motors shall have
suitable torque characteristics as required by the duty of driven equipment. Motors
shall be suitable for operation on 415 volts, 3 phase, 50 Hz, AC supply.
f.
Motors shall be provided with a combination of ball and roller bearings. The roller
bearing shall be fitted at the driving and ball bearings shall be of standard cartridge
type which effectively seals off dust and moisture. Suitable grease nipple shall be
provided for regressing the bearing.
g. Motors shall be provided with a cable box to suit aluminum conductor, PVC insulated,
PVC sheathed and steel armoured cable.
h. Motors shall be so designed to operate successfully under the following conditions of
voltage and frequency variation.
I.
Where the voltage variation does not exceed 10% above or below normal.
II.
Where the frequency variation does not exceed 5% above or below normal.
III.
Where the sum of the voltage and frequency variation does not exceed 10%
(provided the frequency variation does not exceed 5%) above or below normal.
i. Motors starting current shall not exceed the following values.
Squirrel cage motors:600% of full load current. The staring current of the motors shall be
limited by using the following starters, as required.
Type of motor Starting method
i) Squirrel cage motors Direct-on-line starter. upto 7.5 HP.
ii) Squirrel cage motors Star / Delta Starters/ of 10 HP and above. Direct-on-line starter as
per requirements.
8. Motor Starters
a) Motor starters shall be manufactured in accordance with IS: 1882 or BS:587. The starters
shall be totally enclosed, metal clad, dust and vermin proof construction. All starters shall be
direct-on-line/Automatic Star/Delta/Auto-transformer etc. as required.
All starters shall be continuously rated and shall be of automatic contactor type. All starters
shall be suitable for 415 volts, 3 phase, 50 Hz. AC supply. The making and breaking
capacity of the contactor shall be as per category A-4 conforming to BS:775. All the contacts
shall be solid silver or silver faced and all the contractors and starter equipment shall be
designed for not less than 40 operations per hour.
b) Unless otherwise specified, all starters shall have integral 'Start/Stop' push buttons. Start
push buttons shall be coloured green and shall be shrouded to prevent inadvertent
operation. Stop push buttons shall have mushroom heads and coloured red. All push button
operated contractors shall be provided with a maintaining/running contact.
c) All remote control circuit taken from the starter shall operate at 230 Volts or lower voltage.
d) Motor starters shall be provided with thermal overload relay with adjustable settings, on
each phase for three phase motor. The motors of 10 HP. and above shall be provided with
current transformer operated thermal overload relays. The thermal over load relays shall
have thermal characteristics suitable for the associated motor its starting characteristics and
suitably compensated for ambient air temperature variation. Single phase preventer shall be
provided for all the three phase motors.
e) Green, Red, Amber indicating lamps shall be installed on each starter to indicate open and
close conditions of the contractors and fault conditions of motors as directed by the thermal
overload relay.
9. Motor control center and allied electrical works
a) Motor control center shall be of cubicle pattern made out of 16 SWG MS sheet duly
painted with anti-corrosive paint and synthetic enamel paint.
b) All switch fuse units shall be of double make and break type and shall be fitted with HRC
fuses of 35 MV a rupturing capacity.
c) 100 mm square flush type ammeter of suitable range as mentioned in Bill of Quantities
and 0-500 volts voltmeter with CTS and selector switches shall be provided.
d) Three coloured phase indication lamps with toggle switch to be provided in incoming line.
e) The bus bars shall be of aluminium flat with colour coded PVC tapes.
f) Automatic star-delta or DOL motor starter with relay bimetallic thermal overload relays,
ON/OFF indication lamps to be provided for each motor.
g) Cables of approved make shall be laid either in built-in trenches or on walls with MS
clamps, saddles fixed at one meter interval. Wherever required the cable shall be laid in
outdoor trenches including excavation of earth, providing sand cushioning, brick protection,
back- filling, dressing of earth etc.
h) Cables will be terminated in Motor terminal block/in switch fuse units/starter with brass
gland and crimped copper lugs.
i) The control panel shall be provided with at least two earth terminal (of brass nut and bolts)
for connecting them with main system earth.
10. AUTOMATIC DIESEL ENGINE DRIVEN PUMPING SET
1. The pumping set shall be centrifugal end suction type fire pump designed to discharge
required quantity of water as per the requirements of TAC and driven by a diesel engine of
following specifications.
a) Diesel Engine
Direct injection type, compression, ignition type running at required design speed and fitted
with flywheel, coupling and guard, automatically controlled starting motor, spring loaded stop
control, oil bath air cleaner, exhaust silencer, fuel service tank with magnetic fuel level
indicator, supports for fuel tank and cooling system regulator etc. as required.
b) The engine shall be capable of operating on full load continuously for a period of six hours
at site elevation. The engine shall have speed governor to control the engine speed within 4
1/2 % of its rated speed under any condition of the leading. Any manual device fitted to the
engine which could prevent type engine from starting shall return automatically to the'
normal position.
c) Cooling system of the engine shall conform in all respects to specifications of Rules of
TAC.
d) Fuel tank shall be of welded steel conforming relevant Indian Standard. The tank must be
mounted above engine fuel pump to provide a gravity feed. The tank must be fitted with a
magnetic indicator showing the level of the fuel in the tank. The capacity of the tank shall be
as follows:
Extra light hazard: 3 Hrs. full load running.
Ordinary light hazard: 4 Hrs. full loads running.
Extra high hazard: 6 Hrs. full load running.
Fuel feed pipes shall not be soldered and plastic tubing shall not be used.
e) Starting Mechanism
Two separate methods of starting shall be provided as follows:
i) Automatic starting by means of a battery powered electric starter motor having
repeat start facilities, initiated by a fall in the pressure in water supply pipe.
ii) Manual starting by a electric starter motor.
f) Control Panel
Control panel shall comprise of the following:
i) One pressure switch
ii) One electronic calibrated relay
iii) One starter repeater relay
iv) Push button operated switch for manual starting
g) Batteries
Two separate 24 volt heavy duty starter batteries of repeated in wood tray including interbattery connectors and end term shall be supplied.
h) Battery Charger
Wall mounted battery charger with air cooled transformer and wave grid connected rectifier,
suitable for operation single phase AC supply shall be also be supplied.
i) The diesel engine and pump set shall be supplied with fabricated bed plate to carry pump
and engine.
j) Suitable cushy foot mounting for vibration isolation shall be supplied.
11. Spare Parts
The following minimum spare parts shall be supplied with the engine.
a) Fuel Filters, elements and seals : Two sets
b) Lubricating Oil Filters, Elements : Two
sets and Seals.
c) Engine joints, Gaskets and Hoses :One set
d) Injector Nozzles :Two
e) Piston Rings for each Cylinder : One set
f) Exhaust and inlet valve :One
Pumps and motor/engine shall be mounted on a common base frames fabricated from M.S.
Structural and placed on suitable concrete foundations with the help of Dunlop Cushy- foot
mountings (Anti-vibration pads) to avoid vibrations. The Anti-vibration pads shall be of heavy
duty type.
12. Pressure Gauges
All pressure gauges shall be of dial type with Bourbon tube element of SS 316. The gauges
shall be of reputed make. The dial size shall be 150mm dia. and scale division shall be in
metric units marked clearly in black on a white dial. The range of pressure gauge shall be 0
to 14 Kg./cm. All pressure gauges shall be completed with rubber isolation cock, nipples, tail
pipes etc.
13. Pressure Switches
13.1 The pressure switch shall be Industrial type single pole double throw electric
pressure switch designed for starting or stopping of equipment when the pressure in the
system drops or exceeds the pre-set limits. It shall comprise of a single pole changeover switch, Belows element assembly.
13.2 All the pressure switches shall have 1/4 B.S.P. (F) inlet connection and screwed
cable entry for fixing cable gland.
13.3 The Electrical rating of the switch shall be as under:
TYPE OF SUPPLY VOLTAGE
NON-INDUCTIVE
INDUCTIVE
A.C. 110-380
10 Amp.
6 Amp.
D.C. 24-250
12 Watts.
12 Watts.
14. Switchgear Cubicle
14.1The main switch main switch board cubicle panel shall be of floor mounted type, totally
enclosed, dust and vermin proof made from 14 SWG M.S.Sheet of suitable size duly painted
with one coat of anti-corrosive paint and two coats of synthetic enamel paint of approved
make and shade with stove enameled finish. The cubicle shall comprise of the followings:
a) Incoming – 1 Nos. 4P 400A MCCB.
b) Outgoing- 2 Nos 4P 63 A MCB & 1 Nos. 4P 250A MCCB
c) Aluminium Bus bar of 500/600A Suitable .
d) Fully Automatic 'STAR DELTA' starter suitable for the motor H.P. with Push Buttons, and
ON/OFF indicating light one for each motor. Jockey pump to have DOL Starter.
e) Single phasing preventers one for each motor.
f) 95 MM2 Panel type Ampere meters - one for each motor complete with CTs.
g) 150 MM2 Panel type volt meter on incoming main with rotary selector switch to read
voltage between phase to neutral and phase to phase. h) Three non phase indicating lamps.
i) Rotary switch for manual/auto operations.
j) All colour coded internal and inter-connecting wiring from incoming main to Bus bar, switch
board panel and power/control cables from Switch board cubicle to motors engine and
batteries etc. in all respect.
14.2
All switchgears and accessories shall be of approved make to relevant IS Codes
and to the satisfaction of Engineer-in-charge/ Consultant and rating of all
equipment must watch the KW of motors quoted and as per T AC rulesm All
electrical work to be carried out as per T AC and CPWD rules/specifications.
15. Piping
All hydrant pipes, stand pipes etc shall be as per approved make confirming to
relevant IS Codes. Pipes upto 150 mm NB shall be as per IS 1239, Heavy grade.
Pipes of 200mm NB and above shall be as per IS 3589, with 6.35 mm wall thickness.
All welding shall be done be done by qualified welders and shall strictly conform to
Indian Standards code of practice for manual metal arc welding of mild steel. All
fittings shall be shall be mild steel confirming to A 234 GR WPD Sch 40. The flanges
shall be drilled as per relevant IS standards. All flanges, fittings and accessories shall
be suitable for Grade 150 Pressure Rating unless otherwise specified.
15.1
All pipes and their supports shall be thoroughly cleaned and given one
primary coat of red oxide paint before being installed.
15.2
Fitting shall be as per IS 1239 Part ll of pressure rating suitable for the piping
system. Fittings used on welded piping shall be of weldable type.
16. CI Sluice Valves : Non rising spindle sluice valve confirming to IS 14846 with a
rating of PN 1.6 shall be used for the system. These valves are provided at suitable
locations, considering the need of isolation in case of maintenance and this shall be
of ISI approved make.Body-cast iron,Disc-Cast bronze/Stainless steel, Seat and
Oring-EPDM
17. GM Sluice Valve: This shall be as per IS 14846 with female threaded ends used for
instrumentation/draining arrangement and shall have ISI Mark.
18. CI Non Return Valve: As per IS 5312 /PN 1.6 rating and tested to 20kg/cm2. Shall
be Swing check type in horizontal direction run/and lift check type in case of vertical
run.plate shall be of SS/Gun metal.
19. Butterfly Valve: All isolation / shut-off valve shall be of butterfly type IS-13095
wherever indicating in the drawings. The Valves shall have cast Iron body confirming
to IS 210 GR FG 200 and suitable for ANSI 150 Grade Flanges. The valve shall have
cast Iron body confirming to IS 210 GR FG 200 and suitable for ANSI 150 Grade
Flanges. The valve stem shall be of Stainless Steel confirming to SS 410/31. The
disk material shall be of Ductile Iron with Electroless Nickel Plating .The Sheet
material shall be EPDM. All shut-off valves of 50 mm NB and above shall be Butterfly
valves only.
20. Foot valve/stainer as per IS 5312
21. Globe Valve/Check valve : The contractor shall provide 25mm dia Gun metal Globe
valve with GI pipe as per IS as per IS 1239 medium classfor testing & draining
purpose. This shall be measured by numbers and (include GI pipe and elbows fitting,
tees.)
22. Pressure Gauge: Type: Bourdon- for pressure above 1.0 kg/cm2
Sensing Element Material :Bourdan-AISI 316 SS
Movement material :AISI 304 SS; case material: die cast Aluminium, stove
enamelled, black finish, threaded bezel ring, clear glass covers confirming to NEMA
4/IP-65;Dial Size 150mm, Range 0 to 20 kg/cm2;Scale : Black lettering on white
background in 270 Deg.arc; Range Selection: Normal process pressure 70 percent of
range approximately; Over range Protection:125% of maximum range by internal
stop.External stop at zero; Adjustment: External micrometer screw for zero
adjustment. Internal micrometer screw for range adjustment; Element Connection:
Brazing for range below 40 Kg/cm2;1/2”NPT (M) bottom connection for local
mounting;Perfomance: Accuracy +(-) 1.0 % of span; Ambient Temp 70 Deg.C;
Neoprene safety diaphragm at back: Accessories: a) Pipe union b) Snubber for
pulsating fluid applications; 2-valve manifold, Micrometer zero adjusting screw
Standard :a) ASME PTC 19.2(1964) (b) IS-3624-1979.
23. Pressure Switch: Sealed diaphragm/ Bellow /Bourdan actuated with nap action
switch element. Static Pressure up to 15 Kg/cm2: 316 SS diaphragm.
Overpressure:150% of the range; set point-adjustable throughout the range; dead
band adjustable, Temp:0-70% ;Enclosure: Die Cast Aluminium weather proof IP-55;
process connection :1/2”NPT (F); Mounting: field/wall mounting/back panel;Switch
rating:240 V, 5A AC
24. Strainers: Stainless steel strainers shall have minimum 1mm thick screen with 3 mm
perforations. Strainers shall be provided with flanges.
25. Air Vessel/pressure vessel: Air vessel shall be provided shall be fabricated of 8mm
thick M.S.Sheet. The ends shall be dished. This shall be 250 mm dia and 1.2 mtr
high. Flange connection shall be provided for connection. Air release valve and
pressure gauge with shut off valve shall be provided. The air/pressure vessel shall be
tested at 35 kg/cm2 pressure before installation. Air release valve shall be of Gun
metal.
26. Installation: a) the installation work shall be carried out in accordance with the
detailed drawings prepared by the contractor and approved by Engineer-in-charge
and local bodies/authorities.
b) In pipe above ground level, expansion loops or joints shall be provided to take care
of expansion on contractor of pipes due to temperature changes.
c) Tee-off connections shall be through equal or reducing tees, otherwise ferrules
welded to the main pipe shall be used. Drilling and tapping of the walls of main pipe
shall not be restored to.
d) Open ends of piping shall be blocked as soon as the pipe is installed to avoid
entrance of foreign matter.
e) For installing pipes vertically or horizontally inside the building standard pipe
supports of reputed make shall be used. Following supports shall be used: e.1 Split
pipe support clamps with rubber lining for vertical, horizontal & roof hanging. e.2
Clevis hangers for horizontal supports to adjust varying heights.
f) Fasteners and fully threaded rods shall be used for installing the pipe supports. The
sizes pipe supports and installation shall be in accordance with manufacturers
recommendations. For pipes of size 100 mm and above, with the prior approval of
Engineer-in-charge U clamp with dash fasteners may be used for supporting
horizontal pipe from ceiling.
g) In pipe above ground level, expansion loops or joints shall be provided to take care
of axpansion or contraction of pipes due to temperature changes.
h) Pipe support in pump house shall be floor mounted and of mild steel/G/I Spacing
of pipe support shall not be more than that specified:
Nominal Dia of Pipe size (mm)
Spacing (mtr)
20 to 25
2
32 to 125
2.25
150 & above
2.50
of pipe support shall not be more than that specified:
Extra support shall be provided at the bends and at heavy fittings like valves to avoid
undue stress on the pipes.
27. Anti vibration pads, springs or liners of resilient and non-deteriorating materials shall
be provided at each support, so as to prevent transmission of vibration through the
supports. Pipe sleeves of diameter larger than the pipe by atleast 50 mm shall be
provided wherever pipes pass through walls and the annular spaces shall be filled
with felt and finished with retaining rings.
28. It shall be made sure that proper noiseless circulation is achieved in the system. If
proper circulation is not achieved due to air-bound connections, the contractor shall
rectify the defective connections. He shall bear all the expenses for carrying out the
above rectification, including the tearing up and refinishing of floors, walls, etc as
required.
29. Pressure Testing: All piping shall be tested to hydrostatic test pressure of atleast one
and a half times the maximum operating pressure, but not less than 10.5 kg/cm2 for
a period not less than 24 hrs. All leaks and defects in joints revealed during the
testing shall be rectified to the satisfaction of Engineer- in-charge. Piping repaired
subsequent to the above pressure test shall be re-tested in the same manner.
30. Painting: All external steel surfaces shall be thoroughly cleaned to remove rust, scale
etc before applying the primer. All underground piping shall be provided protective
wrappings as per TAC norms. All over ground piping/hose boxes/landing valves/hose
reel, M S frames etc shall be painted with two (2) coats of RED LEAD primer or
equivalent followed by two Coats of Post Office Red coloured Synthetic enamel finish
paint All other equipment shall be given a red oxide/zinc chromate primer and two (2)
coats of synthetic enamel
31. Earthing
31.1 All electrical apparatus, cable boxes and sheath/armour clamps shall be connected to
the main bar by means of branch earth connection of 25mm x 5mm copper strip. All
joints in the main bar and between main bar and branch bars shall have the lapping
surface properly tinned to prevent oxidation.
32. Maintenance Manual
16.1 On completion of the entire work and successful commissioning, Contractor shall
hand-over four copies of maintenance manual of all equipment installed by him.
16.2 Maintenance manual shall include information relating to make, model no. year of
manufacture and guarantee cards for all electrical and mechanical equipment with names of
local suppliers or manufacturer's agents.
33. Measurements
33.1 Pumping sets, and switch board cubicle shall be measured by number and shall
include all item necessary and required and given in the specifications.
34.
Earthing and power/control cabling shall not be measured separately but included in
switchgear cubicle and shall include all items necessary and required to complete the work
as per specification and relevant Indian Standards to the satisfaction of Engineer-in-charge
of Bank.
35.
Pressure Gauges shall not be measured separately but included in respective
pumping sets and shall include all items necessary and required to complete the work to the
satisfaction of Engineer-in-charge of Bank.
36. INSPECTION & TESTING
The Clients have the right to inspect the plants, equipments and materials at manufacturer's
work or at site at any stage and reject the material that is substandard or does not meet the
requirements of the specification and codes.
The contractor shall provide at his cost at site and elsewhere instruments and appliances for
testing and equipments and installation at various stages of manufacturing/installation.
These instruments shall be got tested and calibrated for their accuracy and performance
from the approved institutions.
The inspection and testing carried out by the Consultants/Clients/Third party does not relieve
the contractor of their responsibility of carrying out routine inspection during each stage of
procurement, manufacture and installation and also meeting the intents and requirements of
the specification and statutory requirements.
All equipments and the installation to be tested in the presence of the Consultants/Clients
after carrying out necessary rectification, adjustments and balancing. Four sets of test
readings should conform to the specification, equipment data, standards and codes.
Signature of the contractor with seal
Maintenance Clause During Defect Liability Period
Periodical checks / maintenance to be performed during free service period (One
year) Fire Pumps General.
The routine inspection, testing, and maintenance of fire pump assemblies shall be
conducted as per the table below and maintain the record of the same.
Item
Activity
Frequency
Pump house
Inspection
Weekly
Fire pump system
Inspection
Weekly
Pump operation
No-flow condition Test
Weekly
Flow condition Test
Annually
Hydraulic
Maintenance
Annually
Mechanical transmission
Maintenance
Annually
Electrical system
Maintenance
Varies
Controller various components
Maintenance
Varies
Motor
Maintenance
Annually
Diesel engine system various components Maintenance
Varies
A fire pump assembly provides water flow and pressure for private fire protection. The
assembly includes the water supply suction and discharge piping and valve; pump; electric,
diesel driver and control; and the auxiliary equipment appurtenant thereto.
The pump assembly auxiliary equipment shall include the following:
(a) Pump accessories
1. Pump shaft coupling
2. Automatic air release valve
3. Pressure gauges
4. Circulation relief valve (not used in conjunction with diesel engine drive with heat
exchanger)
(b) Pump test device(s)
(c) Pump relief valve and piping (where maximum pump discharge pressure exceeds the
rating of the system components or the driver is of variable speed)
(d) Alarm sensors and indicators
(e) Right-angle gear sets (for engine-driven vertical shaft turbine pumps)
(f) Pressure maintenance (jockey) pump and accessories
Water Supply to Pump Suction.
The suction supply for the fire pump shall be adequate to provide the required flow at a
gauge pressure of zero (0) psi [zero (0) bar] or higher at the pump suction flange to meet the
system demand.
Energy Source.
The energy sources for the pump driver shall be adequate to supply the necessary brake horsepower of
the driver so that the pump meets system demand.
Driver.
The pump driver shall not overload beyond its rating (including any service factor allowance)
when delivering the necessary brake horsepower.
Controller.
Automatic and manual controllers for applying the energy source to the driver shall be
capable of providing this operation for the type of pump used.
Notification to Supervisory Service.
To avoid false alarms where a supervisory service is provided, the alarm receiving facility
always shall be notified by the owner or designated representative as follows:
(a) Before conducting any test or procedure that could result in the activation of an alarm
(b) After such tests or procedures are concluded.
Inspection.
The purpose of inspection is to verify that the pump assembly appears to be in operating
condition and is free from physical damage.
The pertinent visual observations specified in the following checklists shall be performed
weekly.
Pump House Conditions.
0
0
0
0
(a) Heat is adequate, not less than 40 F (4.4 C) [70 F (21 C) for pump room with diesel
pumps without engine heaters].
(b) Ventilating louvers are free to operate.
Pump System Conditions.
(a) Pump suction and discharge and bypass valves are fully open.
(b) Piping is free of leaks.
(c) Suction line pressure gauge reading is normal.
(d) System line pressure gauge reading is normal.
(e) Suction reservoir is full.
Electrical System Conditions.
(a) Controller pilot light (power on) is illuminated.
(b) Transfer switch normal pilot light is illuminated.
(c) Isolating switch is closed - standby (emergency) source.
(d) Reverse phase alarm pilot light is off or normal phase rotation pilot light is on.
(e) Oil level in vertical motor sight glass is normal.
Diesel Engine System Conditions.
(a) Fuel tank is two-thirds full.
(b) Controller selector switch is in AUTO position.
(c) Batteries' (2) voltage readings are normal.
(d) Batteries' (2) charging current readings are normal.
(e) Batteries' (2) pilot lights are on or battery failure (2) pilot lights are off.
(f) All alarm pilot lights are off.
(g) Engine running time meter is reading.
(h) Oil level in right angle gear drive is normal.
(i) Crankcase oil level is normal.
(j) Cooling water level is normal.
(k) Electrolyte level in batteries is normal.
(l) Battery terminals are free from corrosion.
(m) Water-jacket heater is operating.
Steam System Conditions.
Steam pressure gauge reading is normal.
Testing.
Purpose.
The purpose of testing the pump assembly is to ensure automatic or manual operation upon
demand and continuous delivery of the required system output. An additional purpose is to
detect deficiencies of the pump assembly not evident by inspection.
Weekly Tests.
Qualified operating personnel shall be in attendance during the weekly pump operation.
A weekly test of electric motor-driven pump assemblies shall be conducted without flowing
water. This test shall be conducted by starting the pump automatically. The pump shall run a
minimum of 10 minutes.
A weekly test of diesel engine-driven pump assemblies shall be conducted without flowing
water. This test shall be conducted by starting the pump automatically, and the pump shall
run a minimum of 30 minutes.
The automatic weekly test timer shall be permitted to be substituted for the starting
procedure.
The pertinent visual observations or adjustments specified in the following checklists shall be
conducted while the pump is running.
Pump System Procedure.
(a) Record the system suction and discharge pressure gauge readings.
(b) Check the pump packing glands for slight discharge.
(c) Adjust gland nuts if necessary.
(d) Check for unusual noise or vibration.
(e) Check packing boxes, bearings, or pump casing for overheating.
(f) Record the pump starting pressure.
Electrical System Procedure.
(a) Observe the time for motor to accelerate to full speed.
(b) Record the time controller is on first step (for reduced voltage or reduced current
starting).
(c) Record the time pump runs after starting (for automatic stop controllers).
Diesel Engine System Procedure.
(a) Observe the time for engine to crank.
(b) Observe the time for engine to reach running speed.
(c) Observe the engine oil pressure gauge, speed indicator, water, and oil temperature
indicators periodically while engine is running.
(d) Record any abnormalities.
(e) Check the heat exchanger for cooling water flow.
Annual Tests.
An annual test of each pump assembly shall be conducted under minimum, rated, and peak
flows of the fire pump by controlling the quantity of water discharged through approved test
devices.
(a) Use of the pump discharge via the hose streams; pump suction and discharge pressures
and the flow measurements of each hose stream shall determine the total pump output.
Care shall be taken to prevent water damage by verifying there is adequate drainage for the
high-pressure water discharge from hoses.
(b) Use of the pump discharge via the bypass flow meter to drain or suction the reservoir;
pump suction and discharge pressures and the flow meter measurements shall determine
the total pump output.
(c) Use of the pump discharge via the bypass flow meter to pump suction (closed-loop
metering); pump suction and discharge pressures and the flow meter measurements shall
determine the total pump output.
The pertinent visual observations, measurements, and adjustments specified in the following
checklist shall be conducted annually while the pump is running and flowing water under the
specified output condition.
At No-Flow Condition (Churn). (Conduct this test first.)
(a) Check the circulation relief valve for operation to discharge water.
(b) Check the pressure relief valve (if installed) for proper operation.
(c) Continue the test for 1/2 hour.
At Each Flow Condition.
(a) Record the electric motor voltage and current (all lines).
(b) Record the pump speed in rpm.
(c) Record the simultaneous (approximately) readings of pump suction and discharge
pressures and pump discharge flow.
(d) Observe the operation of any alarm indicators or any visible abnormalities.
For installations having a device installed to control minimum suction pressure by throttling
action, low suction pressure on the device (below set minimum value) shall be simulated
while pumping at the rated flow. Throttling action shall be observed for any abnormality (e.g.,
cavitations, pressure surges, and failure to throttle). The simulated low suction pressure on
the device shall be removed and throttling action again shall be observed for any
abnormality as the pump returns to full flow.
For installations having an automatic transfer switch, the following test shall be performed to
ensure that the over current protective devices (i.e., fuses or circuit breakers) do not open.
Normal power failure shall be simulated while the pump is delivering peak power output to
cause connection of the pump motor to the alternate power source. The pump’s peak power
output shall be restored (if necessary). The simulated normal power failure condition then
shall be removed, which, after a time delay, shall cause the reconnection of the pump motor
to the normal power source.
Alarm conditions shall be simulated by activating alarm circuits at alarm sensor locations,
and all such local or remote alarm indicating devices (visual and audible) shall be observed
for operation.
Other Tests.
Engine generator sets supplying emergency or standby power to fire pump assemblies shall
be tested routinely.
Tests of appropriate environmental pump room space conditions (e.g., heating, ventilation,
illumination) shall be made to ensure proper manual or automatic operation of the
associated equipment.
Test Results and Evaluation.
The interpretation of the test results shall be the basis of the determination of adequacy of
the pump assembly. Such interpretation shall be made by those skilled in such matters.
The pump test curve shall be compared to the unadjusted field acceptance test curve and
the previous annual test curve(s). Increasing engine speed beyond the rated speed of the
pump at rated condition is not an acceptable method for meeting the rated pump
performance. Theoretical factors for correction to the rated speed shall not be applied where
determining the compliance of the pump per the test.
Current and voltage readings whose product does not exceed the product of the rated
voltage and rated full-load current multiplied by the permitted motor service factor shall be
considered acceptable. Voltage readings at the motor within 5 percent below or 10 percent
above the rated (i.e., nameplate) voltage shall be considered acceptable.
The pump shall be capable of supplying the maximum system demand.
Reports.
Any abnormality observed during inspection or testing shall be reported promptly to the
person responsible for correcting the abnormality.
Test results shall be recorded and retained for comparison. All time delay intervals
associated with the pump’s starting, stopping, and energy source transfer shall be recorded.
Maintenance.
A preventive maintenance program shall be established on all components of the pump
assembly in accordance with the manufacturer’s recommendations. Records shall be
maintained on all work performed on the pump, driver, controller, and auxiliary equipment.
In the absence of manufacturer’s recommendations for preventive maintenance, Table
below provides alternative requirements.
Sign of Contractor
LIST OF APPROVED MATERIALS
(ACCEPTABLE MANUFACTURER'S)
ALL MATERIALS SHALL BE FROM THE LATEST LIST OF APPROVED
MANUFACTURERS BY TARIFF ADVISORY COMMITTEE /BEAREAU OF INDIAN
STANDARDS/TESTED BY LABORATORY RUN BY CENTRAL GOVERNMENT.
NOTE: THE BIDDERS SHOULD SUBMIT THE LIST OF MANUFACTURER'S OF ALL
THE MATERIALS.
TECHNICAL DATA TO BE FURNISHED BY CONTRACTOR
a) Diesel fire Pump : Make/ capacity / ModeI / H.P/ Type of Motor .
b) Pipe
1. Make :
2. Standard (IS/BS) :
c) Landing Valve
1. Make :
2. Type :
3. Standard (IS/BS) :
d) Valves
1. Make :
2. Material of body :
3. Material of seat :
4. IS Standard :
e) Hose Pipe
1. Make :
2. Material :
3 IS Standard :
LIST OF APPROVED MAKES
Sr.
Description
Approved Makes
Relevant
IS
1
Diesel Engine
KIRLOSKAR/CUMMINS
As per
TAC/NBC
2
Pumps
KBL/M&P/KSB/Grudfoss
3
Motors
ABB/KIRLOSKAR/Crompton
As per
TAC/NBC
As per
TAC/NBC
4
M.S.Pipe
Asian,TATA,Hissar,Jindal
5
CI Butterfly Valve
6
CI/GM Sluice Valve
7
CI Non Return Valve
8
9
Globe valve upto 15/25 mm
Foot valve/Stainer
Intervalve,Sant,Kalpana,Kirlo
sker
Intervalve,Sant,Kalpana,Kirlo
sker
Intervalve,Sant,Venus,Kalpan
a,Kirlosker
Zoloto/Leader
Kirloskar,Leader,Normax,Wor
thvalve
Indfoss,Switzer,Danfoss
10
Pressure Switch
11
Pressure Gauge
Pressure above-1Kg
Range(0 to 20Kg),150mm dia
H.Guru, Fiebig
12
SS Ball Valve
13
14
15
Wrapping Coating
Paint/Primer
Welding rod
Leader, Intervalve,Worth
valve
IWL/Pypokote/Rustech
Asian,Nerolac,Burger
Advani Make
16
Battery
17
Moulded Case Circuit
Breakers
18
MCB (10KA)
19
20
Selector Switches
LED Indication Lamps &
Panasonic, Global Yuvasa
(Rocket), Exide, Amara Raja.
L&T (D SINE)/ SIEMENS
(3VL)/ ABB
(TMA)/SCHNEIDER (NSX)/
GE (RECORD PLUS)
Legrand / Schneider /
L&T/ABB/Siemens/Hager
Kaycee / Salzer/ AE
L & T (ESBEE) / Schneider
IS-1239 & IS3589(above
200mm)
heavy grade
IS-13095
IS-14846
IS-5312/PN
1.6 rating
IS 1239
IS-5312
As per NFPA20, rating
240V 5A
AC,15
kg/cm2,
overpressure
range 150%
a) ASME PTC
19.2 (1964)
b) IS-3624 –
1979
IS-9890/554
BS 5351
IS-10221
IS-5
As per
standard
AWSD 10.9,
level AR-3
Push buttons
(Telemecanique)
Siemens
21
MV/electrical fire control Panels
Boards
50KA Fault level)
22
23
Digital Energy Meter/Digital
Meters
L.T Cables
24
Cable Tray
25
Control Cables
26
Cable Glands
27
Lugs
Dowell’s/3-D/Comet
28
Maintenance free earthing
Universal Alltec/ Ashlok/
JMV/ERICO/
PVC Pipes
Welding rods
ISI marked
ADVANI
QUALITY)
29
30
/
Adlec
systems
/ SPC
Electrotech
Pvt.Ltd.
/
Advance
/Tricolite/Milestones
L & T /Conserv/AE
Skytone / Havells /
Finolex/Gloster/Polycab
Rico Steel/ Slotco/ Pilco
Skytone / Havells /
Gloster/Polycab/Finolex
Double Compression type,
Siemens type with rubber ring
and double washers –
Comet/Standard Metal
Industries/Dowell’s
MAKE
(ISI
Annexure I
CLIENT’S CERTIFICATE REGARDING PERFORMANCE OF CONTRACTOR
Name & address of the Client -------------------------------------------------------------------Details of works executed by Shri/ M/s.-------------------------------------------------------1
2
3
4
5
6
7
8
9
10
11
12
13
Name of work with brief particulars
Agreement No. and date
Agreement amount
Date of commencement of work
Stipulated date of completion
Actual date of completion
Details of compensation levied for delay (indicate
amount) if any
Gross amount of the work completed and paid
Name and address of the authority under whom
works executed
Whether the contractor employed qualified
Engineer/Overseer during the execution of work?
i) quality of work (indicate grading)
ii) Amount of work paid on reduced rates, if any
i) Did the contractor go for arbitration?
ii) if yes, total amount of claim
Comments on the capabilities of the contractor
a) Technical proficiency
b) Financial soundness
c) Mobilization of adequate T & P
d) Mobilization of manpower
e) General behavior
Outstanding /very good / good /
satisfactory / poor
Outstanding /very good / good /
satisfactory / poor
Outstanding /very good / good /
satisfactory / poor
Outstanding /very good / good /
satisfactory / poor
Outstanding /very good / good /
satisfactory / poor
Outstanding /very good / good /
satisfactory / poor
Note : All columns should be filled in properly.
“Counter signed”
Signature of the Reporting officer*
with
Office seal
*Officer of the rank of Superintending Engineer or equivalent
Annexure-II
FORM OF BANKERS’ CERTIFICATE FROM A SCHEDULED BANK
This is to certify that to the best of our knowledge and information M/s. / Shri ------------------------------------------------having marginally noted address, a customer of our bank are / is
respectable and can be treated as good for any engagement up to a limit of Rs.--------------(Rupees-------------------------------------------------------------------------------------------------). This
certificate is issued without any guarantee or responsibility on the Bank or any of the officers.
(Signature)
For the Bank
Note:
1. Bankers’ certificates should be on the letter head of the Bank, sealed in the
cover, addressed to enlistment authority.
2. In case of the partnership firm, certificate to include names of all partners as recorded
with the Bank.
Bill of Quantity
Supply, Installation, Testing and Commissioning of Fire fighting
equipments(Jockey & Diesel Pumps) & synchronization with main electrical
firepump for wet riser system at PNB, HO5, Sansad Marg, New Delhi
ITE DESCRIPTION
QT
M
Y
NO.
1
Electric motor driven fire water Jockey pump of horizontal centrifugal type
1
180 LPM, 70M head,2900 RPM, with motor base plate, Foundation as per IS,
bolts , nuts and all accessories as per mentioned standard. The engine & the
pump shall be mounted on common base plate fabricated in mild steel
channel with foundation bolts, cement foundation and anti-vibration
mountings/ DonLop make cushing footings with nut & bolts.
2
3
Pumps (Diesel Engine Driven) with Diesel Engine :
Supplying, installing, testing and commissioning of 2280 LPM horizontal top
discharge type single stage centrifugal pumping set with suitable diesel engine
for wet riser system at 7 bar with CI volute and bronze impeller with
mechanical seals directly coupled to automatic Diesel Engine complete with
all accessories like self-starting by means of Battery powered Electric starter
motor, oil bath air cleaner, exhaust silencer etc. complete in all respects. The
engine & the pump shall be mounted on common base plate fabricated in
mild steel channel with foundation bolts, cement foundation and antivibration mountings/ DonLop make cushing footings with nut & bolts. It shall
be automatic in operation with diesel engine control panel with 24 V DC
storage battery and battery accessories. It shall have cooling water lines for
engine with required pipes /valves / fittings/pressure gauges etc. including all
associated electrical work. It consist with Oil Tank of 200 ltrs. Capacity
including first fill of 200 ltrs high speed diesel oil in 16 SWG MS steel oil tank
with manhole cover, glass gauge, inlet and outlet connections with gate
valves, drain plug, GI piping between tank and engine vent pipe with wire
mesh etc. Duly painted and mounted on suitable MS angle staging to maintain
gravity .Tank shall be provided with epoxy coat from inside & two or more
coats of synthetic enamel paint outside over two coats of red oxide primer.
Diesel storage tank shall be double skin. Bypass arrangement should be
provided to check pumps. (Note: Civil work if required any will be inclusive in
qoted rate).
Shifting (Including re-installation, commissioning and testing )of Existing
Electrical motor driven fire water main pump if required due to
synchronisation with Deisel driven pump for hydrant system of horizontal
centrifugal type 2280 LPM, 70 M head,2900rpm, with motor, base plate,
foundation bolts, nuts and all accessories with MOC of casing as CI to IS 210
gr. FG 260 and bronze respective. Servicing & erection including change of
Mechanical seal. (Note: Civil work if required any will be inclusive in qoated
rate)
1
1
UNI
T
set
set
set
4
5
6
Fire Pump Panel (Electrical): Supplying, erecting, testing and commissioning
cubicle pattern electrical control panel made of 16 SWG MS Sheet duly
painted with enamel paint Double door with IP 65 protection comprising of
the Following:
Incoming
1 Nos. 400 Amps 4 pole MCCB with electrical inter lock, 1 set R,Y,B indicating
lamps connected through series resistors, end fuses, suitable CT operated
Ammeter and Voltmeter with selector switches, KWH meter etc. complete
Bus bars:
1 Set 3 Phase, 4 wire bus-bar 500 Amps copper conductor duly sleeved in PVC
colour coded sleeves.
Outgoings.
1 No. 250 A FP MCCB (35 KA) for electrical pump.
1 No. Star Delta starter with overload relay suitable for 60- 70 HP motor.
2 nos. 63 Amp FP MCB
1 no 15 HP Jocky pump delta starter.
(All motor out goings shall have controller unit to switch ON/Off the motors
automatically, accordingly provision shall be made)
Metering
1 No. 0-500 volts, 96mm square with
MCB.
1 No. 0-400 Amps Ammeter of 96mm square with Suitable CT's
1 No. 96sqmm energy meter with CT's
Control Panel (Diesel Engine Driven Pump)
erecting, testing and commissioning cubicle pattern electrical control panel
made of 16 SWG MS sheet duly painted with powder coated comprising of the
following in above said panel:
a) 24 Volts 120 AH capacity battery set.
b) 15 Amps battery charger with
Trickle and boost facility.
c) 0-40 Volts voltmeter.
d) 0-15 Amps ammeter.
e) Auto-starting contactor with relay.
f) Auto/Manual selector switch
THE PANEL FOR ALL THE PUMPS i.e ELECTRIC/DIESEL ENGINE DRIVEN
PUMPING SET SHALL BE ONE COMBINED PANEL
Supplying, laying, terminating following copper /AL conductor, 1.1 KV FRLS,
XLPE insulated armoured cable on necessary M.S. clamps / saddles on
walls/ceiling, cable identification tags etc. a) 3x1/2 core 50 Sq.mm PVC
armoured AL cable along with 2x6 SWG GI wire.
Supplying, laying, terminating following copper /AL conductor, 1.1 KV FRLS,
XLPE insulated armoured cable on necessary M.S. clamps / saddles on
walls/ceiling, cable identification tags etc. a) 4 core 16 Sq.mm PVC armoured
AL cable along with 2x6 SWG GI wire.
1
set
40
mtr
11
5
mtr
7
8
9
10
11
12
13
Cables Supplying, laying, terminating following copper /AL conductor, 1.1 KV
FRLS, XLPE insulated armoured cable on necessary M.S. clamps / saddles on
walls/ceiling, cable identification tags etc. b)4 X 10 sq. mm + 2 X 10 sq. mm
earth copper wire
Cables Supplying, laying, terminating following copper /AL conductor, 1.1 KV
FRLS, XLPE insulated armoured cable on necessary M.S. clamps / saddles on
walls/ceiling, cable identification tags etc. c) 3 core 4 Copper Sq.mm PVC
armoured cable
Cables Supplying, laying, terminating following copper /AL conductor, 1.1 KV
FRLS, XLPE insulated armoured cable on necessary M.S. clamps / saddles on
walls/ceiling, cable identification tags etc. d) 3 x 2.5 Copper Sq.mm PVC
armoured cable
Cable Termination Cutting, peeling, terminating and Connecting the cables
with brass cable gland and crimped copper/al lugs in respective Electrical
panel and motor cable box. a) 3x1/2 x 50 Sq.mm cable.
Cable Termination Cutting, peeling, terminating and Connecting the cables
with brass cable gland and crimped copper/al lugs in respective Electrical
panel and motor cable box. a) 4 x 16 Sq.mm cable.
Cable Termination Cutting, peeling, terminating and Connecting the cables
with brass cable gland and crimped copper/al lugs in respective Electrical
panel and motor cable box. b) 4 X 10 sq. mm copper wire
Fabrication, Supplying, Installation at Basement,Testing & Commissioning of
electrical control panel of Cubical Construction , wall/floor mounted type out
of 2mm, thick CRCA sheet, compartmentalised with higged lockable doors,
dust, and vermin proof, powder coated of approved shade after 7 tank
treatment process, cable -alley interconnection, ,having switchgears and
accessories mounting and internal wiring, earth terminals, numbering
etc.complete in all respects, suitable for operation on 415V, 3 phase 50 HZ AC
supply with enclosure protection class IP 54 with 500 Amp aluminium bus bar
as required. Control for Diesel Engine comprising:
Contactors, relays, timers etc for applying automatic starting pulses to the
diesel engine on receipt of a command signal from the pressure switch with
starting sequence consisting of three electrical pulses of 5 second duration
each spaced at 5 second apart.
Main ON/OFF isolator with DC circuit fuses and main ON indication.
Emergency stop switch within open enclosure with Indication lamps and hour
run meter.
Boost cum trickle automatic 15 A battery charger with fuse protection for AC
charging circuit (trickle/boost), Auto/Manual selector switch for charging,
charging current meter, volt meter( 0-30 V DC ) etc.
Indication/Alarm for the pump "RUN" condition, Annunciation for engine fault
condition, alarm cut off switch and reset switch for fault conditions.
Engine start switch, engine stop switch together with Auto/Manual switch for
engine starting and indication showing failure to start on 'AUTO'.
Engine RPM indication from in built tachometer with engine.
Two numbers additional (spare) auxiliary contactors (24v DC 2no. +ve relays)
40
mtr
30
mtr
30
mtr
2
Eac
h
2
Eac
h
2
Eac
h
1
set
for purchaser’s use, fully wired upto terminal block.
14
15
16
17
18
19
20
Fabrication, Supplying, Installation at entrance of Roof ,Testing &
Commissioning of electrical control panel of Cubical Construction , wall/floor
mounted type out of 2mm, thick CRCA sheet, compartmentalised with higged
lockable doors, dust, and vermin proof, powder coated of approved shade
after 7 tank treatment process, cable -alley interconnection, ,having
switchgears and accessories mounting and internal wiring, earth terminals,
numbering etc.complete in all respects, suitable for operation on 415V, 3
phase 50 HZ AC supply with enclosure protection class IP 54 with 500 Amp
aluminium bus bar as required. Control for 3 nops Pump at terrace :
Incomer 125 A 4 P MCCB :-1 NOS
Outgoing 100 / 63 A 4 P MCCB: 3 Nos.
PUMP AUTO/ MANUAL selector switch- 3 nos.
Pump STOP/RUN push button (Indicator type) - 3 set.
AMMETER & VOLTMETER Analog type (Suitable range)- 3 set.
SITC of MS fabricated 25x3mm flat clamp ,painted suports for Cabels
SITC of Powder coated cabel tray 1.6 mm thickX40mm c X450mm width
Providing and laying GI strip 25 mm x 3 mm in recess for connection etc. as
required.
Providing and fixing 8 SWG copper wire in recess or surface for loop earthing
with sub-main conduit and L.T. cable from panel to DB 's as required.
Wiring for light point/ fan point/ exhaust fan point with 1.5 sq.mm FRLS PVC
insulated multi stranded copper conductor single core cable and 1.5 sq.mm.
FRLS PVC insulated copper conductor single core cable as earth wire in
existing surface/ recessed steel conduit which including dismantling existing
wiring, conduct, in new switch boards and providing new M.S.
conduit/accessories (where ever required) and 2 nos. 2,5 sq. mm . FRLS PVC
insulated copper conductor single core cable as circuit wiring with 1 no. 2,5
sq. mm . FRLS PVC insulated copper conductor single core cable as earth wire
etc as required a)1 light point controlled with 1 no. switch.
Wiring for light point/ fan point/ exhaust fan point with 1.5 sq.mm FRLS PVC
insulated multi stranded copper conductor single core cable and 1.5 sq.mm.
FRLS PVC insulated copper conductor single core cable as earth wire in
existing surface/ recessed steel conduit which including dismantling existing
wiring, conduct, in new switch boards and providing new M.S.
conduit/accessories (where ever required) and 2 nos. 2,5 sq. mm . FRLS PVC
insulated copper conductor single core cable as circuit wiring with 1 no. 2,5
sq. mm . FRLS PVC insulated copper conductor single core cable as earth wire
etc as requiredc) 3 light point controlled with 1 no. switch
1
set
5
15
40
nos
mtr
mtr
30
mtr
2
nos
2
nos
21
22
23
24
25
Wiring for light point/ fan point/ exhaust fan point with 1.5 sq.mm FRLS PVC
insulated multi stranded copper conductor single core cable and 1.5 sq.mm.
FRLS PVC insulated copper conductor single core cable as earth wire in
existing surface/ recessed steel conduit which including dismantling existing
wiring, conduct, in new switch boards and providing new M.S.
conduit/accessories (where ever required) and 2 nos. 2,5 sq. mm . FRLS PVC
insulated copper conductor single core cable as circuit wiring with 1 no. 2,5
sq. mm . FRLS PVC insulated copper conductor single core cable as earth wire
etc as required) 3 light point controlled with 1 no. switch
Supply and installation of LED Tube light With all accessories
Supplying and fixing following way prewired SP&N MCB distribution board of steel
sheet for 240 volts on surface/ recess complete with loose wire box, terminal
connectors for all incoming and outgoing circuits, duly prewired with suitable size FR
PVC insulated copper conductor up to terminal blocks, tinned copper bus bar, neutral
link, earth bar, din bar, detachable gland plate, interconnections, powder painted
including earthing etc. as required. (But without MCB/ RCCB/ Isolator) 2 + 4 way,
Single door for Light
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, "C" curve, miniature
circuit breaker suitable for inductive load of following poles in the existing MCB DB
complete with connections, testing and commissioning etc. as required. Single pole
and neutral- 1 nos & Sin a) Single pole and neutral
Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, "C" curve, miniature
circuit breaker suitable for inductive load of following poles in the existing MCB DB
complete with connections, testing and commissioning etc. as required. Single pole
and neutral- 1 nos & Sin b) Single pole
26
27
28
Pressure gauge Supplying, installing, testing and commissioning 0 to 14 Kg/ cm2 100
mm dial size ON/OFF Pressure switches in delivery line of pump along with control
wiring for auto starting and auto stopping of hydrant and jockey pumps, diesel pump.
(Set of 3 pressure switches)
Pressure Switch Providing, fixing, testing & commissioning of pressure switch for
above fire fighting pumps including providing necessary size of PVC insulated
Armoured cable from control panel to pressure switch for each and every fire fighting
pumps including necessary cable gland & cable end box on both side making
incoming, outgoing connections.
Riser System/fire pumps Supplying, laying, fixing, testing and commissioning heavy
quality MS pipe conforming to IS1239/ IS:3589 6 mm thick including all necessary
pipe fittings like elbows, tees, flanges, tapers, reducers ,offsets, making connections
all type welded ,nuts, bolts, gaskets etc . The piping shall be provided with necessary
steel brackets and hardware for fixing on walls/slabs and with cement concrete
blocks as supports where ever applicable spacing between pipe supports shall be 2.5
meter. Rate shall be inclusive of making holes in RCC floor/wall cutting the
reinforcements etc. For taking pipe and finishing the same after laying of the pipe.
The exposed piping shall be painted with two or more coats of scarlet red enamel
paint over two coats of zinc chromate primer, including scaffolding, working at all
level etc. Complete as directed. a) 250 mm
1
nos
7
1
nos
Nos
1
nos
5
nos
6
Nos
4
Nos
70
mts
29
30
31
32
33
Riser System/fire pumps Supplying, laying, fixing, testing and commissioning heavy
quality MS pipe conforming to IS1239/ IS:3589 6 mm thick including all necessary
pipe fittings like elbows, tees, flanges, tapers, reducers ,offsets, making connections
all type welded ,nuts, bolts, gaskets etc . The piping shall be provided with necessary
steel brackets and hardware for fixing on walls/slabs and with cement concrete
blocks as supports where ever applicable spacing between pipe supports shall be 2.5
meter. Rate shall be inclusive of making holes in RCC floor/wall cutting the
reinforcements etc. For taking pipe and finishing the same after laying of the pipe.
The exposed piping shall be painted with two or more coats of scarlet red enamel
paint over two coats of zinc chromate primer, including scaffolding, working at all
level etc. Complete as directed. b) 200 mm
Riser System/fire pumps Supplying, laying, fixing, testing and commissioning heavy
quality MS pipe conforming to IS1239/ IS:3589 6 mm thick including all necessary
pipe fittings like elbows, tees, flanges, tapers, reducers ,offsets, making connections
all type welded ,nuts, bolts, gaskets etc . The piping shall be provided with necessary
steel brackets and hardware for fixing on walls/slabs and with cement concrete
blocks as supports where ever applicable spacing between pipe supports shall be 2.5
meter. Rate shall be inclusive of making holes in RCC floor/wall cutting the
reinforcements etc. For taking pipe and finishing the same after laying of the pipe.
The exposed piping shall be painted with two or more coats of scarlet red enamel
paint over two coats of zinc chromate primer, including scaffolding, working at all
level etc. Complete as directed. c) 150mm
Riser System/fire pumps Supplying, laying, fixing, testing and commissioning heavy
quality MS pipe conforming to IS1239/ IS:3589 6 mm thick including all necessary
pipe fittings like elbows, tees, flanges, tapers, reducers ,offsets, making connections
all type welded ,nuts, bolts, gaskets etc . The piping shall be provided with necessary
steel brackets and hardware for fixing on walls/slabs and with cement concrete
blocks as supports where ever applicable spacing between pipe supports shall be 2.5
meter. Rate shall be inclusive of making holes in RCC floor/wall cutting the
reinforcements etc. For taking pipe and finishing the same after laying of the pipe.
The exposed piping shall be painted with two or more coats of scarlet red enamel
paint over two coats of zinc chromate primer, including scaffolding, working at all
level etc. Complete as directed. d) 100 mm
Riser System/fire pumps Supplying, laying, fixing, testing and commissioning heavy
quality MS pipe conforming to IS1239/ IS:3589 6 mm thick including all necessary
pipe fittings like elbows, tees, flanges, tapers, reducers ,offsets, making connections
all type welded ,nuts, bolts, gaskets etc . The piping shall be provided with necessary
steel brackets and hardware for fixing on walls/slabs and with cement concrete
blocks as supports where ever applicable spacing between pipe supports shall be 2.5
meter. Rate shall be inclusive of making holes in RCC floor/wall cutting the
reinforcements etc. For taking pipe and finishing the same after laying of the pipe.
The exposed piping shall be painted with two or more coats of scarlet red enamel
paint over two coats of zinc chromate primer, including scaffolding, working at all
level etc. Complete as directed. e) 80 mm
15
mts
10
mts
50
mts
3
mts
Supplying, fixing, testing& commissioning of following size double flanged C.I Nonreturn valve as per IS-5312 or its latest version. Brass hinge pin, nuts & bolts
welding,washers,rubber gasket insersion etc complete.(Kirloskar make)a) 150mm
1
Nos
.
2
Nos
.
34
Supplying, fixing, testing& commissioning of following size double flanged C.I Nonreturn valve as per IS-5312 or its latest version. Brass hinge pin, nuts & bolts
welding,washers,rubber gasket insertion etc complete.(Kirloskar make)b) 80mm
35
1
Nos
1
Nos
2
Nos
2
Nos
3
Nos
1
Nos.
1
Nos.
1
Nos.
2
Nos
.
1
1
Nos
.
Nos
.
nos
1
nos
4
nos
Supplying, fixing, testing& commissioning of following sizes of double flanges sluice
valve of steel/cast iron body screw down type confirming to IS 14846/IS 13095 brass
rod spindle, hand wheel etc. Complete in all respect with BRONZE/GM gate parts
capable with standing pressure up to 14 KG/sq cm Hydraulic pressure complete,a)
200 mm sluice valve
36
37
38
39
40
41
42
43
Supplying, fixing, testing& commissioning of following sizes of double flanges sluice
valve of steel/cast iron body screw down type confirming to IS 14846/IS 13095 brass
rod spindle, hand wheel etc. Complete in all respect with BRONZE/GM gate parts
capable with standing pressure up to 14 KG/sq cm Hydraulic pressure complete, 100
mm
Supplying, fixing, testing& commissioning of following sizes of double flanges sluice
valve of steel/cast iron body screw down type confirming to IS 14846/IS 13095 brass
rod spindle, hand wheel etc. Complete in all respect with BRONZE/GM gate parts
capable with standing pressure up to 14 KG/sq cm Hydraulic pressure complete,c)
150 mm valve
Supplying, fixing, testing& commissioning of following sizes of double flanges sluice
valve of steel/cast iron body screw down type confirming to IS 14846/IS 13095 brass
rod spindle, hand wheel etc. Complete in all respect with BRONZE/GM gate parts
capable with standing pressure up to 14 KG/sq cm Hydraulic pressure complete,d)
100 mm valve
Supplying, fixing, testing& commissioning of following sizes of double flanges sluice
valve of steel/cast iron body screw down type confirming to IS 14846/IS 13095 brass
rod spindle, hand wheel etc. Complete in all respect with BRONZE/GM gate parts
capable with standing pressure up to 14 KG/sq cm Hydraulic pressure complete, e) 80
mm valve
Supplying,fixing,testing& commissioning of Natural Rubber single arch expansion
joint with neoprene cover complete with SRR & control unit (Make ISI Marked)a) 150
mm NB
Supplying,fixing,testing& commissioning of Natural Rubber single arch expansion
joint with neoprene cover complete with SRR & control unit (Make ISI Marked)b) 100
mm NB
Supplying,fixing,testing& commissioning of Natural Rubber single arch expansion
joint with neoprene cover complete with SRR & control unit (Make ISI Marked)c) 80
mm NB
Supplying,fixing,testing& commissioning of 50 NB CI Double Kinetic type air release
valve with flanged ends with CI Gate valve as isolation, complete with companion
flange , nuts bolts and gasket (make ISI marked)
44
Supplying,fixing,testing& commissioning of 250 NB foot valve
45
46
47
48
Supplying,fixing,testing& commissioning of M.S. Air Cushion tank 250 mm dia x 2mts
high complete with all required accessories (Fabricated)
Dismantling, servicing & reinstallation of NRV & valves with all accessories a) 150mm
sluice valve
Dismantling, servicing & reinstallation of NRV & valves with all accessories b) 100 mm
sluice valve
Dismantling, servicing & reinstallation of NRV & valves with all accessories c) 80 mm
butterfly valve
1
49
50
51
Dismantling, servicing & reinstallation of NRV & valves with all accessories d) 100 mm
NRV
Dismantling, servicing & reinstallation of NRV & valves with all accessories e) 80 mm
NRV
1
nos
3
nos
Overall servicing of pumps and repair of base plates of existing terrace pump
with all accessories
2
set
Buy Back items credited to Bank
Supply, Installation, Testing and Commissioning of Fire fighting
equipments(Jockey & Diesel Pumps) & synchronization with main electrical
firepump for wet riser system at PNB, HO5, Sansad Marg, New Delhi
ITEM DESCRIPTION
QTY
UNIT
NO.
1
Rebate for Dismentallaing and taking away for
1
set
Old Main Fire Control Electrical Panel installed at
Basement.
2
3
Rebate for Dismentallaing and taking away for Old
Fire Control Electrical Panel installed at entrance of
Roof on Stair.
Rebate for Dismentalling and taking away of Old 3.5
x 50sqmm Armoured AL cable .
4
Rebate for Dismentalling and taking away of Old 4 x
16sqmm Armoured AL cable .
5
Rebate for Old Submain wiring and old fitting
installed in proposed diesel fire pump installation
area.
1
set
15
mtr
100
mtr
1
LS