1.06
Initial prepared
Mar 2006
John Skinner
Lindsay Perrin
1.10
Revision
Sep 2010
Michael Lambert
John Skinner
1.11
Revision
Feb 2011
Michael Lambert
John Skinner
1.12
Revision
Jan 2012
Michael Lambert
John Skinner
1.12.1
Revision
Mar 2012
Michael Lambert
John Skinner
1.12.2
Revision
July 2012
Michael Lambert
John Skinner
1.12.3
Revision
Sep 2012
Michael Lambert
John Skinner
1.13
Revision
Mar 2013
Michael Lambert
John Skinner
1.13.1
Revision of CCTV section
Nov 2013
Michael Lambert
John Skinner
1.15
Revision
May 2015
Michael Lambert
John Skinner
1.16
Revision
Nov 2016
Michael Lambert
John Skinenr
TABLE OF CONTENTS
Revision 1.16
Page 1 of 51
NOV 2016
ELECTRONIC SECURITY SYSTEMS SPECIFICATION & DESIGN GUIDELINES
1
DOCUMENT SUMMARY .......................................................................................................................... 5
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
2
SECURITY IN CONFIDENCE
INTRODUCTION ............................................................................................................................................. 5
GENERAL ..................................................................................................................................................... 5
SECURITY EQUIPMENT.................................................................................................................................... 5
MAIN SYSTEM COMPONENT REQUIREMENTS ..................................................................................................... 5
SECURITY CABLE DISTRIBUTION ........................................................................................................................ 5
CIVIL WORKS ............................................................................................................................................... 6
LABELLING ................................................................................................................................................... 6
DOCUMENTATION ......................................................................................................................................... 6
INTRODUCTION ...................................................................................................................................... 7
2.1 GENERAL ..................................................................................................................................................... 7
2.2 DISPOSAL OF UNWARRANTED EXISTING EQUIPMENT ............................................................................................. 7
2.3 DESCRIPTION OF SYSTEMS............................................................................................................................... 7
2.3.1 Sub-systems ..................................................................................................................................... 7
2.4 CONFORMITY WITH STANDARDS....................................................................................................................... 8
2.4.1 General ............................................................................................................................................ 8
2.4.2 Quality Standards ............................................................................................................................ 8
2.4.3 Performance Standards ................................................................................................................... 8
2.4.4 Environmental Conditions ............................................................................................................... 9
2.4.5 Acceptable Specifications and Solutions ......................................................................................... 9
3
CONTRACTORS ..................................................................................................................................... 10
3.1 GENERAL ................................................................................................................................................... 10
3.2 CONTRACTOR PROJECT COORDINATOR ............................................................................................................ 10
3.3 USE OF SUB-CONTRACTORS .......................................................................................................................... 11
3.4 HOURS OF WORK ........................................................................................................................................ 11
3.4.1 Business Hours Work ..................................................................................................................... 11
3.4.2 Out of Hours Work ........................................................................................................................ 11
3.5 SITE SPECIFIC INSTRUCTIONS AND BUILDING OWNER / AUTHORITY REQUIREMENTS ................................................. 11
3.6 QUALIFICATIONS ......................................................................................................................................... 12
3.7 MANUFACTURER / VENDOR CERTIFICATION ..................................................................................................... 12
3.7.1 General .......................................................................................................................................... 12
3.7.2 Materials ....................................................................................................................................... 12
3.7.3 Additional works or “Adds, Moves & Changes” ............................................................................ 14
3.7.4 Completion of Works ..................................................................................................................... 14
4
ENVIRONMENTAL SPECIFICATION ........................................................................................................ 15
4.1
4.2
4.3
4.4
5
GENERAL ................................................................................................................................................... 15
OCCUPATIONAL HEALTH & SAFETY ................................................................................................................. 15
DETAIL DESIGN VARIATION TO STANDARDS ...................................................................................................... 15
REQUIREMENTS OF VARIOUS GRIFFITH UNIVERSITY ENVIRONMENTS ...................................................................... 15
TECHNICAL SPECIFICATION ................................................................................................................... 16
5.1 GENERAL ................................................................................................................................................... 16
5.2 CENTRAL MANAGEMENT SYSTEM ................................................................................................................... 16
5.2.1 General .......................................................................................................................................... 16
5.2.2 Programming Of Head Equipment ................................................................................................ 16
5.3 ACCESS CONTROL SYSTEM OVERVIEW ............................................................................................................. 16
5.3.1 Access Controlled Doors ................................................................................................................ 17
5.3.2 Car Park Control System ................................................................................................................ 17
5.3.3 Lift Service Works .......................................................................................................................... 17
5.3.4 Access Control Alarms ................................................................................................................... 18
5.3.5 Access Cards .................................................................................................................................. 18
5.3.6 Access Reader ................................................................................................................................ 19
5.3.7 Sonalerts........................................................................................................................................ 19
5.3.8 Door Release Buttons (If required) ................................................................................................ 19
Revision 1.16
Page 2 of 51
NOV 2016
ELECTRONIC SECURITY SYSTEMS SPECIFICATION & DESIGN GUIDELINES
SECURITY IN CONFIDENCE
5.3.9 Emergency Door Release Unit ....................................................................................................... 19
5.3.10 Electric Door Locking System ......................................................................................................... 20
5.3.11 Naming Conventions ..................................................................................................................... 21
5.4 SECURITY ALARM SYSTEM OVERVIEW ............................................................................................................. 21
5.4.1 Security System Access Codes ....................................................................................................... 22
5.4.2 Alarm monitoring .......................................................................................................................... 22
5.4.3 Alarm Monitoring Panel ................................................................................................................ 22
5.4.4 Alarmed Doors............................................................................................................................... 23
5.4.5 Alarm Inputs .................................................................................................................................. 23
5.4.6 Detectors ....................................................................................................................................... 23
5.4.7 Magnetic Reed Switches ............................................................................................................... 24
5.4.8 End of Line Resistors ...................................................................................................................... 24
5.4.9 Anti-Tamper Circuits ...................................................................................................................... 24
5.5 DURESS ALARM SYSTEM OVERVIEW ............................................................................................................... 25
5.5.1 Duress Buttons (If Required) .......................................................................................................... 25
5.6 CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM OVERVIEW ................................................................................... 25
5.6.1 General .......................................................................................................................................... 25
5.6.2 System Function ............................................................................................................................ 26
5.6.3 Digital Video Recorder ................................................................................................................... 26
5.6.4 Video output display...................................................................................................................... 26
5.6.5 Programming ................................................................................................................................ 26
5.6.6 Alarm Handling ............................................................................................................................. 27
5.6.7 CCTV Interface ............................................................................................................................... 27
5.6.8 CCTV Management Software ........................................................................................................ 27
5.6.9 Matrix Switch ................................................................................................................................ 27
5.6.10 Cameras ........................................................................................................................................ 28
5.6.11 Lens ............................................................................................................................................... 28
5.6.12 Camera Housings and Mounts ...................................................................................................... 28
5.7 CCTV SYSTEM TESTING ........................................................................................................................... 29
5.7.1 Equipment Testing......................................................................................................................... 29
5.8 INTERCOMMUNICATIONS SYSTEM OVERVIEW ................................................................................................... 29
5.8.1 General .......................................................................................................................................... 29
5.8.2 Exchange ....................................................................................................................................... 30
5.8.3 Master Station ............................................................................................................................... 30
5.8.4 Sub Master .................................................................................................................................... 30
5.8.5 Field Station................................................................................................................................... 30
5.8.6 CCTV System Alarm Outputs ......................................................................................................... 31
5.9 SYSTEM POWER SUPPLIES ............................................................................................................................. 31
5.9.1 Standby Power Supplies ................................................................................................................ 31
5.10 RACKS .................................................................................................................................................... 31
6
CABLING AND EQUIPMENT INSTALLATION ........................................................................................... 33
6.1 GENERAL ................................................................................................................................................... 33
6.1.1 Positioning Of Equipment .............................................................................................................. 33
6.2 ELECTROMAGNETIC COMPATIBILITY ................................................................................................................ 33
6.3 CONDUITS ................................................................................................................................................. 33
6.3.1 General .......................................................................................................................................... 33
6.3.2 Metallic Conduits ........................................................................................................................... 34
6.3.3 Conduits In Concrete Slabs ............................................................................................................ 34
6.3.4 Conduits Block Work ..................................................................................................................... 34
6.3.5 Conduits In Columns ...................................................................................................................... 35
6.3.6 Flexible conduit.............................................................................................................................. 35
6.3.7 Conduits And Fittings - External Use ............................................................................................. 35
6.4 CABLING - INSTALLATION METHODS ............................................................................................................... 35
6.4.1 General .......................................................................................................................................... 35
6.4.2 Cabling In False Ceiling Spaces ...................................................................................................... 36
6.4.3 Cabling In Partitions And Similar Enclosures ................................................................................. 36
6.4.4 Cabling Installed Vertically ............................................................................................................ 36
Revision 1.16
Page 3 of 51
NOV 2016
ELECTRONIC SECURITY SYSTEMS SPECIFICATION & DESIGN GUIDELINES
SECURITY IN CONFIDENCE
6.4.5 Cables On Trays ............................................................................................................................. 36
6.4.6 Catenary Wiring Supports ............................................................................................................. 36
6.5 CABLE TYPES .............................................................................................................................................. 37
6.6 GROUNDING AND INTERFERENCE ................................................................................................................... 37
6.7 BOLLARDS.................................................................................................................................................. 37
6.8 FIXINGS ..................................................................................................................................................... 37
7
MATERIALS ........................................................................................................................................... 38
7.1 GENERAL ................................................................................................................................................... 38
7.2 MATERIALS, EQUIPMENT AND WORKMANSHIP ................................................................................................. 38
7.2.1 Uniformity ..................................................................................................................................... 38
8
TESTING, INSPECTION AND COMMISSIONING ...................................................................................... 39
8.1 GENERAL ................................................................................................................................................... 39
8.2 UNWITNESSED TESTING (PRE-COMMISSIONING) ............................................................................................... 39
8.2.1 Witnessed Commissioning ............................................................................................................. 39
8.2.2 Test And Installation Instruments ................................................................................................. 40
8.2.3 Handing Over ................................................................................................................................ 40
9
DOCUMENTATION AND LABELLING ...................................................................................................... 41
9.1.1 General .......................................................................................................................................... 41
9.1.2 Operating Manuals ....................................................................................................................... 41
9.1.3 Installation Manuals...................................................................................................................... 41
9.1.4 Maintenance Manuals .................................................................................................................. 41
9.1.5 Manual Presentation ..................................................................................................................... 42
9.2 LABELLING ................................................................................................................................................. 43
9.2.1 Equipment Marking Standard ....................................................................................................... 43
9.2.2 Cable Marking Standard................................................................................................................ 43
10
SYSTEM TRAINING ................................................................................................................................ 45
10.1
10.2
10.3
11
GENERAL ................................................................................................................................................ 45
USER TRAINING ........................................................................................................................................ 45
OPERATOR TRAINING ................................................................................................................................ 45
DEFECTS LIABILITY AND SYSTEM MAINTENANCE .................................................................................. 46
11.1 GENERAL ................................................................................................................................................ 46
11.2 WARRANTY PERIOD .................................................................................................................................. 46
11.2.1 Software Warranty ........................................................................................................................ 46
11.3 MAINTENANCE SERVICE ............................................................................................................................. 46
11.3.1 General .......................................................................................................................................... 46
12
WITNESSED COMMISSIONING APPLICATION FORM ............................................................................. 47
SAMPLE FORM ONLY ...................................................................................................................................... 47
13
APPENDIX 1 - ACCESS CONTROL EQUIPMENT LIST ................................................................................ 48
14
APPENDIX 2 CCTV EQUIPMENT LIST ...................................................................................................... 50
Revision 1.16
Page 4 of 51
NOV 2016
1
1.1
DOCUMENT SUMMARY
INTRODUCTION
This document outlines the minimum standards required for the supply, installation and
commissioning, testing and ongoing maintenance of electronic security systems for Griffith University.
This section is intended as a quick reference area only, for detailed descriptions of the requirements
of Griffith University (GU) please refer to the body of this document.
This document is relevant for all Griffith University facilities.
This document alone will not provide a definition of a solution or a scope of works.
1.2
GENERAL
Griffith University has a preferred supplier panel for installers of cabling and equipment for electronic
security systems.
All installations shall comply with the relevant Australian Standards, ACA Cabling Guidelines, Building
Codes Australia and Griffith University Design Guidelines.
No security works are to be sub-contracted to the electrical contractor or other sub-trades.
1.3
SECURITY EQUIPMENT
The University has an ‘Approved Security Products Schedule’ detailing a list of security products that
have been tested and proved suitable for use in the University environment. Equipment that does not
appear in this schedule shall not be used without the item being submitted for formal approval prior
to installation works commencing.
1.4
MAIN SYSTEM COMPONENT REQUIREMENTS
At each nominated location for a control module of the access control system two (2) 10/100BaseT
network RJ45 outlets shall be installed, terminated and patched to the appropriate network
equipment.
Where required to be offsite monitored a….. security alarm system’s main controller a PSTN telephone
line and outlet shall be installed and terminated at the nominated location.
Each CCTV digital recorder shall have a 10/100BaseT network RJ45 outlet installed, terminated and
made active at the nominated location. Any network connectivity to Griffith University controlled
network must be undertaken by a Griffith University NCS approved contractor.
1.5
SECURITY CABLE DISTRIBUTION
Before commencing any works the contractor shall refer to detailed design documentation for any
project specific requirements.
Wherever possible cabling shall be installed on cable tray or attached to dedicated catenary wires.
Segregation from other services shall be maintained to ensure works comply with the relevant
standard.
Cables shall be installed in continuous runs and there shall be no joins excepted between panels and
field devices. There shall be no joins within individual cable runs between panels and devices except
at the panel or device termination board.
Revision 1.16
Page 5 of 51
NOV 2016
All wiring and filed devices shall be installed so that they are continuously supervised and that the
system monitors all four state changes.
Cable sizing shall be sufficient to ensure that voltage drop is minimal. Figure 8 cables may be used to
power CCTV cameras and high current devices such as Mag-Locks. When figure 8 cable is used it shall
be one colour with a second colour clearly marking the “trace” core. Other devices shall be wired in
“Security 4 Core” as a minimum. All cabling shall be “AUSTEL” approved.
1.6
CIVIL WORKS
Any cabling installed in an outdoor (exposed) environment or underground shall be installed within a
conduit.
1.7
LABELLING
All equipment enclosures shall be clearly marked to indicate their function.
All system cabling shall be marked with clearly visible identification number at each end.
1.8
DOCUMENTATION
Documentation including schematic diagrams is to be supplied to the GU Project Manager, prior to the
hand-over of any electronic security system.
The Contractors warranty certification shall be supplied as part of the documentation and system
hand-over.
Revision 1.16
Page 6 of 51
NOV 2016
2
INTRODUCTION
2.1
GENERAL
This document outlines the minimum standards required for the supply, installation, and
commissioning, testing and ongoing maintenance of electronic security systems for Griffith University
(GU).
This document describes the supply, installation, testing and commissioning of various electronic
security systems such as access control, intruder alarms, duress and CCTV systems required at all
Griffith University sites.
This standards document shall apply to all new electronic security system installation.
This document alone will not provide a definition of a solution or a scope of works.
Any appointed Contractor shall adhere to all requirements of this standards document as a minimum
and ensure that all of their employees assigned to perform any installation tasks are made fully aware
of their obligations of this document, except where explicitly varied or excluded in supporting
documentation for a specific site.
Any works undertaken which do not adhere to the guidelines contained within this document will be
deemed to be non-compliant, and will be rectified by the Contractor responsible for the works at the
Contractors expense.
2.2
DISPOSAL OF UNWARRANTED EXISTING EQUIPMENT
All existing equipment that is upgraded or deemed not required in the operation of the system shall
be removed and returned to Griffith University.
This equipment shall be returned to Griffith University Campus Life staff within one (1) week of
equipment being removed.
2.3






DESCRIPTION OF SYSTEMS
Integrated System
Access Control System – including door access and licence plate recognition
Intruder Detection System
Duress System
Closed Circuit Television (CCTV) System
Intercoms System
2.3.1
SUB-SYSTEMS
Works to be performed using these guidelines by one of the approved suppliers shall include the
provision of all personnel, services and equipment necessary to design, supply, install, test and
commission an integrated security and surveillance system comprising of any or all of the following as
nominated:

Integrated, computer-based, Security Management System (SMS) to manage and control all
security, surveillance and access control functions of the site, all interface equipment, software,
programming, and other items to make the systems completely operational in accordance with
this Specification.
Revision 1.16
Page 7 of 51
NOV 2016

Access Control System consisting of control panels, electric locks, sonalerts, pushbuttons, break
glasses, card readers, cardholder access tokens, cabling, power supplies, enclosures, all interface
equipment, software, programming, and other items to make the systems completely operational
in accordance with this Specification.

Intruder Detection System consisting of control panels, detection equipment, sirens, strobes,
cabling, power supplies, enclosures, all interface equipment, software, programming, and other
items to make the systems completely operational in accordance with this Specification.

Duress Alarm System consisting of control panels, duress push buttons, mimic panels, cabling,
power supplies, enclosures, all interface equipment, software, programming, and other items to
make the systems completely operational in accordance with this Specification.

Closed Circuit Television (CCTV) System as specified, consisting of cameras and lenses, associated
housings, mounting brackets, control equipment, Digital Video Recorders (DVRs), Network Video
Recorders and servers, monitors, user interface software, power supplies, all interface equipment,
programming, and other items to make the systems completely operational in accordance with
this Specification.

Intercom System consisting of audio master intercom handsets, audio slave intercom stations,
cabling, power supplies, enclosures, all interface equipment, software, programming, and other
items to make the systems completely operational in accordance with this Specification.
2.4
2.4.1
CONFORMITY WITH STANDARDS
GENERAL
Griffith University has a preferred supplier panel of installers of cabling and equipment for electronic
security systems. Works comprising these systems or subsystems shall only be carried out by one of
these approved suppliers.
All works detailed in this document shall be implemented and completed in strict compliance with the
regulations of statutory authorities, applicable standards, codes and the manufactures guidelines. In
general, standards and codes shall be those issued or endorsed by Standards Australia. Where no
Australian Standard exists, use the International Standard as published by the International Standards
Organisation including subsequent amendments.
Should there be any conflict between the requirements of a nominated standard and this specification;
the contractor shall obtain written clarification from Griffith University prior to proceeding with the
works.
2.4.2
QUALITY STANDARDS
The Contractor shall have a quality system in place that conforms to the requirements of ISO 9000
series of quality related standards, or shall provide details of progress toward accreditation to the
related standard.
2.4.3
PERFORMANCE STANDARDS
The contractor shall provide to Griffith University prior to on-site works commencing documentation
describing the installation, testing and commissioning methods and procedures. All installation,
testing, commissioning and documentation shall comply or exceed the following standards.
ACIF S009
AS2201.1
AS2201.2
AS2201.3
Revision 1.16
Installation requirement for customer cabling (wiring rules)
System installed in client's premises
Central stations and signalling links
Detection devices for internal use
Page 8 of 51
NOV 2016
AS2201.5
Alarm Transmission Systems
AS/NZS3000
Wiring rules
AS/NZS 2053
Conduits and fittings for electrical installations
2.4.4 ENVIRONMENTAL CONDITIONS
All equipment used in the electronic security system shall be deemed to be “fit for purpose” and
capable of operating continuously and without degradation in performance for 24 hours per day, 365
days per year, in an ambient temperature of -5ºC to +50ºC, with a relative humidity between 5% and
95% (non-condensing).
2.4.5
ACCEPTABLE SPECIFICATIONS AND SOLUTIONS
The University has an ‘Approved Security Products Schedule’ detailing a list of security products that
have been tested and proved suitable for use in the University environment. Equipment that does not
appear in this schedule shall not be used without the item being submitted for formal approval prior
to installation works commencing.
Griffith University has a preferred supplier panel for installers of cabling and equipment for electronic
security systems works comprising these systems or subsystems shall only be carried out by one of
these approved suppliers.
The contractor and personnel carrying out the works must as a minimum have a ACA Open Cabling
Registration to install security cabling. Any individual and company must also hold certification from
the equipment manufacturer that they are able to supply, install, commission and provide on-going
warranty for the product being installed. The contractor and or employee must also hold any relevant
state or federal security industry licensing that may become required.
For ALL IP CCTV systems, cameras MUST be installed and connected to standard POE data outlets.
These data outlets must be installed by a Griffith University Networking and Communication Services;
Information Services approved data and communication contractor with strict adherence to Section
21 – Design Guidelines and Procedures.
Revision 1.16
Page 9 of 51
NOV 2016
3
3.1
CONTRACTORS
GENERAL
The following outlines the Contractors obligations in relation to work performed:

All contractor’s personnel shall observe the safety and security requirements relating to site in
which they are working. Should their conduct be unacceptable or detrimental to the performance
of their duties or that of the University’s employees or other trades, they shall be instructed to
refrain from such actions and / or at the discretion of the University Project Manager be dismissed
from the site.

The Contractor shall attend any site safety inductions as required.

All personnel working in existing building’s shall inform the University’s Project Manager prior to
commencing works on-site.

Prior to offering a fixed price quotation the Contractor shall inspect the site and all relevant
documentation and verify information provided by the University. If a site inspection is not
undertaken, any additional works required which could have been determined from a site
inspection shall be the responsibility of the Contractor. Preference may be given to contractors
undertaking a site inspection.

The Contractor shall guarantee quality of workmanship for a period of one (1) year from the date
of practical completetion.

The Contractor shall provide all cabling and associated installation products required to complete
the project in a manner consistent with best trade practices and in accordance with this
specification, the equipment manufactures documentation, relevant standards and any University
provided site specific instructions, Detailed Design documentation or Scope of Works.

The Contractor shall, immediately upon completion of the security works, return any keys and
access devices to the University Project Manager.

All works performed shall comply with this specification (latest edition), unless written permission
is obtained from the Griffith University Office of Facilities Management – Security and Traffic
Manager.

Any work performed that does not comply with this specification shall be deemed to be noncompliant and shall be rectified by the Contractor at their expense. All rectification works shall be
completed prior to the final inspection of the works by the University Project Manger.

The Contractor shall obtain written approval from the University Project Manager prior to
undertaking any variations to the work.

Prior to the installation of the electronic security system, cabling and device location plans shall be
inspected and endorsed by the University Project Manager.

The contractor shall be responsible for the removal all redundant cable/s, devices and panels from
the site.
3.2
CONTRACTOR PROJECT COORDINATOR
Prior to the commencement of the Contract, the Contractor shall appoint a suitably qualified Project
Coordinator to coordinate and schedule the design, manufacture, delivery, installation and
commissioning of the system.
This person shall be dedicated to the project and an experienced project manager/site supervisor
trained and holding current certification in the design, installation, testing and commission of the
specific Electronic Security Systems to be installed.
Revision 1.16
Page 10 of 51
NOV 2016
The Project Coordinator shall:


Attend all meetings and shall fully acquaint themselves with the contractual and technical
requirements of the contract.
Be responsible for the on-site supervision of all of Contractor’s employees and any third party
subcontractors appointed by the Contractor.
3.3
USE OF SUB-CONTRACTORS
The Contractor shall be responsible for ensuring the quality of all works carried out by a subcontractor
under their control.
The Contractor shall accept the responsibility for any and all damage and the expense incurred, caused
by a sub-contractor under their control.
The Contractor shall be responsible to ensure that any sub-contractor under their control is adequately
covered by insurances such as public liability and professional Indemnity.
3.4
3.4.1
HOURS OF WORK
BUSINESS HOURS WORK
Unless otherwise specified, the installation works shall be undertaken during the hours of 0700 to 1800
Monday to Friday. The Contractor is not limited to these hours however and shall be expected to
complete the works within the specified timeframe, working whatever hours are required to meet the
project time lines.
3.4.2
OUT OF HOURS WORK
Should “Out of Hours” work, be required to complete the installation within the given time lines, or to
carry out disruptive tasks such as cutting core holes or hammer drilling approval will be required from
the University Project Manager before such work takes place.
3.5
SITE SPECIFIC INSTRUCTIONS AND BUILDING OWNER / AUTHORITY REQUIREMENTS
This document is to be read in conjunction with contractual documents and site instructions issued in
relation to work to be undertaken.
The Contractor will observe the Site Safety Plan and any safety requirements issued by the University
Project Manager.
The Contractor will request and observe any requirements of the Building Fitout Manager or the
University Project Manager in relation to amenities, drilling, lifting, ceiling access, etc.
Clearing and removal from site of work related rubbish and debris, and cleaning of the general work
area, shall be the responsibility of the Contractor and shall be carried out at the completion of each
workday. Unless otherwise agreed to by the University Project Manager, the subcontractor will remove
all rubbish, unwanted materials and off-cuts completely from the site. The Contractor shall ensure
debris (from this trade) in ceiling spaces is removed.
Revision 1.16
Page 11 of 51
NOV 2016
The parking of work or personal vehicles is the responsibility of the Contractor. Vehicles will not be
parked on site without the express permission of the University Project Manager or the building site
manager.
3.6
QUALIFICATIONS
The contractor shall ensure that they provide adequate numbers of supervising installers / cablers
holding current trade licences and or registration to perform security cabling. The supervising cabler
or cablers shall be on site at all times during the installation and testing of the electronic security
system. Refer to the relevant section of this document.
The Contractor shall ensure current trade licences and or registrations issued by regulatory or statutory
authorities, are required for the work to be undertaken on the Site are held by each trades person or
subcontractor under their control.
It shall be the responsibility of the Contractor where licences, certificates or tickets are required, but
not held, that these are obtained by the trades person or operator prior to them commencing any
works on Site.
3.7
MANUFACTURER / VENDOR CERTIFICATION
3.7.1
GENERAL
Electronic Security Systems installed on behalf of University shall be an integrated solution capable of
receiving the respective system manufacturer’s certification
The contractor shall be required to possess the relevant vendor qualifications. These qualifications will
be current and relevant to the products being installed as part of the project.
All personnel performing security equipment and cabling installation works must possess the relevant
equipment manufacturer’s certification and ACA Open Cabling Registration as well as any relevant
state or federal security industry licensing.
3.7.2
MATERIALS
All materials supplied by the contractor shall comply with the relevant statutory standards. To ensure
the consistency of the installation of all equipment / hardware and cabling shall be endorsed within
University’s ‘Approved Security Product Schedule’.
No material, equipment or nominated items requiring approval is to be used until written formal
approval has been obtained.
3.7.2.1
SAMPLES
When required submit samples for any device for approval prior to installation. These may include but
should not be limited to:

Access reader;

Door release button mounted on engraved plate;

Door hold open device;

All lock types;
Revision 1.16
Page 12 of 51
NOV 2016

Reed switch (Standard and heavy duty type);

Monitor and bracket;

Internal/external camera, housing and mounting bracket;

Master, Sub-master and Door intercom; and

All cable types to be used.
When samples are supplied they shall be:

Clearly labelled as to the intended application;

Clearly labelled with the relevant specification clause to which they relate;

Adequately packed;
3.7.2.2
SHOP DRAWINGS
Before the commencement of any work and within thirty days (20) working days of being awarded the
contract, the Contractor shall submit for concurrence detailed design documentation and drawings
indicating the following:
Where required, provide shop drawings as follows:

To scale (except schematics and the like);

Bear a reference number, revision number and date; and

Sufficient information by way of notes, location plans and legends

Site layout diagrams

System block diagrams

Schematic diagrams indicating:

Access Control system configuration.

Electric Door Locking system configuration.

Security Alarm system configuration.

Duress Alarm system configuration.

Intercommunications system configuration.

Closed Circuit Television system configuration.

Any equipment rack(s) layouts.

Any necessary patch panel layouts.

Cable types, descriptions and schedules (including proposed routes)

Interconnection details

Equipment schedule detailing device types, makes and models

A work schedule showing project milestones
Once accepted, no changes shall be permitted without written approval of the Project Manager.
On Design and Construct projects, it is the contractor’s responsibility to ensure all work is carried out
as per the latest vision of the plans.
Revision 1.16
Page 13 of 51
NOV 2016
3.7.2.3
TECHNICAL DATA
When required submit technical data for any of the following items for approval prior to installation:

Door hold open device.

All lock Types.

All cable types to be used.

Equipment rack(s).

Any necessary patch panel(s).

CCTV equipment including cameras and CCTV power supplies.
3.7.3
ADDITIONAL WORKS OR “ADDS, MOVES & CHANGES”
Any additional work undertaken as an expansion or modification to the existing System (This is
commonly referred to as “Adds Moves and Changes”) shall be compliant with this specification and
the Scope of Works.
3.7.4
COMPLETION OF WORKS
On completion of work the Contractor shall undertake a pre-witness test and upon successful
completion shall apply for a witness test by Griffith University.
Upon successful witness testing by the University Project Manager, provide all necessary
documentation to Project Manager with 10 working days.
Refer to relevant section of this document for a copy of this form.
Revision 1.16
Page 14 of 51
NOV 2016
4
ENVIRONMENTAL SPECIFICATION
This section describes typical environments within any Griffith University site and describes the
minimum requirements for that environment.
Environmental factors include architectural and heritage constraints imposed on specific sites.
Equipment supplied and installed on any Griffith University shall always be “fit for purpose”.
4.1
GENERAL
It may not be appropriate that the electronic security solution be installed the same way in all areas
within the University. Environmental factors will affect the way in which the infrastructure will be
installed. Contractors shall adhere to the environmental specification so as to prolong the life span of
the system.
4.2
OCCUPATIONAL HEALTH & SAFETY
All Contractors that perform any work on a production site are to undertake a site safety induction.
No Contractor is permitted to commence any work on site without having completed this site safety
induction.
The induction program will be arranged with the Site Manager where applicable.
4.3
DETAIL DESIGN VARIATION TO STANDARDS
These Standards shall apply for installation activity. Due to specific circumstances for a particular site,
the approved Detail Design Document may be at variance to these Standards. In this instance, the
Detail Design specifications shall prevail.
Smaller projects that do not have Detailed Design Document specifications must comply with this
document.
4.4
REQUIREMENTS OF VARIOUS GRIFFITH UNIVERSITY ENVIRONMENTS
Each of the various environments has differing requirements. These environments will be explained
and requirements detailed. Refer to project specific drawings and Scope of Works.
Revision 1.16
Page 15 of 51
NOV 2016
5
TECHNICAL SPECIFICATION
5.1
GENERAL
The University has an “Approved Security Products Schedule”. All equipment supplied under this
Contract shall be supplied in accordance with these requirements or must be approved in writing by
the University’s Campus Life – Security and Traffic Manager prior to the commencement of works.
Power Boards and Plug Packs are not to be used to provide power to any security equipment.
5.2
CENTRAL MANAGEMENT SYSTEM
5.2.1
GENERAL
5.2.1.1
GALLAGHER COMMAND CENTRE FT
The University has an existing Gallagher Command Centre FT (CCFT) system which provides access
control and security solutions for all Griffith University sites. This system shall be expanded for all new
access control / electronic security requirements.
5.2.2
PROGRAMMING OF HEAD EQUIPMENT
All programming of head end equipment will follow a logical sequence that directly mirrors the existing
naming convention used in the Gallagher CCFT system and the as Built Drawings / Documentation. This
is to include a nominated unique equipment numbering system. This is to also include appropriate
descriptor to the client’s representative’s satisfaction and or directed by the Security and Traffic
Manager.
5.3
ACCESS CONTROL SYSTEM OVERVIEW
The access control system will provide, but is not limited to the following functionality:

Be able to integrate with other electronic security sub-systems (duress, CCTV etc)

Utilise both access levels and time zones to determine whether access is be granted;
All access control panels are to be located in a secured room or cupboard approved by Griffith
University Security and Traffic Manager or Project Manager.
The System shall be capable of providing a means of controlling access through nominated doors,
gates, barriers etc by checking the access privileges stored in memory for access credentials presented
at each access control reader.
The System shall also be capable of monitoring the condition of inputs connected to the access control
readers and control panels forming part of the System. The System shall be able to be programmed to
apply a variety of conditions to the way in which these inputs are monitored and annunciate the
condition of each input in accordance with its programming.
The System shall produce and maintain a log of all events that including but are not limited to:

Normal access transactions

Tampers

System critical events, failures and malfunctions

System programming events
Revision 1.16
Page 16 of 51
NOV 2016
The System shall provide an operator with a means of searching and extracting information relative to
particular events, door operations, cardholder events and the production of printed reports detailing
such information.
5.3.1
ACCESS CONTROLLED DOORS
Electric devices used in securing access controlled doors are to be controlled by the associated card
reader, time and/or event program, via the operator terminal or door release panels. Whenever access
controlled doors are opened on presentation of valid credentials, the associated door alarm will be
suppressed.
Access controlled doors shall provide indication of the status of the door (open or closed) to the
operator through the User Interface. (eg. reed switch)
Forced Door Alarm functionality is to be provided on ALL access controlled doors and are to be
monitored by the operator through the User Interface.
5.3.2
CAR PARK CONTROL SYSTEM
A controlled access system will be provided to restrict unauthorised vehicular access to the secure
vehicle car park.
Configure the system as follows:

Allow operation of the gate through the Access Control System via the presentation of a valid
proximity access card or other valid access credential;

Weatherproof readers mounted onto a steel pedestal;

Steel pedestals to accommodate an intercom;

Face plate of each pedestal to be non-ferrous to maintain maximum card reader range;

Pedestal to be designed to the approval of the Architect and Project Manager;

Secure face plate of each pedestal with tamper proof screws;

Provide all necessary security control equipment and logic interfaces to the control station
Licence Plate Recognition:
Griffith University has an existing Licence Plate Recognition system, Genetec AutoVu. Where required
in the scope of works this system shall be used. This system shall also interface directly with the
Gallagher system for access control decisions.
5.3.3
LIFT SERVICE WORKS
Where lift security is specified, the Lift Contractor is to provide a trailing cable and tie cables to an
enclosure (to be provided by the Security Contractor) located outside the lift motor room from each
lift car for connection of the following:
Table 1 - Lift Services Cabling
Security Item
Card Reader
Revision 1.16
Location in Lift
Mounted on Lift Panel
Page 17 of 51
Cable type
2 x single pair (2 wires) screened
NOV 2016
Camera video and
cabling (analogue)
power Corner of lift car roof in 1x RG-6 coax for video
ceiling space
1x Single (2 wires) pair screened for
power
Camera video
cabling (digital)
power Corner of lift car roof in 1 x POE CAT 6 terminal
ceiling space
and
Note: All cables within lift car to be suitably labelled to identify purpose.
5.3.4
ACCESS CONTROL ALARMS
A separate alarm message shall be transmitted to the Access Control System “Head End” for each of
the following alarm conditions but is not limited to:

Door forced open

Door held open too long

Invalid card
The alarm messages shall be displayed in plain English text.
Each alarm shall clearly identify the time, location and type of alarm.
Access Control Panels (ACP) to comply with the following:

Facilitate the connection of access readers as detailed on the drawings.

Validation data and alarm status data will be maintained locally.

ACP will be capable of being updated via the operator terminal and fully configured (control data,
time schedules, etc.) from the Head End Software.

ACP will operate in a completely stand-alone mode for a minimum of twenty-four hours in the
event of communication loss with the Head End Software.

Be fitted with output control facilities, to enable activation of field equipment either by automatic
reaction to events, or by operator intervention via the keyboard.

Be housed in a secure cabinet equipped with an anti-tamper device.

Check each access card presented against authorised data based information.

Be continuously polled by the Head End. When all access card data is valid, the reader terminal
shall grant access. Invalid data shall be logged and recorded on systems data storage facility.

ACP’s will include a timer, adjustable from 0 to 3 minutes, which is to shunt the door alarm contact
on the associated door, for the period of the timer, whenever access is granted. The timer is to be
set to allow sufficient time for the door to be used and closed again. If the door remains open for
a period exceeding this time, only then is an alarm to be displayed on the operator terminal as the
normal security alarm for that door and logged and recorded.

Provide mains fail and low battery condition alarms (separate alarm inputs) to the operator
terminal with the appropriate alarm text.

At Practical Completion, provide a minimum of 30% spare door control input on each ACP to enable
future connection.
5.3.5
ACCESS CARDS
Access Cards to comply, but is not limited to the following:

The format of the cards to be provided shall be dual technology ISO 125kHz/MiFare 4k
Revision 1.16
Page 18 of 51
NOV 2016
5.3.6
ACCESS READER
Access control readers are to be proximity type operating with passive proximity cards capable of
reading 27 Bit, 125 KHz Motorola type cards currently used by Griffith University, as well as dual tech
Gallagher 125/MiFare Plus cards to which Griffith University will use in the future.
Card reading is required to be both rapid and consistent, regardless of the orientation of the card and
further enclosure of the card.
Access readers to comply, but is not limited to the following:

Card readers are to be surface wall mounted and are to be vandal proof type.

Standard readers will have a minimum read range of 100mm.

Audible and visual indication of a valid, invalid and faulty card read.

Mounted on the lock side of the door where practical, 100mm from the frame of the door.

The centre line of the access reader to equal the centre line of the lock/latch assembly for the
associated door.
5.3.7
SONALERTS
Sonalerts to comply, but is not limited to the following:

Locate above external access controlled fire doors, if required.

Sound if the door remains open longer than a predetermined period. Should the door continue to
remain open longer than a second predetermined period, only then is an alarm to be generated at
the operator terminal.

Capable of being isolated via the operator terminal and be disabled when the associated door is in
access mode.

Flush ceiling mounted, complete with sound selection and level adjustment.
5.3.8
DOOR RELEASE BUTTONS (IF REQUIRED)
Door release buttons to comply, but is not limited to the following:

Install on the secured side of selected access controlled doors as indicated on the drawings and
MUST be non-powered.

On activation, the associated door alarm will be deactivated for a period and the power
interrupted, to allow travel through the door and door to close, while sending a door exit signal to
the Head End User Interface. Door release buttons for automatic sliding doors are to send a signal
to both the Gallagher ACP and door controller. (Dual redundancy)

Door release buttons will be NON-POWERED Green, with a mushroom head, mounted on a white
switch plate engraved with the wording PRESS TO EXIT using 5mm high Universal font.

Compatible with the requirements of the access control system and door locks (ie. the device will
signal a valid egress to the ACP before releasing the electronic lock).

The centre line of the door release button will be equal to the centre line of the lock/latch assembly
for the associated door.
5.3.9
EMERGENCY DOOR RELEASE UNIT
Emergency door release unit to comply, but is not limited to the following:

Install on the egress side of selected access controlled doors as indicated on the drawings.
Revision 1.16
Page 19 of 51
NOV 2016

On activation, power will be directly interrupted to the door. Simultaneously, the associated door
alarm will be activated and can only reset from the operator terminal. An alarm signal will be sent
to the Access Control System and logged.

Emergency door release units will be KAC type (double pole), white in colour, engraved with the
wording EMERGENCY EXIT BREAKGLASS TO RELEASE DOOR.

Compatible with the requirements of the access control system and door locks (ie. the device will
directly cut power to the lock (fail-safe) and signal breakglass activation to the CMS.

The centre line of the emergency door release unit will be equal to the centre line of the lock/latch
assembly for the associated door.

Where a facility or room is deemed to be a bookable space by users other than Griffith University
staff or students and an electronically locked door on an emergency path of egress must be fitted
with a Panic Exit device or crash bar, where required by BCA.

The Panic Exit device must have the same functionality as other electronically controlled doors –
ie door position monitoring, lock monitoring, ability to be locked, unlocked both by card and
remote software.
5.3.10 ELECTRIC DOOR LOCKING SYSTEM
5.3.10.1 ELECTRIC MORTICE LOCKS
Electric mortice locks to comply, but is not limited to the following:

Shall be configured for power to unlock (fail secure) with dead latch, unless otherwise specified.
Refer to drawings to determine lock operation (fail safe/secure).

Shall be capable of Key Manual Override

Shall monitor key override function.

Shall monitor door handle operation.

Shall monitor dead latch and door closed status (in series with reed switch).

Shall have door forced alarm monitoring.

Fit with internal door release switch and be free handle exit (Do not use standalone door release
buttons).

Operation of a free handle shall suppress the associated access control door alarm.

If the lock is fitted with an LED, then this shall be wired to display RED on locked and GREEN on
free.
5.3.10.2 ELECTRIC STRIKES
Electric strikes will only be installed with the express written approval of Griffith University Security
and Traffic Manager. If approval is obtained Electronic Strikes shall comply, but is not limited to the
following:

Shall monitor dead latch pin and electric tongue sensor.

Shall have door forced alarm monitoring.

Request to exit buttons fitted on secure side of nominated doors

Shall be configured for power to unlock (fail-secure) with dead latch, unless otherwise specified.
Refer to drawings to determine lock operation (fail safe/secure).

Tongue sensor wired in series with reed switch.
Revision 1.16
Page 20 of 51
NOV 2016
5.3.10.3 ELECTROMAGNETIC LOCKS
Electromagnetic Locks to comply, but is not limited to the following:

Single doors shall be fitted with EML 6 type locks.

Double doors shall be fitted with EML 10 type locks.

External Gates shall be fitted with external EML type locks.

Provide Hall Effect sensor (Internal Bond Sense) to detect that the door has closed and the
magnetic field has bonded to the lock.

Securely fasten to the head or top frame of the door. If the frame is not structurally strong enough
to prevent lock movement, the Contractor shall strengthen the frame or mount the lock in such a
manner to ensure it is securely fastened.

The contractor shall ensure that the method of installation shall reduce the clear opening distance
of the doorway.
5.3.10.4 CABLE TRANSFER UNIT
Cable transfer units to comply but is not limited to the following:

Shall conceal all cabling.

Shall be installed to all electric mortice lock doors so that cabling can transfer from the door frame
to the door leaf.
5.3.10.5 AUTOMATIC SLIDING DOORS

Doors are to be controlled in such a manner that when the Access Zone is in Free mode the
automatic sliding door is set to auto via enablement of the door PIR’s.

When the Access Zone is Secure then the door shall only be opened via a reader with a valid card
or via a REX button see 5.3.8

All automatic doors are to report Door Forced, Door Open Too Long and valid REX signals to the
Electronic Security System
5.3.11 NAMING CONVENTIONS
Naming conventions for all equipment shall be in a format approved by the university. No variation to
Griffith University Standard Hardware Naming Convention document will be allowed unless written
approval is obtained from the Griffith University, Campus Life – Security and Traffic Manager.
5.4
SECURITY ALARM SYSTEM OVERVIEW
If the site has a GALLAGHER FT system then a separate security alarm system is not to be installed.
The Security Alarm System will provide, but is not limited to the following functionality:

Provide indication of the condition of detection devices connected to the inputs of the Security
Alarm panels forming part of the System.

The System shall be able to be programmed to apply a variety of conditions to the way in which
these inputs are monitored and annunciate the condition of each input in accordance with its
programming.
Field alarm devices, eg Detectors, Reed Switches, and Duress Buttons etc, shall be separately and
independently connected to a separate and individual alarm input.
Revision 1.16
Page 21 of 51
NOV 2016
All security panels are to be located in a secured room or cupboard (preferably in the same space as
the access control panels) and the door to that space must be electronically monitored.
Naming conventions for all equipment shall be in a format approved by the university. No variation
will be allowed unless written approval is obtained from the Griffith University, Office of Facilities
Management – Security and Traffic Manager.
5.4.1
SECURITY SYSTEM ACCESS CODES
Program user codes according to written directions from the University Project Manager.
5.4.2
ALARM MONITORING
The system is required to be monitored by the University’s nominated security monitoring centre.
The following alarms shall report to University’s nominated security monitoring centre but is not
limited to the following:

Tamper alarms of all system components including detection devices on a 24 hour basis;

Duress alarms on a 24 hour basis;

Intruder alarms outside normal business hours;

System seal and unseal events, including times and users;

Partial system seals;

Alarm restoration;

Zone isolations;

Low battery;

AC fail;

Fuse failures; and

Daily communications test and test results;

System lockout after a preset number of unsuccessful code attempts
The Contractor shall coordinate, test and commission the remote monitoring facility via an alarm PSTN
dial-up service or other approved communication method (eg: 3G/4G or IP)
The Contractor shall liaise with University’s nominated security monitoring centre during the test and
commissioning phase to ensure all alarms are reporting properly.
5.4.3
ALARM MONITORING PANEL
Alarm Monitoring Panels (AMP) shall comply, but is not limited to the following:

Facilitate the connection of security field devices as detailed on the drawings.

Be fully intelligent devices capable of processing, transmitting and receiving alarm and control data
from the security communications network.

Control data and alarm status data will be maintained locally.

AMP will be capable of being updated (control data, time schedules, etc).

AMP will operate in a completely standalone mode for a minimum of twenty-four hours in the
event of communication and power loss.

Be fitted with output control facilities, to enable activation of field equipment either by automatic
reaction to events, or by operator intervention via the keyboard.
Revision 1.16
Page 22 of 51
NOV 2016

Be housed in a secure cabinet equipped with an anti-tamper device.

Provide mains fail and low battery condition alarms (separate alarm inputs) to the operator
terminal with the appropriate alarm text.

At Practical Completion, ensure a minimum of 30% spare inputs, are available on AMP’s to enable
connection of additional security devices.
5.4.4
ALARMED DOORS
Access Control and alarmed doors to comply, but is not limited to the following:

Fit with flush magnetic reed door contacts.

Unauthorised access will cause an alarm to be generated at each Operator console.

The alarms associated with emergency exit doors are to be active and instantaneous twenty-hour
(24) hours per day.
5.4.5
ALARM INPUTS
Alarm inputs to comply, but is not limited to the following:

Connect to an individual alarm input.

The only exception is double sets of doors, where each leaf is to be alarmed, but connected to a
single input.
5.4.6
DETECTORS
The maximum number of detectors per alarm input is one (1).
Each individual detector is to report as an individual alarm. The number of detectors to be installed in
an area shall be suitable to the size of the area requiring coverage as specified by the detector
manufacturer.
All cable entries into the detector is to be sealed to prevent the ingress of dirt, insects and the like that
may cause environmental false alarms.
5.4.6.1
WALL MOUNTED DUAL TECHNOLOGY DETECTORS

Located on the wall closest to the position detailed on the attached drawings giving consideration
to coordination with other services equipment.

Shall be mounted at a height and orientation in accordance with the manufacturer’s
recommendations.

The detector when mounted flat on the wall shall be fixed through the rear of the detector (behind
the printed circuit board) or using a metal or other suitably secure manufactured bracket if
mounted in a corner, to ensure that the active field of view does not encroach onto adjacent
external windows.

The configuration shall be such that both technologies must detect motion before an alarm is
signalled (using AND logic).

Sensitivity to be set to give maximum detection capability with NIL false alarms.

The detector cover is to be tamper switched.

The detector shall be installed so the active fields of view provide protection to all possible access
points to the area. Eg: windows, doors, trapdoors etc.
Revision 1.16
Page 23 of 51
NOV 2016
5.4.6.2
CEILING MOUNTED 360° DUAL TECHNOLOGY DETECTORS

Located at the position detailed on the attached drawings giving consideration to coordination
with other services equipment.

Shall be mounted in accordance with the manufacturer’s recommendations.

The configuration shall be such that both technologies must detect motion before an alarm is
signalled (using AND logic).

Sensitivity to be set to give maximum detection capability with NIL false alarms.

The detector cover is to be tamper switched.

The detector shall be installed so the active fields of view provide protection to all possible access
points to the area. Eg: windows, doors, trapdoors etc.
5.4.7
5.4.7.1
MAGNETIC REED SWITCHES
FLUSH TYPE
Flush magnetic reed switches to comply, but is not limited to the following:

Install on nominated internal and perimeter doors as indicated on the drawings.

Installed on the top of the door 100mm from the edge.

Installed opposite hinge or pivot.
5.4.7.2
SURFACE TYPE
Surface magnetic reed switches to comply, but is not limited to the following:

Install on nominated internal and perimeter doors as indicated on the drawings.

Installed on the top of the door 100mm from the edge.

Installed opposite hinge or pivot.
5.4.7.3
SURFACE TYPE (HEAVY DUTY)
Surface magnetic reed switches to comply, but is not limited to the following:

Install on roller doors, gates as indicated on the drawings.

Provide tamper proof junction box for cable terminations and end of line resistors.

Position so as not to be damaged by vehicles or other traffic.

Stainless steel armoured cable.
5.4.8
END OF LINE RESISTORS
All end-of-line resistors must be located at the peripheral device connected to the system and be
installed to monitor 4 states – open, closed, short-circuit and open-circuit.
5.4.9
ANTI-TAMPER CIRCUITS
All field equipment to comply, but is not limited to the following:

Fit with an anti-tamper device.

Circuit is not to be suppressed when the system is in access mode.
Revision 1.16
Page 24 of 51
NOV 2016
5.5
DURESS ALARM SYSTEM OVERVIEW
The Duress Alarm System will provide, but is not limited to the following functionality:

Be able to be integrated with the other electronic security systems installed onsite.

Provide indication of the condition of duress devices connected to the inputs of the Duress Alarm
panels forming part of the System.

The System shall be able to be programmed to apply a variety of conditions to the way in which
these inputs are monitored and annunciate the condition of each input in accordance with its
programming.
Each duress point is to report as an individual alarm. Individual portable radio duress activators are to
be treated as individual alarm points, and are to report as individual alarms.
When specified within the scope of the project, all duress alarms shall also be enunciated in the
nominated area as defined on accompanying drawings.
Duress alarm signals shall also be transmitted on a 24-hour basis to University’s nominated security
monitoring centre and must be afforded the highest priority alarm status.
Naming conventions for all equipment shall be in a format approved by the university. No variation
will be allowed unless written approval is obtained from the Griffith University, Office of Facilities
Management – Security and Traffic Manager.
5.5.1
DURESS BUTTONS (IF REQUIRED)
Under bench and desk buttons shall comply with the following:

Surface mounted on the underside of the bench or desk and fixed with 6 gauge counter-sunk
screws.

Set back from edge of the bench or desk by 25mm.

Shrouded to reduce the risk of false activation.
Wall mounted duress buttons in all other areas shall comply with the following:

Mount at 1100mm from the finished floor level.
Device shall be installed with pushbutton facing downwards and fixed to wall with 6 gauge countersunk screws.
5.6
CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM OVERVIEW
5.6.1
GENERAL
The Closed Circuit Television (CCTV) System also referred to as a surveillance system will provide, but
is not limited to the following functionality:

Be able to be integrated with the other electronic security systems installed onsite.

The University’s CCTV System serves the following principal purposes:

To prevent crime, misconduct and disorder by acting as a psychological deterrent to potential
offenders;

To aid the detection of crime, misconduct and disorder and enable a greater proportion of
crime to come to the attention of Crime Enforcement Authorities or security personnel;
Revision 1.16
Page 25 of 51
NOV 2016

To enhance the apprehension and successful prosecution of offenders by facilitating the
gathering of evidence;

To reduce the likelihood of theft or damage to University property or assets; and

To monitor utilisation of teaching and learning spaces so that the University’s assets may be
used in the most efficient and effective manner.

Be installed, operated and managed in line with the requirements of the Griffith University
CCTV and Surveillance policy
All necessary system design, programming (ie. videotext, point descriptors, display maps, alarm
message text) is to be included.
All CCTV installations and changes require the express permission of the Director, Campus Life and
Vice President (Corporate Services) as per the Griffith University Closed Circuit Television and
Surveillance policy.
Where an IP camera system is to be installed, CAT 6 cabling must be installed by a Griffith University
INS approved data contractor. The outlet for each camera must be completed with adherence to
Section 21- Communication and Data Services, of the Design Guidelines & Procedures document.
5.6.2
SYSTEM FUNCTION
The University protects its Sites and the buildings and physical property on those Sites in accordance
with the Security Policy. Notwithstanding this, the open and accessible nature of the majority of its
buildings and Sites has resulted on occasion in damage and loss of the University’s property and assets
and/or unauthorised access to Sites. To deter and protect its property and assets and measure the
utilisation of specific spaces and assets the University employs a CCTV System.
5.6.3
DIGITAL VIDEO RECORDER
All IP solution cameras will be installed and programmed on the relevant Griffith University CCTV
virtual server. No building based servers are to be installed or allowed for unless express written
permission from the Campus Life – Security & Traffic Manager is obtained.
5.6.4
VIDEO OUTPUT DISPLAY
This shall be taken into account prior to locating, installing and commissioning cameras. Approval shall
be sought from the University’ Project Manager before final camera placement is undertaken.
5.6.5
PROGRAMMING
Programming of the system shall be such that it shall be possible for an authorised operator to easily
change any or all of the system programming parameters with minimal training.
Specific details on how the video control and management system is to be programmed shall be
provided to the Project Manager for approval prior to the commencement of installation.
Naming conventions for all equipment shall be in a format approved by the university. No variation
will be allowed unless written approval is obtained from the Griffith University, Campus Life – Security
and Traffic Manager.
Revision 1.16
Page 26 of 51
NOV 2016
5.6.6
ALARM HANDLING
The system shall include a comprehensive suite of alarm handling routines. Upon receipt of alarm the
associated video input(s) shall be switched to the programmed monitor output for display along with
a pre-programmed alarm enunciated message.
The video management system shall detect video signal failure and initiate an alarm for the user.
5.6.7
CCTV INTERFACE
Provide an interface between the security and surveillance systems to automatically activate the video
surveillance system on activation of the appropriate alarm. The appropriate alarms that trigger the
video surveillance system will include but is not limited to: use of an intercom station, monitored
points, door open too long or door forced alarms and duress alarms, etc., associated in the general
vicinity of a video surveillance camera.
Each security alarm is to be transmitted to the surveillance system as an individual signal. The video
surveillance system shall be configured to activate the appropriate camera, monitor, etc.
5.6.8
CCTV MANAGEMENT SOFTWARE
The software will provide, but is not limited to the following functionality:

The ability to view images as full screen or multi-screen displays;

Ability to network multiple PCs together and view any or all camera images simultaneously;

Individual user and password for system management and remote site access at each PC; and
5.6.8.1
IMAGE AUTHENTICATION AND SYSTEM PROTECTION

Time and data text will be permanently embedded within the recorded image;

Images will be individually watermarked;

The system will provide extensive, user definable password protection (entered via keyboard) for
access to playback, record and system set-up functions;
5.6.9
MATRIX SWITCH
The matrix switch (where required to manage camera system) is to conform, but is not limited to the
following:

The video matrix switcher shall have a capacity to connect all cameras, monitors and keyboards
with a spare capacity of at least 30%, or a minimum forty (40) video inputs, eight (8) video outputs,
and three (3) control keyboards, whichever is greater.

Provide sufficient alarm inputs (make contact or open collector input) for all functions with an
additional 30% spare capacity

Provide sufficient relay outputs (make contact or open collector input) for all functions with an
additional 30% spare capacity

All video inputs of the matrix switcher shall include down frame looping cards (DFL), the looping
output of the down frame looping cards shall be connected to an input of a DVR.

All video signals, shall be looped-through a Patch Panel before being routed through to the matrix
switcher

Shall automatically switch a camera image to the console monitor on an alarm
Revision 1.16
Page 27 of 51
NOV 2016

Shall be password protected with least two access levels
5.6.10 CAMERAS
Cameras to conform but is not limited to the following:

Mounted in appropriate approved housing and supported by appropriate approved brackets.

Shall be phase locked and synchronised to ensure clean, roll-free switching and image stability.

Shall be installed and commissioning to ensure, focus, clarity and brightness of image at each
Operator Console and Recording Device is maintained in all operating conditions.

Shall be powered from a centralised distributed power supply. Plug packs are not acceptable.
5.6.11 LENS
Lenses to conform, but is not limited to the following:

Shall be vari-focal, video driven auto iris type.

The specific focal length required for each camera position will be determined on site. Lens focal
length will typically range from 4mm – 16mm.
5.6.12 CAMERA HOUSINGS AND MOUNTS
5.6.12.1 INTERNAL HOUSINGS
Internal housings to conform, but is not limited to the following:

Fitted with screw fixings to prevent unauthorised access.

Sealed and secured.
5.6.12.2 EXTERNAL HOUSINGS
External housings to conform, but is not limited to the following:

Fitted with screw fixings to prevent unauthorised access.

Sealed and secured.

Provide external housings with a sunshield. (The environmental conditions at some sites may
require external housings to be provided with a heater, blower, thermostat and sunshield. The
Contractor, following a site inspection, will be responsible for determining and providing an
appropriate housing to suit the environment.)
5.6.12.3 CAMERA MOUNTING
Camera mounting to conform to the following:

Utilise wall or ceiling mounted brackets

Provide manual adjustment of position of 0 degrees to 90 degrees tilt and 360 degrees pan

Be firmly locked into the desired position and be rigidly supported to prevent any vibrations and
movement.
Revision 1.16
Page 28 of 51
NOV 2016
5.6.12.4 MOUNTING POLES
External cameras will be typically wall mounted however, selected external cameras will be mounted
on a lighting type column supplied and installed by the Security Contractor.
Camera poles to conform to the following unless otherwise specified:

104mm square section steel (as a minimum)

Minimum 4.0 metres high from finished floor level and underside of camera bracket.

Black powder coated in colour

Fitted with a head frame for the direct mounting of the camera housing brackets

Have a weatherproof and tamper-proof compartment at the base, for the enclosure of wiring and
connectors.

Provide a base-plate suitable for mounting on a rag bolt assembly.
Note: It is the responsibility of the Security Contractor to provide the rag bolt assembly and all
associated hardware. The Security Contractor shall coordinate these works with the University Project
Manager and Builder for the correct setting up, vertical alignment and grouting under base plate as
necessary.
5.7
CCTV SYSTEM TESTING
In addition to the manufactures requirements the following specific CCTV System testing shall be
conducted, as part of the commissioning and acceptance testing procedures outlined further in this
document.
5.7.1
EQUIPMENT TESTING
Equipment tests shall include but is not limited to:

Proposed camera(s) resolution,

Proposed lens(s) resolution,

Proposed camera(s) colour test under natural and artificial light,

Proposed video capture card(s) resolution,

Proposed video recorder(s) recorded resolution,

Installed camera and lens back focus, tested on site during the day and night.
5.8
INTERCOMMUNICATIONS SYSTEM OVERVIEW
5.8.1
GENERAL
The Intercommunications System will provide but is not limited to the following functionality:

Be capable of being integrated with other electronic security systems installed onsite.

Provide audio communication facility to the master station from all sub master and field stations.
Provide Field stations to each of the nominated locations. Each field station may separately or
severally call one (1), some, or all master and sub master stations.
Revision 1.16
Page 29 of 51
NOV 2016
To receive an incoming call at a master station, a call initiated from a field station will illuminate at the
master station and a tone shall sound. The operator at the master station can elect to receive the call
by selecting the relevant field station button.
The master station speaker and microphone are then activated allowing connection to the field station.
The field stations will be hands free in operation once a master station accepts or initiates a call. The
master station will have the ability to terminate the call.
Each additional incoming call will sound a tone and the relevant field station indicator will be displayed
until the call is accepted at the receiving master station.
The master station will be capable of initiating a call to any field, master or sub master station such
that a tone is sounded at the recipient station. It will be possible for field stations to call master stations
but no other field stations.
The contractor shall provide details of the proposed programming of the intercommunications system
to the Project Manager prior to installation.
5.8.2
EXCHANGE
Shall conform as a minimum but is not limited to the following:

Located as defined on drawings or in Scope of Works.

Provide sufficient number of inputs to allow connection of all field stations.

Provide spare capacity for the connection of an additional 30% field stations.

Provide a regulated power supply and cabling terminal block at the Station.

Enclosed in an enclosure of approved manufacture which is monitored for tamper protection.
5.8.3
MASTER STATION
Intercoms shall conform as a minimum but is not limited to the following:

Label each button (with suitably printed text) to identify each field station.

Labelling and text font shall be approved by the University’s representative prior to installation.

All incoming calls will be indicated with an illuminated light and a corresponding tone.

No hum or interference will be detectable.
5.8.4
SUB MASTER
Intercoms shall conform as a minimum but is not limited to the following:

Label each button (with suitably printed text) to identify each field station.

Labelling and text font shall be approved by the University’s representative prior to installation.

All incoming calls will be indicated with an illuminated light and a corresponding tone.

No hum or interference will be detectable.
5.8.5
FIELD STATION
Intercoms shall conform as a minimum, but is not limited to the following:

Flush mounted and centred at 1300mm from the finished floor level, with the exact location for
installation to be determined on site to the approval of the Project Manager.
Revision 1.16
Page 30 of 51
NOV 2016

Face plate to have engraved operating instructions.

No hum or interference will be detectable.
5.8.6
CCTV SYSTEM ALARM OUTPUTS
Provide an output signal for each field station in the form of a normally closed, voltage free, relay
contact, which is to activate/open upon the operation of a call button on a field station.
Configure the output to display an appropriate camera view a monitor located at each Operator
console.
5.9
SYSTEM POWER SUPPLIES
Plug Packs and power boards shall not be used in any instance.
All power supplies installed for the provision Extra Low Voltage power to any part of the equipment
installed at the Site shall conform but is not limited to the following:

Individual power supplies shall be provided for the supply of power to locks and shall be segregated
from power supplies provided for other electronic equipment;

Shall be installed in accordance with the manufacturers recommendations;

Shall be provided with a minimum allowance of 30% spare capacity
5.9.1
STANDBY POWER SUPPLIES
Standby power supplies to comply, but is not limited to the following:

Fit to all access control and alarm monitoring panels.

Shall be integral to all alarm and access control panels.

Shall be installed in suitable enclosures.

Stand by batteries to be installed in suitable enclosures and provide power to the field cabinet for
a period not less than four (4) hours.
5.10 RACKS
Where specified on drawings or in Scope of Works the system equipment with the exception of field
panels and devices, operator consoles, monitors etc shall be housed in a 19 inch type rack to be
provided and installed as part of these works.
Racks shall be enclosed on all sides with lockable doors front and rear including vertical power
distribution rails, cable management (with separation between power and signal cables in accordance
with AS3000 and ACA Cabling Regulations), ventilation (if necessary install fans), cable termination
panels etc.
The rack enclosure is to be constructed with ample manufactured ventilation slots or pores.
The rack shall be positioned such that equipment can be readily accessed, front and rear for
maintenance and servicing purposes.
The rack shall be designed to accommodate all nominated equipment allowing for a 1RU space
between equipment components.
Revision 1.16
Page 31 of 51
NOV 2016
Patch panel(s) shall be provided for all incoming and outgoing video and data cabling.
Cable management shall be provided for all internal and external cabling.
30% spare 240 VAC GPOs shall be provided for testing and servicing.
The rack is to be securely fixed to the floor or wall and equipment securely mounted inside it.
Revision 1.16
Page 32 of 51
NOV 2016
6
CABLING AND EQUIPMENT INSTALLATION
6.1
GENERAL
Provide all materials, equipment and fixings and all necessary cable trays and conduits, control and
power cabling to ensure full operation of the system as specified.
Materials and standards of workmanship shall fully comply with the relevant documents of the
Standards Association of Australia.
All cabling and conduits and ducting are to be fully concealed. Where concealment of cables and
conduit is not possible, written approval to proceed shall is required from the Project Manager prior
to the commencement of this work. This approval is to be obtained in writing prior to installation.
The Contractor shall design all cabling networks such that voltage drops; video signal attenuation,
cable separation and ground loop parameters are designed in accordance with the relevant Standards
and equipment manufacturer’s recommendations.
All cabling shall be adequately shielded to prevent the introduction of spurious signals being generated
onto or from adjacent cables/services. The Contractor shall ensure that shielded cable shall be used
wherever spurious signals could affect the proper operation of the system or other services.
Open wiring is permissible in enclosed, secure spaces under floor, in ceiling and wall cavities and on
cableways only.
6.1.1
POSITIONING OF EQUIPMENT
The layout of equipment shown on the drawings is diagrammatic only, and exact locations shall be
determined on site. Also refer to requirement for location of cameras specified under CCTV within this
specification.
Equipment shall be symmetrically located in relation to other equipment, devices, the building module
and general aesthetic treatment.
6.2
ELECTROMAGNETIC COMPATIBILITY
All equipment and/or appliances provided are to be designed so that no interference will be caused
with any radio or other electronic transmitting or receiving equipment in the same locality.
6.3
CONDUITS
6.3.1
GENERAL
Conduits concealed in wall chases, embedded in floor slabs or installed in inaccessible locations are to
be complete with a draw cords to enable the pulling in of cabling: Run directly between points of
termination, minimising the number of sets. Do not use inspection fittings.
Conduits and fittings are to comply, but is not limited to the following:

Underground conduit use white heavy duty rigid UPVC;

20mm minimal bore;

Use inspection-type fittings only in accessible locations and where exposed to view;

Provide straight long runs, smooth and free from rags, burrs and sharp edges;
Revision 1.16
Page 33 of 51
NOV 2016

If installed in damp locations, galvanise mild steel wiring enclosures and support systems;

If exposed to view, install conduits in parallel runs with right angle changes of direction;

Spare conduits to have:

draw cords installed;

1m of cord coiled at each end of the run;

Use polypropylene cord, or insulated stranded earth wire, 2.5mm2 minimum size;

Provide draw-in boxes at intervals not exceeding 30m in straight runs, and at changes of level or
direction; and

For underground draw-in boxes, provide gasket covers and seal against moisture.

Light duty rigid PVC conduit except in plant areas and exposed external locations or where there
is a security risk;

For installations in car parks and plant rooms below 2100mm above finished floor level use
galvanised steel conduits. For installations above 2100mm use galvanised steel or heavy duty nonmetallic conduit;

Seal other ducts and conduits after cable installation.
6.3.2
METALLIC CONDUITS

Metallic conduits and fittings to comply, but is not limited to the following:

Comply with AS2052;

Screwed steel;

For steel conduits, paint ends and joint threads with zinc rich organic binder to GPC-C-29/16;

Provide flexible couplings consisting of flexible conduit and fittings in the following instances:

at structural expansion joints;


in long straight runs if the ambient temperature varies by more than 40oC.

Maintain electrical conductivity between the two ends of rigid metallic conduit; and

Provide conduit support saddles close to flexible couplings to permit free movement for
expansion and contraction.
Conduits shall be fixed at intervals of not less than 400mm utilising full metal saddles. Metal half
saddles and PVC saddles shall not be accepted.
6.3.3
CONDUITS IN CONCRETE SLABS
Do not install conduits in the following areas:

In concrete toppings;

Within pretension cable zones;

Cross pretension cable zones at right angles;

Avoid crossovers and minimise the number of conduits in any location;

Space parallel conduits at the minimum distances required by the ACMA;

Maximum conduit size 25 mm diameter.
6.3.4
CONDUITS BLOCK WORK
Revision 1.16
Page 34 of 51
NOV 2016
Locate conduits in the core and fill sections of precast hollow.
6.3.5
CONDUITS IN COLUMNS
Do not place more than four (of maximum conduit size 25mm diameter) conduits centrally in each
column.
Enter columns via bends with minimum radius of 150 mm.
Do not chase columns unless where approval is obtained.
6.3.6
FLEXIBLE CONDUIT
Corrugated flexible conduit may only be used where sweep bends are required and for final
connections into cameras, or for the enclosure of cabling where it is necessary to transverse a mains
cable way.
Do not use flexible conduit for straight runs or chased into walls or underground cabling.
6.3.7
CONDUITS AND FITTINGS - EXTERNAL USE
Where exposed to the weather or dampness, provide junction boxes with covers of heavy gauge
material fitted with a neoprene gasket.
In damp and/or exterior locations, mount conduits using pre-painted galvanised saddle spacers of not
less than 13mm from surfaces concerned.
6.4
6.4.1
CABLING - INSTALLATION METHODS
GENERAL
Install cables in a workman like manner parallel to walls, floors and ceilings, as applicable.
Neatly loom and continuously cable tied to the catenary cable or enclosed in conduit, tray or ducting.
Install cables in a manner to eliminate any possibility of strain on the cable itself or on cable
terminations.
Do not embed cables directly in plaster, concrete, mortar or other finishes.
Install cables a safe distance from items liable to become hot.
Care shall be taken in the grouping and installation of single core power cables to reduce inductive
effects, including effects on surrounding metalwork.
Do not install cables from different distribution systems and system voltages or switchboards in the
same length of conduit, duct or junction box.
Bending radii are to be less than the maker's recommendation and in all cases not less than six times
the overall cable diameter.
Install cables straight for at least 300mm immediately prior to entering equipment.
Revision 1.16
Page 35 of 51
NOV 2016
Where groups of sheathed cables are bunched together in the one enclosure, the maximum number
of layers shall be two (2).
6.4.2
CABLING IN FALSE CEILING SPACES
Support cables at intervals not exceeding 1200mm using catenary wires or approved dedicated
hangers fixed to the ceiling structure. Cabling shall not be secured to hangers provided by other
services, pipes, ceiling rods, or other non-structural supports within the ceiling space.
Cables shall be neatly grouped together such that cables do not rest at any point on the topside of the
false ceiling, lighting fittings or other heat producing equipment.
Where tile ceiling support systems are utilised, PVC/PVC cable shall be fixed at intervals not exceeding
300mm in all spaces greater than 600mm deep. In spaces less than 600mm deep PVC/PVC cables may
be fixed at intervals not exceeding 1200mm.
6.4.3
CABLING IN PARTITIONS AND SIMILAR ENCLOSURES
Install cables in areas free from the protrusion of screws and similar fasteners.
Allow cables to run slack.
6.4.4
CABLING INSTALLED VERTICALLY
Support cables running in vertical ducts at intervals not exceeding 1200mm.
Acceptable methods of support include cable tray, cable ladder, unistrut channel or equivalent.
Support cables installed in vertical wiring troughs at a maximum of 5 metre intervals using an efficient
and approved method of clamping to the trough.
6.4.5
CABLES ON TRAYS
Fix cables neatly to the tray, wherever possible, in a single layer and install parallel with the tray edge.
Install cables such that spare space capacity of not less than 20% of each tray is provided.
Install cables at fixed intervals not exceeding 1200mm by means of approved fastenings of
non-corrosive materials.
6.4.6
CATENARY WIRING SUPPORTS
Catenary wire support to comply with the following:

Secure catenary wires by anchoring to the floor slab of the floor above;

Not more than 24 cable runs to be bunched up and fixed to one catenary wire;

The length of any span not to exceed 7 metres;

The maximum sag of any span not exceed 100mm;

Minimum separation between catenary wires not less than 150mm;

Minimum separation between catenary wires and high temperature pipes and steam pipes not
less than 300mm; and

Adhere to cable manufacturers recommended minimum bending radius and installation practices.
Revision 1.16
Page 36 of 51
NOV 2016
6.5
CABLE TYPES
All security devices shall be wired in multi-core cabling to meet manufacturer’s specifications for the
device.
Figure eight (8) cabling shall only be used for power supply to electric locking devices or cameras, not
for data connection of other security devices.
Reed switches and other devices typically only requiring two conductors for operation shall be wired
in four (4) core cabling.
6.6
GROUNDING AND INTERFERENCE
Each electronic panel chassis and respective signal cable shield wire shall be grounded strictly in
accordance with manufacturer’s requirements to ensure against interference and earth ground loops.
The Contractor shall determine:

Adequate shielding of cables;

Adequate separation of cables; and

Earthing requirements are adequate to ensure equipment operates according to the
manufacturer’s specifications
The contractor shall ensure that all existing cabling and equipment is in compliance with the relevant
Standards and the requirements of this Specification.
6.7
BOLLARDS
Bollards are to be designed to support accessories outdoors.

Provide bollards designed, manufactured and tested by a specialist manufacturer;

Provide bollards with mounting bases for fixing to reinforced concrete footings;
6.8
FIXINGS
All fixings are to provide suitable mechanical strength to the satisfaction of the Project Manager.
Revision 1.16
Page 37 of 51
NOV 2016
7
MATERIALS
7.1
GENERAL
Griffith University has an ‘Approved Security Products Schedule’ detailing a list of security products
previously trialled and tested and now approved for use within the University. Under no circumstances
is any deviation to be made from the selection of those approved products without written approval
of Griffith University, Office of Facilities Management – Security and Traffic Manager.
Any proposed alternatives or unlisted products shall be submitted for formal approval prior to the
commencement of the works.
7.2
MATERIALS, EQUIPMENT AND WORKMANSHIP
Only new materials, equipment, components and devices are to be used that are of current
manufacture and first quality. The manufacturer must be approved where this has not been specified.
Manufacturer’s recommendations are to be followed with regard to workmanship and associated
materials, equipment, components and devices.
If the University provides recovered equipment for use at a specific site, the Contractor is to assess the
equipment's suitability and advise the University’s Project Manager should the equipment not be
suitable for use.
7.2.1
UNIFORMITY
When a particular manufacturer has been adopted for fittings, accessories or equipment, all such
fittings and their components must be uniform throughout the project.
Revision 1.16
Page 38 of 51
NOV 2016
8
TESTING, INSPECTION AND COMMISSIONING
8.1
GENERAL
All systems will be completely commissioned by a qualified engineer / technician with appropriate
qualifications and experience to audit and give a certificate of compliance for each project. This is to
include a structured commissioning sheet on Company letterhead detailing exact procedure to verify
system performance as fit for purpose complies with specification and meets all applicable standards.
This commissioning sheet will be signed & dated by the engineer / technician that has performed this
compliance check.
Contractors can either utilise their own engineers / technicians or can employ the professional services
of a commissioning engineer if deemed necessary but will form part of the Contractors cost.
A system will not be deemed fit for purpose, nor can it enter the DLP and final payments cannot be
made until the above compliance testing and verification has been actioned.
Pre-plan and schedule all tests. Submit such information for approval not less than two (2) weeks
before commencement of commissioning.
8.2
UNWITNESSED TESTING (PRE-COMMISSIONING)
Notice of fourteen (14) calendar days is required so that witnessed commissioning can be arranged by
the University.
Before lodging this Notice, the Contractor is to conduct his own 100% pre-commissioning tests on all
equipment.
Should any test fail, determine the cause of the failure, corrected the fault and repeat the test.
The Contractor shall arrange and bear the cost of all the necessary technical and other staff in addition
to test equipment, including at least two (2) hand held two way radios to adequately test the
installation.
All panels, power supplies, detection devices, keypads, cameras and intercoms shall be inspected and
tested for correct operation.
Provide draft “As Installed” documentation inclusive of operating instruction, as installed drawings,
technical and other manuals, and system programming details.
8.2.1
WITNESSED COMMISSIONING
Carry out the following commissioning procedures, testing, checking and adjustments in the presence
of the Griffith University Project Manager or their nominated person(s) to demonstrate the installed
systems complies with the Specification:

Inspect installation.

Demonstrate full system functionality.

Provide a structured staff training and familiarisation session for the Client's nominated staff, the
session being a minimum of two (2) hours duration. The training session is to cover the following
minimum requirements:-

Function and Operation of Various Systems, (generally).
Revision 1.16
Page 39 of 51
NOV 2016

A copy of the training material and program shall accompany the Witnessed Commissioning
Application Form.

At completion of the staff training session, hand over all keys, access codes and final "As Installed"
documentation to the Project Manager and obtain a signed statement from the Client that training
has been satisfactorily provided.
Acceptance of the system based on the commissioning tests shall not absolve the Contractors of
responsibility should any defects appear later, due to poor workmanship of faults in equipment
supplied under this Contract.
8.2.2
TEST AND INSTALLATION INSTRUMENTS
Supply all instruments and appliances necessary to complete the performance tests.
Ensure all test instruments are checked for accuracy by the manufacturer or any approved laboratory
prior to their use.
Provide calibration certificates if requested.
8.2.3
HANDING OVER
Prior to handing over of the installation, adopt the following procedures:
Carry out all preliminary testing, checking and adjusting of the installation before forwarding
notification that the installation is considered to have reached Practical Completion
Provide installation manuals together with post contract drawings and documentation as specified.
Practical completion will be certified only after the system has been inspected tested and approved,
all manuals and drawings have been received and approved and all of the above requirements fulfilled.
Revision 1.16
Page 40 of 51
NOV 2016
9
DOCUMENTATION AND LABELLING
9.1.1
GENERAL
Provide the following documentation as part of the scope of work, but is not limited to the following:

Day to day operation provided on a single laminated sheet;

Operating manuals;

Installation manuals; and
 Maintenance manuals.
Provide two (2) copies of all manuals and “As Installed” documentation (including drawings) to be
presented in hardcopy format and one (1) copy of ALL documentation on storage media correctly
indexed using industry standard file display format, ie. PDF or approved equivalent.
‘As Installed’ drawings on storage media are to be compatible with AutoCAD format.
9.1.2
OPERATING MANUALS
Provide complete sets of operating manuals that include, but is not limited to the following:

Operating handbooks;

Operator instruction manuals; and

Training manuals together with interactive teaching aids (via CD ROM);
9.1.3
INSTALLATION MANUALS
Provide complete sets of installation manuals that include, but are not limited to the following:

Full description of the Installation and the functionality of the various elements involved;

“As Installed” drawings with a legend of symbols where applicable that include:

Schematic wiring diagrams with correct circuit and termination identification;

Final equipment layouts and locations;
If the specification requires specific performance tests to be carried out during the defects liability
period, the manual maybe accepted without the results of tests being included. Provide the results
within one (1) week following completion of the testing.
Further, the cabling system shall be fully documented on a cable schedule which shall detail the device
location, equipment connection details, any auxiliary cabling and field cabling including cable markings
and cable type. The cable schedule shall be documented on a Microsoft Excel spreadsheet.
9.1.4
MAINTENANCE MANUALS
Provide complete sets of maintenance manuals that include, but are not limited to the following:

Manufacture’s literature, diagrams, illustrations, drawings and instructions to cover every action
necessary for the efficient maintenance of the installation;

Test reports covering works tested, site tests and commissioning;

Details of all warranties for equipment supplied;

Routine maintenance schedule detailing period of maintenance and activities undertaken;
Revision 1.16
Page 41 of 51
NOV 2016
9.1.5
MANUAL PRESENTATION
The manuals are to contain only information directly relevant to the project. General brochures and
descriptive literature not totally applicable to the works under the project are not to be included.
Where literature contains reference to alternative models and options on equipment not supplied
under the contract, delete such references or marked "NOT APPLICABLE".
Manufacturer's literature will be assessed on its suitability of purpose, and reproduction. If any
documentation is considered to be unsuited to its purpose the Contractor shall substituted with
written (typed) text. If considered to be unsuitable for copying or if illegible copies are included in final
draft, include original literature to identify clearly particular items incorporated in the work. Text is to
be factual and written in clear, concise English language, easily understood by tradesmen, who may
not be familiar with the equipment.
Be consistent throughout with equipment and component designations and other identifying
references, including text, drawings and components schedules and actual equipment. Be consistent
with component designations with those included in this specification.
Data, which is provided by others, shall be collated and included in the manual so that the manual
forms an integrated whole.
Submit a draft of the proposed manuals for assessment not less than four weeks (4) prior to the date
of practical completion. A further draft copy of each manual may need to be submitted for approval
prior to final printing. The completed manuals are to be compiled and supplied not later than the
practical completion date of the work.
Present the manuals in both Hardcopy and Electronic, but is not limited to the following:
9.1.5.1
HARDCOPY FORM

International A4 size, with stiff plastic covers and be blue in colour;

Face cover, spine and cover sheet shall bear wording as directed and approved;

The binding shall be of loose leaf type with all pages machine punched and shall permit pages to
lie flat and enable easy insertion and removal of pages;

A minimum of 3 rings to be used;

Good quality, durable printing paper (minimum 80GSM) shall be used for text, printed on one side
only;

Drawings, illustrations, diagrams and photographs to be sheets of a height not exceeding the major
dimension of other pages;

Drawings shall be folded type, with no part of the drawing obscured by preceding pages. Drawings
shall be folded in their length to fit covers and put into plastic inserts to enable easy removal;

Each section to be started on a new page, separated from other sections by a stiff indented divider;
and

Each page to be sequentially numbered or otherwise identified, for quick and easy reference.

Each paragraph to be numbered or otherwise identified, for quick and easy reference.
9.1.5.2 ELECTRONIC FORM
All documents specified above must be provided on a CD including all manufacturers’ information.
Revision 1.16
Page 42 of 51
NOV 2016
9.2
LABELLING
Comprehensively label all cables and equipment cabinets to clearly indicate their function.
All system cabling is to be identified using a cable marking system. Cable marking to be permanent
and indelible and indicate a cable number, a prefix relevant to the type of device at the destination of
the cable and the equipment connection location the cable is connected to in the system.
Each cable is to be identified at each point of termination with the identification numbers clearly visible
within fifty (50) mm of the termination.
All wiring terminating within cubicles, control panels or equipment shall be clearly and permanently
identified by means of indented letters or numbers.
Labels shall be affixed to identify each control panel or equipment, power supplies and other items as
necessary.
All labelling information shall be cross-referenced to the “as-installed drawings, documentation and
schedules”.
9.2.1
EQUIPMENT MARKING STANDARD
All electronic security equipment will be appropriately marked with suitable labelling on the exterior
that cross-references all the Pre-Built and As Built Drawings for the project. ie; CCTV Camera No 1 will
be marked - CAM 01
9.2.2
CABLE MARKING STANDARD
All cabling shall be marked at both ends within 100mm of connection point and at any joins with a
clear heat shrink covered label that is clearly typed and is openly visible even when cabling is inside
ducts or looms.
The cabling marking shall be recorded on all drawings including as-built and schematics and will directly
mirror the marking on the cabling. A complete soft copy in XL and hard copy of the cabling schedule
shall be provided with the pre-build and as-built drawings.
The cabling will be marked as follows;
Site No - Device acronym - Device No
Standard acronyms for use on GU’s Security Cabling:
PCR – Proximity Card Reader
CON - Controller
RS - Reed Switch
PB - Push Button
BG - Break Glass
LOK - Locking Device
FP - Fire Panel Interface
CT - Computer Terminal
PIR - Passive Infrared Detector
Revision 1.16
Page 43 of 51
NOV 2016
DT - Dual Technology Sensor
CAM - Camera
PSU - Power Supply Unit
DVR - Digital Video Recorder
SW - CCTV Switcher
I – Intercom
All equipment boxes, cabinets, racks will contain a schematic diagram detailing equipment and a cable
marking schedule for each piece of infrastructure.
Revision 1.16
Page 44 of 51
NOV 2016
10 SYSTEM TRAINING
10.1 GENERAL
Provide the following training courses in the correct use, operation and maintenance of the system:

User training; and

Operator training;
Provide all instructions and full support resources including course outlines, training materials, and
instruction notes.
10.2 USER TRAINING
Provide User level training in use of the new system that includes, but is not limited to the following:

Short training sessions on the main features of the system

Schedule enough sessions to cover all users.
10.3 OPERATOR TRAINING
Provide for operator level training to enable operators to be fully familiar with the system that
includes, but is not limited to the following:

Cater for operators of different skill and authority levels;

Conducted on site on a fully complete and configured system;

Enables operators to become fully familiar with all aspects of the operation of the system;

Be structured to provide operators with sufficient proficiency to perform their duties efficiently;

Provide an introduction to the system in the context of the site and formal instruction detailing
system operation and applicable procedures relevant to the site;

Focus on general operational techniques, control functions, including programming functions,
menu functions and basic fault finding techniques;

Provide charts and diagrams to explain principles; and

Schedule enough sessions to cover all operators.
Provide a full set of typed reference notes for each attendee at the commencement of the course.
Provide a draft syllabus of the content of the operator level training course.
Revision 1.16
Page 45 of 51
NOV 2016
11 DEFECTS LIABILITY AND SYSTEM MAINTENANCE
11.1 GENERAL
A Defects Liability Period is deemed to be the Contractor’s Warranty Period for installation works and
the Manufacturer’s Warranty Period for the security equipment installed.
11.2 WARRANTY PERIOD
The Contractor’s Warranty Period shall be twelve (12) calendar months from the date of Practical
Completion (deemed to be the date of final witness testing by the University’s Representative) will
apply.
At the commencement of the Warranty Period, the University will give a list of defective items to the
Contractor.
The contractor shall make good the defective items within the following timeframes:

Priority 1 (one) 4 hours.

Priority 2 (two) next working day.

Priority 3 (three) 10 working days.

All other repairs 28 working days.
During the Warranty Period:

Replace or otherwise make good any part or parts of the installation, which may prove faulty in
design, workmanship or material. All replacement parts shall be new and covered by an additional
12 months warranty from the date of replacement.

Warrant all faults and defects, which occur during the above period.

Include all labour and all incidental costs for the removal and replacement of defective parts or
components.

Perform the required works as per timeframes listed above.

Test all replaced items and show that the system operates as designed.
Failure to rectify defects found during the Warranty Period may result in the University engaging others
to finish the required works. The costs of these works will be deducted from payments owing or billed,
and the Warranty Period may be extended by the amount of excess time taken to complete them.
11.2.1 SOFTWARE WARRANTY
Where software or firmware is supplied, the contractor shall comply, but is not limited to the following:

Be fully licensed to comply with the software vendor’s requirements.

Provide details of software licenses and copyright information.
11.3 MAINTENANCE SERVICE
11.3.1 GENERAL
Maintenance requirements will be determined by the University and be included within the project
specific Scope of Works.
Revision 1.16
Page 46 of 51
NOV 2016
12 WITNESSED COMMISSIONING APPLICATION FORM
SAMPLE FORM ONLY
The Contractor shall supply a similar form to the University project manager requesting a suitable time and
date for Witness Testing.
CONTRACT:
...........................................................................
CONTRACTOR:
...........................................................................
PHONE:
...........................................................................
FAX: ………………..……
E-MAIL:
...........................................................................
DATE: ..................................
I ...................................................... certify that the system has been 100% pre-commission tested by our
Company and that all Contractual requirements have been fulfilled and I now request a Witnessed commissioning
date be nominated by Griffith University. The following will be supplied and arranged for the day of Witnessed
commissioning:
Requirement:a)
Final "As Installed" documentation.
(Inclusive of operating instruction, technical and other manuals, drawings and system
programming details, include code numbers).
b)
Staff training and system Hand Over to the Client.
c)
Two (2) staff for testing.
d)
Access to the site.
e)
Test equipment, including two (2) operating hand held radios for site communications.
Work
Satisfactory
As Installed Documentation Supplied
Test all Panels
Test all Batteries
Test remote signalling to nominated Monitoring Centres
Test all Access Control Devices
Test all Duress Buttons
Test all Intruder Devices
Test all cameras (including those associated with Duress Buttons),
include cleaning viewing windows on external fixed, & PTZ cameras
Test Video Switcher (if applicable)
Test DVRs - recording and play-back
Test Communications to nominated Monitoring Centres
Provide report
Revision 1.16
............................................................
...................................
Contractor Signature
Date
Page 47 of 51
NOV 2016
13 APPENDIX 1 - ACCESS CONTROL EQUIPMENT LIST
GRIFFITH UNIVERSITY
Electronic Security
Valid as of 16/11/2016
Equipment Type
Manufacturer
Model
Gallagher
FT 6000-8H and dedicated HBUS expansion
modules to suit project requirements
Gallagher (existing only)
FTC 6000-8R & Dedicated expansion
modules to suit project requirements
Gallagher
T11 dual technology readers (black)
Gallagher
T20 Card+Pin (black)
Gallagher
T15 dual technology readers (black) as
required
Gallagher
C300302 T11 Spacer, Black, Pk 10
Lockwood
3570 Series Long Body
Lockwood
3570 Series Short Body
Lockwood
3580 Series Long Body
Lockwood
3580 Series Short Body
Ingersoll Rand
LEGGE 990MFE EML
Abloy
8810 (Assa Abloy or Lockwood)
PADDE
ES200
PADDE
ES2000
PADDE
Z4 single monitored
PADDE
Z6 single monitored
PADDE
Z4 double monitored
Security
Access Controllers50
Card Reader*
*when reader is installed
on an aluminium mullion
*when reader is installed
on ANY metallic surface
Mortice Lock
Power Transfer
Electric Strike
USE ONLY WHERE
APPROVED
Magnetic Lock
Revision 1.16
Page 48 of 51
NOV 2016
PADDE
Z8 double monitored
FSH
MEM2400LP (outward, single, monitored)
FSH
MEM2400LED( inward, single, monitored)
FSH
FEM5700M (single, monitored)
FSH
FEM5700DM (double, monitored)
PADDE
TB25 (monitored bolt position)
FSH
DB1200MLDRET (monitored bolt position)
Power Bolts
Power Supply Unit
Access Control / Security Use
Tactical Technology
TPS13-2.5iB
Tactical Technology
TPS13-5iB
Trojan
EM-REX
Or similar
Non powered
Lockwood
9000/91000, 9300/9400
Ingersoll Rand
Von Duprin “CHEXIT” series
Smart
SMART4342 - Green
Or similar
Non powered
Sentrol
1078C
Tane
TAP103
Tane
TAP1080
Sentrol
1085T
Tane
TAP112
Tane
TAP115
Sentrol
2505A
Sentrol
2202AU-L
Ademco
269R/270R or similar
Visonic
Subject to project requirements
Takex / Pulnix
Subject to project requirements
Emergency Exit Device
Panic Exit Device (Crash Bar)
*where required to meet BCA
Exit Device
Reed Switch
Concealed
Surface Mount
Metal
Duress Button
Intruder Detection Devices
Revision 1.16
Page 49 of 51
NOV 2016
Intercom Devices (analogue)
Bosch
Tritech Series subject to project
requirements
Risco
iWise series (360° or wall mount)
REPLACEMENT ONLY
Aiphone
Subject to project requirements
Emphone
Subject to project requirements
Dallas Delta
Subject to project requirements
Helios
Subject to project requirements
Genetec AutoVu
SharpX Model
Intercom Devices (digital)
Licence Plate Recognition
Subject to project requirements
14 CHANGES TO CONTROLLER BUS PROTOCOL FROM GBUS TO HBUS:
-
-
Gallagher FT6000 HBUS: however please note that ALL new installations and controller replacements
(where possible) will be HBUS compliant. (FT6000-8H modules)
T11 HBUS – all T11 dual tech readers are to be HBUS compliant and installed in HBUS configuration
Additional downstream devices are to be HBUS compatible and installed via HBUS – ie 8in8out door
modules, and HUBS I/O boards
15 APPENDIX 2 CCTV EQUIPMENT LIST
GRIFFITH UNIVERSITY
CCTV – Analogue – ALL ANALOGUE CCTV NEW AND REPLACEMENT
INSTALLATIONS MUST BE APPROVED BY THE SECURITY AND TRAFFIC
MANAGER
CCTV - IP
Equipment Type
Manufacturer
Model
All IP equipment is subject to review during design and prior to commencement of project. All IP cameras
must be submitted for approval and network testing prior to installation.
NVR/DVI
ONSSI
University preferred software
Griffith IT Server
Cameras direct to network and
software stored on server
ALL IP solutions MUST be approved by the Security and Traffic Manager prior to project start and cameras
must be listed: http://www.onssi.com/support/supported-devices
Hardware listed below is to be used as a guide and hardware specification must be submitted prior to install
Camera - Indoor
Revision 1.16
Axis
Page 50 of 51
P33 series
M30 series
NOV 2016
Camera – Outdoor
SONY
Ipela
Axis
P33 series (outdoor, vandal
resistant)
SONY
Camera – PTZ
Axis
SONY
Power Supply
Revision 1.16
POE (Power over Ethernet)
Page 51 of 51
Where applicable
NOV 2016
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement