installation instructions

installation instructions
Any Queries? Call : 08000 23 23 23
INSTALLATION INSTRUCTIONS
Floor Mounted Stand Pipes for bath fillers and bath shower mixers
Important
We recommend that this product is installed by a qualified professional contractor, such as a plumber who is certified to NVQ
(National Vocational Qualification) or SNVQ (Scottish National Vocational Qualification) Level 3.
● Please check this product immediately on receipt to ensure that it has not been damaged and is complete. Before installation,
please make sure this product is the correct model and you have all the parts required for installation and use.
● Please read these instructions carefully and keep for future reference.
Installation
Dimensions
Ø45
2mm
ALLEN
KEY
M4X3
GRUB
SCREW
COVER NUT
WASHER
CONNECTOR
G3/4" FLEXIBLE HOSE
STAND PIPE TUBE
Ø17
600
CAP
560
2x
CONCRETE FLOOR SCREW
M4X3
GRUB
SCREW
8x
WOODEN
FLOOR
SCREW
11.5
2mm
ALLEN
KEY
2-G3/4"
2x
69
Ø100
G3/4" CONNECTOR
HOT
INLET
COLD
INLET
1. Before installation, flush the water system to ensure that there are no metal swarf, solder, and other impurities which can enter the product.
2. Turn off the water supply before commencing work. This should be done at the isolating valves on the inlet feeds (if fitted), or at the main stopcock.
3. Install two water inlet pipes at floor level at 180mm centers. From the front view, hot water should be on the left, and cold water on the right. it is important
that there is sufficient flex and vertical movement in the water inlet pipes to allow the flexible hoses to be connected and the stand pipes to be screwed to the floor.
4. Tighten and fix the two G3/4" connectors on the water inlet pipes.
5. Unscrew the cover nuts from the stand pipe tubes.
7. Slide the Touchstone shelf plate onto the bath tap tails, then screw the cover nuts onto the bath tap tails. Ensure that the wide section of the shelf
plate is to the rear of the bath tap, not underneath the bath spout.
8. Screw the supplied connectors to the bath tap tails. Then screw the G3/4" hoses to the connectors.
9. Unscrew the floor cover plates from the stand pipe tubes, then slide the hoses through the stand pipe tubes and tighten the cover nuts.
Refit the floor cover plates to the stand pipe tubes.
10. Center the stand pipe tubes over the inlet pipes. Mark the positions for the floor fixing holes using the floor cover plates as the template.
Drill the holes and insert the floor plugs (if necessary).
12. Fix the stand pipes to the floor using appropriate screws / bolts for the floor surface. To make things easier, two types of screws are supplied with
the product (concrete floor screws and wooden floor screws with rawl plugs ). The installer should determine and use the correct screws/ bolts for
the particular floor surface onto which the product in being installed.
13. Finally put on the finishing caps over the screw heads.
Maintenance
We do NOT recommend the use of any household cleaners on this product. Household cleaners often contain chemicals or abrasive
materials which may damage ( corrode or scratch ) the product.
The product should only be cleaned with soapy water and rinsed with clean water and dried with a soft cloth.
© ASAQ
1-1
A
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising