No.6x10mm
KUDOS
L Shaped Showerbath Screen
With Handle
TOP COVER CAP
No.6x30mm
TOP PIVOT
BRACKET
INSTALLATION INSTRUCTIONS
Please read these instructions before installing, as
incorrect fitting will invalidate the guarantee. If you
are unsure about these instructions please contact:
Customer Service Helpline: 01539 564040
FRONT PANEL
GLASS
RETURN PANEL
GLASS
TOOLS REQUIRED
Flat-headed screwdriver
Pozi-drive screwdriver
Spirit level
Tape measure
Electric drill
7mm masonry drill
4mm Allen key (supplied)
Silicone Sealant
IMPORTANT
Check appearance of bathscreen.
Any defects must be reported to Kudos Showers before
assembly/ installation.
Claims for imperfections will only be accepted prior to assembly/
installation.
Ensure bath is level in all directions.
Waterproof walls using ceramic tiles/
shower panels etc., before installing
Sealant flush
bathscreen
with top of bath
Care should be taken when drilling
into walls to avoid hidden pipes or
electrical cables
BATH
BRACKET
ASSEMBLY
Any gap or crevice between the rim of
the bath and finished walls must be
filled with silicone sealant flush with
the rim of the bath before installing
bathscreen - see detail opposite
HANDLE
HANDING
HANDING THE SCREEN - this bathscreen is suitable for both
left-hand and right-hand fitting, simply turn the glass panels
around to suit your installation. Ensuring that the Lifeshield
coating is always to the inside.
VERTICAL
CORNER
SEAL
CLEANING
GENERAL - For frame work and fittings use only warm soapy water
and damp cloth/ sponge on a regular basis. After cleaning please
rinse with clean water to remove any residue.
Do not use abrasive scouring powders, chemicals or aerosol
cleaners - these may result in damage to the surfaces, in
particular, the plated component parts
See instruction below for glass cleaning advice.
LONG
BOTTOM
SEAL
LIFESHIELD
Your Kudos Product is pre-treated with Lifeshield on the inside
glass surfaces only. While this makes cleaning the glass a lot
easier and helps prevent the build up of harmful lime-scale and
soap deposits the glass still needs to be maintained on a regular
basis. We recommend the use of a detergent and aroma free glass
cleaner (A 50/50 mix of white vinegar and water works well)
Strong detergents and abrasives can damage the coating.
DO NOT use abrasive cleaners or abrasive scrubbing equipment
for cleaning!!
DO use a squeegee to remove remaining droplets of water from
glass after showering, any build up of residue can be removed
easily using an appropriate cleaner and agitation from soft
cleaning equipment
THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER
SHORT
BOTTOM
SEAL
BOTTOM
CORNER
GROMMET
BOTTOM
PIVOT
BRACKET
BATHSCREEN - EXPLODED VIEW
1
CHECK CONTENTS BY carefully removing bathscreen,
bottom seals and fixing pack from packaging.
2
STAND PRODUCT UPRIGHT on protected floor surface
(carpet or product packaging), to prevent damage.
6
USING SPIRIT LEVEL held securely to the side of the
wallpost, ensure the post is positioned vertically.
MARK POSITION OF HOLES onto the wall through the 3
‘blue’ plastic components located at the top, middle and
bottom of the wallpost.
Remove wallpost from wall.
TIP: Identify top of bathscreen by the top pivot bracket
(with 2 screws visible).
3
TIP: a dab of
paint, nail
polish
or shoe
polish
on end of drill
bit is used to
mark the wall.
REMOVE THE 2 SCREWS (put these aside for later) from
the top pivot bracket and lift this out of the wallpost.
NB - THIS CAP SECURES THE GLASS TO THE WALLPOST
AND YOU MUST HOLD THE GLASS WHEN REMOVING CAP.
Top of screen
has 2 screws
visible.
NOTE How Glass
is held into frame
by holding tube.
Ensure frame is vertical
before marking holes
7
DRILL HOLES into wall using 7mm masonry drill and fit
rawl plugs provided (or fixings suitable for the construction
of your wall). Push wall plugs behind tiles to avoid cracking
and silicone seal over each for watertight fit.
8
APPLY SILICONE
sealant to underside
of bottom pivot
bracket.
9
FIX WALLPOST TO WALL using the 3 No.8 x 60mm
panhead screws provided.
Do not overtighten these screws.
BE SURE TO HOLD TUBE INTO
FRAME AS SHOWN WHEN
REMOVING THIS CAP. THIS WILL
PREVENT THE GLASS SLIDING
OUT.
4
LIFT THE GLASS
(with tube attached)
out of the wallpost and
put in a safe area.
5
MARK POSITION OF WALLPOST using tape measure and
pencil, mark 12mm from the outer rim of the bath inwards.
This is the position of the outer face of the wallpost when
set on the bath.
Fixing holes
are adjacent
to the nylon
head screws
top, middle
and bottom
12mm
12mm
REMOVING BLUE
INSERT SLEEVE IF
NECESSARY
FOR
LEFT HANDED
BATH
FOR
RIGHT HANDED
BATH
Mark with pencil
12mm in from
edge of the bath
Mark with pencil
12mm in from
edge of the bath
TIP
TIP: If the wallpost is not vertical, it is possible to adjust.
Remove the wall fixing screws and use these to withdraw
the blue insert sleeve which the screws pass through and
discard the sleeve.This will leave a slotted hole.
Replace the screw, set the wallpost to vertical and retighten.
PLACE THE SPIRIT level onto the front face of the wallpost
10 and,
if necessary, adjust until vertical by turning the top
and/ or bottom plastic adjustment screws.
IMPORTANT - use the middle adjustment screw to
ensure the wallpost is straight. This will also ensure
that the seals are in full contact with the tube along
their entire height when fitted.
Note: max. 18mm adjustment in wallpost
13
TIP
SECURE THE OUTER wallpost to the inner wallpost using
the pre-drilled holes and the 4 No.6 x 25mm panhead
screws provided. Ensure you progressively tighten each
left and right pair so as not to pull the outer wallpost
out of alignment.
Insert screws square to the wallpost to ensure they pick-up
second hole in inner wallpost.
You do not need to overtighten these screws.
Holes at Top
Turning nylon
headed screws
anticlockwise
adjusts wallpost
outwards,
and clockwise
adjusts the
wallpost inwards.
Holes at Bottom
Close up view
GLASS and top pivot bracket and secure bracket
14 REFIT
with two screws removed in stage 3.
11
It is important that these screws are correctly re-fitted into
their screwports - failure to ensure this will result in damage
to the product.
Do not overtighten these screws.
POSITION GLASS CAREFULLY onto wallpost. The bottom
of the tube has a hole which must slide over the pin in the
bottom pivot bracket.
FIT TOP PIVOT BRACKET into wallpost and tube and hold
this in position. Do not fit the two fixing screws yet.
TIP
Use stepladders to help ensure screws are located correctly.
Ensure logo
on glass is
to bottom
SCREWS INSERTED
AT ANGLE
Top pivot
bracket must
be fully inserted
SCREWS INSERTED
VERTICALLY
VERTICAL CORNER SEAL to
15 FIT
return glass panel ensuring this
lines up with bottom edge of glass.
12
CHECK GAP - Ensuring glass panel is running parallel with
the bath edge check gap between bottom of glass panel
and top of bath is equal along the entire length. If not,
adjust the wallpost, as described in stage 10, until the gap
is equal.
TIP
Wipe glass edge with clean damp
cloth to ease fit.
L/HAND
BATH
BOTTOM
OF GLASS
R/HAND
BATH
RETURN GLASS PANEL
16 FIT
to front glass panel ensuring
both glass panels are fully
inserted into the corner seal
along the full height.
IMPORTANT: Ensure the
bottom edges of both glass
panels line up with each
other.
EQUAL
EQUAL
TIP
Wipe glass edge with clean
damp cloth to ease fit.
Holes
Ensure logo on
glass is to bottom
17
18
FIT CORNER BRACKETS
Fit plain protective washers to both inner ‘L’ shaped
brackets and fit boss-type protective washers to the four
outer square brackets.
Using M5 x 10mm long screws provided, fit brackets to both
panels through holes in glass. Ensure outer brackets are
square to panel before tightening screws.
22
CHECK SEALS - Both bottom seals and corner grommet
must be in contact with the bath top along their entire
lengths. If not, ensure front panel glass is parallel with the
bath edge and push seal(s) and corner grommet down, as
necessary, to make full contact with the bath top.
23
SECURE GROMMET - fold
screen INWARD into the bath
and secure grommet in place
by inserting the no.6x12mm
long screw provided into hole
on u/side of grommet.
FIT HANDLE using 4mm allen key provided.
Hold the grommet still and
finger-tighten the screw only.
TIP
Fold screen back parallel to bath edge and check that both seals
and grommet are in full contact with bath top.
24 SILICONE SEAL - the wallpost to the wall and bath.
From Here
LONG BOTTOM SEAL to front panel glass ensuring
19 FIT
that the factory fitted end grommet is pushed fully up to the
tube.
To Here
Seal down full height of
wallpost to wall on
INSIDE & OUTSIDE
Seal junction of wallpost to bath
on OUTSIDE ONLY as shown.
DO NOT SEAL BOTTOM OF WALLPOST TO BATH ON INSIDEwater must be allowed to drain out of wallpost to inside.
FIT BOTTOM CORNER GROMMET into end of bottom seal
20 then
push both up onto the glass and vertical corner seal.
SEAL - the bottom corner grommet to bottom
25 SILICONE
seals and vertical corner seal on inside and outside as
shown and wipe clean excess silicone.
Please note corner grommet shown in grey for clarity purposes only
FIT SHORT BOTTOM SEAL
21 grommet
and onto glass.
into end of bottom corner
TIP
Factory fitted endcap to this end
Use clear/transparent silicone sealant for best results
DO NOT MOVE SCREEN & ALLOW 24 HOURS
FOR SILICONE TO CURE BEFORE USE
Important - when installed correctly, we guarantee the
screen will not leak under normal showering use, ie. when
the shower head is in it’s normal showering position.
NB - Using the shower head to clean/rinse down the
screen does not constitute normal showering use.
">