HARLEY-DAVIDSON V-ROD ‘07 – ‘08 SUPERCHARGER KIT (Non USA) (PATENT PENDING) INSTALLATION INSTRUCTIONS Kit Serial # _________________________ Supercharger Serial # __________________ ECU Serial # Page - 1 - of 82 Copyright © _________________________ Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 Table of Contents IMPORTANT INFORMATION ______________________________________________ - 5 - SAFETY WARNING ______________________________________________________ - 6 - WARNING______________________________________________________________ - 6 - W A R R A N T Y ________________________________________________________ - 7 - CHANGES TO FACTORY SPECIFICATIONS _________________________________ - 8 - INTELLECTUAL PROPERTY USED IN THIS PUBLICATION _____________________ - 8 - RECORD OF AMENDMENTS __________________ ERROR! BOOKMARK NOT DEFINED. PARTS SUPPLIED – (MAIN BOX) __________________________________________ - 9 - PARTS SUPPLIED – (MODEL BOX) _______________________________________ - 10 - SUMMARISED INSTRUCTIONS ___________________________________________ - 11 - FOR EXPERIENCED VRSC TECHNICIANS__________________________________ - 11 - SUMMARISED INSTRUCTIONS ___________________________________________ - 12 - FOR EXPERIENCED VRSC TECHNICIANS CONTINUED ______________________ - 12 - DISASSEMBLY INSTRUCTIONS __________________________________________ - 13 - 35(3$5$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 385*,1*)8(/6<67(0 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 0$;,)86(5(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB $,5%2;,17$.($,57(03(5$785(6(1625$1'$,5),/7(55(029$/ %$77(5<5(029$/BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB +2515(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 7+5277/(%2'<5(029$/BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &22/$175(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &22/$17%277/(5(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB (1*,1(2,/$1'),/7(55(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBB 35,0$5<'5,9(&29(55(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB (;+$8676<67(05(029$/BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &22/$17+26(5(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB Page - 2 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 :$7(538035(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB MODIFICATION INSTRUCTIONS __________________________________________ - 24 - )8(/6<67(002',),&$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB %5($7+(502',),&$7,21BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 63$5.3/8*5(3/$&(0(17 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 7+5277/(%2'<',6$66(0%/< BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 7+5277/(%2'<5(029$/BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 7+5277/(%2'<$66(0%/< BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ,'/($,5&21752/,$&9$/9(,167$//$7,21 BBBBBBBBBBBBBBBBBBBB 7+5277/(326,7,216(1625,167$//$7,21 BBBBBBBBBBBBBBBBBBBBB ,17$.($,57(03(5$785(6(1625,$7,167$//$7,21 BBBBBBBBBBBB 7+5277/(%2'<5(,167$//$7,21BBBBBBBBBBBBBBBBBBBBBBBBBBBBB -2,1(5%/2&.),77,1* BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB ($57+%2/75(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB :,5,1*/22002',),&$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB :$7(53803'5,9(6+$)75(3/$&(0(17 BBBBBBBBBBBBBBBBBBBBBBB INSTALLATION INSTRUCTIONS __________________________________________ - 53 - '5,9(%2'<,167$//$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 683(5&+$5*(5%5$&(,167$//$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBB '5,9(38//(<,167$//$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &22/,1*6<67(0,167$//$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB %$77(5<,167$//$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 6833/(0(17$5<(1*,1(&21752/81,7,167$//$7,21 BBBBBBBBBBBB 683(5&+$5*(5,167$//$7,21BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &5$1.$1*/(6(1625 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB $,5),/7(5),77,1* BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &22/$17%277/(,167$//$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB %(/77(16,21(5),77,1* BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB %(/7,167$//$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB Page - 3 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 (;+$8675(),77,1* BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 5(),//,1*(1*,1(2,/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB %(/7&29(5,167$//$7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB )8(/6<67(05(&211(&7,21 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 0$;,)86(5(),77,1* BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB (&85(6(7 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB PRE TEST-DRIVE INSPECTION ___________________________________________ - 76 - 35(67$57,163(&7,21BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB (1*,1(:$5083 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB $,5%2;&29(55(),77,1* BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB MAINTENANCE INSTRUCTIONS __________________________________________ - 78 - 683(5&+$5*(5'5,9(%(/75(3/$&(0(17 BBBBBBBBBBBBBBBBBBBBBBB 683(5&+$5*(52,//(9(/,163(&7,21 BBBBBBBBBBBBBBBBBBBBBBBBBB 683(5&+$5*(55(029$/ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 683(5&+$5*(52,/5(3/$&(0(17BBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 63$5.3/8*5(3/$&(0(17 BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB Page - 4 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 IMPORTANT INFORMATION PRODUCT WARNING Installation of the Sprintex® Supercharger kit may void all or parts of Harley-Davidson’s Warranty. Customers should consult their Harley-Davidson dealer for details. Your Sprintex® Supercharger installation should only be carried out by an authorised Sprintex® approved supercharger specialist. Sprintex® makes no representation that installation and use of the Sprintex® supercharger kit is legal for road use worldwide. Customers should check that installation and use of the Sprintex® supercharger kit is legal by contacting the relevant statutory authority in their jurisdiction. Provided in this installation manual are detailed instructions to the installer on how to install the Sprintex® patent pending supercharger kit to the Harley-Davidson V-Rod. The instructions are aimed at being simple yet informative, and are aided with well presented pictures to make installations as simple, fast, and problem free as possible. Please read the entire instruction manual prior to beginning the installation procedure. Pictures and descriptions may vary slightly from model to model. It is recommended that all wiring harness connectors, and vacuum hoses are labelled at the time of removal for easy and correct refitting. Some components that are removed and are to be refitted are fragile, and should be stored safely to prevent damage to these components. Sprintex® recommends performing the following vehicle checks prior to installing the supercharger. 1) Check that the factory fuel system is operating correctly. 2) Inspect the factory exhaust catalyst for blocks or damage, and 3) Check fuel quality in fuel tank ensuring that it is not stale or low octane fuel. Replace with a higher octane, 93OCTANE Premium Unleaded Gasoline / Fuel as required. It is also recommended to replace the fuel filter if the vehicle has travelled more than 15,000Kms. Sprintex® will not be liable for any loss, damage, payment, costs, expenses or other liability, not expressly stated in this document. In particular, Sprintex® shall not be liable to any person for any consequential, indirect or economic loss or punitive or exemplary damages of any kind. Sprintex® reserves the right to change specifications from time to time and will not be liable to any person for doing so. Sprintex® believes that information in this document is correct at time of print. Sprintex® limits its liability to the maximum extent permissible at law with regard to the reliance which any person places on anything in this document. Page - 5 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 SAFETY WARNING Your Sprintex® supercharger installation should only be carried out by an authorised Sprintex® approved supercharger specialist. No unauthorised service or alteration may be undertaken to the Sprintex® supercharger Installation should be carried out in a workshop which is a safe ventilated working environment with equipment and procedures compliant with local authority guidelines and legal requirements. Authorised Sprintex® approved supercharger specialists are required to hold current worker’s injury insurance. Installers should ensure adequate hearing, eye, and physical protection is used at all times during the installation process. Installers should take reasonable precautions to avoid fatigue and closely follow the installation instructions during every installation. Sprintex® recommends installation should not be carried out unsupervised. Sprintex®, its directors, employees and agents will not accept liability for damage accident or injury resulting from the installation process. Safety warnings are provided throughout this document indicated by a L. WARNING THIS SPRINTEX® INSTALLATION REQUIRES A STANDARD HARLEY-DAVIDSON FACTORY ECU CALIBRATION TO BE INSTALLED PRIOR TO THE INSTALLATION OF THE SPRINTEX® SUPERCHARGER KITÊ. FAILURE TO ENSURE THIS WILL AFFECT THE PERFORMANCE AND MAY VOID YOUR WARRANTY. SHOULD YOU BE UNSURE RETURN YOUR MOTORCYCLE TO YOUR NEAREST HARLEY-DAVIDSON DEALER TO ENSURE THE STANDARD CALIBRATION HAS BEEN REINSTATED AND IS OPERATING CORRECTLY. SAFETY WARNING! Do not start or run your Sprintex® VRSC Supercharged Motorcycle without the Belt cover installed – Belt or pulley failure without the Belt cover installed may result in injury, accident or death. Sprintex® supports safe riding so always remember to observe all speed limits and road rules relevant to your state or city. Always wear appropriate safety equipment when riding. WARNING: Fitment of this kit to your Harley-Davidson V-Rod may affect the manufacturer’s warranty. Customers in doubt should check with their Dealer. Sprintex® does not warrant that purchase, use or installation of this kit is legal for use worldwide. Customers should refer to their statutory authority in their local jurisdiction prior to using this kit for public road use. Page - 6 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 WAR RAN TY 1. WARNING Your Sprintex® VRSC supercharger system installation should be carried out by an authorised Sprintex® approved supercharger specialist for your warranty to apply. No unauthorised service or alteration may be undertaken to the Sprintex® supercharger system or standard motorcycle specification. Any modification or alterations from the Sprintex® or Harley-Davidson specification will void your WARRANTY. (Refer to clause 7) 2. FUEL SPECIFICATION V-ROD USA Europe Australia New Zealand Minimum 93 OCTANE Premium Unleaded Gasoline / Fuel Minimum 95 RON Premium Unleaded Petrol Minimum 95 RON Premium Unleaded Petrol Minimum 95 RON Premium Unleaded Petrol WARNING SPRINTEX® ADVISES THAT THE USE OF ETHANOL BLENDED FUELS MAY CAUSE DAMAGE TO YOUR ENGINE. THEREFORE USE OF ETHANOL BASED FUELS IS NOT RECOMMENDED. IN CIRCUMSTANCES WHERE ETHONOL BLENDED FUELS ARE UNAVOIDABLE, SPRINTEX® RECOMMENDS THAT THE USER MODIFIY THEIR DRIVING STYLE ACCORDINGLY AS WARRANTY DOES NOT EXTEND TO DAMAGE CAUSED BY THE USE OF ETHANOL BLENDED FUELS. 3. SUPERCHARGER BELT & PULLEY Must be inspected at every routine service and the belt replaced when required. 4. OIL SPECIFICATION (ENGINE ONLY) Harley-Davidson Type HD Multigrade HD Multigrade Viscosity SAE10W40 SAE20W50 Harley-Davidson Rating HD360 HD360 Lowest Ambient Temperature Below 40°F (4°C) Above 40°F (4°C) Cold Weather Starts Below 50F (10C) Excellent Good 5. SPRINTEX® VRSC SUPERCHARGER SYSTEM The Sprintex® VRSC supercharger system WARRANTY provides a guarantee against any manufacturing defect in the parts supplied during the warranty period. The warranty guarantees the replacement of any parts of the supercharger installation which fail as a result of a manufacturing defect in normal operation conditions. 6. WARRANTY PERIOD New Bike 12 months (from date of purchase) Used Bike 6 months (from date of purchase) 7. TERMS OF WARRANTY Any and all products returned for warranty purposes must be returned freight pre-paid. Sprintex® is not responsible for any freight or handling charges on warranted products returned to Sprintex®. If the products are warranted, Sprintex® will pay for ground shipping charges only to return the parts to the customer. This warranty is for a specific time period only and does not apply to actual operational time or distance. It does not cover products which fail due to alteration, disassembly, accident, racing, misuse, neglect, improper installation, abuse or when used in applications for which they were not designed or approved. Sprintex® shall not be liable for non Sprintex® products that have been purchased through Sprintex® and all warranties will be at the sole discretion of the original manufacturer. Sprintex® makes no representation as to the suitability of any products purchased for uses implied by the customer. Removal, installation, transportation, labour, loss of time, inconvenience, destruction of other components and personal damages are not covered. Sprintex® shall not be liable for any and all consequential damages occasioned be the breach of any written or implied warranty pertaining to a sale in excess of the purchase price of the product sold. 8. LIMITATION OF LIABILITY Except to the extent that a warranty is imposed by an applicable law and cannot be excluded, Sprintex® gives no other warranty either express or implied as to any matter whatsoever concerning the Sprintex® VRSC supercharger system. Sprintex® limits it’s liability under any such warranty to the maximum extent permitted. 9. WARRANTY CLAIMS must be lodged with your authorised Sprintex® approved supercharger specialist and must be accompanied by proof of purchase. *THIS WARRANTY IS NOT TRANSFERABLE Page - 7 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 CHANGES TO FACTORY SPECIFICATIONS FUEL: MINIMUM 93 OCTANE PREMIUM UNLEADED GASOLINE/FUEL TO BE USED AT ALL TIMES. NEVER ALLOW THE ENGINE TO KNOCK OR DETONATE AS SERIOUS ENGINE DAMAGE MAY OCCUR. SPARK PLUGS: NGK DCPR9E SPARK PLUGS. PLUG GAP TO BE SET TO 0.62mm/0.025” REQUIRED SERVICE: (SEE MAINTENANCE SECTION OF MANUAL) 1. INSPECT SUPERCHARGER DRIVE BELT AT EVERY ROUTINE SERVICE AND REPLACE WHEN REQUIRED. 2. CHECK SUPERCHARGER OIL LEVEL AT EVERY ENGINE OIL SERVICE. 3. DRAIN AND REPLACE SUPERCHARGER OIL AT EVERY SPARK PLUG SERVICE. IT IS REQUIRED TO REMOVE SUPERCHARGER TO CHANGE OIL AND REMOVE SPARK PLUGS. USE REDLINE EQUIVALENT. 75W/90 HIGH PERFORMANCE FULLY SYNTHETIC GEAR OIL OR IT IS CRITICAL NOT TO OVERFILL SUPERCHARGER GEARBOX AS DAMAGE WILL OCCUR. ONLY FILL UNTIL OIL DRAINS FROM LEVEL PLUG AT BOTTOM EDGE OF SUPERCHARGER GEARBOX COVER. Intellectual Property used in this Publication Sprintex® is a registered trademark of Sprintex® Australasia Pty Ltd, a wholly owned subsidiary of Automotive Technology Group Pty Ltd both companies are incorporated in Australia. This document is copyright of Automotive Technology Group Pty Ltd, and is not a public document. This document may not be re-sold, copied or distributed in any way without prior written authorisation of a director of Automotive Technology Group Pty Ltd. This document remains the property of Automotive Technology Group Pty Ltd and must be returned on request. Sprintex® has patents for its supercharging system pending. Any unauthorised copying or modification of the system may result in legal action. Harley-Davidson and V-rod are registered trademarks of Harley-Davidson Motor Company, a subsidiary of HarleyDavidson, Inc. incorporated in Wisconsin, United States of America. Harley-Davidson does not have any association with Sprintex® or its related companies, and have not authorised fitment of the Sprintex® supercharger system (patent pending). Gates is a registered trademark of the Gates Rubber Company, a subsidiary of Tomkins Plc, incorporated in London, United Kingdom. Other than commercial supply arrangements, Gates and Tomkins Plc do not have any association with Sprintex® or Automotive Technology Group Pty Ltd. Loctite® is a registered trademark of Henkel KGaA, a company incorporated in Dusseldorf, Germany. Other than commercial supply arrangements, Loctite® and Henkel KGaA do not have any association with Sprintex® or Automotive Technology Group Pty Ltd. Red Line is a registered trademark of Red Line Synthetic Oil Corporation, a company incorporated in California, United States of America. Other than commercial supply arrangements, Redline and Red Line Synthetic Oil Corporation do not have any association with Sprintex® or Automotive Technology Group Pty Ltd. Page - 8 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 PARTS SUPPLIED – (Main Box) 1 Sprintex® Supercharger Kit Ê 2 Joiner blocks / spark plugs 10 Supplementary Injection System 3 Belt tensioner / air filter 11 Radiator cap assembly 4 Drive shaft 12 Drive Belt 5 Support brace 13 Cooling Assembly 6 Drive body 14 Drive Shaft Tool 7 Supercharger Drive Pulley 9 Page - 9 - of 82 Copyright © Breather Hoses Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 PARTS SUPPLIED – (Model Box) Installation Manual 8 Wiring Loom Owners Manual 8 Supplementary ECU Sprintex® Key Fob 15 Sprintex Badges Coolant Bottle with Hose Page - 10 - of 82 Copyright © Belt Cover Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 SUMMARISED INSTRUCTIONS FOR EXPERIENCED VRSC TECHNICIANS Note: Alarm immobiliser must be kept in proximity of bike during installation process to prevent alarm going off or to disable alarm turn ignition on then off and remove maxi fuse within 5 seconds. DISSASSEMBLY 1. 2. 3. 4. Remove fusible link Drain coolant Drain engine oil Remove air box and air filter, remove the air temperature sensor and cylinder head breather rubber (only on later models) from air box for use later 5. Remove battery 6. Remove throttle body assembly 7. Remove horn 8. Remove complete exhaust system (unplug oxygen sensors at harness) 9. Remove coolant filler hose and tube (details in Section 12 page 21) 10. Remove water pump 11. Remove front and rear spark plugs. Replace with spark plugs supplied in kit 12. Remove alternator cover and place to side. 13. Remove TPS sensor, idle air valve, front cylinder throttle plate and front cylinder throttle shaft from throttle body as described in Section 6 page 30 MODIFICATION 1. 2. 3. 4. Modify fuel system and fit fuel hose supplied in Bag 10 as described in Section 1 page 24 Modify breather as described in Section 2 page 30 Using tool supplied in Bag 14 remove water pump shaft as described in Section 14 page 49 / 51 Replace water pump shaft with new shaft supplied in Bag 4 as described in Section 14 page 51 (NOTE: please take care and read Section 14 page 48) 5. Install drive body supplied in Bag 6 as per instruction in Section 1 page 54 (NOTE: DO NOT INSTALL HD WATER PUMP GASKET) 6. Install drive pulley supplied in Bag 7 taking careful note of torque and Loctite® specification described in Section 3 page 55 7. Refit alternator 8. Install water pipe and water pump supplied in Bags 11 & 13 as described in Section 4 page 55 9. Install battery as described in section 5 page 57 10. Modify HD wiring loom as described in Section 6 page 59, using extensions supplied in Bag 8 (Model Box) 11. Modify earth / ground connection as described in Section 12 page 45 12. Install Sprintex® wiring loom and supplementally ECU supplied in Bag 8 as described in Section 13 page 45 13. Remove the throttle body from Sprintex® supercharger Section 5 page 36 14. Assemble throttle shaft, throttle plate, idle air valve and TPS sensor previously removed from Harley throttle body into Sprintex® throttle body as described in Section 6 page 37 (new throttle plate screws provided in Bag 2). Adjust throttle plate rest position as described in Section 6.17 page 41. Do not install throttle body to supercharger at this stage 15. Install joiner block supplied in Bag 2 to supercharger assembly as described in Section 11 page 44 16. Install supercharger assembly as described Section 7 page 60 17. Install mounting bracket supplied in Bag 5 as described in Section 2 page 55 Secure bracket to supercharger using remaining bolts from Bag 5 Page - 11 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 SUMMARISED INSTRUCTIONS FOR EXPERIENCED VRSC TECHNICIANS continued 18. After fitting main body of supercharger, connect throttle cables to Sprintex® throttle body then install throttle body to supercharger using silicone sealant as described in Section 10 page 43 19. Install belt tensioner supplied in Bag 3 as described in Section11 page 70 20. Install belt as described in Section 12 page 70 21. Install belt cover supplied in Bag 15 as described in Section 15 page 72 REASSEMBLY 1. Refit exhaust system 2. Fill crank case with engine oil as recommended by Harley Davidson 3. Fill cooling system with coolant recommended by Harley Davidson, bleed air from cooling system as described in VRSC manual 4. Refit fusible link 5. Reset ECU as described Section 18 page 74 6. Start and test run engine NOTE: BEFORE RUNNING MOTORCYCLE ON CHASSIS DYNO RIDE THE MOTORCYCLE IN A ‘NORMAL’ MANNER FOR 5 – 10 MINUTES TO ALLOW LEARN FUNCTIONS IN THE HD ECU TO COMPENSATE FOR CHANGE OF OPERATING PARAMETERS. IDLE QUALITY MAYBE POOR UNTIL ECU HAS COMPENSATED. Page - 12 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGER KITÊ SECTION 1 DISASSEMBLY INSTRUCTIONS Page - 13 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS DISASSEMBLY PROCEDURES 1. Preparation 1.1 Ensure bike is located in a secure position. Sprintex® recommends to avoid injury you should secure the bike on a scissor lift or similar bike stand using straps at anchor points provided. 2. Purging Fuel System LSAFETY WARNING: Fuel system is under high pressure. To prevent uncontrolled fuel spray during installation, it is required to purge the system of high pressure fuel. INADEQUATE SAFETY PRECAUTIONS COULD RESULT IN PERSONAL INJURY OR DEATH. ENSURE NO POTENTIAL OF EXTERNAL IGNITION SUCH AS NAKED FLAMES, WELDING OR SPARKS ARE OCCURING IN THE VICINITY PRIOR TO COMMENCING THIS PROCEDURE. YOU SHOULD ENSURE YOU ARE WEARING EYE PROTECTION AND LOW COMBUSTIBLE CLOTHING PRIOR TO COMMENCING THIS PROCEDURE. IT IS RECOMMENDED TO KEEP AN APPROPRIATE TYPE OF FIRE EXTINGUISHER READILY AVAILABLE. 2.1 Lift seat. 2.2 Disconnect fuel module connector from fuel tank top plate (1). 2.3 Start engine and allow to run. 2.4 When engine stalls, continue to turn engine over for approximately 3 seconds using the starter to remove any fuel pressure from the fuel lines. LSAFETY WARNING: Allow engine to cool prior to proceeding with disassembly to prevent scalding. Page - 14 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS DISASSEMBLY PROCEDURES 3. Maxi-fuse Removal 3.1 LSAFETY WARNING: ensure the bike is not running and the ignition key is in the off position for the remainder of the disassembly procedure. 3.2 To disarm alarm, turn ignition to on then off and remove maxi fuse within 5 seconds. 3.3 Remove fastener (1) and remove RH side battery cover (2). 3.4 Remove maxi-fuse and store safely. 4. Air box, Intake Air Temperature Sensor And Air Filter Removal 4.1 Remove air box cover by turning retaining fastener ¼ turn counter clockwise. Pull air box cover away from locating holes. 4.2 Place cover in a safe place away from potential damage. Page - 15 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 4.3 Remove connector from Intake Air Temperature Sensor (IAT) (1). The sensor will be used later in the installation. 4.4 Unclip 8 clips (2) retaining air box top, and remove air box top. There are three clips on each side, one on the front and one at the back. 4.5 Remove wing-nut securing air filter and remove air filter from air box. 4.6 Disconnect breather hose (1). 4.7 Slide o-rings (2) up velocity stacks and remove 3 cap screws securing each stack. 4.8 Remove velocity stacks. 4.9 For models with moulded breather hoses, front breather hose is a press fit, and disconnects when air box base is lifted. Rear breather needs to be disconnected from oil/air separator and pushed out of air box base. Lift base to remove. DISASSEMBLY PROCEDURES 1 2 1 4.10 For other models, the front breather is retained by a worm clip, loosen clamp. Rear breather is secured to air box bottom with a worm clip. Loosen clamp, disconnect hose and remove air box bottom. Page - 16 - of 82 Copyright © 2 Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS DISASSEMBLY PROCEDURES 4.11 Cover the throttle body intakes to prevent contaminants / objects from falling down the throttle bores. 5. Battery Removal NOTE: Always disconnect negative battery cable first. This prevents possible shorting and potential battery damage. 5.1 Remove negative (-) terminal bolt first, then remove positive (+) terminal bolt. 5.2 Remove battery cable clip and remove battery. 6. Horn Removal 6.1 Remove acorn nut and washer securing horn to chassis. 6.2 Disconnect two wires from rear of horn and place horn in a safe place. Page - 17 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS DISASSEMBLY PROCEDURES 7. Throttle Body Removal 7.1 Disconnect throttle position sensor connector (1). 1 7.2 Disconnect idle air control (IAC) motor connector (2). 7.3 Loosen clamps securing throttle (Rocker-covers shown removed) 7.4 Remove throttle body by gently rocking whilst pulling upwards. 2 body. NOTE: • After removing throttle body, tape up inlets with tape to prevent any debris from falling into engine risking engine damage. Page - 18 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 7.5 DISASSEMBLY PROCEDURES Remove throttle cable housings from guides at throttle body and remove cable barrels from throttle cam. 8. Coolant Removal 8.1 LSAFETY WARNING: Allow cooling system to cool prior to commencing this procedure. Ensure you are wearing appropriate protective clothing to prevent scalding. When removing pressure cap use a cloth to prevent spillage and scalding. 8.2 Using a cloth over pressure cap, turn ¼ turn counter clockwise to safety stop and allow pressure to relieve. Remove cap once pressure has escaped. 8.3 Remove LH radiator cover, by removing 5mm button head screw from underside of cover, and lifting gently. 8.4 Place container under radiator and remove radiator drain plug (1) and allow coolant to drain completely. 8.5 Once coolant has completely drained, replace radiator drain plug. Tighten plug to 9-11Nm. Page - 19 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS DISASSEMBLY PROCEDURES 9. Coolant Bottle Removal 9.1 Disconnect overflow pipe from water manifold filler neck being careful not to spill coolant onto bike (see 13 Page 22). 9.2 Disconnect breather pipe from top of coolant bottle. 9.3 Remove coolant bottle by lifting vertically to release locating lugs from rubber grommets. 10. Engine Oil and Filter Removal 10.1 Place a suitable container under oil drain plug at front of oil pan on left hand side. 10.2 Remove engine oil drain plug and allow oil to drain completely. 10.3 Once oil has drained completely, install drain plug and tighten to 35Nm (25.8ft/lb) NOTE: It is recommended, but not compulsory to change the oil filter. 10.4 Remove engine oil filter using the Oil Filter Wrench HD-44067. 10.5 Clean filter sealing surface on engine. 10.6 Lube seal on new oil filter, and install new filter. Tighten filter 2/3 to 1 turn after the filter’s seal has contacted the mounting surface. Page - 20 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS DISASSEMBLY PROCEDURES 11. Primary Drive Cover Removal 11.1 Remove three cap screws securing primary drive cover and remove cover. Page - 21 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS DISASSEMBLY PROCEDURES 12. Exhaust System Removal 12.6 Remove lower fasteners (1) securing auxiliary volume and muffler to the exhaust support bracket. Note location of L bracket when Remove the fastener (1) holding the upper removing front lower fastener. muffler (25) to the lower muffler (26). 12.7 Remove three 5mm cap screws from right hand Slide upper muffler rearward separating from side drive sprocket cover and remove cover. auxiliary volume (24). 12.8 Remove oxygen sensor cable bracket (29) and Remove both heat shields (21, 20) from front disconnect oxygen sensors at harness. and rear header pipes (10, 9) 12.9 Remove four hex nuts (4) securing front and rear Remove hex-nut (4) and pin (11) on exhaust headers to cylinder heads. support bracket. 12.10 Remove header pipes with the auxiliary volume and lower muffler all attached. Lift and adjust the assembly until header pipes slide out and away from the cylinder heads. 12.1 Loosen upper muffler clamp (18). 12.2 12.3 12.4 12.5 NOTE: To maintain the alignment of all the components, keep the lower muffler, auxiliary volume, exhaust clamp and the front and rear header pipes firmly connected. 13. Coolant Hose Removal 13.1 Loosen and remove hose clamp (4). 13.2 Loosen and remove cap screw (7) securing P-clamp (8) to engine. Remove P-clamp. 13.3 Loosen hose clamp (12) at bottom of hose connected to water pump. 13.4 Using a thin screwdriver, loosen hose clamp (12) and pull hose (13) off radiator. 13.5 Remove engine coolant pipe (2). Page - 22 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS DISASSEMBLY PROCEDURES 14. Water Pump Removal 14.1 Unbolt 6 water pump cap screws and remove water pump cover. 14.2 Remove the water pump insert. 14.3 Using a soft mallet, tap on side of water pump to break seal. 14.4 Remove water pump by gently pulling outwards. NOTE: Ensure to remove water pump gasket which fits between water pump and crankcase, and discard. DO NOT RE-INSTALL THIS GASKET. Page - 23 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGER KITÊ SECTION 2 MODIFICATION INSTRUCTIONS Page - 24 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 1. Fuel System Modification LSAFETY WARNING: Residual pressure may be released when the fuel system check valve is removed. You should ensure you are wearing appropriate protective face and body clothing and take steps to minimise spillage and fire. Avoid being in the potential path of the fuel release. 1.1 Remove fuel rail from the bike. 1.2 Remove fuel system check valve from fuel rail. Page - 25 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 1.3 Remove the fuel pressure regulator by removing the two side screws from the clamp. 1.4 Tap the hole in the fuel pressure regulator with an M5 tap. MODIFICATION PROCEDURES Note: Do not screw the tap too far in the regulator body as it will damage the internal spring. 1.5 Clean and dry the pressure regulator using low pressure air. Page - 26 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 1.6 Put a tiny amount of Loctite 222 on the thread of the quick-fit connector elbow and screw it to the fuel pressure regulator. 1.7 Lubricate o-rings on the fuel regulator and reinstall it to the fuel rail. (Secure regulator with the clamp and two screws which were removed previously.) 1.8 Using supplied fuel supply hose, banjo bolt and 2 5/16” copper washers (from Bag 10) secure the fuel supply hose to fuel rail in place of the check valve (previously removed). 1.9 Route supplied fuel hose under fuel rail. Page - 27 - of 82 Copyright © MODIFICATION PROCEDURES Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 1.10 Lubricate fuel injector o-rings and reinstall fuel rail to the bike. 1.11 Ensure supplementary injector hat is aligned as shown. Tighten fuel hose banjo bolt to 11Nm/8.3ft/lb. Page - 28 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 1.12 Secure the fuel rail in position. 1.13 Connect supplied Teflon pipe to quick-fit elbow on the fuel pressure regulator. 2. Breather Modification 2.1 For later models using softer 5/16” moulded hose, the breather system does not need to be modified. However, the front rocker cover breather will need to be refitted to the supercharger assembly, as described later in this section. (Breather hose pictured). The rear rocker cover breather will also need to be removed from the air box and refitted to the rear rocker cover breather outlet. Page - 29 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES For 5/16” Moulded Breather Model 2.2 Remove front cylinder moulded breather hose from oil air separator in air box base. 2.3 Press moulded breather hose out through base of air box to remove, and set aside. 2.4 Fit removed breather hose to breather bracket and fitting on supercharger as pictured. 2.5 Secure breather hose to brass fitting with a cable tie. 2.6 Ensure breather hose is correctly located in breather bracket, and not kinked at any point. 3. Spark Plug Replacement 3.1 Remove front and rear coil fasteners. 3.2 Detach coil connectors 3.3 Pull coil and boot assembly straight up to disconnect spark plug. Page - 30 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 3.4 MODIFICATION PROCEDURES Remove spark plugs using correct spark plug socket NOTE: Check spark plug gaps on supplied spark plugs, Part No. DCPR9E, are set to 0.62mm/0.025”. 3.5 Install new plugs and tighten to 23Nm (16.9ft/lb). 3.6 Install coil and boot assemblies over plugs with wiring connector facing rear of motorcycle. 3.7 Insert coil fasteners with longer fastener used on left hand side. Tighten fasteners to 9.7Nm (7.2ft/lb). 3.8 Connect connectors to coils. 4. Throttle Body Disassembly 4.1 Remove two security screws (1) securing Throttle Position Sensor to throttle body. Remove sensor and set aside. 1 Page - 31 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 4.2 MODIFICATION PROCEDURES Remove countersunk screws securing TPS plate to throttle body by heating the bosses under the TPS to break Loctite®. 1 4.3 Using a heat gun, gently heat Idle Air Control screws (1) to break Loctite® patch and remove screws. 4.4 Pull IAC and O-ring from throttle body. Set IAC aside. 1 4.5 Remove circlips from the three posts shown. 4.6 Remove two washers from lower two posts. Page - 32 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 4.7 Take note of spring tail location on throttle swing arm. 4.8 Remove bush from throttle assembly. 4.9 Disconnect throttle arm from top post. MODIFICATION PROCEDURES 4.10 Remove throttle swing-arm by rotating front throttle shaft clockwise and lifting upwards. 4.11 Remove swing-arm spring and spring carrier. Page - 33 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 4.12 Heat security screws securing swing arm plate and remove screws. 1 4.13 Heat security screw securing cable guide to throttle body and remove guide. 1 NOTE: Some butterfly screws have been staked peened on the backside, and will need the protruding portion of the thread ground off with a die grinder or similar prior to removal. 1 4.14 Heat front butterfly screws with a heat gun. 4.15 Remove front cylinder butterfly from standard throttle body assembly by removing the 2 security fasteners. Page - 34 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 4.16 Remove circlips securing front throttle shaft ensuring not to damage the nylon washer. 4.17 Remove nylon washer from front throttle shaft. 4.18 Remove throttle shaft and set aside 5. Throttle Body Removal NOTE 1: It is easier to fit the previously removed throttle linkages to the Sprintex® supercharger kit with the supplied throttle body removed from the supercharger kit. 5.1 Disconnect vacuum hose from bypass actuator as indicated at (1). 5.2 Disconnect breather hose from throttle body (2). 5.3 Disconnect vacuum line from 3/16” fitting as pictured. Page - 35 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 5.4 Remove the 4 M5 cap screws securing bypass elbow to supercharger kit. 5.5 Remove the 5 M6 cap screws securing throttle body to supercharger kit, and remove throttle body. Note position of different length screws for reassembly. MODIFICATION PROCEDURES 6. Throttle Body Assembly NOTE: The throttle body now needs to be assembled using the previously removed throttle linkage components and throttle butterfly. This section may appear complicated and require practice to master. Page - 36 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 6.1 Secure throttle linkage bracket on supercharger throttle body using 2 supplied M5x12 countersunk screws from Bag 2. Tighten to 6Nm (4.4ft-lb) 6.2 Insert throttle shaft and spring into supplied throttle body. 6.3 Ensure throttle return spring is temporarily located as pictured. MODIFICATION PROCEDURES NOTE: It is necessary to assemble the swing arm and throttle shaft at the same time, but for ease of description, the following pictures show the throttle shaft not installed. 6.4 Place swing arm plastic spring carrier and swing arm spring onto post and align as pictured. 6.5 Take careful note of the location of the spring ends. Page - 37 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 6.6 Using previously removed swing-arm, insert swing arm spring tag through hole in between the two throttle cable barrel mounting holes as pictured. 6.7 Position swing-arm onto post, and rotate clockwise. 6.8 Gently push swing arm down, until the stop tag on the underside locates in the cut-out in the throttle body. MODIFICATION PROCEDURES NOTE: It may take some adjusting of the location of the plastic spring locator before the swing arm will sit down in its position properly. 6.9 Once swing arm is located properly it should look like the picture. The swing arm should have a light pretension on the spring, and should rest against its stop in the shown position. 6.10 As the throttle shaft should have already been installed, it is important that the swing arm is located over post as pictured. Page - 38 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 6.11 Place washer over swing-arm post and secure assembly in position with previously removed circlips. 6.12 Insert previously removed bush, washer and circlips onto throttle arm post. 6.13 Rotate throttle return spring, and lift over post to position shown in picture. 6.14 Secure throttle shaft in throttle body using supplied E-clip from Bag 2 and nylon washer previously removed from throttle body. Page - 39 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 6.15 Install throttle butterfly to throttle shaft using new screws supplied in Bag 2. NOTE: Ensure to use Loctite ® or similar locking compound to security screws prior to fitting. 6.16 Ensure throttle assembly rotates smoothly and returns to correct position. 6.17 Adjust the idle position of the throttle butterfly, by adjusting the screw on the throttle body to give a rest position of .003.004" throttle plate clearance. NOTE 1: It may be necessary to adjust this clearance after the installation if the engine does not idle properly. Too little clearance and the engine will want to stall. Too much and the engine will flair, taking time to return to desired idle speed. NOTE 2: In some instances harmonic vibration has been found to cause the adjustment screw to move hence it is recommended to apply wick-in Loctite®, or similar, once the set up is complete. 7. Idle Air Control (IAC) Valve Installation 7.1 Insert IAC valve and O-ring into throttle body and secure with 2 supplied M4x12mm cap screws from Bag 2. Tighten screws to 3Nm (2.2ft-lb) 7.2 Ensure IAC is aligned as pictured. Page - 40 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 8. Throttle Position Sensor Installation. 8.1 Fasten throttle position sensor mounting plate to throttle body using 2 M5x12 supplied countersunk screws from Bag 2. Tighten screws to 6Nm (4.4ft-lb) 8.2 Ensure plate is fixed as pictured. 8.3 With connector facing side of throttle body as shown, verify that shaft pocket of TP sensor fits over shaft on throttle body. 8.4 Align holes in throttle body plate. 8.5 Fasten TPS to TPS mounting plate using supplied M4x12 cap screws from Bag 2. Tighten screws to 3Nm (2.2ft-lb) 8.6 Ensure that there is a light preload on the TP sensor when it is aligned as pictured. The TPS can be incorrectly mounted but still be aligned as shown, and will result in poor engine operation. 9. Intake Air Temperature Sensor (IAT) Installation 9.1 Press IAT sensor into throttle body as shown. Take care not to damage the oring. Page - 41 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 10. Throttle Body ReInstallation 10.1 Apply a gasket sealant to the highlighted surface as shown in picture. 10.2 Loosely fasten throttle body to inlet manifold using previously removed cap screws and schnor washers. Ensure not to cross-thread screws which may permanently damage the manifold and affect performance. 1. M6x45 2. M6x55 3. M6x55 4. M6x65 5. M6x70 10.3 Apply Gasket Sealant to both contact surfaces of bypass elbow. Page - 42 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 10.4 Fit bypass elbow and secure using previously removed fasteners. Do not tighten fasteners yet, just tighten enough for faces to contact throttle body and plenum top. 10.5 Gently tighten the five M6 cap screws securing throttle body to the intake manifold. Tighten to 10Nm (ft-lb). 10.6 Tighten 4 M5 cap screws securing bypass elbow to 6Nm (4.4ft-lb) 10.7 Connect breather line to bottom hose quick-fitting. 10.8 Top actuator must be connected to fitting furthest from IAT sensor, located on side of intake manifold. (Red Line) 10.9 Fitting next to IAT on throttle body, must be connected to lower actuator on other side of supercharger. (Blue Line) 10.10 Ensure MAP line has not been accidentally disconnected from fitting on plenum top. (Green Line) 11. Joiner Block Fitting 11.1 From Bag 2, remove the joiner block, one M5x40 (1), one M5x65 (2) and two schnor washers. 1 2 11.2 Fit to base of supercharger plenum as pictured. Ensure that the front face of the joiner block is flush with, and square to the adjoining plenum face. 11.3 Fasten cap screws to 6Nm (4.4ft-lb) Page - 43 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 12. Earth Bolt Removal 12.1 It is necessary to remove the front and rear cylinder head earth bolts, as this is used to mount the supercharger kit. NOTE: The earth straps will need to be mounted at the bottom of the supercharger mounting bolts. 13. Plenum Mounting Bracket Fitting 13.1 Locate earth straps on to shoulder bolts and fit mounting bracket to front and rear cylinder heads. Do not tighten bolts until both are fitted. Note: It is important to locate the two earth strap eyelets, one on either bolt, underneath. The eyelets will be located between washer and cylinder head. 13.2 Tighten bolts to 15NM Page - 44 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 14. Wiring Loom Modification NOTE: Due to the relocation of some of the engine management sensors, it is required to install wiring loom extensions supplied in Bag 8. 1 IAC Loom Extension (1) This loom is supplied with 4 coloured wires. 2 TPS Loom Extension (2) This loom is supplied with 3 coloured wires, with a break-out loom and connector. 14.1 Remove the plastic conduit from the IAC loom and TPS looms as pictured. IAC Loom Extension 14.2 Factory IAC connector has letters on the plug defining each of the wires connected to it. 14.3 These will be connected to each of the wires on the supplied extension. Page - 45 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 14.4 Cut wire (A) at IAC connector on factory loom. 14.5 Strip 10mm of the outer insulation. 14.6 Slide over supplied heat shrink from Bag 8. 14.7 Solder to wire A of the extension. 14.8 Repeat the above for wire B, C and D while taking care not to touch the soldering iron against any other parts. Note: Cut one wire at a time and join to the corresponding wire from the extension loom (A-A, B-B, C-C, and D-D). LSAFETY WARNING: Ensure you are wearing appropriate protective clothing such as eye protection and gloves and follow manufacturer’s safety instructions prior to using a soldering iron. 14.9 Slide up heat shrink over soldered joint and shrink using a heat gun. Do not use a naked flame as heat shrink may melt. Page - 46 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES TPS Loom Extension 14.10 Factory TPS connector has letters on the plug defining each of the wires connected to it 14.11 These will be connected to each of the wires on the supplied extension as follows. Factory TPS Extension (A) Black / White (A) Black (B) Red / White (B) Orange (C) Grey / Purple (C) White 14.12 Cut Black / White wire (A) at TPS connector on standard loom. 14.13 Strip 10mm of the outer insulation. 14.14 Slide over supplied heat shrink from Bag 8. 14.15 Solder to the Black extension wire (A). 14.16 Slide up heat shrink over soldered joint and shrink using a heat gun. Do not use a naked flame as heat shrink may melt. 14.17 Repeat steps 13.12-13.16 for wires (B)-(C) according to above table. Page - 47 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 15. Water Pump Drive Shaft Replacement 15.1 Place drip pan under alternator cover to catch any remaining oil. 15.2 Remove 14 cap screws securing alternator cover. 15.3 Using 2 derby cover fasteners (3), position alternator stator cover remover/installer tool (HD-45304) (4) as shown. 15.4 Install two gasket alignment dowels (HD45340) (2) in two of the alternator cover holes to steady cover as it is removed. 15.5 Remove alternator cover by pulling outwards. Beware of fingers as the cover is held in place by the alternator magnets. 15.6 Remove alternator cover gasket and set aside for reuse in re-assembly stage. NOTE: If cover removal tool and dowels not available, cover can be removed by levering at 2 lever points on the back side of the cover. LSAFETY WARNING: Be careful of fingers as the cover is held in place by the alternator magnets and may snap back into place if not removed carefully. Support stator housing and place to one side. Be careful as wire harness is very short. 15.7 Holding crankshaft 36mm rotor nut with wrench, loosen triple sprocket fastener and remove. Page - 48 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 15.8 Attach Sprintex® drive shaft guide, Part No 201P9001, to engine at points indicated using 4 M6x16mm cap screws supplied with tool. Do not tighten bolts yet. 15.9 Carefully insert Sprintex® drive shaft tool Bag 14, Part No 201P9005, into shaft guide, inserting tool into triple sprocket. 15.10 When aligned correctly, tighten Sprintex® guide. LSAFETY WARNING: Prior to using the hammer, ensure you have reasonable footing to avoid slipping or falling. Also ensure the bike is well secured and will not fall over. 15.11 Gently tap drive shaft tool through triple sprocket, pushing out water pump drive shaft, and keeping triple sprocket in correct position. NOTE: DO NOT REMOVE DRIVE SHAFT TOOL FROM DRIVE SHAFT GUIDE. TRIPLE SPROCKET WILL SPRING OUT OF ALIGNMENT. Page - 49 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 15.12 Thoroughly clean the shaft from Bag 4 with an air drying solvent paying particular attention to the threads in each end of the shaft. Apply engine assembly lube to shaft bearing surfaces as indicated in picture. 15.13 Carefully insert replacement drive shaft from Bag 4, through crank case. 15.14 Align shaft with alignment carrier, and carefully tap new drive shaft through triple sprocket, gently pushing out alignment tool. 15.15 Care must be taken not to dislodge the bushing behind triple sprocket whilst tapping in the shaft. Remove alignment tool carrier and alignment tool. Page - 50 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 15.16 Using a deep 22mm socket, secure driveshaft. NOTE: Do not use hex on end of drive shaft to secure drive shaft. Damage to the shaft may occur. 15.17 Install supplied triple sprocket bolt from Bag 4 and tighten to 77Nm (56.8ft-lb) Note that triple sprocket bolt is left hand thread. NOTE: Use Loctite ® 222 or similar locking agent on triple sprocket bolt. After tensioning bolt tap the head of the bolt with a soft mallet to ensure that shaft bushing is seated correctly in the crankcase. NOTE: After installing driveshaft, ensure crankshaft turns freely, and drive shaft has a minimum 0.05mm/0.002” end float. Only rotate crankshaft in correct direction. Page - 51 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS MODIFICATION PROCEDURES 15.18 Using a new gasket, or using a sealant on the old gasket, carefully align and replace alternator cover. LSAFETY WARNING: Be careful of trapping fingers when replacing alternator cover. It will snap into position due to the magnets within the alternator body. 15.19 Fit all bolts to cover and tighten to 9.7Nm (7.2ft-lb) according to the procedure pictured. 15.20 Route stator wiring harness through cable clip and latch clip. Page - 52 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGER KITÊ SECTION 3 INSTALLATION INSTRUCTIONS Page - 53 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 1. Drive Body Installation 1.1 Using supplied drive body from Bag 6, Apply a thin smear of sealant around points indicated. 1.2 Apply a thin smear of grease on the two orings on the drive body. 1.3 Ensure the original water pump gasket has been removed, and that the crank case surface is clean from debris and oil. 1.4 Apply engine lube along the length of the shaft where the roller bearing and seal in drive body run. 1.5 Carefully insert supplied drive body into water pump drive housing, ensuring not to damage O-rings. 1.6 Secure drive body to engine using Bag 6 supplied M6x16mm cap screws and Bag 1 supplied M6x35mm cap screw and the supplied schnor washers from Bag 6. Tighten to 10Nm (7.4ft-lb) Page - 54 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 2. Supercharger Brace Installation 2.1 Secure supercharger brace from Bag 5 to drive body at points indicated with 4 supplied M6x16mm cap screws and schnor washers from Bag 5. Tighten cap screws to 10Nm (7.4ft-lb) 3. Drive Pulley Installation 3.1 Fit drive pulley from Bag 7 to drive shaft. Use a small amount of Loctite® 680 or similar on the mating faces between the shaft and the pulley. 3.2 Secure drive pulley with supplied countersunk M10x25 bolt from Bag 4, and tighten to 52Nm (38ft-lb). Ensure to hold pulley by using a 36mm spanner across flats on hex centre. 3.3 Use Loctite® 222on drive pulley bolt, be careful not to apply to countersunk face of bolt head. 4. Cooling System Installation 4.1 Fit cooling assembly by fitting manifold to radiator and securing with previously removed hose clamp. Tighten clamp to 34Nm (2.2-2.9ft-lb). 4.2 Align cooling assembly with chassis upper chassis rail and front rail. Page - 55 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 4.3 Attach electric water pump hose to drive body fitting using supplied hose clamp and tighten clamp to 3-4Nm (2.2-2.9ft-lb). 4.4 Locate radiator cap body from Bag 11 in pictured location. 4.5 Attach ½” hose to drive body using supplied hose clamp, Bag 11, and tighten to 3-4Nm (2.2-2.9ft-lb). 4.6 Attach radiator cap body to water manifold using hose clamp provided and tighten to 3-4Nm (2.2-2.9ft-lb). 4.7 Fasten previously removed P-clamp around both coolant pipes and secure to front rocker cover with fastener. Tighten fastener to 6-10Nm (4.4-7.4ft-lb). 4.8 Ensure no hoses are kinked and cooling assembly is properly located, not rubbing on any engine or chassis components. Page - 56 - of 82 Copyright © INSTALLATION PROCEDURES Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 5. Battery Installation 5.1 Slide battery back into battery box ensuring that the terminals are at the top. (Positive on left hand side). 5.2 Connect the positive lead and fasten using previously removed fastener. Tighten fastener to 6.8-10.9Nm (5-8ft-lb). 5.3 Do not connect earth lead yet. 5.4 Do not replace battery strap yet. Page - 57 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 6. Supplementary Engine Control Unit Installation Figure 6-1 1. Supplementary ECU – SMT6H 2. Diagnostics Connector. To be connected to HD diagnostics plug. 8. Supplementary Injector Connector. Connected to supplementary injector on underside of supercharger kit intake manifold. 3. TPS Connector. To be connected to break-out loom from TPS extension. 9. Injector Connector. Connect to front fuel 4. Earth Connector. To be connected to battery earth on rocker cover. 10. Crank trigger output. 5. Water Pump Connector. water pump. Connected to 6. Supplementary MAP sensor Connector. Connected to MAP sensor on side of supercharger. 7. Injector Connector. Connect to front cylinder fuel injector. injector connector on factory loom. 11. Crank trigger input. 12. Data interface connector. (no wires to be connected) 13. Air Temperature Sensor Plug 14. Computer Diagnostic Plug 15. IAC Connector. Connect to Intake Air Sensor on Throttle Body. Page - 58 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 6.1 Insert supplementary ECU and loom on top of battery as shown. (Insert with connectors first). Ensure wiring loom is located back out through battery hold down strap. 6.2 Move hold-down strap over battery and supplementary ECU to secure into position. 6.3 Undo battery earth cable from rocker cover. 6.4 Place earth connector from supplementary loom onto mounting bolt and refasten using the previously removed nut. 6.5 Ensure battery earth cable is located flush against the battery. 6.6 Remove connector from front cylinder fuel injector. 6.7 Connect supplementary loom male injector plug (9 in Figure 6.1) to factory front injector connector. 6.8 Connect supplementary loom female injector plug (7 in Figure 6.1) to front cylinder injector. (Not connected in picture for clarity). Page - 59 - of 82 Copyright © INSTALLATION PROCEDURES Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 6.9 INSTALLATION PROCEDURES Route water pump plug under injector body and connect to water pump. 6.10 Connect multiplug on supplementary loom to diagnostics multiplug located at RHS of battery. 6.11 Carefully mount connected wires to stable mounting points using cable ties. 7. Supercharger Installation 7.1 Carefully lubricate O-rings on supplied fuel injector, Bag 10 with rubber grease. 7.2 Insert inlet end of fuel injector previously installed injector hat. 7.3 Connect supplementary injector connector from installed wiring loom, (connector 8 in figure 6.1), to injector. Align injector as shown, with connector facing downwards. into Page - 60 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 7.4 Throttle cables need to be re-routed through battery hold down strap, on RHS of supplementary control unit on top of battery. 7.5 If battery positive connector is unprotected, use plastic conduit to protect and prevent possible shorting. INSTALLATION PROCEDURES NOTE: Please make sure that all sealing tape is removed. Remove transit cable tie from actuator linkage as shown in picture. 7.6 Carefully place supercharger upside down over engine in position shown. 7.7 Fitting pull cable first, insert throttle cable barrel into swing arm as shown. 7.8 Fit outer cables to locating posts. Ensure throttle operates correctly, without sticking, and check to make sure full throttle can be achieved. Page - 61 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS 7.9 INSTALLATION PROCEDURES Carefully rotate swing-arm clockwise, and slip cable over swing-arm. 7.10 Whilst pulling on outer cable, slide inner cable under throttle shaft arm, over post and locate in slot in throttle cable post. 7.11 When located as shown release outer cable and allow to fit snugly in counter-bore in throttle cable post. 7.12 Fit throttle return cable barrel to swing arm. 7.13 Pull back cable outer and insert into throttle cable post. NOTE: It may be necessary to wind back the throttle cable adjustment at the grip to allow cable to extend back to cable post. Page - 62 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES Throttle Cable Adjustment 7.14 Turn the throttle adjusters, (2,4) and jamnuts (3) as short as they will go. Both cables should have zero adjustment at the start of this procedure. 7.15 Ensure the front wheel is pointed straight ahead. 7.16 Turn the throttle grip wide open and hold it there. 7.17 Turn the throttle cable adjuster (2), lengthening the sleeve, until the throttle cam just touches the cam stop. 7.18 Tighten the adjuster jam-nut and (3) and release the throttle. 7.20 Check adjustment. a. Work the throttle grip to be sure the cable returns to idle position when released. 7.19 Turn the idle cable adjuster (4), lengthening the sleeve until the cable housing touches the spring on the cable support sleeve. LSAFETY WARNING: Check that the throttle control operates freely without binding. Irregular or sticking throttle response could cause a loss of control, leading to an accident which could result in death or serious injury. b. If the cable does not return to idle, turn idle adjuster, shortening the sleeve until correct adjustment is reached. Tighten the jam-nut (3) NOTE: If the throttle is slow to return, ensure that the cables are located correctly and not twisted or bent too sharply. If the throttle is still slow, the cables will need to be oiled or replaced. 7.21 Carefully flip supercharger over. 7.22 Insert supplementary injector into base of inlet manifold. 7.23 Fasten supplementary fuel injector to supercharger manifold using two M5x20 cap screws and two schnor washers from Bag 10. Tighten cap screws to 6Nm (4.4ftlb) NOTE: Ensure that fuel injector connector points downwards as much as possible to prevent interference with throttle linkage. Page - 63 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 7.24 If V-rod has early model breathers which have been previously modified; Push front and rear hoses over brass fittings on plenum chamber. 7.25 If late model breather (moulded), fit the rear cylinder breather to rear brass fitting, and secure with cable tie. 7.26 Carefully lower supercharger assembly and push front breather over the front cylinder rocker cover breather tube. 7.27 Connect electrical plugs to additional MAP sensor (1), IAC (2), TPS (3), and IAT sensor (4). (Supercharger kit shown installed). 7.28 Carefully mount supplementary loom securely to chassis rail or other stable mounting points. 7.29 Press supercharger down into inlets. 7.30 After ensuring supercharger is located properly, tighten inlet hose clamps to 35Nm (2.2-3.7ft-lb). 7.31 Insert air temp plug into air temp sensor (number 13 – refer to wiring diagram page 58) Page - 64 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 7.32 Connect the fuel pressure regulator pipe to the quick fit tee supplied. To plenum / supercharger To fuel pressure regulator To MAP sensor 7.33 From RHS of bike, loosely fasten two M6x20 cap screws and two M6x16 cap screws, Bag 5, through brace and into supercharger assembly. Page - 65 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 7.34 Fit supplied hardened washers and nyloc nuts to Plenum Mount bracket studs and tighten to 15NM. 7.35 Tighten two M6x20 and two M6x16 cap screws on RHS of bike to 10Nm (7.4ft-lb) 7.36 Connect the negative lead to battery, fasten using previously removed fastener, and tighten to the 6.8-10.9Nm (5-8ft-lb). Page - 66 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 8. Crank Angle Sensor 8.1 Remove L/H radiator side cover by removing cap screw and lifting off cover. 8.2 Route crank angle sensor plugs along frame and cable tie. 8.3 Unplug crank angle sensor and plug in plugs (1) and (2). 8.4 Cable tie wiring and plugs. 8.5 Replace side cover securing with previously removed cap screw. Page - 67 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 9. Air Filter Fitting 9.1 Remove belt tensioner from inside air filter. 9.2 Remove filter from protective cover. 9.3 Install filter to throttle body inlet. 9.4 Tighten hose clamp to 3-4Nm (2.2-3ft-lb). 10. Coolant Bottle Installation 10.1 Install supplied coolant bottle (note: the supplied coolant bottle has an indentation to clear the check butterfly actuator). 10.2 Fit breather pipe to top of coolant bottle (1). 10.3 Using supplied overflow hose from Model Box connect hose to radiator cap body overflow fitting. 10.4 Thread pipe through protective sleeve which was removed from original overflow pipe and pipe clamp. Install pipe onto bottom fitting on overflow bottle and affix pipe clamp (2). 10.5 Cable tie pipe so that it is not kinked or rubbing on any engine or chassis components. Refilling Cooling System Note: It is important to fill and bleed cooling system with bike on side stand. LSAFETY WARNING: Ensure coolant does not make contact with other parts. Use a funnel and drop cloth to prevent damage. 10.6 Remove air bleed plug from top cooling system hose. Page - 68 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 10.7 Fit bleeding assembly (barb with clear riser tube). 10.8 Through new radiator cap body and filler neck, fill cooling system with genuine Harley-Davidson extended life antifreeze & coolant up to lower sealing surface in radiator cap body until the coolant is visible in bleed riser tube. Page - 69 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 10.9 Replace filler cap and turn ignition to IGN. This will activate the electric water pump which will circulate the coolant. Whilst the pump is running the coolant level will drop in the riser pipe. 10.10 Switch off the ignition and carefully remove the filler cap. 10.11 Top up coolant level if required and repeat above steps until coolant level in both the filler neck and riser tube no longer drops. 10.12 Once cooling system has been bled of all air, place some tissue paper or cloth; around the riser fitting base and remove bleeding assembly. 10.13 Fit bleed plug with sealing washer and tighten to 9 – 11 Nm (6.6 – 8.1 ft-lb). Note: It is advisable to place a cloth under the bleed point to catch any spilt coolant. Coolant is extremely toxic and will permanently mark any paint it comes into contact with. 10.14 Check coolant level and add as necessary through filler neck up to lower sealing surface in filler neck. 10.15 Run engine to normal operating temperature and then recheck system coolant level repeating above steps as needed. 10.16 Check coolant level in overflow bottle with coolant cold and bike on side stand. Add coolant to cold Full Line as needed. Page - 70 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 11. Belt Tensioner Fitting 11.1 Fit supplied belt tensioner using one M8x45 cap screw and zinc washer from Bag 3 in location shown. Ensure spring tag sits properly in locating hole. To do this, apply pressure in a clockwise direction to the tensioner assembly while tightening the mounting bolt. 11.2 Tighten cap screw to 25Nm (18.4ft-lb) 12. Belt Installation 12.1 Route supplied drive belt, Part No. 4PK945 over bottom drive pulley and over supercharger pulley. 12.2 Using 15mm spanner rotate drive belt tensioner clockwise until belt can be routed as shown. The new belt will need to be levered over belt tensioner. 12.3 Release belt tensioner ensuring belt is correctly aligned on both drive pulleys. Page - 71 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 13. Exhaust Refitting 13.1 Gently lift the lower muffler, auxiliary volume, 13.9 Place clamp (18) on upper muffler (25). Slide and header pipe assembly into position. muffler over upper opening of auxiliary volume (24). Position clamp with compression fastener to inboard with tightening nut upward. 13.2 Slip both front and rear header flanges over the studs in the cylinder heads. Thread two hexnuts (4) on header flange studs. Do not tighten. 13.10 Thread upper muffler fasteners (1) into the lower muffler (26). Do not tighten. 13.3 Reinstall oxygen sensor cable with bracket (29) 13.11 Torque the fasteners to the indicated torque in and plug cables back into harness. the following order. 13.4 Install support pin (11) in isolator mount (17) on the exhaust support. Thread on the hex-nut (4). Do not tighten. 13.5 Hold a ½” spacer between frame rail and the header pipe exhaust clamp. a. Upper muffler clamp – 65Nm (48ft-lb) b. Upper muffler fasteners – 23Nm (17ft-lb) c. Lower muffler and auxiliary volume fasteners to support bracket – 23Nm (17ft-lb) d. Exhaust flange hex-nuts – 6-10Nm (4.47.4ft-lb) 13.6 Thread in the lower muffler fastener (1) through the exhaust support. 13.7 Thread in the auxiliary volume fastener (1) through the bracket (27) and the exhaust support. Do not tighten. 13.8 Torque the pin hex nut to 23Nm (17ft-lb) Page - 72 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 13.12 Check the tightness of the exhaust clamp by the clamp nut to 32-37Nm (23.6-27.3ftlb). 13.13 Replace front and rear heat shields. Tighten the heat shield screws to 10Nm (7.4ft-lb). 13.14 If removed, replace drive sprocket cover. Tighten to 6-10Nm (4.4-7.4ft-lb). 14. Refilling Engine Oil 14.1 Ensure previously removed drain plug is installed and tightened to 35Nm (25.8ft/lb). 14.2 Fill crank case with engine oil recommended by Harley Davidson. as 15. Belt Cover Installation 15.1 Fit belt guard using the supplied M6 cap screws and posts, Bag 15 in Model Box. 15.2 Loosely secure the cover at (1) with the 23mm post and M6x40mm cap screw. 15.3 Loosely fix the 40mm post and the M6x55mm cap screw at 2. 15.4 Fit remaining posts at (3 & 4) with two M6x75mm cap screws, and tighten all cap screws to 10Nm (7.4ft-lb) to secure belt cover. Page - 73 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 16. Fuel System Reconnection 16.1 Reconnect fuel module (1). 17. Maxi-fuse Refitting 17.1 Replace maxi-fuse (3). 17.2 Replace RH side battery cover (2) and secure using previously removed fastener (1). Tighten to 10Nm (7.4ft-lb) Page - 74 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS INSTALLATION PROCEDURES 18. ECU Reset 18.1 It is necessary to complete a reset of the Turn Signal Module and the Security Modules. 18.2 Turn ignition key to ON position. 18.3 Push key in and turn a further position clockwise to ACC. 18.4 Wait 5 seconds for ECU to complete reset operation. Gauges will traverse full deflection and return to zero position. Reset is complete. Page - 75 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGER KITÊ SECTION 4 PRE TEST-DRIVE INSPECTION Page - 76 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGING INSTRUCTIONS TESTING PROCEDURES 1. Pre-Start Inspection 1.1 Ensure coolant is at correct level. 1.2 Ensure engine oil is at correct level. 1.3 Ensure throttle opens fully and returns to stop completely. LSAFETY WARNING: Ensure adequate steps are taken to prevent injury, spillage or fire should any of the required installation steps not have been carried out to specification. 2. Engine Warm Up 2.1 Start engine and allow to run until engine reaches normal operating temperature. (Engine may take a few attempts to start due to prior evacuation of fuel in fuel system). 2.2 Check for oil leaks around stator cover. 2.3 Check for coolant leaks throughout cooling system. 2.4 Check for fuel leaks from supplementary injector and banjo fitting. 3. Air box Cover Refitting 3.1 Position air box cover so that the locating pins on the front align with the holes on the frame tabs above the battery and push pins into holes. 3.2 Fasten air box cover with previously removed bail head fastener and turn fastener ¼ turn clockwise to secure. 3.3 Push seat down and lock into position. Page - 77 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 003 V-ROD SUPERCHARGER KITÊ SECTION 5 MAINTENANCE INSTRUCTIONS Page - 78 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 002 V-ROD SUPERCHARGING INSTRUCTIONS MAINTENANCE PROCEDURES 1. Supercharger Drive Belt Replacement 1.1 Remove air box cover by turning retaining fastener ¼ turn counter clockwise. Pull air box cover away from locating holes. 1.2 Place cover in a safe place away from potential damage. 1.3 Remove belt guard by removing 4 M6 cap screws and mounting posts. 1.4 Using a 15mm spanner, tensioner clockwise. 1.5 Lever belt release. 1.6 Remove worn drive belt from top and bottom pulley and discard. 1.7 Route new Gates drive belt, Part No. 4PK945 over bottom drive pulley and over supercharger pulley. 1.8 Using 15mm spanner rotate drive belt tensioner clockwise until belt can be routed as shown. The new belt will need to be levered over belt tensioner. 1.9 Release belt tensioner ensuring belt is correctly aligned on both drive pulleys. away from rotate belt tensioner and Page - 79 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 002 V-ROD SUPERCHARGING INSTRUCTIONS MAINTENANCE PROCEDURES 1.10 Fit belt guard using the previously removed M6 cap screws, posts and washers. 1.11 Loosely secure the cover at (1) with the 23mm post and M6x40mm cap screw. 1.12 Loosely fix the 40mm post and the M6x55mm cap screw at 2. 1.13 Fit remaining posts at (3 & 4) with two M6x75mm cap screws, and tighten all cap screws to 10Nm (7.4ft-lb) to secure belt cover. 1.14 Position air box cover so that the locating pins on the front align with the holes on the frame tabs above the battery and push pins into holes. 1.15 Fasten air box cover with previously removed bail head fastener and turn fastener ¼ turn clockwise to secure. 1.16 Push seat down and lock into position. 2. Supercharger Oil Level Inspection 2.1 Place bike on bike stand ensuring that the supercharger kit is perfectly level. 2.2 Remove fill plug from top of supercharger gearbox cover. 2.3 Remove level plug from supercharger gearbox cover. 2.4 Using Redline 75W90 high quality fully synthetic gear oil, or equivalent, add a small amount of oil to gearbox until oil drains through oil level plug on side of gearbox. side of NOTE: NEVER OVERFILL GEARBOX AS DAMAGE WILL OCCUR. ONLY EVER FILL TO LOWER OIL PLUG LEVEL. Page - 80 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 002 V-ROD SUPERCHARGING INSTRUCTIONS MAINTENANCE PROCEDURES 3. Supercharger Removal 3.1 This is a reversal of the installation steps in Section3. The necessary steps are as follows. 7. Undo bolt securing supercharger to rocker cover. 8. Undo supplementary remove. 9. Undo hose clamps at inlets. 10. Undo wiring connectors at IAC, TPS, MAP, IAT. injector 1. Remove air box cover. 2. Remove maxi-fuse. 3. Remove belt cover. 4. Remove belt. 11. Remove air filter. 5. Remove belt tensioner. 12. Remove breather hoses. 6. Undo bolts securing supercharger to brace. 13. Remove throttle cables. 14. Remove supercharger assembly. and 4. Supercharger Oil Replacement 4.1 With supercharger assembly removed from the bike, remove the top and bottom gearbox cover plugs. 4.2 Tilt supercharger to allow all oil to drain from gearbox. Allow to drain for several minutes. 4.3 Sit supercharger upright on a flat surface. 4.4 Using Redline 75W90 high quality fully synthetic gear oil, or equivalent, add a small amount of oil to gearbox until oil drains through oil level plug on side of gearbox (approximately 60mL). NOTE: NEVER OVERFILL GEARBOX AS DAMAGE WILL OCCUR. ONLY EVER FILL TO LOWER OIL PLUG LEVEL. 4.5 Refit oil drain plugs to gearbox and follow instructions in Section 3 to re-install supercharger kit. Page - 81 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 002 V-ROD SUPERCHARGING INSTRUCTIONS 5. Spark Plug Replacement 5.1 Remove supercharger kit as described above. 5.2 Replace spark plugs as instructed in Section 2, Modification Instructions, subsection 3. MAINTENANCE PROCEDURES NOTE: Ensure to use specified DCPR9E spark plugs with plug gaps set to 0.62mm/.025” 5.3 Re-install supercharger kit as described in Section 3, Installation instructions, subsections 7 to 17. Page - 82 - of 82 Copyright © Harley-Davidson V-Rod ’07 – ’08 Supercharger Kit Installation Instructions 201D1005 Rev 002
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
advertisement