LaCie 12big rack serial Data Storage Quick Install Guide
Below you will find brief information for Data Storage 12big rack serial. This guide provides instructions for installing and setting up your LaCie 12big rack serial storage system. It covers unpacking, rack mounting, module installation (PSUs, fans, I/O), drive installation, and initial power-on. Safety precautions and troubleshooting tips are also included.
Advertisement
Advertisement
LaCie 12big rack serial
Quick Install Guide
Table of Contents page 1
EN
English
Table of Contents
1. Introduction ............................................................................................................. 2
1.1. Safety .......................................................................................................................................... 2
1.2. Rack System Precautions ............................................................................................................ 2-3
1.3. ESD Precaution ............................................................................................................................ 3
2. Preparation ............................................................................................................. 3
2.1. Before you begin .......................................................................................................................... 3
3. Unpackaging the Storage System ............................................................................ 3
4. Mounting the System into the Rack .......................................................................4-5
5. Installing Modules ................................................................................................... 5
6. Installing the PSU Modules ...................................................................................... 5
7. Installing the Dual Fan Cooling Module .................................................................. 6
8. Installing the I/O Modules ....................................................................................6-7
9. Connecting Storage System to Host ......................................................................... 7
10. Installing Drives ..................................................................................................... 8
11. Power On .............................................................................................................. 8
12. I/O Module .........................................................................................................8-9
LaCie 12big rack serial
Quick Install Guide
1. Introduction
European Regulations
This equipment complies with European Regulations EN
55022 Class A: Limits and Methods of Measurement of Radio
Disturbance Characteristics of Information Technology
Equipments and EN50082-1: Generic Immunity.
USA Federal Communications Commission (FCC)
This equipment has been tested and found to comply with the limits for a class A digital device, pursuant to part 15 of the
FCC rules.
1.1. Safety
All plug-in modules and blank plates are part of the fire enclosure and must only be removed when a replacement can be immediately added. The system must not be run without all modules in place.
Permanently unplug the unit if you think that it has become damaged in any way and before you move it.
• The enclosure can weigh up to 32kg (70.4lb). Do not try to lift it by yourself.
• Do not lift a populated enclosure by the module handles or those on the front of the enclosure, they are not designed to support the weight of the populated enclosure.
• In order to comply with applicable safety, emission and thermal requirements no covers should be removed and all bays must be fitted with plug-in modules.
• The enclosure must only be operated from a power supply input voltage range of 100-120VAC or 200-240VAC.
• The power supply is used as the main disconnect device.
Ensure that the socket outlets are located near the equipment and are easily accessible.
• The equipment is designed to be operated with two working power supply modules.
• To prevent overheating do not operate the enclosure with one power supply removed for more than 30 minutes.
• Disconnect all supply power for complete isolation.
Introduction page 2
• The power connection should always be disconnected prior to removal of the Power Supply module from the enclosure.
• A safe electrical earth connection must be provided to the power cords. Check the grounding of the enclosure before applying power.
• Provide a suitable power source with electrical overload protection to meet the requirements laid down in the technical specification.
1.2. Rack System Precautions
The following safety requirements must be considered when the unit is mounted in a rack.
• The rack design must incorporate stabilizing features suitable to prevent the rack from tipping or being pushed over during installation or in normal use.
• To avoid the danger of the rack tipping over, do not slide more than one enclosure out at once.
• When loading a rack with the units, fill the rack from the bottom up and empty from the top down.
• The rack design should take into consideration the maximum operating ambient temperature for the unit, which is 40°C.
• The system must be operated with low pressure rear exhaust installation (back pressure created by rack doors and obstacles not to exceed 5 pascals (0.5mm water gauge)).
• The rack must have a safe electrical distribution system.
It must provide over-current protection for the unit and must not be overloaded by the total number of units installed in the rack. Consideration of the electrical power consumption rating shown on the nameplate should be used when addressing these concerns.
• The electrical distribution system must provide a reliable earth for each unit in the rack.
• Each power supply in each unit has an earth leakage current of 1.5mA max at 60Hz, 264VAC per PSU. The design of the electrical distribution system must take into consideration the total earth leakage current from all the power supplies in all the units. The rack may require labelling with “HIGH LEAKAGE CURRENT. Earth connection essential before connecting supply”.
• The rack when configured with the units must meet the safety requirements of UL 60950-1 and IEC 60950-1.
LaCie 12big rack serial
Quick Install Guide
Warning: Do not remove covers from the PSU. Danger of electric shock inside. Return the PSU to your supplier for repair.
Caution: If this equipment is used in a manner not specified by the manufacturer, the protection provided by the equipment may be impaired.
1.3. ESD Precautions
It is recommended that you fit and check a suitable anti-static wrist or ankle strap and observe all conventional ESD precautions when handling LaCie 12big rack serial plug-in modules and components. Avoid contact with backplane components and module connectors, etc.
2. Preparation
2.1. Before You Begin
Before you begin, make sure the site where you intend to set up and use your storage system has the following:
• Standard AC power from an independent source or a rack power distribution unit with a UPS.
• Host computer with the correct firmware, BIOS and drivers.
Contact your supplier for the correct software levels.
The Accessory Box contains the power cables and other ordered accessories.
Before setting up your enclosure ensure you have the following:
• SAS HBA
• Mini-SAS to Host Cable
• Power Cable
• Rack kit (if installing within a rack)
Refer to your supplier for a list of qualified accessories for use with the enclosure.
Figure 1: Unpacking the
Storage System
(Populated Enclosure)
Introduction/Preparation/Unpackaging page 3
3. Unpacking the Storage
System
Position the shipping packaging within reasonable distance of the site where you intend to install the storage system.
Inspect the packaging for crushes, cuts, water damage, or any other evidence of mishandling during transit. If any damage appears to be present, it is suggested to take photographs before opening any boxes. You may wish to contact the shipping company if there is apparent damage.
Open the carton top and remove the accessory kit.
Remove the foam component on top of the enclosure.
Using an assistant, lift the enclosure from the carton and place it on a stable work surface.
LaCie 12big rack serial
Quick Install Guide
4. Mounting the System into the Rack
Mounting the System into the Rack page 4
1. Remove the Rack Mounting Rail Kit from the Accessory
Box and check for damage.Attach the left and right chassis slides to the enclosure sides using six M3x4 button head screws. Three screws each side see Figure 2 for locations.
2. Attach left and right chassis slides to the enclosure sides using 8 M3 x 4 buttonhead screws (see Figure 2).
3. Assemble the left and right chassis latches using the special chassis latch screws. Ensure the latch is orientated as shown in Figure 2, with the spring arm located against its stop. On the right hand side this is at the top, on the left at the bottom.
4. Assemble the rack brackets to the rack posts as follows
(see Figure 3): a. Position the location pin at the rear of the rail into a rear rack post hole. Attach the bracket to the rear rack post using the washers and screws supplied. The screws should be left loose. b. Extend rail to fit between the front and rear rack posts. c. Attach the bracket to the front rack post using the washers and screws supplied. The screws should be left loose. d. Tighten the two clamping screws located along the inside of the rear section of the rack bracket (see Figure 3).
Figure 2: Securing Chassis Slides to Enclosure
Figure 3: Securing Brackets to Rack
LaCie 12big rack serial
Quick Install Guide
Mounting the System/Installing Modules/Installing the PSU Modules page 5
6. Installing the PSU Modules
5. Mount the enclosure into the rack as follows (see Figure 4): a. Lift the enclosure and align it with the rack rails. b. Carefully insert the chassis slides into the rack rails and push fully home. c. Tighten the rear rack bracket mounting screws. d. Withdraw enclosure until it reaches the hard stops
(approx. 400mm) and tighten the front rack bracket mounting screws. e. Return the enclosure to the fully home position and attach it to the rack using the captive fasteners on the front flanges.
Warning: Do not mix PSUs of different types or makes.
Caution: Handle the module carefully and avoid damaging the connector pins. Do not install if any pins appear to be bent.
imPortant: To prevent overheating, do not operate the enclosure for more than 30 minutes with one PSU removed.
1. Check for damage, especially to the rear connector of the PSU.
2. Slide the PSU into the enclosure (see Figure 6).
3. Continue to push the PSU until it fully seats. A click should be heard as the handle latch engages.
4. Connect the power cables to the power source and to the PSU.
5. Engage the retaining spring.
note: The alarm will sound until the PSU is operating correctly.
Figure 4: Mounting the System into a Rack
5. Installing Modules
Fit the modules into the bays defined in Figure 5.
Figure 6: Installing the AC Power Supply Module
Figure 5: Module Locations
LaCie 12big rack serial
Quick Install Guide
7. Installing the Dual Fan
Cooling Module
Installing the Dual Fan/Installing the I/O Modules page 6
8. Installing the I/O Modules
Caution: Handle the module carefully and avoid damaging the connector pins. Do not install if any pins appear to be bent.
1. Check for damage, especially to the rear connector of the module.
2. With the latch in the open position (see Figure 7), slide the module into the enclosure until the latch engages automatically.
3. Secure the module by manually closing the latch. A click should be heard as the module latch engages.
imPortant: If only one I/O module is fitted, it must be installed into the lower (Slot 0) location, otherwise direct SATA will not work.
Caution: Handle the modules carefully and avoid damaging the connector pins. Do not install if any pins appear to be bent.
1. Check for damage, especially to the rear connector of the module.
2. With the latch in the open position (see Figure 9), slide the module into the enclosure until the latch engages automatically.
3. Secure the module by manually closing the latch. A click should be heard as the module latch engages.
Figure 7: Cooling Module Latch
Figure 9: I/O Module Latch
Figure 8: Installing the Dual Fan Cooling Module
Figure 10: Installing the I/O Module (1)
LaCie 12big rack serial
Quick Install Guide
Installing the I/O Modules/Connecting Storage page 7
Figure 11: Installing the I/O Module (2)
9. Connecting Storage
System to Host
Figure 14: Dual Host, Single Connection
Figure 12: Basic Configuration
Figure 15: Dual Host, Dual Connection imPortant: Refer to release note for configuration of maximum number of enclosures.
Figure 13: Single Host, Single Connection
LaCie 12big rack serial
Quick Install Guide
10. Installing Drives
Installing Drives/Power On/I/O Module page 8
5. Carefully insert the anti-tamper lock key provided into the cutout in the handle and rotate the key in a clockwise direction until the red indicator is visible in the aperture beside the key (see Figure 15).
Caution: All drive bays must be fitted with either a drive carrier or dummy carrier module. No bays should be left empty.
Column 1 Column 2 Column 3 Column 4
Row 1
Row 2
Row 3
Figure 16: Bay Number Definition
The 12big rack serial enclosure system supports SAS and SATA drives. However, mixing of drive types within a single enclosure is not supported. The enclosure has no restrictions on drive location.
1. Ensure the anti-tamper lock is disengaged (see Figure 15).
2. Release the carrier handle by pressing the latch in the handle towards the right and insert the carrier into the enclosure.
3. Gently slide the carrier all the way into the enclosure until it is stopped by the camming lever on the right of the carrier (see Figure 16).
Figure 17: Drive Anti-Tamper Lock
Figure 18: Installing a Drive Carrier (1)
4. The camming foot on the base of the carrier will engage into a slot in the enclosure. Continue to push firmly until the handle fully engages. A click should be heard as the latch engages and holds the handle closed (see Figure 17).
Figure 19: Installing a Drive Carrier (2)
11. Power On
Power on the storage system by connecting the power cables to the power distribution unit (PDU), powering on the PDU, moving the PSU switches to the ON position, and then powering on the host system.
All LEDs on the Ops Panel should illuminate and the alarm will beep momentarily when power is activated. Wait for one minute before accessing the system(s).
Figure 20: Connecting the AC Power Cables to the PDU
12. I/O Module
Figure 21: I/O Module
LaCie 12big rack serial
Quick Install Guide ops Panel LEDs
I/O Module page 9
On
On
On
On
Off
On
On Flash
On Flash
Logical Fault (a
On any any any any
On Flash
On Flash
On
On
On
On
On Off
On
On
On Flash
On
Off
On
Flash any any any any
As per Drive fault
LED
As per Drive fault
LED any any any
On any any any any any any any 2 any 2 any any any any any other associated LEDs or alarms
12big rack serial Module activity LEDs flash
Dual Fan Cooling Module Fault LED on.
Continuous beep.
Dual Fan Cooling Module Fault LED on.
Intermittent beep.
PSU Module Fault LED on.
Intermittent beep.
Intermittent beep.
Intermittent beep.
Continuous beep.
Continuous beep.
None
None
12big rack serial Fault & ID LEDs on.
Continuous beep.
12big rack serial Fault & ID LEDs on.
Internittent beep.
12big rack serial Fault & ID LEDs on.
Intermittent beep.
LED operation set via SES Control page 0x02
On
On
On
On
On
On any
On Flash any Off any As per Drive fault
LED any As per Drive fault
On any
LED any any any any
On
On
On any any any any any any any any any any any
Flash
Drive Bay Fault LED flash.
Drive Bay Fault LED flash.
Continuous beep.
Intermittent beep.
Continuous beep.
notes
1. The 12big rack serial alarm pattern is a 1 second on, 1 second off sequence, applied to all 12 Activity LEDs.
2. If an 12big rack serial fault LED is fitted, this will be set for all the above conditions. In addition this LED will flash for an 12big rack serial module soft failure.
3. The Logical Fault LED will take the state of the highest priority drive bay fault LED.
State Description
Ops Panel power on test state.
Power On. All functions good.
Dual Fan failure.
Single Fan failure.
Single PSU failure.
PSU removed.
Over or under temperature warning.
Over or under temperature critical.
Voltage critical.
Drive critical.
Drive non-critical.
12big rack serial Module watchdog failure.
12big rack serial Module soft (or POST) failure.
Other 12big rack serial Module fault.
Power On. All functions good.
POST fault bit set for any Array Device
Element.
Other Array bits set for any Array Device
Element.
UNRECOV bit set in Audible Alarm element.
INFO, NON-CRIT, CRIT bits set in Audible
Alarm element
UNRECOV bit set in Audible Alarm element.
REQUEST WARNING bit set in Enclosure element.
REQUEST FAILURE bit set in Enclosure element.
RQST IDENT bit set in Enclosure element.
Contact Us
LaCie USA
22985 NW Evergreen Pkwy
Hillsboro, OR 97124 [email protected]
LaCie France
17, rue Ampère
91349 Massy Cedex [email protected]
LaCie Asia (HK)
25/F Winsan Tower
98 Thomson Road
Wanchai, Hong-Kong [email protected]
LaCie Asia (Singapore)
Centennial Tower, Level 34
3 Temasek Avenue
Singapore 039190 [email protected]
LaCie Australia
458 Gardeners Rd.
Alexandria, NSW 2015 [email protected]
LaCie Belgium
Vorstlaan 165/ Bld du Souverain 165
1160 Brussels [email protected]
LaCie Canada
235 Dufferin St.
Toronto, Ontario M6K 1Z5 [email protected]
LaCie Germany
Am Kesselhaus 5
D-79576 Weil Am Rhein [email protected]
LaCie Italy
Milano Business Park
Via dei Missaglia 97
20142 Milano [email protected]
LaCie Japan K.K.
Uruma Kowa Bldg. 6F
8-11-37 Akasaka, Minato-ku
Tokyo 107-0052 [email protected]
LaCie Netherlands
Postbus 134
3480 DC Harmelen [email protected]
LaCie Middle East FZE
LIU-E6, PO Box 293860,
Dubai Airport Free Zone,
Dubai, U.A.E.
LaCie Nordic
(Sweden, Denmark, Norway, Finland)
Sveavägen 90, 5tr
113 59 Stockholm, Sweden [email protected]
LaCie Spain
C/ Núñez Morgado, 3, 5 a pl.
28036 Madrid [email protected]
LaCie Switzerland
Davidsbodenstrasse 15 A
4004 Basel [email protected]
LaCie United Kingdom and Ireland
LaCie LTD - Friendly House
52-58 Tabernacle Street
London, England EC2A 4NJ
Ireland: [email protected]
LaCie Worldwide Export
17, rue Ampère
91349 Massy Cedex, France [email protected]
Visit www.lacie.com for more information on LaCie products.
Copyright © 2009, LaCie
713355 090529
![](http://s1.manualzz.com/store/data/003281272_1-f1e9da40e0f7b068df35ea39830c673b-210x147.png)
Advertisement
Key Features
- Rack-mountable design
- Hot-swappable drives
- Dual power supplies for redundancy
- Dual fan cooling module
- SAS and SATA drive support