Klein + Hummel PRO M 1012 Operator's Manual

Klein + Hummel PRO M 1012 Operator's Manual

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Manual
Klein + Hummel PRO M 1012 Operator's Manual | Manualzz

Monitor Management System

P RO M 1012

Operators Guide

Pre-Programmed Setups

Connection Diagram

Programming: Surround 5.1

K+H Vertriebs- und

Entwicklungsgesellschaft mbH

Auf dem Kessellande 4a • 30900 Wedemark/Germany

058-E0159

Version 060426

SW Rev KH 2.000

Tel: +49 (0) 5130 5848-0

Fax: +49 (0) 5130 5848-11 www.klein-hummel.com

www.klein-hummel.com

1 Operation Instructions

Logo Illumination

Einschaltkontrolle

Inkrementgeber:

- Volume im normalen Arbeitsmodus

- Parametervariation im Programmiermodus

- Enter-Taste im Programmiermodus (Push)

LCD Display

IR Remote

Sensor für IR-

Control Sensor

Fernbedienung

Input Cannel

Kanalwahltasten für

Eingangskanäle

Mains Power

Switch

Netzschalter

- via Shift: 7...12

Flashes!)

The PRO M 1012 has 80 Basic Configurations stored in internal memory. Twelve of these may be quickly recalled as preprogrammed setups. Basic Configurations define all signal routing and gain settings plus all parameter values configured in Program Mode for the input and output channels

(see Pro M 1012 Reference Manual)

• Setups 1 - 6 can be recalled by pressing the numbered SETUP keys and setups 7 - 12 by pressing the SHIFT + SETUP keys. When a SETUP is recalled, the LCD briefly shows the

SETUP No. and name and then displays the current volume level on the bottom line.

• VOLUME Control (rotary encoder) for adjusting the volume level or for changing parameter values in Program Mode. When the volume level is adjusted, the top line of the LCD display shows a volume-level bar graph.

• REF LEVEL key recalls the reference volume level and the DIM key decreases the volume level (Default values: REF = 0 dB, DIM = -20 dB).

• INPUT CHANNEL MUTE keys mute individual or multiple input channels (channel key is illuminated when muted)

• SOLO key activates (solo-in-place) the selected input channels (SOLO key is illuminated and INPUT CHANNEL key flashes)

• SOLO IN CENTER key will solo the selected input channels and route them to the center channel output (SOLO key and SOLO IN PLACE key are illuminated and the INPUT

CHANNEL key flashes)

• PROGRAM MODE key activates the Program Mode to change or store setups, select new

Basic Configurations, trim gain levels, etc.

PRO M 1012 page 2 of 6

2 Pre-Programmed Setups 1 - 12

SETUP 1 SETUP 2 SETUP 3 SETUP 4 SETUP 5 SETUP 6

9-5.1-Su/SW

5.1 Surround,

Bass Management

(LFE+LF routed to

Sub output)

13-5.1-Su/LCR 25->2/0-SuLR/SW 24->1/0-SuC/SW

5.1 Surround,

LFE routed to

L/C/R outputs

Downmix 5.1 to

2/0, reproduced by

L/R+Sub outputs

Downmix 5.1 to

1/0, reproduced by

C+Sub outputs

46-ST1-SuLR/SW

Stereo Input 1, reproduced by

L/R+Sub outputs

7-ST2-SuLR/SW

Stereo Input 2, reproduced by

L/R+Sub outputs

Shift +

SETUP 1

= Setup 7

16-5.1-Su/DIS

5.1 Surround,

LFE routed to dedicated Sub output

Shift +

SETUP 2

= Setup 8

79--- MUTE --

(free)

Shift +

SETUP 3

= Setup 9

29->2/0-LR2

Downmix 5.1 to

2/0, reproduced by L/R(2) outputs

Shift +

SETUP 4

= Setup 10

28->1/0-LR2

Downmix 5.1 to

1/0, reproduced by L/R(2) outputs

Shift +

SETUP 5

= Setup 11

42-ST1-LR2

Stereo Input 1, reproduced by

L/R(2) outputs

Shift +

SETUP 6

= Setup 12

3-ST2-LR2

Stereo Input 2, reproduced by

L/R(2) outputs

3 Basic Configurations

• A Basic Configuration defines all signal routing and gain settings plus all parameter values for the input and output channels

• The PRO M 1012 has 80 Basic Configurations stored in internal memory. Twelve of these may be quickly recalled as preprogrammed Setups by pressing the numbered SETUP keys

(or SHIFT + SETUP). The factory preprogrammed setups are shown in the table above.

• The 80 Basic Configurations plus all additional settings saved in Program Mode define the

PRO M 1012’s Project File (*.prj)

• Project Files can be changed or created with the PRO M 1012 Configuration Manager

Software using a PC (running Windows® version 98 or later), after first transferring the file to the PC (see Configuration Manager Manual)

3.1 Recalling Basic Configurations and Storing them as Setups:

• Press “PROGRAM MODE” key (will start flashing to indicate initiation of Program

Mode)

• Go to „BASIC CONFIGURATION“ menu by turning the incremental encoder, then press the incremental encoder to verify

• Name and number of Basic Configuration will be shown in the second line of LCD display. (Format: [BasicConfigNo]-[BasicConfigName])

• Turn the incremental encoder to select desired Basic Configuration, then press to activate it

PRO M 1012 page 3 of 6

• To store this temporary Basic Configuration as a base of one of setups 1…12, turn incremental encoder one step back to “STORE SETUP” menu and verify by pressing it

• Select desired setup (1...12) by turning the incremental encoder, then press to store it

• Press “PROGRAM MODE” key (will stop flashing, system works in normal operation mode again)

PRO M 1012 page 4 of 6

4 Rear Panel Connection Diagram

Project-File: Pro M 1012 Surround 5.1_GUI2.004_111005 .prj

PRO M 1012

---

--d lle sta in ot

N

---

--page 5 of 6

Appendix

A1 Transferring New Project Files from a PC to the PRO M 1012

Important note! The Pro M 1012’s Project File contains the 80 Basic Configurations plus all userdefined parameter settings. If the existing parameter settings need to be saved for future use, then transfer the existing Project File to the Configuration Manager (see A2) before transferring a new project file to the PRO M 1012!

• Connect the 9-Pin D-SUB RS-232 connector on the rear panel of the PRO M 1012 to the

PC

• Double-click the ProM1012ConfigMan.exe file to start installation of the PRO M 1012

Configuration Manager and follow the instructions given during the installation process.

(File is included on the CD-ROM that is supplied with the Pro M 1012 or may be downloaded from www.klein-hummel.com)

• After successful installation, start Configuration Manager and apply power to the PRO M

1012

• In File => Open Project, open the new Project File

• In Transmit/Receive => Connection, set the correct COM Port (typically COM2, however, when using USB-to-RS-232 adapter cables the correct Port can be checked in the

Hardware menu of the Windows® Control Panel)

• In Transmit/Receive => Transmit to Pro M 1012, select Transmit whole Project

• Check OK to start the transfer process. Progress will be indicated by the blue bar

• The message “Project has been transmitted successfully!“ will appear, when the transfer is complete

A2 Transferring the System’s Project File to a PC

• Start Configuration Manager and apply power to the PRO M 1012

• In Transmit/Receive, select Receive from Pro M 1012 => Receive whole Project

• Check OK to start the transfer process. Progress will be indicated by the blue bar

• The message “Project has been transmitted successfully!“ will appear, when the transfer is complete

• The Project File can now be opened in Configuration Manager and can be edited and stored via File => Save Project as...

PRO M 1012 page 6 of 6

advertisement

Related manuals

Download PDF

advertisement