Exaco RIGA 5 Kit Assembly Instructions
Below you will find brief information for Greenhouse Riga S II, Greenhouse Riga S III, Greenhouse Riga S IV, Greenhouse Riga III, Greenhouse Riga IV. This user manual provides detailed assembly instructions for the HOKLARTHERM Riga greenhouse. It covers the setup process, including assembling the foundation frame, installing door and window units, and securing the roof windows.
PDF
Download
Document
Advertisement
Advertisement
ALUMINIUM GREENHOUSE Riga S/Riga Subject to technical changes! Current as of 02/2012 Basic kit assembly instructions model Riga system width 2,96 m model Riga S system width 2,32 m 1 Dear garden friend, congratulations on the purchase of an aluminium greenhouse made by The construction is simple. First read the assembly instructions and follow them step by step. Parts and parts list Please complete all boxes stored dry and protected from direct sunlight! number of cartons basic construction (gable/eaves) curved center profiles windows/ doors glazing Riga S/II/III/IV 1 1 1 1 Riga III/IV/V 1 1 1 1 Start with the basic kit. Please do not open all the boxes at the same time. Let's not get confused by the variety of items. Before you begin assembly, check on the parts lists, if all parts are present. Each box goes through a quality check before it is closed, thus missing parts are almost excluded. Should any parts are missing, please give us the wrong position. Customer Service: 877-760-8500 or 512-407-8500 [email protected] Exaco Trading 10203 Metropolitan Dr. Austin, TX 78758 Location Choose, if possible, a sunny place for your greenhouse. Avoid the shadow of buildings and trees. For vegeteables, like tomatoes, cucumbers and melons, make your greenhouse as possible in north-south-direction. For flowers and potted plants in east-west-direction. Warning: The greenhouse should preferably be placed in a sheltered spot and not in stormy weather. It is dangerous to leave a partly assembled house! With the correct assembly resists this greenhouse and strong winds. The manufacturer assumes no responsibility for any damage by improper installation or acts of God. The constructions of the greenhouse must be conducted by at least two people. Work with secure, craft-oriented tools. Be careful when assembling on a secure stand of the ladder (risk of accident!). In principle, only with gloves on (risk of injury, average risk!). 2 For the configuration you need the following tools: 1 pc. Phillips screwdriver size 2 1 pc. foot-end wrench10 mm 1 pc. screwdriver 1 pc. allen key 3 mm (in the accessoires bag of the roof window) 1 pc. level 1 pc. stepladder 1 pc. file to remove any burrs on the profiles 1 pc. rubber hammer 1 pc. tape measure You should be careful: Hexagonal screws can also be inserted later in the plastic slider! Wedge seals (V23) pull apart the center! Plastic slider in the bottom door frame, side and roof bars Push the seal 3 - 5 mm between the soil profile and the glazing. Both within the greenhouse! Important: This compress the seals because they contract in cold weather! numbers of wedge seals length model 3 - 5 mm 3 - 5 mm 6 - 8 mm 712 mm 768 mm 1030 mm 4 4 4 1 1 1 7 11 14 Riga S II Riga S III Riga S IV length model Riga III Riga IV Riga V -5 s.1 po -4 1 .4- -2 s.3 o p 3 .3- s s. s.1 pos.2-3.1 po po s.1 -1 pos.2-3.1 pos.1-7 6 -9 8 -5- s.1 .1- s.1 po po s po pos.1-6 po po -4 1-5 2 .4- s po -1 s.2 o p -9 3 3 - 5 mm 768 mm 1030 mm 1030 mm 1 1 1 pos.1-5-6 s po 3 - 5 mm 4 4 4 6 - 8 mm 11 14 16 !!!Note: Important information for glazing!!! The ISO-Cellular sheets, speak glazing, always install the UV coated side out. The plates have on the protective film has a hint. The protective film, first loosen the edges and only after the complete assembly pull it off immediately. After several days of sunlight can burn the film firmly on the plates and can be solved only with difficulty. Do not pull the box right after the film, otherwise you could not tell which side has the UV protection! Question: Do I have a greenhouse and the greenhouse glazing and "seal"? In principle: No. But we recommend the horizontal transitions of the glazing to the profile (see sketch --> dashed line ----) sealed with neutral cure, silicone transparent, so that as little water and can therefore get a little dirt in the glas shots. Advantage: The greenhouse looks to length of optically better. The tendency to formation of algae just takes considerably in these areas. Moisture/water can also occur within the glass/hollow chambers depending on the wheather, since the plastic plates are not "water-vapor-permeable solid", ie moisture occurs in the form of water vapor into the plate. This is possible a purely optical disadvantage, however, can not be avoided. The plates can thus take no damage, even at freezing temperatures. Warning: Use only neutral cure silicone, otherwise it may lead to stress cracks in plastic deglazing. This is the most common silicone sealant. It is in any hardware store or at HOKLAR-Therm for about 4 - 6 € available/ cartridge. Cleaning and care: The greenhouse with plenty of water such as car washing brush. In addition, using a little detergent. 4 Foundation frame for digging (optional) !!!Warning: Use only according to instructions under foundation. See below!!! This is the easiest, safest and also foundation of a greenhouse. The foundation frame is hooked force-fit into the soil profile of the greenhouse screwed into the corners with a corner angle (V26). (See page 6). The foundation frame is assemble to coincide with the greenhouse together. Setting up the foundation frame A small ditch, sod (about 10 - 12 cm deep), dug into the dimensions of the foundation frame. Use in the corners as a paving stone according to the other horizontally. These are then the safe circulation and avoid "bagging" a possibly of the greenhouse. The greenhouse and the foundation frame in this "gab" and set them with earth fill. Expedient is also the creation of garden slaps or stone pavement, so the greenhouse at eg heavy rain is not covered by mud splashes is. In addition, the work made easier around the greenhouse, such as mowing the lawn. Profiles and accessoires for foundation frame Riga S: overview pos. 6.1 6.2 V26 V27 description foundation frame profile/ gable foundation frame profile/ eaves foundation frame corner bracket 40/40/2 x 105 item no 9999 0078 mounting bracket (rung/foundation frame) item no 9999 0267 S12 S1 hexagonal screw M6 x 12 + nut M6 number/length in mm type II type III type IV 2 2 2 2199 2199 2199 2 2 2 2033 3091 4149 4 4 4 105 105 105 10 135 10 135 10 135 20 20 20 item no 9999 0124 + 9999 0128 Profiles and accessoires for foundation frame Riga: (V26/V27/S12/S1 as above) overview pos. 6.1 6.2 description foundation frame profile/ gable floundation frame profile/ eaves 5 number/length in mm type III type IV type V 2 2 2 2835 2835 2835 2 2 2 3091 4149 5207 Assembly foundation frame The foundation frame profiles separately in the soil profiles rotate and center align. Note: The foundation frame profiles are shorter than soil profiles! Note: The foundation frame profiles are shorter than soil profiles! To stabilisize the house, the mounting bracket (V27) using bolts M6 x 12 (S12) retracted bolted to the foundation frame and the side rungs or door frames. In the foundation frame profiles in the corner of one bolt M6 x 12 (S12) to move, corner brackets (V26) and fasten with nut M6 (S1). Foundation of the greenhouse We recommend that you use for the bolt in place anchor bolts. These are not included! side rung/ door frame mounting bracket - offset - (V15) bolt M6 x 12 (S12) + nut M6 (S1) soil profile 6 Foundation plan Riga S/Riga all dimensions in [cm] Foundation of your greenhouse with a strip foundation If you have not bought a foundation frame, the secure foundation by means fo strip foundation. Then please create such a foundation in accordance with the specified dimensions below. You have set up your possibility to the greenhouse on low cur stones such as, 50 x 25 x 8 cm or better 50 x 30 x 10 cm. Please note that the foundation is made evenly horizontally. exterior edge of the foundation The greenhouse then please anchoring with the included mounting brackets (V15) with the dowels (minimum) 7 Screws and ancors are not included. exterior edge of the greenhouse frost-free ground upper edge of ground model Riga S II Riga S III Riga S IV Riga III Riga IV Riga V foundation B1 L1 greenhouse B2 L2 249 249 249 312 312 312 232 338 443 338 443 533 233 233 233 296 296 296 216 322 427 322 427 533 Content main box - basic kit Riga S/Riga Please check in the tables list the completeness of the components. Profiles for both gables: overview pos. 1.1 number/length in mm Riga S Riga II III IV III IV 2 2 2 2 2 2238 2238 2238 2874 2874 description soil profile/gable V 2 2874 1.5.4 rand rung left - curved 2 2 2 2 2 2 1.5.6 rand rung right - curved 2 2 2 2 2 2 2 1876 2 1876 2 758 1 758 4 702 2 1876 2 1876 2 758 1 758 4 702 2 1876 2 1876 2 758 1 758 4 702 2 2059 2 2059 2 758 1 758 4 1020 2 2059 2 2059 2 758 1 758 4 1020 2 2059 2 2059 2 758 1 758 4 1020 1.6 1.7 1.8 1.8 1.9 door frame left with slant door frame right with slant and drilling door frame above crossbar in the side door without crossbar left and right Profiles for eaves: overview pos. description II number/length in mm Riga S Riga III IV III IV V 2.1 soil profile/eaves 2 2072 2 3130 2 4188 2 3130 2 4188 2 5246 2.3 side rung - curved 2 4 6 4 6 8 3.2 cross bar/roof window 1 1020 1 1020 2 1020 1 1020 2 1020 4 1020 3.3 ridge profile 1 2137 1 3195 1 4253 1 3195 1 4253 1 5311 3.4 angle stabilization 4 2104 4 3162 4 4220 4 3162 4 4220 4 5278 8 Accessories bag basic kit Riga S/Riga overview num- number ber RigaS Riga description/ pos. item number V9 corner soil profile 4 4 Ortgangprofil/Türzarge 4 4 mounting crossbar/rear 2 2 2 2 item no 9999 0003 V5 connecting plate item no 9999 0028 V10 connecting plate 90 x 35 mm item no 9999 0030 V11 endplate ridge/gutter item no 9999 0075 V4 connecting plate for crossbar/roof window item no 9999 0031 V12 S21 corner 30/30/2/15 mm item no 9999 0072 blind plug Ø10 mm II = 2 III = 2 III = 2 IV = 4 IV= 4 V = 8 soil profile screw the corner from inside 4 4 rand rung -drilling crossbar 4 4 door threshold seal 1 1 sealing the soil profile inside See table below ! See table below! door frame-soil profile/ cover plate/corner (V12) 38* 38* gable 6 6 item no 9999 0097 V14 hose section 760 mm lg. item no 9999 0181 V23 wedge seal 3 - 5 mm item no 9999 0119 S9 self-tapping screw pan head 4,2 x 13 item no 9999 0144 S13 self-tapping screw pan head 4,8 x 45 item no 9999 0150 S5/ S1 hexagnal screw M6 x 16 + nut screws for pulling item no 9999 0183 + 9999 0128 for the attachement of the greenhouse on foundation by customer (not with foundation item no 9999 0207 frame) V15 mounting bracket - offset 74 x 30 x 33 mm S32 washer A6,4 door frames, roof and side rungs item no 9999 0173 V1 mounting corner bracket inside item no 9999 00074 9 II = 40* III = 40* III = 40* IV = 44* IV = 44* V = 48* 10 10 20 20 V = 24 je je 2x lks. 2x lks. 2x rts. 2x rts. Assembly procedure gable view from inside ATTENTION! When using a foundation frame assemble in advance on this soil profile (see page S. 5, 6) step 1 to step 1: door frame right (pos.1.7) door frame left (pos.1.6) corner soil profile (V9) First, please slide the door frame left (pos.1.6) and the door frame (pos.1.7) (profile with 8 drill holes, a 30° chamfer and a black plastic glide) up to the small holes in the middle of the soil profile. The chamfer must show this to the outside. Then attach the corner bracket (V9) on the soil profile. soil profile (pos.1.1) step 2 to step 2: Riga 730 x 728 1048 x 728 gl az i gl az i ng ng Riga S Even now you need the small side windows. Dimensions are listed in the table. With bar direction - vertical - in the soil profile and sideways while in the door frame. self-tapping screw pan head 4,2 x 13 (S9) Note: Only after the screw mounting of the door --> ability to align. to step 3: step 3 Now the crossbar (pos. 1.9) is inserted from the top of the glazing. crossbar (pos.1.9) crossbar (pos.1.9) self-tapping screw pan head 4,2 x 13 (S9) step 4 view from inside connecting plate (V5) g az in screw M6 x 16 (S5) with nut M6 (S1) gl gl az in g door frame above (pos.1.8) 10 to step 4: Before the connecting plate (V5) with the door frame above (pos.1.8) screwed, slide in the vertical door frames (pos.1.6/1.7) two hex screws M6 x 16 (S5) and in the horizontal door frame in M6 x 16 (S5) one. Assembly procedure gable view from inside ATTENTION! When using a foundation frame assemble in advance on this soil profile (see page 5, 6) to step 5: holes for door lock The square peg of the corner connector is plugged in the rand rung (pos.1.5.4/1.5.6). Small triangular glazing positioned on the door frame (pos.1.8). rand rung right - curved (pos.1.5.6) rand rung left - curved (pos.1.5.4) step 5 glazing The rand rung by means of connecting plate (V5) screwed to the door frame. On the rand rung you need 2 self-tapping screws pan head 4,2 x 13 (S9), on the door frame 2 hexagonal screws M6 x 16 (S5). rand rung to the corner connection peg plugged - See also step 4! - step 6: to step 6: view from outside The crossbars (pos.1.9) are mounted sideways with the selftapping screw pan head 4,8 x 45 (S13). The rear gable is assembled in the same way!!! Only rear gable! to step 7: Slide before mounting the crossbar required hex screws M6 x 16 (S5) into the profile of the crossbar (pos.1.8 und 1.9). The crossbar in the rear gable is used the same height as the existing crossbar. Attachment is to the connecting plate (V10). connecting plate (V10) crossbar (Pos.1.8) az in g Now comes the glazing (787 x 728 mm). The remaining opening is later closed by the supplied rear window. gl step 7: 11 You should be careful: T-seals (V25) for all doors and windows (total: 15 meters) Attention! When the roof window for pushing into the ridge the T-seal at this side omit!!! In the door area the hose section(V14) is pressed into the soil profile. (As a stop/seal to protect from dirt into the soil profile). Attention! In the bottom door is first pressed the seal, and only then will the rectangular tube screwed! Profiles for roof windows (per roof window) overview numlength in mm ber pos. description 4.1 roof window profile 2 541 4.2 roof window profile 2 953 Content accessories bag roof window (per roof window) overview pos. description/item number * V25 T-seal item no 9999 0032 V13 corner with grub screw, internal hex and flat point numlength in mm ber 2 641 1 1052 4 item no 9999 0070 V21 allen key 1 item no 9999 0056 S12/ hexagonal screw M6 x 12 S1 nut M6 V24 corner bracket/roof window item no 9999 0124 4 item no 9999 0005 * Note: The seal is bundled in one strand for all doors and windows, please cut accordingly. 12 3 item no 9999 0128 Assembly roof window corner with grub screw (V13) corner bracket/roof window (V24) window profil (pos.4.2) (Pull in this profile no seal!) Recommendation! It is advisable to seal up around the window and the corner bracket, thus no moisture can occur. Attention: In the bottom cross profile inserting two hex screws M6 x 12 (S12) for the window opener! window profil (pos. 4.1) window profil (pos. 4.1) First you screw three profiles, then use the glazing and finally attach the fourth profile. window profile (pos. 4.2) automatic roof window opener Mounting roof window wrong!!! right Please push the roof window from the gable side into the ridge and slide in position. Automatic window opener mount. 13 Insertion of the seal in the roof window area pos. 4.1 Please insert all the 4 plastic corner connectors with silicone and seal the transitions cleanly ( ). ▲ cross-section of the seal ▲ ▲ pos. 4.1 pos. 3.2 length: 2,3 m The seal is inserted as the sketch above. Attention: Seal does not cut into the corners! Important! The transitions of the glazing and the corner bracket/roof window to roof it with silicone → window profile, please seal see sketch. Here you need seal all around ( ▲ ▲ ▲ side rung pos. 2.3 crossbar pos. 3.2 window profile pos. 4.1 und 4.2 14 )! Parts window opener 1 2 3 4 5 window opener pressure cylinder cotter pin mounting plate window profile mounting plate crossbar 3 1 4 2 5 User guide - window opener Assembly instructions: 1. Check whether the greenhouse window can open and close freely and unhinderedly. Please remove from other manufacturers in advance the existing hand openers. 2. First install the window opener with the mounting plate (4) to the roof window profile (pos. 4.2). 3. Choose from the mounting plate (5) the middle hole and attach it to the cross rung (pos.3.2) below the roof window. 4. The pressure cylinder at the upper end of threaded device secure with the cotter pin in the t-coupling (upper hole). Ajustment: The window opener needed after the assembly about 3 - 4 hours to adjust the temperature in the greenhouse. The more you screw the pressure cylinder into the threaded device, the earlier and more highly opens the window. Do you want earlier/higher opening, turn the pressure cylinder clockwise. In a later/lower opening counter-clockwise, with one turn is about 0,5°C. Please keep in mind that can vary the temperature in your greenhouse and several window openers have small tolerances. Winter-storage: If the greenhouse is not "frost-free" hold, we recommend you to remove the entire window opener or only the pressure cylinder. Please keep the window opener in a dry or frost-free place. Before reassembly in the spring especially the cylinder rod and the cylinder threads are greased to check if it is. The cylinder rod check for ease of movement, please. 15 Profiles for divided revolving door - bottom overview numlength in mm ber pos. description 5.3.1 door profile bottom 1 700 5.6 door profile left with hole for sash lock 1 692 5.7 door profile right with hinge hole 1 692 5.9 door profile top with transverse hole 1 700 5.8 square tube with transverse hole 1 740 number length in mm Content accessories bag divided revolving door - bottom overview pos. description V51 metal hinge, black 2 item no 9999 0358 V28 sash lock 1 item no 9999 0023 V29 QR-stopper 30 x 30 x 1,5-2 2 item no 9999 0099 * V25 T-seal item no 9999 0032 self-tapping screw countersunk head 4,8 x 25 S18 (hinges) 2 2 8 item no 9999 0163 self-tapping screw countersunk head 4,2 x 45 S17 (doors) 4 item no 9999 0160 self-tapping screw countersunk head 3,5 x 22 S19 (sash lock) 2 item no 9999 0152 S6 self-tapping screw pan head 3,5 x 38 (square tube) 2 item no 9999 0138 V32 glazing block 30 x 10 x 4 V30/ corner bracket door profile V31 2 left - item no 9999 0009 right - item no 9999 0011 * Note: The seal is bundled in one strand for all doors and windows, please cut accordingly. 16 4 710 744 Assembly - divided revolving door - bottom view from outside Place the profile like the image on a flat underground (possibly on cardboard or something similar). Square tube and door profile top screw with self-tapping screw pan head 3,5 x 38 (S6). Attention: Move before sealing. (see sketch!) corner bracket door profile (V30/V31) QR-stopper (V29) square tube (pos. 5.8) door profile right (pos. 5.7) sash lock (V28) with self-tapping screw countersunk head 3,5 x 22 (S19) scews. door profile left (pos. 5.6) door profile top (pos. 5.9) glazing block (V32) self-tapping screw countersunk head 4,2 x 45 (S17) door profile bottom (pos. 5.3.1) * Note: The seal is bundled in one strand for all doors and windows, please cut accordingly. 17 Profiles for divided revolving door - top overview pos. description 5.1 door profile left 5.2 door profile right 5.3 door profile top with hinge hole with hole for lockable door handle 5.4.1 crossbar number/length in mm Riga S Riga 1 1 1081 1264 1 1 1081 1264 1 1 700 700 1 1 700 700 Content accessories bag - divided revolving door - top overview number/length in mm Riga S Riga pos. description V52 door handle, lockable outside - item no 9999 0035 inside - item no 9999 0244 self-tapping screw countersunk head 4,2 x 45 S17 (door) 1 1 6 6 2 2 2 710 2 1112 2 710 2 1295 2 2 8 8 1 1 2 2 1 1 1 1 2 2 item no 9999 0160 V32 glazing block 30 x 10 x 4 * V25 T-seal item no 9999 0032 V51 metal hinge, black item no 9999 0358 screw countersunk head 4,8 x 25 S18 self-tapping (hinge) item no 9999 0163 V28 sash lock, small item no 9999 0023 screw countersunk head 3,5 x 22 S19 self-tapping (sash lock) item no 9999 0152 V33 door locking device item no 9999 0230 self drill, screw counters head 3,5 x 13 S22 wing-type (door stop) item no 9999 0189 V30/ corner bracket door profile V31 left - item no 9999 0009 right - item no 9999 0011 * Note: The seal is bundled in one strand or all doors and windows, please cut accordingly. 18 Assembly - divided revolving door - top view from outside Place the profiles like the image on a flat underground (possibly on cardboard or something similar). corner bracket door profile (V30/V31) door profile top (pos. 5.3) door profile right (pos.5.2) Assembly o door locking 2. door profile left (pos.5.1) 1. 3. 4. glazing block with silicone fix in position crossbar (pos.5.4.1) self-tapping screw countersunk head 4,2 x 45 (S17) sash lock (V28) with self-tapping screw countersunk head 3,5 x 22 (S19) screws * Note: The seal is bundled in one strand for all doors and windows, please cut accordingly. 19 Profiles for rear window overview pos. description 5.1.2 door profile left 5.2 with hole for sash lock door profile right with hinge hole 5.3.1 door profile top 5.4.2 door profile bottom with hole for window opener number/length in mm Riga S Riga 1 1 1081 1264 1 1 1081 1264 1 1 700 700 1 1 700 700 Content accessories bag - rear window overview number/length in mm Riga S Riga pos. description S17 self-tapping screw countersunk head 4,2 x 45 (window) item no 9999 0160 6 6 2 2 2 710 2 1112 2 710 2 1295 2 2 screw countersunk head 4,8 x 25 S18 self-tapping (hinges) 10 10 V28 sash lock, small 1 1 screw countersunk head 3,5 x 22 S19 self-tapping (sash lock) 2 2 V53 fixation of window 1 1 1 1 1 1 screw countersunk head 4,2 x 16 S31 self-tapping (f. holder V35) 2 2 S2/ S1 hexagonal screw M6 x 30 + nut 1 1 S3/ S4 screw countersunk M6 x 20 + hex nut - self locking 1 1 1 1 2 2 V32 glazing block 30 x 10 x 4 * V25 T-seal item no 9999 0032 V51 metal hinge, black item no 9999 0358 item no 9999 0163 item no 9999 0023 item no 9999 0152 item no 9999 0079 V34 corner (fixation of window) item no 9999 0094 V35 holder (fixation of window) item no 9999 0002 item no 9999 0157 item no 9999 0126 + 9999 0128 item no 9999 0170 + 9999 0151 S20 knurled nut - white item no 9999 0025 V30/ corner bracket door profile V31 left - item no 9999 0009 right - item no 9999 0011 * Note: The seal is bundled in one strand for all doors and windows, please cut accordingly. 20 Assembly - rear window view from outside sash lock, small (V28) with self-tapping screw countersunk 3,5 x 22 (S19) screws door profile right (pos. 5.2) door profile left (pos. 5.1.2) door profile top (pos. 5.3.1) glazing block with silicone fix in position self-tapping screw countersunk head 4,2 x 45 (S17) crossbar (pos. 5.4.2) openers for rear window window fixation with self-tapping countersunk screw 4,2 x 16 (S31) screw * Note: The seal is bundled in one strand for all doors and windows, please cut accordingly. 21 Assembly procedure - eaves ATTENTION! When using a foundation frame assemble in advance on this soil profile (see page 5, 6) step 8 to step 8: First, the lateral soil profiles on the corner bracket on the gable attach. ) 2.1 s. po et ( file ack pro er br l i so corn to corner bracket (V12) screwed with self-tapping screw pan head 4,2 x 13 (S9). slid e to step 9: step 9 ridge profile (pos. 3.3) at the gable and end plate (V11) screw with self-tapping screw pan head 4,2 x 13 (S9) (p fil rid g Now you need several hands or corresponding aids. .3) .3 os Gable upright, hold and secure support. ro ep The ridge profile (pos. 3.3) now introduce into the existing grooves/ slots of the gable, so that the profiles is flush with the front. Now screw the end plate (V11) with self-tapping screw pan head 4,2 x 13 (S9). ends support or hold up it to step 10: step 10 Slide the side glazing in the soil profiile and rand rung and threading. tip: please solve the foil only at the margin! insert the side glazing and thread 22 Assembly procedure - eaves ATTENTION! When using a foundation frame assemble in advance on this soil profile (see page 5, 6) step 11 to step 11: The side rung (pos. 2.3) above into the ridge profile and below into the soil profile to glazing insert it. There, the plate is threading. If neccessary, timber and plastic hammer to get help. Tip: Greasing plastic gliders perhaps a little! shown enlarged side rung (pos. 2.3) step 12 to step 12: Insert further side glazing and rungs. The connecting plate (V4) from inside screwed with screw hex M6 x 16 and nut M6. step 13 to step 13: Insert the remaining plates and rungs now. 23 Assembly procedure - eaves ATTENTION! When using a foundation frame assemble advance on this soil profile (see page 5, 6) to step 14: step 14 The door gable is pre-mounted and screwed. For added stability must now mounting inside corner (V1) be attached. Use the self-tapping screw pan head 4,2 x 13 (S9). to step 15: step 15 Install door and window. Instructions, see page 12-21. Mounting roof window wrong!!! right step 16 to step 16: Represented for the better representation plates cut. The stabilization angle (pos 3.4) become on both sides from inside to the side rung with screw M6 x 16, nut M6 and washer A6,4 screwed. The angles are also profiles for rearward tables and shelves (see separate instructions). 24 glas plan with ISO-cellular sheets 10 mm gable above gable below gable triangular door/ window div. revolv. rear gable door/bottom below side plate roof window below roof window b b b b b b b b b type of house a a a number size (a x b) number size (a x b) number size (a x b) number size (a x b) 1 724 x 676 1 787 x 728 3 1048 x 2634 1 974 x 565 1 1048 x 1984 2 724 x 1031 1 724 x 676 1 787 x 728 5 1048 x 2634 1 974 x 565 1 1048 x 1984 2 779 x 239 2 724 x 1031 1 724 x 676 1 787 x 728 6 1048 x 2634 2 974 x 565 2 1048 x 1984 4 1048 x 728 2 779 x 239 2 724 x 1215 1 724 x 676 1 787 x 728 5 1048 x 3000 1 974 x 565 1 1048 x 2345 4 1048 x 1319 4 1048 x 728 2 779 x 239 2 724 x 1215 1 724 x 676 1 787 x 728 6 1048 x 3000 2 974 x 565 2 1048 x 2345 4 1048 x 1319 4 1048 x 728 2 779 x 239 2 724 x 1215 1 724 x 676 1 787 x 728 6 1048 x 3000 4 974 x 565 4 1048 x 2345 a a a number size (a x b) number size (a x b) Riga II S 4 730 x 1135 Riga III S Riga IV S a number size (a x b) number size (a x b) number size (a x b) 4 730 x 728 2 779 x 239 2 724 x 1031 4 730 x 1135 4 730 x 728 2 779 x 239 4 730 x 1135 4 730 x 728 Riga III 4 1048 x 1319 Riga IV Riga V 25 a a ">
Advertisement
Key features
- Easy Assembly
- Durable aluminium construction
- Optional foundation frame
- Secure foundation options
- Roof window opener
- Divided revolving door
- Rear window
- ISO-Cellular sheets glazing
- UV coated glazing
- Detailed instructions
Frequently asked questions
The manual suggests using a strip foundation or an optional foundation frame for added stability.
You will need a Phillips screwdriver, foot-end wrench, screwdriver, allen key, level, stepladder, file, rubber hammer, and a tape measure.
The window opener should be mounted to the roof window profile and cross rung. Follow the instructions for adjusting the opener's temperature sensitivity.
The greenhouse uses ISO-Cellular sheets, which are UV coated and offer insulation against temperature fluctuations.
Clean the greenhouse using plenty of water and a car washing brush. You may also use a small amount of detergent.