Advertisement
Advertisement
ALUMINIUM
Greenhouse
Rose / Orchidee
Technical changes reserved.
Mounting instruction
Basic kit
As at 02/2005
Rose System breadth 2,32 m
1
Orchidee System breadth 2,96 m
Dear garden friend,
Congratulations for the purchase of an aluminum greenhouse from .
The erection is simple. First read the mounting instruction and follow this step by step.
Parts and piece list
Start with the basic kit (please do not open all the boxes at the same time) and do not confuse about the numerous single parts. Before you start with the assembly please check with the piece list, if all the parts are there. Every box is checked by a quality control before closing it and consequently missing parts can nearly be excluded. Should there be any lacking parts, please state the mistake in position.
Location
Please choose, as far as possible, a sunny place for your greenhouse. Avoid the shadow of buildings and trees. For vegetables like tomatoes, cucumbers and melons you have to place your greenhouse in the Northern-Southern direction. For flowers and pot plants it is the Eastern-Western direction.
Attention:
If possible, the greenhouse should be set up at a wind-protected place and not in stormy weather. It is dangerous to have stand a partly assembled house.
An assembly according to the rules lets resist this greenhouse heavy wind. The manufacturer is not responsible for any damages being arisen by improper assembly or acts of God!
The assembly must be executed by at least two persons!
Work with safe, proper tools and be careful for a secure standing of the ladder during the assembly (danger of accident).
Do only work with gloves
(danger of injury, danger of cutting)
!
For the assembly you need the following tools:
1 pc screwdriver for recessed-head screws, size 2
1 pc open-jawed wrench 10 mm
1 pc screwdriver for slotted screws
1 pc Allan key 3 mm (in the bag of accessories for skylight)
1 pc water level
1 pc ladder
1 pc file to remove possible burs at the profiles
1 pc rubber hammer
1 pc measuring tape
2
Assembly course gable
(see also description from p.12 on)
(View from the outside)
Step 1
Step 2
*Rose *Orchidee
730 x 728 1048 x 728 angle bracket Pos.1
Step 3
Frame of doors left Pos.1.6
Floor profile Pos.1.1
Frame of doors right with hinge borings Pos.1.7
Crossbeam Pos.1.9
Crossbeam Pos.1.9
Step 5
Verge flashing profi le , left Pos.1.5
-
Groove on top!
Glazing
Borings for door locking device
-
Glazing
Glazing
Glazing
Tallow-drop srew 4,2x13 Pos.12 (screw down only after installation of door = (alignment possibility)
Step 4
View from inside
Tallow-drop screw
4,2x13
Connection sheet
Pos.2
Screw M6x12
+ nut
Frame of doors, top
Pos.1.8
Glazing
Step 6
Crossbeam
Pos.1.9 to screw down with tallowdrop screws
4,8x45 at both sides
Detach edge stay bars on angle bracket
Step 7
Only back wall gable!
(Inside view)
Connect crossbeam with connection sheets and inserted screws M6x12 and nuts M12.*
Screws M6 can also inserted later with every profile with PVC-gliders.
Connection sheet Pos.3
Crossbeam Pos
Glazing
3
Attention!
Introduce necessary screws
M6x12 in profile nut before assembly (at
Pos.1.8 and 1.9)
Step 8
Assembly course eaves and skylight
for ex. back wall gable
Step 9
Step 10
Floor profile Pos.2.1 to push on angle bracket
Step 11
insert lateral glazings
Step 12
Screw down ridge and grooved profiles at gable with end plate
Pos.4 (raised countersunk head screw 4,2x13)
Front gable to assemble the same way later!
Insert grooves Pos.2.2 lateral stay bars enlarged!
Insert lateral stay bars Pos.2.3 at top into grooved profile and at bottom into the floor profile. Push straight on up to glazing and "thread" pane.
Step 13
Ridge profi le Pos.3.3
Support ends or let hold up
Insert skylight glazing at both sides
4
Step 14
Screw down with round connection sheet Pos.5 from inside with screws
M6x12+nuts.
Step 15
Glazing of eaves and skylight and stay bars to push in completely (skylight window important!)
Step 16
Build in doors and windows
Instruction see page 8-11
Pull apart wedge sealing Pos.11 in center!
Press sealing between floor profile and glazing (inside of greenhouse!)
Place door gable in front and screw down
Screw angle bracket Pos.6 in with screw 4,2x13
Pos.1-5
Pos.2-2
Pos.4-2
Pos.1-4
Pos.1-8
Pos.3-3
Pos.1-5-2
Pos.3-1
Pos.3-2
Pos.1-9
Pos.2-2
Pos.1-1
Pos.1-9
Pos.2-1
Pos.1-4
T-Sealings Pos.1, 4, 7, 3 for all doors & windows
(altogether 15 meter)
Attention! At skylight window - owith the side for insertion into ridge!!!
Attention!
Press sealing with the door at the bottom first and then screw down rectangular tube!
Hexagon bolts can be inserted later as well in the area of the PVC-glider!
Tubing section Pos. 10 will be pressed into floor profile. (as buffer / sealing or protection against dirt in floor profile).
PVC-glider in frame of doors at bottom, lateral and skylight stay bars
5
Please check according to tables if the components are complete
Contents of main box - basic construction-
Detail
Detail
Pos.
Profiles for both gables
Designation
Amount/Length mm
Rose Orchidee
II III III IV
1.1
1.2.1
1.3.1
1.4
1.5
1.5.2
1.6
1.7
1.8
1.8
1.9
Floor profile -gable-
2
2238
Edge stay bar
Edge stay bar
left
right
Verge flashing profile
left
Verge flashing profile r ight
Verge flashing profile right with Borings
Frame of doors left
Profile with slope
2
1453
2
1453
2
1283
1283
2
1283
Frame of doors
right
Profile w. slope a. boring
2
1854
2
1854
Frame of doors
top
Crossbeam without door
Crossbeam in the side
right + left
2
758
1
758
4
702
2
2874
2
1453
2
1453
2
1650
2
1650
2
1650
2
2037
2
2037
2
758
1
758
4
1020
2
2874
2
1453
2
1453
2
1650
2
1650
2
1650
2
2037
2
2037
2
758
1
758
4
1020
2
2238
2
1453
2
1453
2
1283
2
1283
2
1283
2
1854
2
1854
2
758
1
758
4
702
Pos.
Profile for eaves and roof
Designation
Amount/Length mm
Rose Orchidee
II III III IV
2.1
Floor profile -side-
2
2072
2
3130
2
3130
2
4188
2.2
2.3
3.1
3.2
3.3
Grooved profile
Lateral stay bar
Trellis for glass roofs
Crossrail/skylight
Ridge profile
2
2137
2
1445
2
1283
1
1018
1
2137
2
3195
4
1445
4
1283
1
1018
1
3195
2
3195
4
1445
4
1650
1
1018
1
3195
2
4253
6
1445
6
1650
1
1018
1
4253
6
Detail
*
Accessories bag basic construction
Position
Designation
*
We recommend to use hexagon head cap wood screws and pegs included for pegging. These are not within the scope of delivery!
7
8
9
10
11
12
13
14
1
2
3
4
5
6
15
Amount
Angle bracket / floor profile
Connection sheet
Verge flashing profile/frame of doors
Connection sheet35x90
Fixing crossbeam-back wall
Ridge / grooved end plate
Connection sheet, round
for skylight crossbeam
Angle/floor profile 30x30x20
screwing down of corners from inside
Cover
Edge stay bar - boring crossbeam
Gutter piece
4
4
2
6
2
4
4
2
Gutter stopping
2
Tubing section 760 lg
Sealing of door sill
Wedge sealing 3-5 mm
Sealing of inside floor profile
Tallow-drop screw 4,2x13
Frame of do./floor prof./cover sheet/angle Pos.6
Tallow-drop screw4,8x45
Gable
Hexagon bolt M6x12 +
nut
screws for insertion
Fastening angles 74/30 x 33 bent at right angles
- for fixing of the greenhouse on foundation by customers (inapplicable with foundation frame!)
1 see table below
35*
6
30*
10
* plus substitute screws
Amount wedge sealings 3-5 mm
Model
Length
712 768 1030
Rose II 4 1 4
Rose III 4 1 6
Orchidee III
Orchidee IV
-
-
1
1
10
12
7
Detail
Pos.
4.1
4.2
Profiles for skylights
Designation
Window profile roof
Window profile roof
Detail
Contents accessories bag skylight
Pos.
Designation
*
1
T-sealing
2
Assembly angle w. setscrew
3
4
5
*
Annotation:
sealing is bunched in one hank for all the doors and windows, cut to size please.
Allan key
Hexagon bolt M6x12 + nut
Angle bracket / skylight
2
2
Amount/Length
541
953
2
1
4
1
3
4
Amount/Length
641
1052
Window profile Pos.4.2 ( no sealing to insert in this profile!)
Angle bracket
Pos.5
Screw down three profiles first (with small assembly angles), insert glazing and fix fourth profile.
Recommendation!
It is useful to seal the panes all around and the angle brackets to avoid any penetration of humidity.
Attention!
Insert 2 screws in the cross-section at the bottom - for window opener!
Assembly angle Pos.2
Window profile Pos.4.2
Automatic skylight opener
8
Detail
Profiles for divided revolving door -at the bottom-
Pos.
Designation Amount / Length
1 700
5.3.1
Door profile at the bottom
5.6
5.7
5.9
5.8
Door profile left with borings for sash lock
Door profile right
with hinge borings
Door profile w. cross holes top
Rectangular tube w. cross holes
1 734
1 734
1 700
1 740
Detail
Accessories bag Geteilte Tür -unten-
Pos.
Designation
Amount / Length
*
5
6
7
8
9
1
2
3
4
Hinge
Sash lock
End cap for rectangular tube
T-sealing
Countersunk head screw 4,8x25 / Hingee
Countersunk head screw 4,2x45 / Türen
Countersunk head screw 3,5x22 / Sash lock
Tallow-drop screw3,5x38 / Rectangular tube
Glazing block 30x10x4
View from outside
Lay out the profiles according to illustration on an even surface (possibly on paperboard or similar).
End cap Rectangular tube
Pos.3
2
1
2
2 710
2 744
8
4
2
2
2
*
Annotation:
Sealing is bunched in one hank for all the doors and windows, cut to size, please.
Countersunk head screw 4,2x45 Pos.6
Rectangular tube 5.8
Door profile, top Pos.5.9
Sash lock
Pos.10 with screw 3,5x22 befestigen
Rectangular tube and door profile top with tallow-drop screw3,5x38 Pos.8
to screw down.
Attention! Insert sealing before
(see sketch above)
Glazing block*
Pos.9
Door profile, at the bottom Pos.5.3.1
9
Detail
Special accessories -can be delivered for an extra charge-
Profiles for divided revolving door -top-
Pos.
Designation
5.1
Door profile left
5.2
5.3
Door profile with Hinge borings right
Door profiles top
5.4
Door profile w. long hole at the bottom for bar & boring for sash lock
5.4.1
Door profile with boring at the bottom for lockable door handle
Amount / Length
1 x 1102 Rose / 1 x 1285 Orch.
1 x 1102 Rose / 1 x 1285 Orch.
1 700
1 700
1 700
1.
Detail
*
Accessories bag divided door -top-
Pos.
Designation
5
6
7
8
1
2
3
4
9
10
11
12
13
Locking thorn
Knurled nut -small-
Threaded rod -M10-
Knurled nut -big-
Countersunk head screw 4,2x45 / Tür
Glazing block
T-sealing
Hinge
Countersunk head screw 4,8x25 / Hinges
Sash lock
Countersunk head screw 3,5x22 / Sash lock
Door locking device
Tallow-drop screw3,5x13/door locking device
Amount / Length
1
1
1
1
8
2
2 x 710
2 x 1112 Rose/ 2 x 1295 Orch.
2
8
1
2
1
Door profile, top
Pos.5.3
*
4
Annotation:
Sealing is bunched in one hank for all the doors and windows, cut to size, please.
2.
3.
4.
Countersunk head screw
4,2x45 Pos.12
Fix glazing block
Pos.15 with Silicon on position.
Door profile, bottom, Pos.5.4 or Pos. 5.4.1
10
Fix sash lock
Pos.10 with screw 3,5x22
Detail
Detail
*
Annotation:
Sealing is bunched in one hank for all the doors and windows, cut to size, please.
*
9
10
11
12
13
14
5
6
7
8
1
2
3
4
Profiles for back wall window
Pos.
5.1.2
5.2
5.3.1
5.4.2
Designation Amount / Length
Door profile w. borings left for sash lock
Door profile right with hinge borings
Door profile top
Door profile w. borings for at the bottom window opener
1 x 1102 Rose / 1 x 1285 Orch.
1 x 1102 Rose / 1 x 1285 Orch.
1 700
1 700
Accessories bag back wall window
Pos.
Designation
Amount / Length
Countersunk head screw 4,2x45 / window
Glazing block
T-sealing
Hinge
Countersunk head screw 4,8x25 / Hingee
Sash lock
Countersunk head screw 3,5x22 / Sash lock
Window fixing
Angle / window fixing
Holder / window fixing
Countersunk head screw 4,2x16
/
Holder Pos.10
Hexagon bolt M6x30 + Nut
Countersunk screw M6x20+ lock nut
Knurled nut -white-
6
2
2 x 710
2 x 1112 Rose/ 2 x 1295 Orch.
2
8
1
2
1
1
1
2
1
1
1
Door profile, top Pos. 5.3.1
Fix sash lock pos.10 with screw 5x22
Countersunk head screwn 4,2x45 Pos.12
Fix glazing block
Pos.15 with silicon on
Position.
Door profile, at the bottom Pos. 5.4.2
11
Back wall window opener
Window fixing with screw 4,2x16 to screw down
12
Foundation frame (extra accessories)
Profiles for foundation frame
Detail Pos.
Designation
Amount/Length mm
Rose Orchidee
II III III IV
6.1
6.2
Foundation frame profile
Foundation frame profile
2
2199
2
2033
2
2199
2
3091
2
2835
2
3091
2
2835
2
4149
6.3
Angle bracket/foundation
frame 40/40 x 135
4
135
4
135
4
135
4
135
6.4
Fixing plate (stay bar
- foundation frame)
10
135
10
135
10
135
10
135
Assembly of foundation frame
Each foundation frame is to turn into the floor profiles.
Pos.6.1 is intended for the gable side and Pos.6.2 for the side with the eaves.
Insert one screw M6x12 into each of the corners of the foundation frame profiles, detach angles and screw down with nut M6.
13
For stabilization purposes of the house some plates
(Pos. 6.4) will be screwed on the foundation frame and lateral stay bars or frame of doors by means of pulled in screws M6.
Good advice for a quick and perfect assembly of the greenhouse from KGT
Most of the assembly can be done by you alone. The assembly for gable and lateral walls takes 2 – 4 hours according to your skills. It is best if you have further two persons being able to hold it for approx. half an hour when putting the greenhouse upright.
If you want to go on mounting it alone you have to look for a secure, suitable mounting course by means of stay bars, ladder or other fixings.
Unlike the most usual greenhouses, the mounting of the aluminum profiles is done together with the glazing. This results into an absolutely secure glazing and the biggest possible stability of the greenhouse.
You obtained 3 to 5 boxes depending on the greenhouse.
1 x basic kit → contents see p. 6 + 7
1 x windows and doors → contents see p. 8 – 11
1 x glazing (for bigger houses 2 boxes)
Please stay all the boxes in a dry place and protected against sunlight (see note below).
Please first open and unpack only the main box with the basic kit to avoid a mixing of the many different parts.
Please start with the assembly of the greenhouse gables. Door wall gable and back wall gable are nearly the same.
Push the profile of the frame of doors pos. 1.6 –right- and pos. 1.7 –left- (profile with 8 borings with a slope of 30° as well as a black PVC-glider) up to the smaller borings in the centre of the floor profile.
The slopes there have to point to the outside direction. Then detach the angle brackets pos. 1 (see step
1).
Already now you need the small lateral glazing (measurements see table*). Push it with the web direction – vertical – into the floor profile and push laterally into the profile of the frame of doors (see step 2).
*Rose *Orchidee
730 x 728 1048 x 728
Important note:
The ISO-cellular sheets, that is the glazing, are always to build in with the UV-coated side to the outside.
On the protection foil you find a corresponding note or a blue foil. Loosen the protection foils only at the edge and the complete rest of the foil only after the finished assembly . With some days of insolation the foil can burn "tight" on the plates and is to stripe off with difficulty.
Do not stripe it completely off when unpacking the goods because then you cannot see the side with the UV-protection.
Now detach the crossbeam pos. 1.9 from the top onto the glazing (see step 3). Then the beveled glazing is to put in the same way. Joint the frame of doors with the connection plate pos. 2 (see step 4).
Attention!
In advance 2 screws have to be screwed in both vertical frames of doors and 2 screws into the horizontal frame of doors.
14
On the square head of the angle bracket you detach the edge stay bars pos. 1.2 + pos. 1.3
(length 1447 mm). Take care that the groove is on the top! Do not position any triangular glazing onto the frame of doors.
The verge flashing profiles in pos. 1.4 and 1.5 must be detached onto the slopes and be joined together with the profile of the frame of doors by means of a trapezoid clamping plate.
At the verge flashing profile with two sheet metal screws 4,2 x 13, at the profile of the frame of doors with M6 x 12 (see step 4 + 5).
Screw down the crossbeam by means of sheet metal screws 4,8 x 45 (see step 6).
Note 1:
If the profiles have any PVC-gliders you can still later push in the required screws through the opening of the PVC-glider!
Note 2:
One verge flashing profile has two small openings for the fixing of the door locking device, thus you have to determine now where the door should be mounted.
The back wall gable is to assemble the same way. Please build in one crossbeam in pos. 1.8 (length
758 mm) exactly in the height of the already existing crossbeams. Fix with the rectangular connector 35 x 90 with 3 borings (see step 7).
Attention! Here you put in the glazing 787 x 728 mm before! The above remaining opening will be closed later by the intended standard back wall window.
Assembly of the lateral and skylight segments ( see steps 8 - 15)
Now you need some more assistance or corresponding aids!
Set the gable upright, hold it or support it safely (see step 8).
At first the lateral floor profiles (measurement see table*) are to detach on the angle bracket of the gable (see step 8).
A lateral glazing is to push into the floor profile and the edge profile. It is best, if at both sides. Thus the gable stands safely (see step 9).
*Rose II
*Rose III
*Orchidee III
*Orchidee IV
2167 mm
3225 mm
3225 mm
4284 mm
Now push the grooved profiles onto the glazing and joint together with the end plate pos. 4 and screw
4,2 x 13 (see step 10).
The ridge profile is now to introduce into the existing nuts / slots of the gable that the profile is flush in the front. Now screw together with the ridge / grooved end plate by means of sheet metal screws 4,2 x 13 (see step 12).
The next is to push in a pane of the skylight glazing into the grooved profile and into the verge flashing profile. Introduce roof stay bars into the grooved profile and eaves profile and push up until the glazing
(thread-up glazing). The remaining panes are to complete.
Please determine the position of the window in time!
Here put in the short pane of the skylight glazing and close with the window crossbeam pos. 3.2. The round connection plates have to be used to screw (see step 14).
15
Now the second gable in the foot is to connect with the floor lengthwise profile in the same way already known. Push the grooved profile and ridge profile into the nuts / slots of the gable profiles. Screw down as well with the grooved and ridge end plates.
Now a small angle 30/30/20 x 2 can be screwed in by means of sheet metal screws 4,2 x 16 to secure the floor profiles (see step 15). If you use a foundation frame this angle not urgently necessary, as the foundation frame has an L-connection (see p. 13).
Now the skeletal structure is finished – topping-out ceremony is the order of the day!
Please open now the accessories box. Here you find:
1 pc skylight including automatic window opener
1 pc divided revolving door
1 pc back wall window contents see p. 8 contents see p. 9 + 10 contents see p. 11
These parts are to mount according to the instructions (see p. 8 – 11).
Doors and back wall window can be mounted at both gables. Borings for the door hinges / bands exist in every profiles of frames of doors. However, please take care that we have intended the borings for the door locking device at only one verge flashing profile (see step 5). Should you mount the door on the other side, the corresponding borings have to be transferred then.
The skylight is to push from the lateral into the ridge (see step 16). This system is generally very simple and explains itself.
Further useful notes:
Erection with a foundation frame:
This is the simplest but also the securest erection of a greenhouse. The foundation frame is hooked non-positively into the floor profile of the greenhouse and screwed down in the edges by an angle bracket (see p. 13).
It is best and easiest to assemble the foundation frame together with the greenhouse!
But this is also possible later – without any energy. Then you only must lift the greenhouse (it is best to do this at one side) and laterally hook in the foundation frame into the floor profile.
Erection with the foundation frame:
At first you have to dig a small ditch, cut of the spade approx. 10 – 12 cm deep, according to the given measurements of the foundation frame. In each of the four corners you horizontally place a cobblestone as a support for an exact level compensation. This avoids a possible sinking of the greenhouse. Then the greenhouse with the foundation frame is to put in this ditch and the foundation frame is to fill by the excavated material. It is useful to lay down there some garden plates or flagstones in order to avoid any dirty splashes at the greenhouse due to strong rain. Besides, working around the greenhouse is simpler, e.g. mowing the lawn.
16
Question:
Is it necessary to „seal“ the greenhouse or greenhouse glazing respectively ?
Principally: not.
However, we recommend to seal the horizontal transitions from the glazing to the profile (see sketch
→ broken lines ---) with neutrally linking, transparent silicon in order to have the most possible small amount of water and thus little dirt in the glazing reception.
Advantage: In the long term the greenhouse has a better appearance. The tendency to the algae formation just in this area decreases tremendously.
Humidity / water can also appear within the glazing/cellular sheets according to the weather situation because the PVC-sheets are not
"steam-diffusion-tight", that means that humidity in the form of steam penetrates into the sheet. This is a purely optical disadvantage which cannot be avoided.
The sheets cannot suffer any damage, even not with frosty days.
Attention:
Use only „neutrally linking“ silicon due to possible stress cracks in the PVC-glazing. This is the most common silicon sealant being available with any DIY superstore or with your KGT expert dealer priced at 4 – 6 € / 310 mm cartridge.
Cleansing and maintenance:
Clean the greenhouse with much water only (for ex.: with a car wash-brush or a HP-cleaning apparatus.
You can additionally use any purifiers.
We wish all the buyers and users of this KGT-greenhouse much fun with their hobby of gardening and have much success with growth!
All our statements are based upon many years of experience and are drawn up to the best of our knowledge and belief and they do not cover any legal entitlements in case of any possibly arising events of claim.
17
18
Advertisement