Gronomics MRGW 34-48 Assembly Instruction

Add to my manuals
2 Pages

advertisement

Gronomics MRGW 34-48 Assembly Instruction | Manualzz

1 Parts Identifi cation

Stack matching pieces in piles. Using the parts list, locate and count the individual pieces and verify that you have received the correct number of pieces.

If any pieces are missing or replacement parts are required, contact

Gronomics at 1-855-299-6727.

NOTE: It is recommended to place a protective layer between the ground and the pieces during assembly. This will help prevent damage to the pieces.

Modular Rustic Garden Wedge

(34”W x 48”L x 32”H - 18D)

Assembly Instruction

MRGW 34-48

1 2

3 4 5

7

8

6

9

ITEM

1

2

3

4

5

6

7

8

9

10

2

1

4

1

QTY.

4

8

2

2

2

2

PART #

CP41

R4501

ES2613L

ES2013

ES1313

ES0713

SH43

BCR43

R3100

FL3652

Parts List

DESCRIPTION

Corner Post, 3-1/4” x 3-1/4” x 41-1/4”

Front & Back Side Rails, 45” x 5-5/8 x 13/16”

End Side Rails, 26-3/8” x 5-1/2” x 13/16”

End Side Rails, 20-1/4” x 5-1/2” x 13/16”

End Side Rails, 13.7/8” x 4-3/8” x 13/16”

End Side Rails, 7-3/4” x 5-1/2” x 13/16”

Shelves, 43-3/4” x 5-1/2” x 1-3/8”

Bottom Center Rail, 43-3/8” x 2-1/2” x 13/16”

Post Cap, 4-5/8” x 4-5/8” x 1-1/2”

Fabric Liner, 36” x 52”

2 Post Assembly

Place two 3-1/4” x 3-1/4” x 41-1/4” corner posts (Item 1) together as shown.

Repeat procedure for the two remaining corner posts.

1

Packaged & Inspected by: www.gronomics.com East Bethel, MN USA

Date:

Continued

763-753-7374

3 Side Rail Assembly

Install the eight 45” x 5-5/8” side rails (Item 2) into the upper part of the slots between the corner posts and slide down.

2

5 Bottom Center Rail Assembly

Install the 43-3/8” x 2-1/2” bottom center rail (Item 8) with the tapered edges of the rail facing down.

Install the fabric liner into the Garden Wedge.

Soil Capacity: 6.5 Cubic Feet

2

4 End Side Rail Assembly Continued

Install the four end side rails (Item 6, 5, 4 & 3) into the upper part of the slots between the two corner posts and slide down.

Repeat procedure on the opposite end with the four remaining end side rails.

8

6 Shelve Assembly

Install the two 43-3/4” x 5-1/2” shelves (Item 7) onto the side rails on both sides of the Garden Wedge.

7 www.gronomics.com

6

5

4

3

7 Post Cap Assembly

Remove the rubber cap from the post studs.

Align the hole of the 4” x 4” post cap (Item 9) with stud and tighten until the post cap makes contact with the post. Do not overtighten.

9

Stud

East Bethel, MN USA 763-753-7374

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement