Ariel 701 Installation Guide

Add to my manuals
8 Pages

advertisement

Ariel 701 Installation Guide | Manualzz

STEAM BATHROOM

MODEL : WS-701

No advanced advice will be submit before we change our design and size.

The pictures may be a little different from the real products.

Our company keep the final explanation right.

Your best choice!

TECHNIQUE PARAMETER

Vol tage

Ac 110 V( ±10%)

Freque ncy

60H

Z

Water

Volatge

0. 1~0 .2M pa

Power of steam generator

2. 65K W

Power of water pump

Power of heat pump

1. 2H P 1. 0K W

Power of air pump

0. 2K W

Storage capacity

66g al lon

Storage capacity

0. 3m

3

CAUTIONS: Heat pump and air bubble pump is required by customers.

CONSTRUCTION SKETCH

Self-clean system

Step 2

Step 1

Handrail Step 3

Step 4

Pour into cleaning liquid from here

Glass door

01

SIZE1660x1660x2250 mm

65.4″x65.4″x88.6″

Cleaning method:

1.Clean the steam engine regularly at least once by every 2weeks or after using 20 times.

2.Inject citric acid as main cleaning liquid,add 1.5L each time.after 10 minutes, turn on and When the system turns on, press button to start the steam function for about 30seconds and then shut down the system.After vent the stagnant water,repeat 2 or 3 times.

3.CAUTION: The system must be shut down before injecting

WS-701

14

Packing list

Packing 1 four pieces of glass shower body, four pieces of fixed glass door , two pieces of sliding glass door ,one piece of post,two pieces of decorating post,two pieces of magnetic strip,four pieces of water resist strip,six pieces of single side plastic seal, two pieces of up and down bended aluminum column,two pieces of decorating board.茎 one tray,one roof, two pieces of long handle.

Packing 2

Spare parts list two set of shower,one set of towel shelf,one piece of herb box,one piece of soap box, one piece of drainage cover

,wheel with cover,two pieces of “T” shaped pillow,M6*25 screw(1),M6*35 screw(2),ST4*20 screw(3),ST4*25 screw(4),ST4*20 screw(5), ST4*12 screw(6),M4*25 screw(7),one instruction.

SCREW (1) M6x25

SCREW (2)

M6x35

SCREW (3)

SCREW (4)

SCREW (5)

St4x20

St4x25

St4x20

SCREW (6) St4x12

SCREW (7) M4x20

10pcs

10pcs

4pcs

4pcs

16pcs

8pcs

4pcs

13

CONSTRUCTION SKETCH

1

2

3

4

5

6

7

8

9

10

1.roof

2.top shower

3.room body

4.moveable shower

5.movable arm

6.handrail

7.nozzle

8.bottom bathtub

9.water pump switch

10.waterfall

11.exhaust fan

12.top light

13.decorated light

14.temperature needle

15.control panel

16.soap box

17.switch

18.cold/hot water switch

19.steam out

20.water in

21.air conditioning

22.big nozzle(6 PCS)

23.drainage

WS-701

02

11

12

13

14

15

16

17

18

19

20

21

22

23

INSTALLATION SKETCH

150

(5.9

″)

The socket of power and the socket of telephone

Cold water pipe

Hot water pipe

1800

(70.8″)

1250

(49.2″)

53

0(2

0.9

″)

29

0(11

.4″

)

(6

5.

16

60

29

0(

11

.4

″)

4″

) 16

60

(6

5.4

″)

Other screws

M4x16 M4x25

03

Install the screw

M6x25

53

0(

20

.9

″)

Active chain wheel of glass

SIZE:1660×1660×2250mm

65.4″x65.4″x88.6″

ILLUSTRATION OF INSTALLATION

1.The products should be installed by technical guy who are got the certificate or those technical who are assign by dealers. The main power switch and electronic leakage device should be installed.

2.The plug of electronic should be installed above the steam generator and the length of electronic wire not less then

1800MM from the earth.

3.There are should be with main power switch for hot and cold water pipe of steam room and the water pipe should be connect to drainage water pipe.

4.Install the products according to the diagram of installation

When fixed the place for the products.

ATTENTION

1.In order to be tripped and fell down, pay more attention when get into the steam room. Please don't shut the finger in the door in order to be hurt.

2.In order to avoid damaging the surface of products please do not use hardness and sharpness tool to curve the products.

3.In order to course fire, no smoking inside the bathroom.

4.the jets of steam and drainage pipe both are high temperature when products working, in order to be hurt please be careful.

5.In order to be tripped and fell down please keep clear of the bathtub after taking shower each time.

6.It will be leaking if the glass glue plastic sheet be off then please add some more for recover.

7.If there are marks of water please clear with soft cloth and toothpaste.

8.In order to be blocked of drainage device please keep clean of the surface of bathtub.

9.Please do not hang up heavy things on the steam room or the handle of steam room.

10.Please deal with the products according to the local laws when it is no longer be use.

ATTENTION FOR USAGE

1、check if power and cold/hot water switch be turn on or be turn off each time before use this product.

2、check if power of electronic leakage device be get through or not.

Checking way:

Press testing button, light of power be off, press button of restart then light of power be on.It is not being what mentioned above after operated step by step,then that shows the electronic protection device out off control or there is something wrong with the electronic leakage device,so should ask professional to check and maintain the product.

3、 Turn off the main power of control panel after stop usage. The plug of power should be pull out because only turn off all the functions of control panel that is not stop the power.

4、 People with hypertension or drunk are not allowed to have sauna steam bath.

5、 Children should have sauna steam bath under adult's instruction.

6、 Please don't shut the finger in the door in order to be hurt when get into the steam room.

7、 In order to be tripped and fell down, pay more attention when get into the steam room.

8、 keep clean of the tray in order to be tripped and fell down.

WS-701

12

Attention:

The machine must be fixed in the circuit which protected

by creepage protectionand should be well-connected with the ground. Nontechnical people can not be fixed or removed at random.

6、Technical parameter

Model

KL-824

Top light

20W

AC12V

Voltage

110V

Sidelight

5W

AC12V

Current

25A

Fan

3.5W

DC12V

Power protecting electrifying Waterproof Grade

2650W I

Water inlet valve

Water drain valve

6W 7W

Ip4

DC12V DC12V

INSTALLATION PROCESS

1.Assembly of tray

If the ground is not smooth,please adjust the nail under the tray to keep the balance of the tray and ground.

S T E P 1

Gla ss boa rd ium

S TEP2

2 Install the back shower body

C o n n e c t a l l t h e b a c k g l a s s shower body.

11

S T E P3

3. Install the shower body

Put the back shower body onto the tray,fix it.

WS-701

04

05

STEP 5

M4x1 2

STEP4

6. Install the shower body

Put the glass door on the tray, together with the back shower body,fix it.

Active chain wheel of glass

5. Assembly of sliding door put the sliding door into the up and down aluminum track to keep it balance,fix it.

M4x20

4 . A s s e m b l y o f f i x e d glass door

Connect the fixed glass door.

C C

S T E P 6

(1) The electrical pitch

Press pitch can open the machine, the temperature is the room temperature.The time will show 30m. At the same time, it will open the ceiling lamp.Press again will close all the

functions. (After the closure of the machine, the water case will drainfor 2 minutes)

(2) The application of the back lamp

Press ,the sidelight is on. Press again, the ceiling

lamp is out, press a third press, the sidelight is out too.

3) The steam function

Press ,startup the steam function, the water case will pump water automati-cally. After 60minutes or so, it will generate steam. (When the water case is lack ofwater,

the controller will replenish automatically)

(4) The air draft function

Under the condition of turnning on, press can start up air draft function, pressagain will colse it.

(5) The setting of time or temperature

1. Press pitch can adjust the time from 1-99.

2. Press pitch can adjust the temperature from

30-60 .

WS-701

10

7. Install the roof

Put the roof onto the top of shower body,then fix tightly with bolts.

M6x25

1

2

3 6

7

8

4

5

C C

1 Time adjustment pitch+

2 Temperature adjustment pitch+

3 CeilingLamp/Back Lamp pitch

4

Time adjustment pitch-

5

Temperature adjustment pitch-

6

Fan Pitch

7

8

Steam Pitch

Main Cock Pitch

09

M4x20

S TE P8

STEP7

8. Install spare parts

A. Finish assembling the whole set,in order to aviod water and steam leaking,except the position of sliding glass door do not use the silicone, the silicone should be used on all else connecting position .

B. While connecting the cold water pipe and drain pipe ,wipe the silicone on the connecting mouth to make it will be connected very well.

C . S k e t c h m a p o f p i p e connection(show as the picture).

D. Assembly of spare parts(shower and so on)

A f e r a l l s p a r e p a r t s h a v e b e e n i n s t a l l e d w e l l , p u t o n t h e p o w e r supply and cold/ hot water switch to check whether all functions work normally. If not,please install again.

WS-701

06

DRAWING OF WATER CONNECTION

connection according to the serial number v1,v2,etc.

Movable shower head

Top shower

Switch valve

Switch valve

Waterfall

Movable shower head

Nozzle cold/hot water switch

Hot water connection

(red pipe)

Nozzle cold/hot water switch

Cold water connection

(red pipe)

Drainage

Steam generator clean system

Steam out

ELECTRIC CIRCUIT SKETCH clean system steam outlet water inlet

Power

Control

panel

Light

(AC12V)

Fan

(DC12V)

07 WS-701

08

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement