N&W Korinto ES coffee maker Service manual

N&W Korinto ES coffee maker Service manual

The Korinto ES is a coffee maker that can make espresso, cappuccino, and other coffee drinks. It features a grinding unit that grinds coffee beans on the spot and a pressure boiler that heats water to the perfect temperature. It also has a frother unit that creates a creamy milk foam for cappuccino. The Korinto ES is easy to use and maintain, with clear instructions and easy-to-clean parts.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

N&W Korinto ES Service Manual | Manualzz

TECHNICAL AND AFTER-SALES SERVICE

SERVICE MANUAL

“KORINTO”

(Espresso Version)

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 1 / 41

INDEX

20

21

22

23

24

25

26

12

13

14

15

16

17

18

19

27

28

6

7

8

9

9.1

9.2

10

11

2

3

4

5

1

1.1

1.2

PLANNED MODELS

MAIN EXTERNAL COMPONENTS

MAIN INTERNAL COMPONENTS

LIST OF MAIN COMPONENTS

TECHNICAL DATA AND FEATURES

ELECTRICAL SAFETY AND RELEVANT STANDARDS

REQUIREMENT FOR THE USERS

HYDRAULIC LAYOUT “ESPRESSO”

HYDRAULIC LAYOUT “INSTANT”

HYDRAULIC LAYOUT “FRESH BREWER”

INTERNAL LAYOUTS

ELECTRICAL SYSTEMS – CONNECTIONS

CONNECTION OF ELECTRONIC BOARDS

WIRING DIAGRAMS

ACTUATION BOARD – CONFIGURATIONS

PUSH-BUTTON BOARD

ESPRESSO BOILER CONTROL BOARD

AIR-BREAK AND BOILERS ( INSTANT & ESPRESSO)

INSTRUCTIONS FOR REMOVING THE CASINGS

POMPE E BY PASS

ESPRESSO & FRESH BREWER UNITS

SPOUTS ASSEMBLY

POWDER PRODUCT CONTAINER AND DOSER DEVICES

ASSEMBLY

MIXER ASSEMBLY

COFFEE DOSER GRINDER UNIT

SELECTION DOSE TABLE

ROUTINE AND EXTRAORDINARY MAINTENANCE SCHEDULE

TROUBLE-SHOOTING

HACCP DIRECTIVE

DAILY CLEANING AND HYGIENE SCHEDULE

WEEKLY CLEANING AND HYGIENE SCHEDULE

MONTHLY CLEANING AND HYGIENE SCHEDULE

Pag. 3

Pag. 4

Pag. 5- 6-7-8

Pag. 9

Pag. 10

Pag. 11

Pag. 11

Pag. 12

Pag. 13

Pag. 14

Pag. 15

Pag. 16

Pag. 16-17

Pag. 18

Pag. 19-20

Pag. 21

Pag. 21

Pag. 22-23-24

Pag. 25-26

Pag. 27

Pag. 28

Pag. 29

Pag. 30

Pag. 31

Pag. 32

Pag. 33

Pag.34

Pag.-35-36-37

Pag. 38

Pag. 39

Pag. 40

Pag. 41

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 2 / 41

1 - PLANNED MODELS

INSTANT VERSION ESPRESSO VERSION

CUP

E

SPRESSO VERSION WITH FROTHER AND CUP

-

WARMER

F

RESH

B

REWER VERSION

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 3 / 41

1

2

7

8

9

10

11

1.1 MAIN EXTERNAL COMPONENTS

3

4

5

6

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 4 / 41

1.2 MAIN INTERNAL COMPONENTS

12

17

13

18

13 14 15

16

19

20

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 5 / 41

REAR COMPARTMENT WITHOUT PROTECTIVE CASING

26

8

9

10

11

21

22

23

DETAIL OF CPU / ACTUATION

MACHINE BOARD

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 6 / 41

24

25

31 32 33

DETAIL OF POWER SUPPLY CABLE

CLAMPING

27

28

29

30

10

PERSPECTIVE VIEW WITHOUT

PROTECTIVE CASING - AIR-BREAK SIDE

DETAIL OF PUMP AND BOILER FOR

FROTHER UNIT

34

SIDE VIEW WITHOUT PROTECTIVE

CASING - ESPRESSO BOILER SIDE

35

27

DOSER GRINDER UNIT DETAIL

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 7 / 41

SIDE VIEW WITHOUT PROTECTIVE CASING -

INSTANT BOILER SIDE

( Only for INSTANT VERSION or FRESH BREWER )

FRONT VIEW WITHOUT PROTECTIVE

CASING - INSTANT BOILER SIDE

(Only for INSTANT VERSION )

DETAIL OF SOLENOID VALVES FOR INSTANT BOILER

(Only for INSTANT VERSION )

36

37

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 8 / 41

2 - LIST OF MAIN COMPONENTS

N° Ref. DESCRIPTION

1 Lock

2 Cabinet

7

8

10

11

12

13

14

Rear protective casing

Power supply fuses

Water inlet solenoid valve

Power supply cable

Grinder and doser device

Coffee beans hopper

Instant product canister

16 Door

17 Espresso coffee brewer unit

18

19

Decaf. coffee door (pre-measured sachets of ground coffee)

Coffee hopper lid

21 Actuation and control board

24 Power supply interference suppressor

25 Transformer

26

27

Boiler power supply board

Grinder and doser device

31

33

Power supply cable

Power supply cable connector

35

36

Frother unit boiler

Instant boiler solenoid valve

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 9 / 41

3 – TECHNICAL DATA AND FEATURES

Height 28.14"

Width 13.03"

Depth 20.78"

Overall depth with door open 28.89"

Weight 70.54lb

Power supply 120V AC 60 Hz

Installed power 1300W ( Espresso)

Payment systems used:

The machine is pre-set to use (by means of special kits) payment systems, coin mechanisms and 24 V DC validators with EXECUTIVE,

BDV and MDB protocols.

The payment systems must be housed in the special side module supplied as optional accessory together with the payment system kits.

Water supply

:

From the mains, 7-123PSI 0.05-0.85 Mpa 0.5-8.5

Available adjustments:

Grade of grinding for espresso coffee

Espresso coffee dose through number of rotations of grinding wheels + time-out

Water doses for coffee by volume

Water doses for instant products by timing

Powder doses for instant products by timing

Boiler temperature adjusted via software

Overall size of vending machine and of base cabinet (optional)

Base versions:

Espresso – Instant – Fresh brever

Installed boilers and temperature:

Una caldaia in pressione per la versione espresso

One open-top boiler for Instant and Fresh-brew versions - Temperature setting via SW

Safety devices:

Main switch (at the back) – Main safety switch for opening the door

Water inlet solenoid valve with passive overflow device

Manual-reset boiler safety thermostat

Manual-reset instant boiler anti-boiling thermostat

Air-break float jamming and instant boiler

Presence of liquid waste tray – Presence of coffee grounds tray

Boiler sensor control (short-circuit or failure)

Double heating and timing protection for:

Pump – Doser devices – Coffee unit ratiomotor – Coffee grinder – Mixer motors

Fuse protection for: Transformers, electronic boards and main wiring

Protection for 100% impedance: Instant product solenoid valves, water inlet solenoid valve

Controls:

Presence of water - Presence of coffee - Operating temperature reached

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 10 / 41

4 – ELECTRICAL SAFETY AND RELEVANT

STANDARDS

The vending machine KORINTO was designed and made in conformity with the provisions of the following directives and related European standards:

MACHINE SAFETY DIRECTIVE EEC 98/37

EN 60529 UNI EN 292 –1-2 IEC 695-2-2

LOW VOLTAGE DIRECTIVE EEC 73/23; EEC 89/392; EEC

89/336

(the low voltage directive covers all equipment powered with voltage below 400 V AC)

The following European standards are applied:

EN 60335-2-14 EN 60335-2-15 EN 60335-2-24 EN 60335-2-75

ELECTROMAGNETIC COMPATIBILITY DIRECTIVE

EN 61000-3-3 EN 61000-4-2 EN 61000-4-3 EN 61000-4-4 EN 61000-4-5 EN 61000-4-11

---…----…---…---

With regard to Low Voltage and Electromagnetic Compatibility this vending machine KORINTO was tested and certified by IMQ, a certifying body authorised by ministerial decree at European level.

It is therefore prohibited (on pain of voiding the warranty and the responsibility of the certification) to replace any electrical component with non-original parts during the routine and extraordinary maintenance operations.

Therefore it is also prohibited to:

Tamper with or deactivate the safety systems installed in the vending machine.

Install the vending machine outdoor or in any case in a place that is not protected from the weather.

Use the vending machine for purposes other than those indicated in the sales contract.

Connect the vending machine by means of extension cords or multiple sockets and/or adapters.

Use water jets for cleaning.

Then, it is also compulsory to:

Verify the conformity and suitability of power supply line and of the power outlet.

5 – REQUIREMENT FOR THE USERS

For safety purposes, three different operators with different qualifications have been defined.

USER

The user is practically the final user who buys the products from the machine.

The user must not have any access whatsoever to the inside of the machine.

PERSON RESPONSIBLE FOR REFILLING AND ROUTINE CLEANING

The person responsible for refilling has the key for opening the machine and is in charge of the refilling, cleaning and internal hygiene of the machine.

He must not have any access to energised parts or moving parts.

MAINTENANCE TECHNICIAN

The maintenance technician must be a highly skilled person and must be aware of the electrical hazards in the event of complex technical operations and can operate with the machine switched on and the door open, using the safety key supplied.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 11 / 41

6 – HYDRAULIC LAYOUT “ESPRESSO”

5

4

3

2

1

15

ESPRESSO VERSION COMPONENTS (with variable brewing chamber)

6

7

8

9

10

11

12

13

14

RIF DESCRIPTION RIF DESCRIPTION RIF DESCRIPTION

1 Spouts assembly for double coffee

4 Brewing chamber

2 Instant drinks spouts assembly

5 Solenoid valve assembly

3

6

Mixer

Espresso boiler

7 Piston solenoid valve

10 By-pass pump

13 Water solenoid valve

8 By-pass

11 Volumetric counter

14 Water filter

9 Vibration pump

12 Air-break

15 Vent tube

N.B. The diagram shown is given only as a reference as it may differ for each version.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 12 / 41

7 – HYDRAULIC LAYOUT “INSTANT”

2

1

INSTANT VERSION COMPONENTS

RIF DESCRIPTION

1 SPOUTS ASSEMBLY

RIF DESCRIPTION

2 Mixer

4 Water solenoid valve 5 Boiler assembly

RIF

3

6

DESCRIPTION

Solenoid valves

Boiler vent tube

7 Drain tube

N.B. The diagram shown is given only as a reference as it may differ for each version.

3

4

5

6

7

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 13 / 41

8 – HYDRAULIC LAYOUT “FRESH BREWER”

3

2

1

COMPONENTS OF FRESH BREWER VERSION

RIF DESCRIPTION

1 Spouts assembly

4 Solenoid valves

7 Vent tube

RIF DESCRIPTION

2 Sigma Brewer unit

5 Instant boiler

8 Drain tube

RIF

3

6

9

Mixer

DESCRIPTION

Water solenoid valve

N.B. The diagram shown is given only as a reference as it may differ for each version.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 14 / 41

4

5

6

7

8

9 - INTERNAL LAYOUTS

EXAMPLES OF INTERNAL LAYOUT

NOTE: THE FOLLOWING I LAYOUTS ARE ONLY GIVEN AS AN EXAMPLE FOR THE PURPOSE OF INDICATING

THE CONFIGURATION POSSIBILITIES. REFER TO THE TABLES SUPPLIED WITH THE MACHINE FOR THE

ACTUAL LAYOUT.

LAYOUT OF KORINTO INSTANT AND

SELECTION PANEL

LAYOUT OF KORINTO FRESH BREWER

AND SELECTION PANEL

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 15 / 41

9.1 - ELECTRICAL SYSTEMS – CONNECTIONS

The machine is designed to operate under a single-phase voltage of 120 V AC (+5-10V)

It is protected with a main 15 A fuse on both phases.

With regard to the transformer: the primary winding is protected with a 125 mA fuse the secondary winding is protected with a 1.25 mA fuse

It is fitted with a door opening safety switch.

The power cable can be supplied as standard feature and chosen among the following types:

1) HO5 RN – F copper with a 3 x 1.5 mm 2 section

2) HO5 V V – F ,, ,, ,, ,,

3) HO5 V V – F ,, ,, ,, ,,

Fitted with a fixed SCHUKO ** plug.

NB **: it is possible that for some specific markets a cable with specific plug be fitted in accordance with the regulations in force in that country.

In the event of replacement cables of exactly the same characteristics must be used.

Since the “KORINTO” vending machine is approved by an electrical safety certification institute (IMQ) , replacements with non-original components are not permitted.

Otherwise the electrical safety certificate and the warranty will be void.

9.2 – CONNECTION OF ELECTRONIC BOARDS

2

3

4

5

7

1

6

8

1

2

3

4

5

6

7

8

Actuation board

Steam exhauster

Switch and fuses

Terminal strip

Boiler control board

Secondary winding fuses

Interference suppressor filter

Transformer

VIEW OF POWER SUPPLY UNIT COMPARTMENT AND ACTUATION BOARD

(ESPRESSO VERSION WITHOUT REAR PROTECTIVE CASING)

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 16 / 41

BOARD CONNECTION DIAGRAM

Signal DESCRIPTION

P1

SM 1

P2

SAL Power supply card

SM FB Sigma brewer control board (where provided)

Actuation & control board SM

CCG

SM 1

LCD

Mechanical general counter

Push-button and display control card

Liquid Crystal Display

IDEC Decaf. coffee door switch

P1- P2 Selection keypad

NB: The above codes are indicated in the wiring diagrams and in the tables supplied with the machine.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 17 / 41

UPS CONNECTION

DIAGRAM

(Cooler unit)

10 - WIRING DIAGRAMS

BLOCK CONNECTIONS DIAGRAM

(see detail in previous page)

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 18 / 41

9

8

7

11 - ACTUATION BOARD – CONFIGURATIONS

This board houses the Flash EPROM. The control software of the board is installed directly (via RS232) in the microprocessor.

10

ACTUATION BOARD

This board, placed at the back of the machine, processes the information from the push-button card and from the payment system fitted); it also controls the actuations, the input signals and the boiler board.

(if

The 15 VAC voltage necessary for operating the board is supplied by the transformer, protected by a 125 mAT fuse on the primary winding and by a 1.25 AT fuse on the secondary winding; the voltage is rectified and stabilised directly by the board.

The program can be updated or some of its functions can be changed through a PC or palmtop with special Software.

- The red LED (7) indicates the operating status of the boiler heating element;

- The red LED (9) for resetting the CPU glows during the board reset;

- The green LED (11) blinking indicates that the microprocessor is working correctly;

- The yellow LED (12) indicates the presence of 12 V DC.

11 12

13 14 15 16 17 18

6

5 4 3 2 1

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 19 / 41

1 - 120 V~ power users

2 - Input signal

3 - Can-Bus connection

4 - Can-Bus connection

5 - Relay expansion connection

6 - Boiler control probes

7 - Red LED - boiler heating element

8 - Input signal

9 - Red LED

10 - Not used

11 - Green LED

12 - Yellow LED

13 - To the push-button board

14 - Connector for board programming (RS232)

15 – Up-Key connector

16 - Board power supply (15Vac)

17 - Relays K1 to K16

18 - Connector for 120 V AC power users

SM: REFERENCE TO RELAY CODE AND ACTUATIONS – ESPRESSO VERSION

ESPRESSO CONFIGURATION

K 9

K 10

K 11

K 12

K 13

K 14

K 15

K 16

K 1

K 2

K 3

K 4

K 5

K 6

K 7

K 8

Starting pump

Not used

Whipper motor 1

Not used

Coffee dispensing solenoid valve

Discharge solenoid valve 1

Coffee brewer motor

Discharge solenoid valve 2

Instant prod. solenoid valve 1

Doser device motor 1

Instant prod. solenoid valve 2

Not used

Not used

Mains water inlet solenoid valve

Not used

Coffee grinder ratiomotor

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 20 / 41

2

3

12 - PUSH-BUTTON BOARD

4

5

6

7

8

1

9 10 11 12 13

1 - Selection buttons (not used)

2 - Not used

3 - To mechanical counter (optional)

4 - To actuation/CPU board

5 - Input

6 - Display adjustment trimmer

7 - To display

8 - 12 Vdc validators

9 - Not used

10 - RS232 serial port

11 - Not used

12 - Programming access button

13 - Wash button

14 - Display card

14

13 - ESPRESSO BOILER CONTROL BOARD

STRC

J2

J1

Triac board

This board is controlled by the machine board and is powered under 120 V AC.

It is used for controlling and starting the boiler heating element.

Connector J2 is connected to a 120 V AC phase

Connector J1 receives the information from the SM board that sends a consent signal to activate the triac for the power supply to the heating element.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 21 / 41

14 – AIR-BREAK AND BOILERS

The air-break is a functional unit with the function of keeping the water level constant and of signalling a water flow interruption from the mains; in the event of such water failure it serves the purpose of completing the current selection.

In the espresso version, it serves the purpose of holding a reservoir of water at normal atmospheric pressure, so that the pump can draw the correct water dose for the selection and deliver it to the

Espresso boiler without changes in pressure that may affect the volumetric counter reading.

The water level is ensured by a float that triggers a micro-switch, keeping the level between a factory set minimum and maximum (it very important not to replace the micro-switch with any one of different mechanical characteristics, as a variety of malfunctions may occur).

In the event of failure to the maximum level micro-switch, an overflow hole allows the water to be conveyed through a tube and to the safety device fitted on the water inlet solenoid valve, thus causing its mechanical lock (such safety device is triggered also in the event of a power failure).

In the Instant version the level is controlled directly through a float located in the boiler itself (see page

24).

SIDE VIEW - AIR-BREAK SIDE

(WITHOUT PROTECTIVE CASING)

DETAIL OF WATER LEVEL MICRO-SWITCH

DETAIL OF AIR-BREAK IN

WORKING POSITION

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 22 / 41

BOILERS

For the KORINTO model there are three base versions:

1) Espresso version, fitted with a pressure boiler, very similar to the one used in the entire range.

2) Instant version, fitted with only the open-top instant boiler, also fitted with a new design level control system.

3) Fresh brewer version, fitted with only the same open-top instant boiler used in the Instant version.

The espresso boiler is the same used for KORO / BRIO models, therefore with the same well known and established characteristics and reliability.

The open-top boiler for the Instant / FB version is a new and specific design with the feature of being molded from thermoplastic material with specific technical characteristics. (Already used in the KORO and

Brio 3 models - instant and FB)

For further technical information see the functional unit manuals

To access the boiler and the pump see instructions at page. …

1

PRESSURE BOILERS (espresso version)

Solenoid valve assembly

(Three 2-way valves + one 3way valve)

Bipolar safety thermostat

2

SIDE VIEW WITHOUT PROTECTIVE CASING –

INSPECTION SIDE OF PRESSURE BOILER (1)

AND VIBRATION PUMP (2)

PRESSURE BOILER REMOVED FROM THE MACHINE

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 23 / 41

OPEN-TOP BOILERS (Instant & Fresh Brewer models)

SIDE VIEW WITHOUT PROTECTIVE CASING

– OPEN-TOP BOILER COMPARTMENT

T2

A Open-top boiler

T1

OPEN-TOP BOILER – DETAIL OF

SOLENOID VALVES AND

OVERHEATING PROTECTIONS

NOTE: The open-top is made of special thermoplastic material and coated with insulating material for more efficient heat insulation; two overheating protections are fitted for safety.

(practically it is the same boiler used in the KORO instant model).

1) Dry operation protection.

2) Anti-boiling protection.

In the event of failure to the control system and of boiler without water, the thermostat T is triggered at approximately 125°C, disconnecting the power supply. In order to reactivate everything, the fault must be identified and the thermostat must be reset by pressing the central red button.

In the event of failure to the control system and of a full boiler, upon reaching boiling temperature, as the steam exits from tube A it touches and triggers the two thermostats T2 (each thermostat disconnects one phase of the power supply).

Proceed as above to reset them; see specific chapter to identify the type of malfunction.

See relevant section in the functional unit manual for details, photos and complete description: BOILERS

The internal temperature control is by means of an NTC type electronic probe fitted with an internal 12K ohm (+/- 4 ohm) resistance at a temperature of 25° C. The following table shows the changes in internal resistance as the temperature changes.

We can see that the resistance decreases as the NTC temperature increases

The SW, when reading such changes, causes the activation or deactivation of the heating element with a specific cycle to avoid temperature changes that are too high.

Boiler temperature °C

25

Value in ohm

12000

Allowed tolerance

50 2900

85 1475

90 1260

100 963

+/- 4 ohm

,,

,,

,,

,,

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 24 / 41

15 - INSTRUCTIONS FOR REMOVING THE CASINGS

TO ACCESS THE INTERNAL PARTS OF THE MACHINE

In order to remove the rear casing and access the electrical parts, undo the two screws indicated by the arrows and lift vertically and remove, thus releasing the upper fasteners

In order to remove the left side casing and access the internal functional units, undo the two screws located at the front, both upper and lower

Proceed the same way to remove the right side casing

Rear view without protective casing

Slightly lift the casing to slide out the upper fasteners

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 25 / 41

ADDITIONAL INSTRUCTIONS TO ACCESS THE OPEN-TOP BOILER IN THE

INSTANT VERSION

After removing the side casings to have full access to the instant boiler, remove also the lower front casing (Photo at the side).

Undo the two screws on each side

After undoing the two screws for each side, pull outwards and remove it completely.

At this point the boiler is completely accessible for removal from the machine

See photo at the side

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 26 / 41

To the boiler

Recycle

WATER

INLET

16 – PUMPS AND BY-PASS

In order to supply water to the espresso boiler and to the frother module (specific version) a vibration pump used, which is the same used in the entire H&C range of Necta.

The application is specific, as pump, boiler, triac control circuit and connections are located inside the cabinet and access is gained by removing the side casing (see photo).

This solution ensures total full access for maintenance and hygiene.

The pump has overheating protection in case of continuous or dry operation by means of a 90°C self-reset klixon. It is fitted with a by-pass at the outlet to ensure correct and consistent dispensing pressure.

The by-pass is factory pre-set to 12 bar.

The pump is activated by relay K 8.

PUMP COMPARTMENT OF THE FROTHER MODULE

BOILER

PUMP

BOILER AND PUMP COMPARTMENT -

VIEW WITHOUT SIDE CASING

BY-PASS

Klixon

Overheating protection

PUMP REMOVED FROM THE BOILER ASSEMBLY

THE PUMP IS LOCATED IN THE LEFT SIDE

COMPARTMENT

In the event of malfunctions the pump can be replaced with a new one.

To have access to the pump it is necessary to remove the side casing, undoing the two fastening screws on the front side and slide the panel upwards until removing it completely.

The PUMP is located on the left-hand side and is mounted on two rubber anti-vibration elastic supports.

Disconnect the connection cables and remove after undoing the special screws.

NEVER change the setting of the bypass, especially adjusted at the factory, if the malfunction is due to clogging from calcium deposits; replace with the complete check-valve spare part set.

If the malfunction was due to triggering of the klixon, replace it with an identical one.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 27 / 41

17– ESPRESSO & FB UNITS

The espresso version is equipped with the new Z 3000 unit, used in three specific versions (refer to the specific Z 3000 service manual). In any case it is an evolution, with many improvements, of the Z 2000 model, more specifically planned for the following versions:

1)

2)

Standard version, which is equivalent to the old Z 2000 but with a simpler structure.

Variable chamber version, which permits brewing with variable coffee doses (model being examined).

A heating system (optional) has been designed for all versions, for the purpose of increasing the temperature of the first coffee.

A specific brewer unit for filtered coffee, SIGMA BREWER, is used in the FB version.

For further details on the functional units refer to the specific H&C functional unit manuals “BREWER

UNITS”.

The Espresso brewer unit uses coffee that is ground on the spot by the grinder and doser unit, specifically designed for this model and that also uses a particular method of metering the ground coffee dose.

The FB unit uses specific coffee, already ground to an optimum grade for quick and adequate brewing.

DETAIL OF TUBE CONNECTIONS,

ADJUSTMENT OF BREWING CHAMBER AND

WATER INLET FOR COFFEE BREWING

Door open with view of brewer unit

Tube for varying the brewing chamber

Brewing chamber with lower filter

Tube for brewing water

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 28 / 41

18 – SPOUTS ASSEMBLY

Because of the size of the vending machine

FIXED SPOUTS have been designed.

The spouts are mounted onto a tray that is easy to remove for daily cleaning

SPOUTS ASSEMBLY

EXTERNAL VIEW WITH DETAIL OF COFFEE SPOUT

WITH SPLIT OUTLET TO OPTIMISE QUALITY AND TO

PERMIT DISPENSING OF DOUBLE COFFEE

DETAIL OF SUPPORT TRAY BEING REMOVED

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 29 / 41

19 – POWDER PRODUCT CONTAINER AND DOSER

DEVICES ASSEMBLY

According to new market requirements, it was necessary to design new solutions using quick fastening without any screws, to allow easy access for maintenance, as well as quick changes to the layout by means of preassembled modules.

MIXER RATIOMOTOR ASSEMBLY BEING

REMOVED FROM ITS SEAT

DOOR OPEN - VIEW OF COFFEE AND

INSTANT POWDER CANISTERS

DETAIL OF POWDER CANISTER

MIXER RATIOMOTOR ASSEMBLY

VIEWED FROM BELOW

RATIOMOTOR REMOVED FROM ITS SEAT

Standards components are used, already adopted in other applications, but in a new support and with newly designed specific powder containers, comprising also the mixer assembly.

The system is modular and of the same width as a powder container.

It was designed for quick and easy removal as required by the particular type of machine

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 30 / 41

20 – MIXER ASSEMBLY

TRAY UNDER THE MIXER BEING REMOVED

MIXER IN EXTRACTION POSITION:

DETAIL OF RELEASE LEVER

MIXERS WITH EXTERNAL PARTS SUBJECT

TO DAILY HYGIENE BEING REMOVED

PLASTIC COMPONENTS OF DISASSEMBLED MIXER

The mixers are newly designed, although many components are developed from the ones used in previous models.

The power supply is 230 V AC, the rotation velocity is 20,000 RPM, the motors have overheating selfprotection and the axial sealing system is patented, using special “self-positioning” technical material.

More specifically, the release and opening system of the external assembly is new, while the motor and the water tightness system are identical.

The new system permits easier disassembly for daily cleaning.

For further details and technical information refer to the specific “Service Manual” .

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 31 / 41

21 – COFFEE DOSER GRINDER UNIT

SIDE VIEW WITHOUT PROTECTIVE

CASING – COFFEE GRINDER UNIT

POSITION AREA

The coffee grinder is a new design and the ground coffee dose is determined via software setting and by means of a sensor that counts the number of revolutions of the grinding wheels (see view from below).

Therefore, it is very important that the mechanical adjustments to the grade of grinding be checked very frequently.

In order to get a dose of 7 grams of coffee a certain number of revolutions is counted; by increasing or decreasing such value the amount increases or decreases.

It is therefore possible to set selections with different coffee doses.

It is therefore clear that it is very important to keep the adjustment of the grinding wheels constant to obtain accurate coffee doses, especially in the first period of use (1000-2000 selections), because of the greater wear due to the initial settling. the adjustment can be performed also approximately by regularly checking the weight of the ground coffee and its grade of grinding.

The motor winding is fitted with a self-reset overheating protection.

Flat-type grinding wheels are used.

For further information refer to the specific manual.

COFFEE GRINDER - VIEW IN

OPERATING POSITION

COFFEE GRINDER (VIEW FROM BELOW)

SENSOR SIDE

Knob for adjusting the distance between grinding wheels

Ground outlet exit port

E XPLODED VIEW

DISTANCE TO

BE CHECKED

COFFEE GRINDER (PERSPECTIVE VIEW)

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 32 / 41

22 – SELECTION DOSE TABLE

The software is programmed by default with the most suitable settings for the relevant market.

The following table is an example, and are for the Italian market settings, and the correct and updated settings are indicated in the tables supplied with the machine.

Coffee beans

Coffee

Instant

Water c.c.

Powder g

Fresh-brew coffee g

Remarks

NOTE 1

The water flow in the mixers is approximately 10 c.c. per second and it is given as a guideline, as there are many variables that can affect the accuracy.

The liquid dose is determined by the flow-meter pulse counting (volumetric counter).

Both versions (Instant and Espresso) use an electromechanical vibration pump (with the espresso boiler) for the water flow, therefore the liquid dose in both versions is measured in flow-meter pulses (fmp).

NOTE 2

To be noted that the number of pulses does not change in a linear manner (i.e. double the amount of water does not correspond to double the number of pulses), however the counter varies the accuracy according to the water flow velocity, and namely:

For espresso coffee it is reduced considerably because of the coffee compress reaction that slows down the water flow, while it is accelerated in the instant drinks selections, since there are no obstructions to the water flow. Therefore, in the event of changing the doses set at the factory, some measurements must be made using measuring containers.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 33 / 41

23 – ROUTINE AND EXTRAORDINARY

MAINTENANCE SCHEDULE

The vending machine KORINTO was designed to operate for a long time without malfunctions; however in order to ensure excellent reliability periodic maintenance is necessary.

Such maintenance must be performed according to the number of selections made and the time lapsed.

Periodic and correct maintenance ensures reliability, constant quality and also guarantees safety standards over time.

The following table indicates the functional units that must be subjected to periodic maintenance and the frequency of maintenance. For the operations to be carried out, refer to the specific Functional unit

manuals.

Name of unit

DESCRIPTION OF OPERATION

N. of

selections

Max frequency

Espresso

Brewer Unit

Fresh Brewer

Unit

Mixer Assembly

Boiler And

Solenoid Valve

Assembly

Steam

Exhauster Unit

Coffee Grinder

Assembly

1) Check state of filters and wear of silicone O-ring seal

2) Replace upper and lower filters and related seals

3) Descale the internal vent hole and lubricate with specific food-safe grease

1) Check state of filters and wear of silicone O-ring seal; see details in the functional unit manual for FB coffee brewing

2) Open the unit and check the state of wear and internal lubrication and if necessary replace and lubricate

1) Check the water tightness in the axial bush and the correct assembly, if necessary replace.

2) Check the wear of the motor brushes and clean off the excess of carbon powder

If the boilers and the solenoid valves operate with soft water or are fitted with specific softener filters, the should be no need of periodic maintenance; otherwise periodically check the grade of scaling and if necessary proceed to complete descaling.

There is not need of any particular maintenance

For perfect functioning, it is necessary that the powder removal boxes be emptied periodically.

In addition, daily cleaning ensures also maximum hygiene of the machine.

The motor was designed to operate for more than 200000 grinding cycles and the grinding wheels can ensure correct grinding for at least 50000 cycles.

However, these values can vary because of possible impurities in the coffee (pebbles, pieces of hard wood, etc.), therefore it is advisable, except for premature wear, to check and if necessary replace the grinding wheels every 50000 cycles.

Every 200000 cycles check the state of wear of the ratiomotor brushes, if necessary replace and clean off the wear residues.

In addition, every month check the correct positioning of the grinding wheels and if necessary adjust to the correct setting by means of the knurled knob.

5000

8000

30.000

4000

40.000

50.000

According to the water hardness

50000

200000

4000

1 month

6 months annual

1 month annual annual

Every 6 months

Every year month

Extraordinary maintenance is carried out in the event of possible malfunctions.

For the most typical problems the vending machine is fitted with sensors that inform the software about any malfunction. The following tables list the possible malfunctions and possible remedies.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 34 / 41

PROBLEM

(and/or indication on the display)

24 – TROUBLE-SHOOTING

POSSIBLE CAUSE SOLUTION

The machine does not go into the boiler heating phase and the display shows the message

“W ATER FAILURE ”

(espresso versions)

The display indicates the message

“N O COFFEE ”

The display indicates

“W the message

ASTE CONTAINER FULL ”

If the micro-switch of the air-break

(if fitted) float in the instant boiler, or of the float in the water supply tank, is not activate within one minute, the software disables the machine.

If the coffee grinder exceeds the grinding speed for longer than 5 seconds, the espresso coffee selections are disabled. All instant product selections remain available.

When the float in the liquid waste tray triggers the signal micro-switch.

Check the following situations:

Machine with air-break: check that there is water from the mains; if this is the problem, wait for the water from the mains to be resumed. Otherwise, check the operation of the inlet solenoid valve from the mains, check the operation of the air-break microswitch

Machine with instant boiler: in this case it is the boiler to perform the air-break function. Then, repeat the above checks.

Machine with water supply tank:

Check the operation of the magnetic float, and of the water supply pump.

Check the activation of relays K1 and K14

When an espresso coffee selection is made the grinder is activated conveying coffee directly to the brewing chamber of the Z3000 unit, and the amount is determined by the number of revolutions of the grinding wheels by means of a special sensor.

Check the presence of coffee

Check the distance between the grinding wheels

Check the presence of the sensor

Check the functioning of the relay K16

Empty the tray, removing it from the lower section of the cabinet.

Check the operation and correct functioning of float and micro-switch.

The display indicates the message

“A IR BREAK ”

The display indicates the message

“V OLUMETRIC COUNTER ”

The machine locks if after 10 selections the float micro-switch does not change position.

When the counter does not signal any counting within a time-out set by default.

Check the following situations:

Machine with air-break: check that there is water from the mains; if this is the problem, wait for the water from the mains to be resumed. Otherwise, check the operation of the inlet solenoid valve from the mains, check the operation of the air-break microswitch

Machine with instant boiler: in this case it is the boiler to perform the air-break function. Then, repeat the above checks.

Machine with water supply tank:

Check the operation of the magnetic float, and of the water supply pump.

Check the activation of relays K1 and K14

The water amounts necessary for espresso coffee selections are ensured by a volumetric counter that with the water flow causes a wheel to rotate and sends to the software a number of pulses corresponding to the set water dose; if such dose is not reached within

60 seconds it means that there is a problem.

Check that there is water (see above); check that there are no obstructions to the correct flow of water.

Check the correct functioning of the impellers.

There must be 5 VAC on the terminals during the counter operation. Check that coffee was ground correctly and that dose is accurate.

Check that the coffee filters are not clogged.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 35 / 41

The display indicates the message

“B OILER ”

The machine will lock if after the maximum time of heating from the machine start, or from the last selection, there is no signal of correctly reaching the temperature set in the software.

Check that the heating element and the STRC card are functioning correctly.

Check that the overheating control systems were not triggered.

Check the functioning of the probe (ohm control)

Should the overheating protection be triggered before resetting, the cause must be found and eliminated.

Check the connections.

Check that the power supply is correct.

Replace the board.

The display indicates the message

“CAN-BUS BOARD ”

Failed dialogue between CPU board and can-bus board that controls the

SIGMA BREWER unit.

The display indicates the message

“C OIN MECHANISM ”

(only if equipped with a payment system)

The display indicates the message

“G RINDER BLOCKED ”

The display indicates the message

“E SPRESSO UNIT ”

The display indicates the message

“RAM DATA ”

The display indicates the message

“F RESH BREWER PISTON ”

The display indicates the message

“F RESH BREWER BRUSH ”

The machine will lock if it receives an impulse longer than two seconds on a validator line or there is no communication with the serial coin mechanism for more than 30 seconds (executive protocol).

Or 75 seconds (BDV protocol)

If the coffee grinder does not rotate or rotates too slowly for longer than

5 seconds, the espresso coffee based selections are disabled.

If the unit does not reach the initial standby position after making a selection (checked by a position micro-switch) the espresso based selections are disabled.

Check that connection is correct and the software setting is correct for the protocol.

If necessary replace the payment system.

The grinder rotation is controlled by a sensor; if no rotation is detected within 5 seconds, check:

That there are no blockages in the grinding wheels.

That the overheating control systems on the winding were not triggered.

That the sensor works correctly.

Check the activation of relay K16

The standby position is checked by a position microswitch, and every time the machine is started the unit is checked.

If the change in the “on” condition is not read, check that: the motor is started, the position micro-switch works correctly, the brewing chamber is not clogged with too much coffee.

Check the activation of relay K7.

Enter into the installation procedure and initialise the software; if the failure persists replace the CPU board.

One or more areas of the RAM memory contain altered or noncompatible data, which is corrected by the software with default setting data; therefore the machine continues to operate with the initial data, but initialise will be required.

The default position is determined by the micro-switches, and the position is factory preset; if for any reasons they are not triggered, FRESH-BREW coffee selections are disabled.

The standby position is checked by a position microswitch, and every time the machine is started the unit is checked. check that: the motor is started, the position micro-switch works correctly, the brewing chamber is not clogged with too much coffee. the filter is not clogged.

Check the connection with the FB board

The default position is determined by the micro-switches, and the position is factory preset; if for any reasons they are not triggered, FRESH-BREW coffee selections are disabled.

The standby position is checked by a position microswitch, and every time the machine is started the unit is checked. check that: the brush is new and the motor is activated.

That there are not any mechanical blockages.

Check the connection with the FB board

For espresso only:

Coffee is dispensed too slowly and it tastes

burnt.

Excessive coffee dose or ground too finely.

The dose is calculated using an algorithm that counts the number revolutions of the grinder, and the doses are dispensed correctly if the grinder is adjusted with the correct grade of grinding.

Check that the distance between the grinding wheels is the factory default one.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 36 / 41

For espresso only:

The coffee lacks body and is dispensed too quickly .

The mixers clog up

Coffee dose too small, or ground too coarsely.

Failed rotation of the mixer.

Excessive instant product dose.

Steam exhaust box clogged.

Water to powder ratio not correct.

The dose is calculated using an algorithm that counts the number revolutions of the grinder, and the doses are dispensed correctly if the grinder is adjusted with the correct grade of grinding.

The dispensing time must remain constant.

Check that the distance between the grinding wheels is the factory default one; with use the grinding wheels are subject to wear and it will be necessary to reset the correct measurement periodically.

Check for the motor overheat protection trigger, if necessary check the cause of such trigger.

Empty the powder removal box, adjust and check the correct water to powder ratio.

Check the logic of the cycles.

Check the activation of relay K3.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 37 / 41

25 – HACCP DIRECTIVE

HACCP DIRECTIVE (EEC 93/43 and 96/3)

Outline and instructions for use

Notes: What is it and what is indicated by the European Directive

Directives EEC 93/43 and 96/3 regard the hygiene of food products and are based on the HACCP

(Hazard Analysis Critical Control Point).

The purpose of this directive is to safeguard the consumer health, suggesting a series of actions to be taken by the vending company, aimed at checking, identifying and correcting any critical aspects in the foodstuff chain, from the purchase of products and machines to the dispensing of the product.

The HACCP is therefore a system that addresses the analysis of any potential risks in the manufacturing and distribution cycle of food product and the identification of critical points where such risks can occur; the system also highlights the actions to be undertaken and the decisions to be made with regard to such critical points, as well as the implementation of checking and monitoring procedures.

Therefore, each vending company must develop a Company Hygiene Self-control Manual according to the provisions of the directive - and if necessary use the information and recommendations formulated by some associations in the sector. The manual must contain a programming and checking schedule for the vending machine hygiene condition

Important notes:

For a correct use of the machine, the directives must be fully applied. The operator is responsible for

correct operations on a vending machine

HACCP Directives (EEC 93/43 and 96/3)

Guidelines for correct application

-

Ensure hygiene control with a special manual for correct hygiene practices.

-

After cleaning, do not touch the surface of any elements that may come into contact with food.

-

Wash your hands thoroughly, preferably using disinfectant, before starting any hygiene operations

-

Use disposable sterile gloves

-

Always use a clean cloth to wipe dry.

-

Keep the work area tidy.

-

Check that the product packages are intact and not damaged.

-

Keep coffee and powder products in a cool, dark and dry place.

-

Use products within the recommended time period (see expiry date on the package).

-

Always use products from the warehouse according to the principle of “first-in first-out”.

-

Tightly close and seal any product packages not completely used.

-

Coffee and consumables must be kept and transported separate from the cleaning products.

-

The product containers must be cleaned regularly (see operation instructions).

-

Only fill coffee or other product containers with sufficient amount for the expected use until the next cleaning.

Cleaning the machine (Pages 39, 40 & 41)

-

Carefully observe the following cleaning instructions!

-

Clean the machine, preferably at the end of the day or in the morning before the machine is used.

-

After cleaning, dispense and check a drink (see last check).

-

Fill in the check list log for cleaning operations.

-

When the display indicates an error message immediately check the trouble-shooting sheet.

-

Use only recommended cleaning products approved for foodstuff, preferably liquid; avoid the use of powder and abrasive products.

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 38 / 41

26 – DAILY CLEANING AND HYGIENE SCHEDULE

DAILY CLEANING AND HYGIENE “ESPRESSO VERSION”

( Expected time 6’ )

Fig. 1

Fig. 3

Fig. 5

Fig. 6

Open the door. Remove the dispensing compartment and the tray, slide out the coffee grounds container. Clean and rinse the components thoroughly under current water.

FIG. 1 Instant version

FIG. 2-3 Espresso version

Remove the coffee grounds container, empty it and rinse it thoroughly. (FIG. 2)

Remove the drip tray located under the mixer, rinse it and eliminate any residue. (FIG. 4)

Slide out the external mixer assembly and disassemble it (FIG. 5 – 6), clean and rinse out thoroughly all residue.

Remove the brewer unit, clean and rinse with hot water (FIG. 7 – 8).

Reassemble all parts, taking care not to touch with your hands any parts that come into contact with food.

Carry out a mixer automatic wash cycle according to the pre-set procedures.

Close the door and make some test selections.

For the disassembly instructions, see specific service manuals or specific chapters.

NB: in order to speed up the operations, it is advisable to replace with components that were already cleaned and sanitised at the workshop, and take to the workshop the dirty components for cleaning and sanitising. The cleaning and hygiene operations must be carried out the evening, after the machine use, or the next morning before starting to use the machine.

Fig.8

Fig. 2

Fig. 4

Fig. 7

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 39 / 41

27 – WEEKLY CLEANING AND HYGIENE SCHEDULE

WEEKLY CLEANING AND HYGIENE

( Expected time 6 ’ )

Fig. 1

Fig. 3

Fig. 6

Fig. 7

Open the door. Remove the dispensing compartment and the tray, slide out the coffee grounds container. Clean and rinse the components thoroughly under current water.

FIG. 1 Instant version

FIG. 2-3 Espresso version

Remove the coffee grounds container, empty it and rinse it thoroughly

Remove the powder and coffee bean containers, empty and clean them removing all encrustations

(FIG. 2 - 3 )

Remove the brewer unit, clean thoroughly and rinse with hot water. (FIG. 4-5)

Remove the liquid collection container, empty it, rinse it and clean thoroughly. (FIG. 6)

Remove the spouts holder unit, clean and rinse thoroughly. (FIG. 7)

Remove the mixer assembly, clean and rinse thoroughly. (FIG. 8)

Reassemble all parts, taking care not to touch any parts that come into contact with food.

Make some test selections.

Fig. 8

Fig. 2

Fig. 4

Fig. 5

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 40 / 41

28 – MONTHLY CLEANING AND HYGIENE SCHEDULE

MONTHLY CLEANING AND HYGIENE (or every 5000 selections)

Expected time 18’

FIG. 1

FIG. 3

FIG. 4

FIG. 7

ONCE A MONTH, OR EVERY 5000 SELECTIONS,

THE FOLLOWING SCHEDULED MAINTENANCE

OPERATIONS MUST BE CARRIED OUT; AS

USUAL IT IS ADVISABLE TO CARRY OUT SUCH

OPERATIONS AT THE WORKSHOP, AND ON

SITE SIMPLY REPLACE THE UNITS WITH THE

ONES WHICH WERE ALREADY SUBJECTED TO

SCHEDULED MAINTENANCE.

Remove the “Z3000” unit from the vending machine (FIG. 1); disassemble the unit completely, remove the upper piston and the lower brewing chamber (FIG. 3 – FIG. 4); carry out the maintenance operations indicated in the specific manual, and more specifically, clean or replace the filters and lubricate the seals.

Remove the side casing to access the air-break unit (FIG. 2), empty it and rinse it with specific hygiene products, at the same time rinse the entire hydraulic circuit.

Remove the powder containers, empty and clean them thoroughly in the inside, especially the ports and the auger (FIG. 5-6)

Remove the grinder and doser assembly, empty any coffee residue, check the state of the grinding wheels, check the efficiency of the sensor that detects the number of revolutions

(FIG. 7-8)

Reset the correct distance between the grinding wheels (see specific manual).

Reassemble all parts, taking care not to touch any parts that come into contact with food.

Make some test selections.

FIG. 2

FIG. 5

FIG. 6

FIG. 8

N & W Global Vending TECHNICAL MANUAL

This document was produced by MARK AC for the exclusive use of the technical personnel in the after-sales service.

All rights reserved. No part of this document may be divulged to a third party or reproduced partially or entirely without the prior permission of N & W GLOBAL VENDING.

“KORINTO ES” 09/05/06 Page 41 / 41

advertisement

Key Features

  • Pressure boiler for espresso
  • Grinding unit for fresh coffee beans
  • Frother unit for cappuccino
  • Digital display
  • Easy-to-clean parts
  • Adjustable coffee doses

Frequently Answers and Questions

What types of coffee drinks can I make with the Korinto ES?
The Korinto ES can make a variety of coffee drinks, including espresso, cappuccino, latte, and macchiato. It can also make hot water for tea.
How do I clean the Korinto ES?
The Korinto ES is easy to clean. There are instructions in the manual on how to clean the grinder unit, boiler, frother unit, and other parts.
How do I adjust the coffee doses?
You can adjust the coffee doses by using the digital display.
How do I maintain the Korinto ES?
You should maintain the Korinto ES regularly to ensure it continues to function properly. The manual has instructions on how to perform routine maintenance tasks.

Related manuals

Download PDF

advertisement