Installation Instructions - UNIGUARD

Installation Instructions - UNIGUARD
10
Fitting of venturi pipe in ducts with different diameter.
12
Installation Instructions - UNIGUARD
UG-Bracket for circular or insulated rectangular ducts.
Using the UG-Bracket the diameter of the duct can be as small as 100 mm.
Drill a hole
Ø 35 mm.
Drill a hole
Ø 35 mm.
Diameter of the duct bigger
than 0,6 m.
The venturi pipe should
penetrate the whole duct.
Max diameter of the duct 0,6 m.
Use the venturi pipe 0,6 m.
Shorten the pipe, if necessary.
Mounting and Positioning.
Fix
the bracket
on to
the duct.
The Uniguard should be installed with the arrow on the
cover corresponding to the direction of airflow in the duct.
The Uniguard can be placed horizontally or vertically,
on the top, side or bottom of the duct.
Drill a hole
Ø 50 mm.
The UG-bracket can easily be bent or shaped
to fit a circular or rectangular duct.
Shorten the pipe to correct length.
We recommend that the Uniguard is mounted at an equal
distance from heating, cooling, or humidy devices, and
similar to the siting for flow monitors.
A distance of 3 times the duct diameter should be left before
a damper, filter or change of the duct direction, and 5 times the
diameter after these devices.
dh
Insert the end plug.
Put on the end plastic
gasket.
The UG-Bracket is supplied flat.
Example of location after
change of duct direction.
Example of location
after air inlet.
Air inlet.
Put on the rubber
gasket, TET 26-35.
For ducts with a ø of less than 0,6 m use the 0,6 m tube.
For ducts with a ø of between 0,6 m and 1,4 m use the 1,5 m tube.
NOTE!
For ducts which are larger than 1,4 m use the 2,8 m tube.
Drill a hole
Ø 50 mm.
Circular duct.
Location in places where condensation
problems could arise due to temperature
differences e.g. cold attics or outdoor.
Rubber
gasket.
Rubber
gasket.
Insulated
rectangular
duct.
5 dh
Hydralic diameter
The venturi pipe shall not
protude more than 30 mm
through the duct wall.
CIRCULAR DUCT
HIDDEN
Sign
smoke detector
Remote LED
indication
RECTANGULAR DUCT
dh = D
FINAL CHECKS
11
Outdoor positioning.
Where large temperature variations occur,
e.g. on outdoor locations or in areas subject
to external temperatures (roof, attics),
the Uniguard should be insulated, see para 11.
5 dh
dh =
2xHxB
H+B H
ØD
B
• The arrow of the cover must have the same direction as the airflow in the duct.
• Check that the rubber gasket between the cover and bottom of the Uniguard is air-tight.
Example of location
• Check that the plastic plug of the test hole is air-tight.
• Check that the flow indicator oscillates ensuring proper air flow through the detector.
MIN 3xdh
• It is recommended that smoke from a smoke generator is introduced into the duct to
check the function of detector.
• Check that the end resistor is mounted in the last smoke
detector.
• Check that the resistance is 2,2 kOhm.
• Check that there are no bad connections or short circuits
in the loop.
• Check that the control unit is OK by placing the 2,2 kOhm
resistor directly on the control unit.
• Check with a voltmeter, that 24VDC is present in the
detector base. Note! The voltage must have the correct
polarity.
GX
MIN 5xdh
6
MIN 5xdh
MIN 5xdh
GX
GX
SILENCER
BATTERY
MIN 3xdh
GX
• Smoke detector is contaminated with dirt or condensation.
• Smoke detector is faulty.
MIN 3xdh
GX
GX
DAMPER
GX
Smoke detector and control unit indicates alarm
without smoke and cannot be reset.
MIN 3xd h
Only control unit indicates alarm.
MIN 3xdh
MIN 5xdh
GX
FAN
For outdoor location use protection
cover e.g. Calectro´s UG-SH (IP-65).
Trouble shooting.
5
MIN 3xdh
GX
MIN 3xd h
Drill a hole
Ø 35 mm.
Use insulation cover of 100-200 mm
and protect the entire Uniguard.
LED indication and sign must be used
to show location of smoke detector.
GX
MIN 3xdh
MIN 5xdh
GX
MIN 5xdh
GX
GX
GX
GX
GX
Inform Trycket AB 2003.01
Drill a hole
Ø 35 mm.
MIN 5xdh
GX
CHANGE OF DUCT
DIRECTION
MIN 5xdh
MIN 3xdh
DUCT NARROWING OR
DUCT EXPANSION
DUCT BRANCHING
RETURN AIR
INLET AIR
AIR "CONTROL" EQUIPMENT
Box 4113, 426 04 Västra Frölunda. Telefon: 031-69 53 00. Fax: 031-29 32 91.
Telefon säljavd: 031-69 53 01. Fax säljavd: 031-69 86 45.
[email protected][email protected] • www.calectro.com
5
Drill a hole in the duct: • Without bracket - diameter 35 mm.
1
• With bracket - diameter 50 mm, (see para 12).
8
Mount the booster fan, if necessary.
Test of detector.
5b
Flow indicator.
2
NOTE!
The indicator oscillates
but does not rotate.
If the indicator does
not move, you should
check your positioning
of the Uniguard.
Do not shorten this end.
Booster fan.
Direction of the airflow.
(The arrow of the fan
shall point down at the
venturi pipe.)
End plugg.
Check the detector with smoke
from a match or approved testgas like Calectro´s RDP-300.
• Measure the diameter of the duct.
• Shorten the pipe, if necessary. The pipe should
penetrate approx 90% of the width of the duct.
NOTE! See para 10.
• Insert the end plug.
6
6b
9
Secure the cover.
Mount the block.
3
• Secure the pipe
with the locking screw.
Quick connection of the booster fan.
• Mount the gasket on the pipe.
• Put the pipe into the buttom of the Uniguard.
NOTE - IMPORTANT!
The arrow on the Uniguard cover
must have the same direction
as the airflow in the duct.
Fitting of cover.
7
Electrical installation.
Do not drill any holes in the cover for signs etc.
Holes will cause air leakages and seriously
disturb the function of the detector.
4
Connect the cables according to
the wiring diagram.
When using Calectro´s control units.
• Mount the Uniguard with its pipe on the duct.
• Secure the bottom of the Uniguard with the 3 locking screws.
(Positions marked.)
2
If only one smoke detector is connected to the control unit,
this detector should be provided with a resistor (2,2kΩ).
When several smoke detectors are connected to one control
unit, the end-of-line resistor (2,2kΩ) should be connected in
the last smoke detector. Only one resistor per loop.
3
4
5
Drill a hole in the duct: • Without bracket - diameter 35 mm.
1
• With bracket - diameter 50 mm, (see para 12).
8
Mount the booster fan, if necessary.
Test of detector.
5b
Flow indicator.
2
NOTE!
The indicator oscillates
but does not rotate.
If the indicator does
not move, you should
check your positioning
of the Uniguard.
Do not shorten this end.
Booster fan.
Direction of the airflow.
(The arrow of the fan
shall point down at the
venturi pipe.)
End plugg.
Check the detector with smoke
from a match or approved testgas like Calectro´s RDP-300.
• Measure the diameter of the duct.
• Shorten the pipe, if necessary. The pipe should
penetrate approx 90% of the width of the duct.
NOTE! See para 10.
• Insert the end plug.
6
6b
9
Secure the cover.
Mount the block.
3
• Secure the pipe
with the locking screw.
Quick connection of the booster fan.
• Mount the gasket on the pipe.
• Put the pipe into the buttom of the Uniguard.
NOTE - IMPORTANT!
The arrow on the Uniguard cover
must have the same direction
as the airflow in the duct.
Fitting of cover.
7
Electrical installation.
Do not drill any holes in the cover for signs etc.
Holes will cause air leakages and seriously
disturb the function of the detector.
4
Connect the cables according to
the wiring diagram.
When using Calectro´s control units.
• Mount the Uniguard with its pipe on the duct.
• Secure the bottom of the Uniguard with the 3 locking screws.
(Positions marked.)
2
If only one smoke detector is connected to the control unit,
this detector should be provided with a resistor (2,2kΩ).
When several smoke detectors are connected to one control
unit, the end-of-line resistor (2,2kΩ) should be connected in
the last smoke detector. Only one resistor per loop.
3
4
5
Drill a hole in the duct: • Without bracket - diameter 35 mm.
1
• With bracket - diameter 50 mm, (see para 12).
8
Mount the booster fan, if necessary.
Test of detector.
5b
Flow indicator.
2
NOTE!
The indicator oscillates
but does not rotate.
If the indicator does
not move, you should
check your positioning
of the Uniguard.
Do not shorten this end.
Booster fan.
Direction of the airflow.
(The arrow of the fan
shall point down at the
venturi pipe.)
End plugg.
Check the detector with smoke
from a match or approved testgas like Calectro´s RDP-300.
• Measure the diameter of the duct.
• Shorten the pipe, if necessary. The pipe should
penetrate approx 90% of the width of the duct.
NOTE! See para 10.
• Insert the end plug.
6
6b
9
Secure the cover.
Mount the block.
3
• Secure the pipe
with the locking screw.
Quick connection of the booster fan.
• Mount the gasket on the pipe.
• Put the pipe into the buttom of the Uniguard.
NOTE - IMPORTANT!
The arrow on the Uniguard cover
must have the same direction
as the airflow in the duct.
Fitting of cover.
7
Electrical installation.
Do not drill any holes in the cover for signs etc.
Holes will cause air leakages and seriously
disturb the function of the detector.
4
Connect the cables according to
the wiring diagram.
When using Calectro´s control units.
• Mount the Uniguard with its pipe on the duct.
• Secure the bottom of the Uniguard with the 3 locking screws.
(Positions marked.)
2
If only one smoke detector is connected to the control unit,
this detector should be provided with a resistor (2,2kΩ).
When several smoke detectors are connected to one control
unit, the end-of-line resistor (2,2kΩ) should be connected in
the last smoke detector. Only one resistor per loop.
3
4
10
Fitting of venturi pipe in ducts with different diameter.
12
Installation Instructions - UNIGUARD
UG-Bracket for circular or insulated rectangular ducts.
Using the UG-Bracket the diameter of the duct can be as small as 100 mm.
Drill a hole
Ø 35 mm.
Drill a hole
Ø 35 mm.
Diameter of the duct bigger
than 0,6 m.
The venturi pipe should
penetrate the whole duct.
Max diameter of the duct 0,6 m.
Use the venturi pipe 0,6 m.
Shorten the pipe, if necessary.
Mounting and Positioning.
Fix
the bracket
on to
the duct.
The Uniguard should be installed with the arrow on the
cover corresponding to the direction of airflow in the duct.
The Uniguard can be placed horizontally or vertically,
on the top, side or bottom of the duct.
Drill a hole
Ø 50 mm.
The UG-bracket can easily be bent or shaped
to fit a circular or rectangular duct.
Shorten the pipe to correct length.
We recommend that the Uniguard is mounted at an equal
distance from heating, cooling, or humidy devices, and
similar to the siting for flow monitors.
A distance of 3 times the duct diameter should be left before
a damper, filter or change of the duct direction, and 5 times the
diameter after these devices.
dh
Insert the end plug.
Put on the end plastic
gasket.
The UG-Bracket is supplied flat.
Example of location after
change of duct direction.
Example of location
after air inlet.
Air inlet.
Put on the rubber
gasket, TET 26-35.
For ducts with a ø of less than 0,6 m use the 0,6 m tube.
For ducts with a ø of between 0,6 m and 1,4 m use the 1,5 m tube.
NOTE!
For ducts which are larger than 1,4 m use the 2,8 m tube.
Drill a hole
Ø 50 mm.
Circular duct.
Location in places where condensation
problems could arise due to temperature
differences e.g. cold attics or outdoor.
Rubber
gasket.
Rubber
gasket.
Insulated
rectangular
duct.
5 dh
Hydralic diameter
The venturi pipe shall not
protude more than 30 mm
through the duct wall.
CIRCULAR DUCT
HIDDEN
Sign
smoke detector
Remote LED
indication
RECTANGULAR DUCT
dh = D
FINAL CHECKS
11
Outdoor positioning.
Where large temperature variations occur,
e.g. on outdoor locations or in areas subject
to external temperatures (roof, attics),
the Uniguard should be insulated, see para 11.
5 dh
dh =
2xHxB
H+B H
ØD
B
• The arrow of the cover must have the same direction as the airflow in the duct.
• Check that the rubber gasket between the cover and bottom of the Uniguard is air-tight.
Example of location
• Check that the plastic plug of the test hole is air-tight.
• Check that the flow indicator oscillates ensuring proper air flow through the detector.
MIN 3xdh
• It is recommended that smoke from a smoke generator is introduced into the duct to
check the function of detector.
• Check that the end resistor is mounted in the last smoke
detector.
• Check that the resistance is 2,2 kOhm.
• Check that there are no bad connections or short circuits
in the loop.
• Check that the control unit is OK by placing the 2,2 kOhm
resistor directly on the control unit.
• Check with a voltmeter, that 24VDC is present in the
detector base. Note! The voltage must have the correct
polarity.
GX
MIN 5xdh
6
MIN 5xdh
MIN 5xdh
GX
GX
SILENCER
BATTERY
MIN 3xdh
GX
• Smoke detector is contaminated with dirt or condensation.
• Smoke detector is faulty.
MIN 3xdh
GX
GX
DAMPER
GX
Smoke detector and control unit indicates alarm
without smoke and cannot be reset.
MIN 3xd h
Only control unit indicates alarm.
MIN 3xdh
MIN 5xdh
GX
FAN
For outdoor location use protection
cover e.g. Calectro´s UG-SH (IP-65).
Trouble shooting.
5
MIN 3xdh
GX
MIN 3xd h
Drill a hole
Ø 35 mm.
Use insulation cover of 100-200 mm
and protect the entire Uniguard.
LED indication and sign must be used
to show location of smoke detector.
GX
MIN 3xdh
MIN 5xdh
GX
MIN 5xdh
GX
GX
GX
GX
GX
Inform Trycket AB 2003.01
Drill a hole
Ø 35 mm.
MIN 5xdh
GX
CHANGE OF DUCT
DIRECTION
MIN 5xdh
MIN 3xdh
DUCT NARROWING OR
DUCT EXPANSION
DUCT BRANCHING
RETURN AIR
INLET AIR
AIR "CONTROL" EQUIPMENT
Box 4113, 426 04 Västra Frölunda. Telefon: 031-69 53 00. Fax: 031-29 32 91.
Telefon säljavd: 031-69 53 01. Fax säljavd: 031-69 86 45.
[email protected][email protected] • www.calectro.com
10
Fitting of venturi pipe in ducts with different diameter.
12
Installation Instructions - UNIGUARD
UG-Bracket for circular or insulated rectangular ducts.
Using the UG-Bracket the diameter of the duct can be as small as 100 mm.
Drill a hole
Ø 35 mm.
Drill a hole
Ø 35 mm.
Diameter of the duct bigger
than 0,6 m.
The venturi pipe should
penetrate the whole duct.
Max diameter of the duct 0,6 m.
Use the venturi pipe 0,6 m.
Shorten the pipe, if necessary.
Mounting and Positioning.
Fix
the bracket
on to
the duct.
The Uniguard should be installed with the arrow on the
cover corresponding to the direction of airflow in the duct.
The Uniguard can be placed horizontally or vertically,
on the top, side or bottom of the duct.
Drill a hole
Ø 50 mm.
The UG-bracket can easily be bent or shaped
to fit a circular or rectangular duct.
Shorten the pipe to correct length.
We recommend that the Uniguard is mounted at an equal
distance from heating, cooling, or humidy devices, and
similar to the siting for flow monitors.
A distance of 3 times the duct diameter should be left before
a damper, filter or change of the duct direction, and 5 times the
diameter after these devices.
dh
Insert the end plug.
Put on the end plastic
gasket.
The UG-Bracket is supplied flat.
Example of location after
change of duct direction.
Example of location
after air inlet.
Air inlet.
Put on the rubber
gasket, TET 26-35.
For ducts with a ø of less than 0,6 m use the 0,6 m tube.
For ducts with a ø of between 0,6 m and 1,4 m use the 1,5 m tube.
NOTE!
For ducts which are larger than 1,4 m use the 2,8 m tube.
Drill a hole
Ø 50 mm.
Circular duct.
Location in places where condensation
problems could arise due to temperature
differences e.g. cold attics or outdoor.
Rubber
gasket.
Rubber
gasket.
Insulated
rectangular
duct.
5 dh
Hydralic diameter
The venturi pipe shall not
protude more than 30 mm
through the duct wall.
CIRCULAR DUCT
HIDDEN
Sign
smoke detector
Remote LED
indication
RECTANGULAR DUCT
dh = D
FINAL CHECKS
11
Outdoor positioning.
Where large temperature variations occur,
e.g. on outdoor locations or in areas subject
to external temperatures (roof, attics),
the Uniguard should be insulated, see para 11.
5 dh
dh =
2xHxB
H+B H
ØD
B
• The arrow of the cover must have the same direction as the airflow in the duct.
• Check that the rubber gasket between the cover and bottom of the Uniguard is air-tight.
Example of location
• Check that the plastic plug of the test hole is air-tight.
• Check that the flow indicator oscillates ensuring proper air flow through the detector.
MIN 3xdh
• It is recommended that smoke from a smoke generator is introduced into the duct to
check the function of detector.
• Check that the end resistor is mounted in the last smoke
detector.
• Check that the resistance is 2,2 kOhm.
• Check that there are no bad connections or short circuits
in the loop.
• Check that the control unit is OK by placing the 2,2 kOhm
resistor directly on the control unit.
• Check with a voltmeter, that 24VDC is present in the
detector base. Note! The voltage must have the correct
polarity.
GX
MIN 5xdh
6
MIN 5xdh
MIN 5xdh
GX
GX
SILENCER
BATTERY
MIN 3xdh
GX
• Smoke detector is contaminated with dirt or condensation.
• Smoke detector is faulty.
MIN 3xdh
GX
GX
DAMPER
GX
Smoke detector and control unit indicates alarm
without smoke and cannot be reset.
MIN 3xd h
Only control unit indicates alarm.
MIN 3xdh
MIN 5xdh
GX
FAN
For outdoor location use protection
cover e.g. Calectro´s UG-SH (IP-65).
Trouble shooting.
5
MIN 3xdh
GX
MIN 3xd h
Drill a hole
Ø 35 mm.
Use insulation cover of 100-200 mm
and protect the entire Uniguard.
LED indication and sign must be used
to show location of smoke detector.
GX
MIN 3xdh
MIN 5xdh
GX
MIN 5xdh
GX
GX
GX
GX
GX
Inform Trycket AB 2003.01
Drill a hole
Ø 35 mm.
MIN 5xdh
GX
CHANGE OF DUCT
DIRECTION
MIN 5xdh
MIN 3xdh
DUCT NARROWING OR
DUCT EXPANSION
DUCT BRANCHING
RETURN AIR
INLET AIR
AIR "CONTROL" EQUIPMENT
Box 4113, 426 04 Västra Frölunda. Telefon: 031-69 53 00. Fax: 031-29 32 91.
Telefon säljavd: 031-69 53 01. Fax säljavd: 031-69 86 45.
[email protected][email protected] • www.calectro.com
INSTALLATION INSTRUCTIONS FOR UNIGUARD DUCT SMOKE DETECTORS
Wiring diagram
Conventional smoke detectors with external control unit:
CONTROL UNIT
ABV-3
2
24V AC/DC 10
CONTROL UNIT
ABAV-S
6
7
24V AC/DC
alt.
230V AC
ALARM
24V AC/DC
alt.
230V AC
10
9
2
7
5
1
ALARM
CONTROL UNIT
ABAV-S3
4
3
11
8
ALARM
ALARM
1
3
4
5
ALARM
24V AC/DC
1
2
ALARM
11
8
12
13
SERVICE
14
The alarm relay and the failure
relay outputs are shown in
alarm/no power on condition.
The service alarm relay is shown in
operative/no power on condition.
DUCT SMOKE DETECTORS, UG-2-NS-AIS/AOS
SD1
Terminals
in the Uniguard
SDn
Terminals
in the Uniguard
The alarm relay and the service
relay outputs are shown in
operative/no power on condition.
The failure relay is shown in
alarm/no power on condition.
8
9
24VAC
separate
supply for
booster fan
10
11
ALARM 2 12
13
14
FAULT 15
16
17
SERVICE 18
19
LonWorks:
24VAC
separate
supply for
booster fan
FAULT
3
4
5
ALARM 1
SDn
Terminals
in the Uniguard
2,2 kohm
1
3
4
5
Analogue/addressable smoke detectors:
CONTROL UNIT
KE-1000
SD1
Terminals
in the Uniguard
10
9
2
SERVICE 15
ALARM
16
9
6
7
DUCT SMOKE DETECTORS, UG-2-J/O
Relay outputs:
ABV
ABAV-S
ABAV-S3
KE-1000
Alarm
Alarm
Service
Alarm
Service
Fault
Alarm
Service
Fault
230V 10A
250V 8A
250V 8A
250V 8A
250V 5A
250V 5A
250V 8A
250V 8A
250V 8A
DUCT SMOKE DETECTOR, UG-2-J-LON
,
SD1
Terminals
in the Uniguard
SDn
Terminals
in the Uniguard
2004.10
Inform Trycket Gbg 2004
24VAC
separate
supply for
booster fan
☎ 031-80 50 95
LPT-10
Svalörtsgatan 16 • Box 4113 • SE-426 04 Västra Frölunda, Sweden
Phone: +46 (0)31-69 53 00/01 • Fax: +46 (0)31-29 32 91/69 86 45
[email protected][email protected] • www.calectro.com
INSTALLATION INSTRUCTIONS FOR UNIGUARD DUCT SMOKE DETECTORS
Wiring diagram
Stand Alone with built in control unit:
DUCT SMOKE DETECTOR, UG-2-A2
Alarm relay: ONE changing contact, max 250V, 2A.
NO
Alarm
Output
C
NC
The alarm relay output is shown in alarm/no power
on condition.
Note!
Changing between 24 VAC and 24 VDC is made by a jumper.
= 24 VDC
Supply 24 VADC 100mA (±20%)
= 24 VAC
The jumper is factory set to 24 VAC.
DUCT SMOKE DETECTOR, UG-2-A3
Alarm relay: ONE changing contact, max 250V, 2A.
NO
Alarm
Output
C
The alarm relay output is shown in alarm/no power on
condition.
NC
Supply 230 VAC 100mA (±20%)
DUCT SMOKE DETECTOR, UG-2-A4
NO
Service
Alarm
Output
C
NC
NO
Alarm
Output
Alarm and service alarm relays:
ONE changing contact, max 250V, 2A, each.
The alarm relay and the service relay outputs are shown
in alarm/no power on condition.
Note!
Changing between 24 VAC and 24 VDC
is made by a jumper.
C
= 24 VDC
NC
= 24 VAC
The jumper is factory set to 24 VAC.
Supply 24 VADC 100mA (±20%)
Svalörtsgatan 16 • Box 4113 • SE-426 04 Västra Frölunda, Sweden
Phone: +46 (0)31-69 53 00/01 • Fax: +46 (0)31-29 32 91/69 86 45
[email protected][email protected] • www.calectro.com
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF