Mitsubishi Electric MXZ-4D 83VA, MXZ-5D 102VA split-type air conditioner Installation Manual

Below you will find brief information for split-type air conditioner MXZ-4D83VA, split-type air conditioner MXZ-5D102VA. This manual describes the installation of the outdoor unit for the MXZ-4D83VA and MXZ-5D102VA split-type air conditioners. The installation consists of connecting wires and refrigerant pipes to the unit.

PDF
Document
Mitsubishi Electric MXZ-4D83VA, MXZ-5D102VA Installation Manual | Manualzz

Advertisement

Advertisement

Advertisement

Key features

  • Outdoor unit installation
  • Refrigerant pipe connection
  • Purging procedures
  • Leak test
  • Test run
  • Relocation and Maintenance
  • Pumping down

Frequently asked questions

The maximum pipe length for the outdoor unit is 25 meters.

Purging procedures involve removing air from the refrigerant system to prevent contamination and ensure proper operation.

Pumping down the refrigerant involves evacuating the refrigerant from the system to prepare for relocation or disposal.
Preparing document for printing…
0%