advertisement
▼
Scroll to page 2
of 16
www.jbctools.com Nano Rework station Ref. NASE-B Packing List The following items should be included: Control Unit ................... 1 unit Ref. NAE-1B (120V) NAE-2B (230V) NAE-9B (100V) Nano Handle ................. 1 unit Ref. NT105-A Steady Nano Tweezers ........................ 1 unit Ref. NP105-B Cartridge dispenser Case ............ 1 unit Ref. 0011568 Allen key ........................ 1 unit Ref. 009848 Tool Holder .................. 2 units Ref. 0016606 Cartridges included Ref. C105-101 x1 C105-103 x1 C105-105 x2 C105-107 x1 C105-112 x1 C105-113 x2 Metal Brush ..... 1 unit Ref. CL2466 Brass Wool ....... 1 unit Ref. CL6210 Power Cable ..... 1 unit Ref. 0009417 (100/120V) 0009401 (230V) Manual .............. 1 unit Ref. 0016767 w w w.jbctools.com Nano Rework station Ref. NASE-B 2 w w w.jbctools.com Features Cable collector Accessories not included: Stand: Intelligent Heat Management Tool extension cord (1m) Ref. A1205 Cartridge extractor and tip aligner Process Screen: 2.8 Color TFT Pedal Ref. P-005 Brass wool Metal brush Puts the tool into hibernation mode Steady Nano Tweezers Ref. NP105-B USB-B connector USB-A connector Nano Handle Ref. NT105-A Main switch RJ12 connector for Robot Power socket Equipotential connector Pedal connectors 3 Tool Holder assembly Cable assembly 1 2 For Nano Tweezers For Nano Soldering Iron Changing the tip cleaning system Replace the tip cleaning system: - Brass wool - Inox wool - Metal brush 4 w w w.jbctools.com Changing grips 1. Push the grip with the tabs onto the handle. 2. To remove the tabs, hold the grip and pull them out. Use a pliers if necessary. Grip for NT105-A Nano handle Changing cartridges Save time and change cartridges safely without having to switch the station off. Removing Inserting Aligning Push the cartridge into the handle to the mark*. Use the holes to rotate the cartridges for a proper alignment. 1 2 Place the cartridge in the slot as shown and pull the handle to remove it. *Important It is essential to insert the cartridges as far as the mark for a proper connection. Compatible cartridges The NASE-B works with C105 cartridge range. Find the model ø 0,6 2,4 x 0,6 1 0,2suits x 0,1your ¥ that best soldering 0,3 needs in www.jbctools.com ø 0,3 Round Chisel Mark Bevel 2,5 Round bent Knife Stainless steel chisel High thermal Ø2,5 performance 5 Operation The JBC Exclusive Heating System Our revolutionary technology is able to recover tip temperature extremely quickly. It means the user can work at a lower temperature and improve the quality of soldering. The tip temperature is further reduced thanks to the Sleep and Hibernation modes which increase the tip life by 5. 1. Work 2. Sleep 3. Hibernation Long time in the holder When the tool is lifted from the holder the tip will heat up to the selected temperature. When the tool is in the holder, the temperature falls to the preset Sleep temperature. 17:14 NT105 NT105 ºC Selected 350ºC Power 45% 17:14 17:14 NT105 350 After longer periods of inactivity, the power is cut off and the tool cools down to room temperature. Sleep Hibernation Tool in the stand Actual Temp. 25ºC Actual Temp. 180ºC Port 2 Delay to hibernation: 29:30 Port 2 Port 2 Tools Menu: Tools Menu: Tools Menu: · Set temperature limits · Select temperature levels · Set Sleep temperature · Set Sleep delay (from 0 to 9 min or no Sleep) · Set Hibernation delay (from 0 to 60 min or no H ibernation) 6 w w w.jbctools.com Work Screen The NASE-B offers an intuitive user interface which provides quick access to station parameters. Original PIN: 0105 17:14 Status bar NT105 350 Tool in use ºC Temp. Levels Power indicator Power 45% Displayed if temperature levels are activated 250 350 380 Port 2 Station Information Change port Menu Options System notifications (Status Bar) Press INFO for each parameter description. USB flash drive is connected. Station is controlled by a PC. Station is controlled by a robot. Station Tools Counters Station software update. Press INFO to start the process. Warning. Press INFO for failure description. Peripherals Graphics Reset Error. Press INFO for failure description, the type of error and how to proceed. 7 Process analysis By pressing Graphics in the main MENU, temperature and power figures in real time are displayed for each port. This helps you decide which tip to use to obtain the best quality solder joints. Graphics Power (%) 17:14 450 400 Power (%) 350 300 250 200 Temperature 150 100 50 Power Temp Port 1 - NT105 See other port graphic Export graphics Insert a USB flash drive into the USB-A connector to save your soldering process in csv format. 8 w w w.jbctools.com Soldering Net Remotely manage and monitor as many stations as your PC can handle. 1. Download the JBC Manager software and the user manual from www.jbctools.com/manager.html 2. Connect the stations via USB-B connector and the PC will automatically detect them. 3. The notification will be displayed on the station. Functions: - Set all the station parameters from your PC. - Organize groups of stations and set all their parameters at the same time. - Store specific configurations for later uses. - Analyze the soldering graphics of the stations on your PC and export them. JBC Manager Software USB Hub any JBC station 9 Working with Robots Manage and monitor the station using a Robotic system. 1. Connect the tool to the station port. 2. Connect your Robot system to the Robot connector (RJ12) of the station. DB9-RJ12 Adapater available only if necessary (Ref: 0013772). 3. Enable the Robot option in the station settings and the notification will be displayed: 4. Set your Robot’s commands according to the Robot Communication Protocol, available on the website www.jbctools.com/jbcsoftware-menu-115.html. Robot Control Unit RS-232 connection Update the station software 1. Download the JBC Update File from www.jbctools.com/software.html and save it on a USB flash drive. Preferably one with no other files. JBC Update File 10 2. Insert the USB flash drive to the station. The icon is diplayed while updating. w w w.jbctools.com Maintenance Before carrying out maintenance or storage, always allow the equipment to cool. - Clean the station screen with a glass cleaner or a damp cloth. Clean periodically - Use a damp cloth to clean the casing and the tool. Alcohol can only be used to clean the metal parts. - Periodically check that the metal parts of the tool and stand are clean so that the station can detect the tool status. - Maintain tip surface clean and tinned prior to storage in order to avoid tip oxidation. Rusty and dirty surfaces reduce heat transfer to the solder joint. - Periodically check all cables and tubes. - Replace a blown fuse as follows: Fuse holder Fuse holder Fuse 1. Pull off the fuse holder and remove the fuse. If necessary use a tool to lever it off. 2. Press the new fuse into the fuse holder and replace it in the station. - Replace any defective or damaged pieces. Use original JBC spare parts only. - Repairs should only be performed by a JBC authorized technical service. 11 Safety It is imperative to follow safety guidelines to prevent electric shock, injury, fire or explosion. - Do not use the units for any purpose other than soldering or rework. Incorrect use may cause fire. - The power cord must be plugged into approved bases. Be sure that it is properly grounded before use. When unplugging it, hold the plug, not the wire. - Do not work on electrically live parts. - The tool should be placed in the stand when not in use in order to activate the sleep mode. The soldering tip, the metal part of the tool and the stand may still be hot even when the station is turned off. Handle with care. - Do not leave the appliance unattended when it is on. - Do not cover the ventilation grills. Heat can cause inflamable products to ignite. - Avoid the contact of flux with skin or eyes to prevent irritation. - Be careful with the fumes produced when soldering. - Keep your workplace clean and tidy. Wear appropriate protective glasses and gloves when working to avoid personal harm. - Utmost care must be taken with liquid tin waste which can cause burns. - This appliance can be used by children over the age of eight and also persons with reduced physical, sensory or mental capabilities or lack of experience provided that they have been given adequate supervision or instruction concerning use of the appliance and understand the hazards involved. Children must not play with the appliance. - Maintenance must not be carried out by children unless supervised. 12 w w w.jbctools.com 有害物质含量表 产品中有害物质的名称及含量 有害物质 部件名称 铅(Pb) 汞(Hg) 镉(Cd) 六价铬 (Cr(VI)) 多溴联苯 (PBB) 多溴二苯醚 (PBDE) 烙铁头 O O O O O O 手柄 O O O O O O 电源线 O O O O O O 主机 O O O O O O 电源插座 O O O O O O 保险丝 O O O O O O 主开关 O O O O O O 电位连接 X O O O O O 变压器 O O O O O O 线路板 X O O O O O O 表示该有害物质在该部件所有均质材料中的含量均在GB/T 26572 规定的限量要求以下。 X 表示该有害物质至少在该部件的某一均质材料中的含量超出GB/T 26572 规定的限量要求。 13 Exploded View 14 w w w.jbctools.com 15 Specifications NASE-1B 120V 50/60Hz. Input fuse: 0.5A. Output: 8.5V NASE-2B 230V 50/60Hz. Input fuse: 0.2A. Output: 8.5V NASE-9B 100V 50/60Hz. Input fuse: 0.5A. Output: 8.5V - Weight: 2,5 kg (5.40 lb) - Dimensions: 170 x 90 x 135 mm (6.70 x 3.54 x 5.31 in) - Output Peak Power: 14W per tool - Temperature Range: 90 - 450°C (190 - 840ºF) ±5% - Idle Temp. Stability (still air): ±3 ºC (±5.5 ºF) - Tip to ground resistance: <2 ohms - Ambient operating temp: 10 - 40 ºC (50 - 104 ºF) - USB-A / USB-B / Pedal connectors - RJ12 connector for Robot Complies with CE standards. ESD protected. Warranty JBC’s 2 year warranty covers this equipment against all manufacturing defects, including the replacement of defective parts and labour. Warranty does not cover product wear or misuse. In order for the warranty to be valid, equipment must be returned, postage paid, to the dealer where it was purchased. Manual in other languages available on our website www.jbctools.com 0016767-0917 This product should not be thrown in the garbage. In accordance with the European directive 2002/96/EC, electronic equipment at the end of their life must be collected and returned to an authorized recycling facility.
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project