HI FLOW WIDESPREAD ROMAN TUB
ROUGH-IN INSTALLATION DIRECTIONS
CAUTION: Always turn water OFF before disassembling faucet. Open faucet handles to alleviate water pressure to insure that
COMPLETE water shut-off has been accomplished.
Before turning water on, during either rough-in or trim out, make sure that cartridge retainer nuts are in place. The cartridge and cartridge
retainer nuts were properly installed and tested before leaving the factory. Although it is unlikely, it is nevertheless possible that through the
handling of the faucet by any number of persons the cartridge retainer nuts may not be properly installed. This should be carefully checked
at time of rough-in and trim-out. If the cartridge retainer nuts are not properly installed, water pressure could force the cartridge out of the
faucet body. Personal injury or water damage to the premises could result.
THICK DECK
INSTALLATION
THIN DECK
INSTALLATION
GENERAL INFORMATION
NOTE: When top of valve body is flush
with top mounting nut, valve body outlet ports will be 3-1/2" below deck.
Valve top locknuts and spout retaining
ring washer are to be on the same
plane.
LOCKNUT FULLY
ENGAGED TO TOP OF
VALVE BODY ONLY.
(No valve body threads
above locknut).
NOTE: FINISHED DECK THICKNESS IS
GREATER THAN 3/4", BUT LESS THAN 1 1/4"
TO INSTALL VALVE BODIES
2. Slide valve bodies up through mounting holes and fasten front
above temporarily with top locknut. Slide washer on spout
shank under retaining ring and put shank through center hole
of deck. Install bracket and mounting hardware.
THREADED
FOR TEST PLUG
SPOUT
SHANK
RETAINING
RING
3. Measure supply tubes on valve bodies to connecting tee (not
furnished). Measure tube (not furnished) from tee to spout
shank. Cut them to suit.
1248
CARTRIDGE
4. With valve bodies, tee, and spout tube assembled and
properly aligned, hand tighten and solder where required.
WASHER
TOP
LOCKNUT
BRACKET
BOTTOM
VALVE
MOUNTING
WASHER
LOCKNUT
1/2" COPPER TUBE
(NOT FURNISHED)
1-1/4" FOR STANDARD
INSTALLATION
BOTTOM
VALVE BODY
MOUNTING NUT
THIN DECK
INSTALLATION
NOTE: When top of valve body is flush
with top mounting nut, valve body outlet ports will be 3-1/2" below deck.
Valve top locknuts and spout retaining
ring washer are to be on the same
plane.
VALVE
COVER
TUBE
5. Make final tightening of valve bodies and spout shank from
below.
SCREW
(SELF-TAPPING)
TEE
(NOT FURNISHED)
6. Connect supply lines with 1/2" copper fittings (not furnished).
2. Slide valve bodies up through mounting holes and fasten front
above temporarily with top locknut. Slide washer on spout
shank under retaining ring and put shank through center hole
of deck. Install bracket and mounting hardware.
THREADED
FOR TEST PLUG
ESCUTCHEON
ADJUSTER
SPOUT
SHANK
RETAINING
RING
CARTRIDGE
RETAINER NUT
3. Measure supply tubes on valve bodies to connecting tee (not
furnished). Measure tube (not furnished) from tee to spout
shank. Cut them to suit.
1248
CARTRIDGE
4. With valve bodies, tee, and spout tube assembled and
properly aligned, hand tighten and solder where required.
WASHER
TOP
LOCKNUT
BRACKET
BOTTOM
VALVE
MOUNTING
WASHER
LOCKNUT
1/2" COPPER TUBE
(NOT FURNISHED)
1-1/4" FOR STANDARD
INSTALLATION
7. Install a test plug (not furnished) in spout shank.
BOTTOM
VALVE BODY
MOUNTING NUT
8. Test installation for leaks.
1. Turn valve mounting nuts all the way down on valve bodies for
tub base clearance. Drop one mounting washer on each side.
SPOUT
COVER
TUBE
VALVE
COVER
TUBE
5. Make final tightening of valve bodies and spout shank from
below.
SCREW
(SELF-TAPPING)
TEE
(NOT FURNISHED)
8. Test installation for leaks.
9. Remove test plug from spout shank and proceed to install trim.
3-1/2"
4-5/8"
4-5/8"
MODEL 4999
MT335H
MODEL 4999
MT335H
HI FLOW WIDESPREAD ROMAN TUB
ROUGH-IN INSTALLATION DIRECTIONS
CAUTION: Always turn water OFF before disassembling faucet. Open faucet handles to alleviate water pressure to insure that
COMPLETE water shut-off has been accomplished.
Before turning water on, during either rough-in or trim out, make sure that cartridge retainer nuts are in place. The cartridge and cartridge
retainer nuts were properly installed and tested before leaving the factory. Although it is unlikely, it is nevertheless possible that through the
handling of the faucet by any number of persons the cartridge retainer nuts may not be properly installed. This should be carefully checked
at time of rough-in and trim-out. If the cartridge retainer nuts are not properly installed, water pressure could force the cartridge out of the
faucet body. Personal injury or water damage to the premises could result.
THIN DECK
INSTALLATION
GENERAL INFORMATION
NOTE: When top of valve body is flush
with top mounting nut, valve body outlet ports will be 3-1/2" below deck.
Valve top locknuts and spout retaining
ring washer are to be on the same
plane.
THICK DECK
INSTALLATION
LOCKNUT FULLY
ENGAGED TO TOP OF
VALVE BODY ONLY.
(No valve body threads
above locknut).
NOTE: FINISHED DECK THICKNESS IS
GREATER THAN 3/4", BUT LESS THAN 1 1/4"
LOCKNUT DIA. 1-5/8"
VALVE BODY DIA. 1-1/8"
SPOUT SHANK DIA. 27/32"
VALVE BODY LOWER
MOUNTING WASHER DIA. 1-3/4"
SPOUT SHANK TOP
MOUNTING WASHER DIA. 1-5/8"
TO INSTALL VALVE BODIES
1. Turn valve mounting nuts all the way down on valve bodies for
tub base clearance. Drop one mounting washer on each side.
SPOUT
COVER
TUBE
2. Slide valve bodies up through mounting holes and fasten front
above temporarily with top locknut. Slide washer on spout
shank under retaining ring and put shank through center hole
of deck. Install bracket and mounting hardware.
THREADED
FOR TEST PLUG
SPOUT
SHANK
RETAINING
RING
3. Measure supply tubes on valve bodies to connecting tee (not
furnished). Measure tube (not furnished) from tee to spout
shank. Cut them to suit.
1248
CARTRIDGE
4. With valve bodies, tee, and spout tube assembled and
properly aligned, hand tighten and solder where required.
WASHER
TOP
LOCKNUT
BRACKET
BOTTOM
VALVE
MOUNTING
WASHER
LOCKNUT
1/2" COPPER TUBE
(NOT FURNISHED)
1-1/4" FOR STANDARD
INSTALLATION
BOTTOM
VALVE BODY
MOUNTING NUT
HI FLOW WIDESPREAD ROMAN TUB
ROUGH-IN INSTALLATION DIRECTIONS
CAUTION: Always turn water OFF before disassembling faucet. Open faucet handles to alleviate water pressure to insure that
COMPLETE water shut-off has been accomplished.
Before turning water on, during either rough-in or trim out, make sure that cartridge retainer nuts are in place. The cartridge and cartridge
retainer nuts were properly installed and tested before leaving the factory. Although it is unlikely, it is nevertheless possible that through the
handling of the faucet by any number of persons the cartridge retainer nuts may not be properly installed. This should be carefully checked
at time of rough-in and trim-out. If the cartridge retainer nuts are not properly installed, water pressure could force the cartridge out of the
faucet body. Personal injury or water damage to the premises could result.
THIN DECK
INSTALLATION
GENERAL INFORMATION
NOTE: When top of valve body is flush
with top mounting nut, valve body outlet ports will be 3-1/2" below deck.
Valve top locknuts and spout retaining
ring washer are to be on the same
plane.
NOTE: FINISHED DECK THICKNESS IS
GREATER THAN 3/4", BUT LESS THAN 1 1/4"
VALVE
COVER
TUBE
SCREW
(SELF-TAPPING)
TEE
(NOT FURNISHED)
5. Make final tightening of valve bodies and spout shank from
below.
6. Connect supply lines with 1/2" copper fittings (not furnished).
TO INSTALL VALVE BODIES
2. Slide valve bodies up through mounting holes and fasten front
above temporarily with top locknut. Slide washer on spout
shank under retaining ring and put shank through center hole
of deck. Install bracket and mounting hardware.
THREADED
FOR TEST PLUG
ESCUTCHEON
ADJUSTER
CARTRIDGE
RETAINER NUT
SPOUT
SHANK
RETAINING
RING
3. Measure supply tubes on valve bodies to connecting tee (not
furnished). Measure tube (not furnished) from tee to spout
shank. Cut them to suit.
1248
CARTRIDGE
4. With valve bodies, tee, and spout tube assembled and
properly aligned, hand tighten and solder where required.
WASHER
TOP
LOCKNUT
BRACKET
BOTTOM
VALVE
MOUNTING
WASHER
LOCKNUT
1/2" COPPER TUBE
(NOT FURNISHED)
1-1/4" FOR STANDARD
INSTALLATION
7. Install a test plug (not furnished) in spout shank.
8. Test installation for leaks.
1. Turn valve mounting nuts all the way down on valve bodies for
tub base clearance. Drop one mounting washer on each side.
SPOUT
COVER
TUBE
STEM
EXTENSION
BOTTOM
VALVE BODY
MOUNTING NUT
VALVE
COVER
TUBE
SCREW
(SELF-TAPPING)
TEE
(NOT FURNISHED)
5. Make final tightening of valve bodies and spout shank from
below.
6. Connect supply lines with 1/2" copper fittings (not furnished).
7. Install a test plug (not furnished) in spout shank.
8. Test installation for leaks.
9. Remove test plug from spout shank and proceed to install trim.
3-1/2"
4-5/8"
LOCKNUT FULLY
ENGAGED TO TOP OF
VALVE BODY ONLY.
(No valve body threads
above locknut).
SCREW
9. Remove test plug from spout shank and proceed to install trim.
3-1/2"
THICK DECK
INSTALLATION
LOCKNUT DIA. 1-5/8"
VALVE BODY DIA. 1-1/8"
SPOUT SHANK DIA. 27/32"
VALVE BODY LOWER
MOUNTING WASHER DIA. 1-3/4"
SPOUT SHANK TOP
MOUNTING WASHER DIA. 1-5/8"
SCREW
CARTRIDGE
RETAINER NUT
6. Connect supply lines with 1/2" copper fittings (not furnished).
7. Install a test plug (not furnished) in spout shank.
9. Remove test plug from spout shank and proceed to install trim.
ESCUTCHEON
ADJUSTER
NOTE: FINISHED DECK THICKNESS IS
GREATER THAN 3/4", BUT LESS THAN 1 1/4"
TO INSTALL VALVE BODIES
STEM
EXTENSION
3-1/2"
STEM
EXTENSION
THICK DECK
INSTALLATION
LOCKNUT FULLY
ENGAGED TO TOP OF
VALVE BODY ONLY.
(No valve body threads
above locknut).
SCREW
1. Turn valve mounting nuts all the way down on valve bodies for
tub base clearance. Drop one mounting washer on each side.
SPOUT
COVER
TUBE
CARTRIDGE
RETAINER NUT
CAUTION: Always turn water OFF before disassembling faucet. Open faucet handles to alleviate water pressure to insure that
COMPLETE water shut-off has been accomplished.
Before turning water on, during either rough-in or trim out, make sure that cartridge retainer nuts are in place. The cartridge and cartridge
retainer nuts were properly installed and tested before leaving the factory. Although it is unlikely, it is nevertheless possible that through the
handling of the faucet by any number of persons the cartridge retainer nuts may not be properly installed. This should be carefully checked
at time of rough-in and trim-out. If the cartridge retainer nuts are not properly installed, water pressure could force the cartridge out of the
faucet body. Personal injury or water damage to the premises could result.
LOCKNUT DIA. 1-5/8"
VALVE BODY DIA. 1-1/8"
SPOUT SHANK DIA. 27/32"
VALVE BODY LOWER
MOUNTING WASHER DIA. 1-3/4"
SPOUT SHANK TOP
MOUNTING WASHER DIA. 1-5/8"
SCREW
ESCUTCHEON
ADJUSTER
ROUGH-IN INSTALLATION DIRECTIONS
GENERAL INFORMATION
LOCKNUT DIA. 1-5/8"
VALVE BODY DIA. 1-1/8"
SPOUT SHANK DIA. 27/32"
VALVE BODY LOWER
MOUNTING WASHER DIA. 1-3/4"
SPOUT SHANK TOP
MOUNTING WASHER DIA. 1-5/8"
STEM
EXTENSION
HI FLOW WIDESPREAD ROMAN TUB
4-5/8"
TO DISASSEMBLE VALVE:
TO DISASSEMBLE VALVE:
CAUTION: SHUT OFF HOT AND COLD WATER SUPPLIES AND OPEN FAUCET HANDLES TO ALLEVIATE WATER PRESSURE AND
INSURE THAT COMPLETE WATER SHUT-OFF HAS BEEN ACCOMPLISHED.
CAUTION: SHUT OFF HOT AND COLD WATER SUPPLIES AND OPEN FAUCET HANDLES TO ALLEVIATE WATER PRESSURE AND
INSURE THAT COMPLETE WATER SHUT-OFF HAS BEEN ACCOMPLISHED.
1. Remove stem extension, screw, and stem extension.
1. Remove stem extension, screw, and stem extension.
2. Remove escutcheon adjuster.
2. Remove escutcheon adjuster.
3. Using cartridge removal tool (not supplied), unscrew and remove cartridge retainer.
3. Using cartridge removal tool (not supplied), unscrew and remove cartridge retainer.
4. Replace stem extension and screw. Grasp stem extension, being careful not to damage threads, pull straight upward removing cartridge.
4. Replace stem extension and screw. Grasp stem extension, being careful not to damage threads, pull straight upward removing cartridge.
SCREW
TO ASSEMBLE VALVE:
SCREW
TO ASSEMBLE VALVE:
CAUTION: FAILURE TO FOLLOW THESE INSTRUCTIONS CAN
CAUSE A FAULTY INSTALLATION OR DAMAGE THE NEW CARTRIDGE.
STEM
EXTENSION
CARTRIDGE
REMOVAL
TOOL
ESCUTCHEON
ADJUSTER
1. Drop stem extension with cartridge attached into valve body, press down until it bottoms.
2. Slowly rotate stem extension clockwise while still pressing down. This will align the
"KEY" on the cartridge with the "NOTCH" in the valve body. When the key enters the
notch you will feel it drop in, then the cartridge will be in place. To be certain, rotate
the stem extension clockwise and then counterclockwise. You should feel the cartridge stop in both directions. If so, the cartridge is in place. Do not turn on water yet.
3. Using a cartridge removal tool (not supplied), reinstall cartridge retainer nut until it bottoms (DO NOT CROSS THREAD).
4. Reinstall escutcheon adjuster.
CAUTION: FAILURE TO FOLLOW THESE INSTRUCTIONS CAN
CAUSE A FAULTY INSTALLATION OR DAMAGE THE NEW CARTRIDGE.
STEM
EXTENSION
CARTRIDGE
REMOVAL
TOOL
ESCUTCHEON
ADJUSTER
1. Drop stem extension with cartridge attached into valve body, press down until it bottoms.
2. Slowly rotate stem extension clockwise while still pressing down. This will align the
"KEY" on the cartridge with the "NOTCH" in the valve body. When the key enters the
notch you will feel it drop in, then the cartridge will be in place. To be certain, rotate
the stem extension clockwise and then counterclockwise. You should feel the cartridge stop in both directions. If so, the cartridge is in place. Do not turn on water yet.
3. Using a cartridge removal tool (not supplied), reinstall cartridge retainer nut until it bottoms (DO NOT CROSS THREAD).
4. Reinstall escutcheon adjuster.
You are now ready to turn on the water. Check complete system for leaks.
STEM
CARTRIDGE
RETAINER NUT
You are now ready to turn on the water. Check complete system for leaks.
STEM
CARTRIDGE
RETAINER NUT
KEY
KEY
1248
CARTRIDGE
1248
CARTRIDGE
TOP
LOCKNUT
TOP
LOCKNUT
NOTCH IN
BODY
HELPLINE: Call our toll free Helpline number:
NOTCH IN
BODY
HELPLINE: Call our toll free Helpline number:
(800) 321-6636
(800) 321-6636
for answers to any product, installation, replacement
parts, or warranty questions.
MT335H - 10/02
MOEN INCORPORATED, 25300 AL MOEN DRIVE., NORTH OLMSTED, OH. 44070, U.S.A.
for answers to any product, installation, replacement
parts, or warranty questions.
© Copyright, 2002
Moen Incorporated
Printed in U.S.A.
MT335H - 10/02
MOEN INCORPORATED, 25300 AL MOEN DRIVE., NORTH OLMSTED, OH. 44070, U.S.A.
© Copyright, 2002
Moen Incorporated
Printed in U.S.A.
TO DISASSEMBLE VALVE:
TO DISASSEMBLE VALVE:
CAUTION: SHUT OFF HOT AND COLD WATER SUPPLIES AND OPEN FAUCET HANDLES TO ALLEVIATE WATER PRESSURE AND
INSURE THAT COMPLETE WATER SHUT-OFF HAS BEEN ACCOMPLISHED.
CAUTION: SHUT OFF HOT AND COLD WATER SUPPLIES AND OPEN FAUCET HANDLES TO ALLEVIATE WATER PRESSURE AND
INSURE THAT COMPLETE WATER SHUT-OFF HAS BEEN ACCOMPLISHED.
1. Remove stem extension, screw, and stem extension.
1. Remove stem extension, screw, and stem extension.
2. Remove escutcheon adjuster.
2. Remove escutcheon adjuster.
3. Using cartridge removal tool (not supplied), unscrew and remove cartridge retainer.
3. Using cartridge removal tool (not supplied), unscrew and remove cartridge retainer.
4. Replace stem extension and screw. Grasp stem extension, being careful not to damage threads, pull straight upward removing cartridge.
4. Replace stem extension and screw. Grasp stem extension, being careful not to damage threads, pull straight upward removing cartridge.
SCREW
TO ASSEMBLE VALVE:
SCREW
CAUTION: FAILURE TO FOLLOW THESE INSTRUCTIONS CAN
CAUSE A FAULTY INSTALLATION OR DAMAGE THE NEW CARTRIDGE.
STEM
EXTENSION
CARTRIDGE
REMOVAL
TOOL
ESCUTCHEON
ADJUSTER
1. Drop stem extension with cartridge attached into valve body, press down until it bottoms.
2. Slowly rotate stem extension clockwise while still pressing down. This will align the
"KEY" on the cartridge with the "NOTCH" in the valve body. When the key enters the
notch you will feel it drop in, then the cartridge will be in place. To be certain, rotate
the stem extension clockwise and then counterclockwise. You should feel the cartridge stop in both directions. If so, the cartridge is in place. Do not turn on water yet.
3. Using a cartridge removal tool (not supplied), reinstall cartridge retainer nut until it bottoms (DO NOT CROSS THREAD).
4. Reinstall escutcheon adjuster.
CAUTION: FAILURE TO FOLLOW THESE INSTRUCTIONS CAN
CAUSE A FAULTY INSTALLATION OR DAMAGE THE NEW CARTRIDGE.
STEM
EXTENSION
CARTRIDGE
REMOVAL
TOOL
ESCUTCHEON
ADJUSTER
You are now ready to turn on the water. Check complete system for leaks.
CARTRIDGE
RETAINER NUT
STEM
CARTRIDGE
RETAINER NUT
2. Slowly rotate stem extension clockwise while still pressing down. This will align the
"KEY" on the cartridge with the "NOTCH" in the valve body. When the key enters the
notch you will feel it drop in, then the cartridge will be in place. To be certain, rotate
the stem extension clockwise and then counterclockwise. You should feel the cartridge stop in both directions. If so, the cartridge is in place. Do not turn on water yet.
3. Using a cartridge removal tool (not supplied), reinstall cartridge retainer nut until it bottoms (DO NOT CROSS THREAD).
4. Reinstall escutcheon adjuster.
STEM
KEY
1248
CARTRIDGE
1248
CARTRIDGE
TOP
LOCKNUT
NOTCH IN
BODY
HELPLINE: Call our toll free Helpline number:
(800) 321-6636
for answers to any product, installation, replacement
parts, or warranty questions.
MOEN INCORPORATED, 25300 AL MOEN DRIVE., NORTH OLMSTED, OH. 44070, U.S.A.
NOTCH IN
BODY
HELPLINE: Call our toll free Helpline number:
(800) 321-6636
MT335H - 10/02
1. Drop stem extension with cartridge attached into valve body, press down until it bottoms.
You are now ready to turn on the water. Check complete system for leaks.
KEY
TOP
LOCKNUT
TO ASSEMBLE VALVE:
for answers to any product, installation, replacement
parts, or warranty questions.
© Copyright, 2002
Moen Incorporated
Printed in U.S.A.
MT335H - 10/02
MOEN INCORPORATED, 25300 AL MOEN DRIVE., NORTH OLMSTED, OH. 44070, U.S.A.
© Copyright, 2002
Moen Incorporated
Printed in U.S.A.