MONACO Installation Instructions
Wall Slide
HORIZONTALLY FASTENED TOP TRACK - PLAN 4
PLAN 4
SYSTEM PARTS
SECTION B
OPTIONAL PARTS
❒
Minimum 1-1/2˝ Overlap
CUSHION CAPTURE ROLLER ASSEMBLY
(SHOWN WITH SINGLE TOP TRACK)
Minimum 1-1/2˝ Overlap
❒
SNAP-ON FASCIA
A
B
BLACK ANODIZED FINISH
ELEVATION A
SINGLE TRACK END CAP
❒
SYSTEM 214
2-1/4” WIDE STILE
T-STILE
SEE PAGE 2 FOR CORNER DETAILS
* FLOOR POST
❒
❒
SYSTEM
214 LOCK
SYSTEM
214 EDGE PULL
PROJECT:
ARCHITECT:
ALLIANCE GLASS DOORS INC.
Surrey, BC, Canada, V3W 1A2
T: 604.501.2588
F: 604.501.1608
MONACO Mx-SWP* with Mx-SWP* at 90˚
Single Track - Wall Mount - Floor Post to Single Track - Wall Mount - Floor Post
SHEET:
JOB #:
PLEASE NOTE: “x” in the product code refers to the stile options - Standard = “T” ; Sys 214 = “W”
CARRIER POST
DRAWN BY:
JL
STANDARD INSERTS
SPECIAL INSERTS
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
❒
DIFFUSED WHITE LAMI GLASS
CLEAR LAMINATED GLASS
MIRROR
PREFINISHED HARDBOARD
MIRROR / HARDBOARD
DATE:
04/07/2016
POLAR WHITE GLASS
BLACK GLASS
CABANA LITE LAMI GLASS
WHITE SAND LAMI GLASS
CUSTOMER SUPPLIED INSERT
DIVISION BARS
CHECKED BY:
DL
MONACO Installation Instructions
Wall Slide
HORIZONTALLY FASTENED TOP TRACK - PLAN 4
T: 604.501.2588
F: 604.501.1608
IMPORTANT: Read these instructions completely before beginning any installation.
Once the product is at the opening site and tools and parts are set up and ready to go, each
panel should be able to be installed in 20 - 30 minutes.
A
Install Top Track Main Portion
1 1/2" Panel Overlap
of Side Walls Side
NOTE: Top of top track = panel height plus 3" (+/- 1/4") from finished
floor. Additionally, panels should overlap side walls by 1 1/2" on each
side. Refer to Wall Mount form at www.rivieraglassdividers.com
1
Measure track and using a power miter box (chop saw) trim
both main track and fascia to length as required. Allow a
minimum 1 1/2" overlap on each side wall when slider is in the
fully closed position. You will also want to ensure that there is
enough length of track for the slider to completely clear the
opening when it is in the fully open position.
Slider in Fully
Closed Position
Position track on the wall to allow for wall overlap when slider
is in the fully closed position.
3
Mounting screws MUST be located into solid backing and
spaced at approximately 24" - 32" centres including a fastener
at each end of the track. Mark drill locations on the inside of
the fixed fascia and drill fastener holes using the bottom drill
line provided. Tip: To aid in track levelling drill fastener holes
slightly oversized (5/16") to fit the HEX drive screws provided.
4
N
Finished Opening
1
Allow enough Track Length for
Slider to Clear Opening in
Fully Open Position
Finished Opening
2
Top Track Position
Slider in Fully
Open Position
4
Install cushion capture and rollers into track ensuring that the
roller bumper faces the cushion capture hook. Level and
mount the top track to the wall above opening.
DON’T INSTALL FASCIA AT THIS TIME
B
5
Install Floor Post
5B
Screw the FLOOR POST to the floor in front of the wall that the
panel will slide over when open, so the leading EDGE of the
post is 1/8" back from the vertical edge of the opening. The
Post should be centred vertically under top roller track.
Top Track
5A
Slider Closest to Wall
in Fully Closed Position
Plans 1,2,4 and
Panel A on Plans
7, 8, 9, 10, and 12
Post Location
1/8" Back from
Opening Edge
Finished Opening
Floor
1/8"
1
MONACO Installation Instructions cont.
B
5.1
HORIZONTALLY FASTENED TOP TRACK - PLAN 4
Install Floor Post cont.
ALTERNATE INSTALLATION: If it is not desirable to screw into the floor,
a CARRIER POST may be wall applied. Position as above however
Carrier Post MUST be spaced 1/2" - 5/8" away from the Top Track
mounting surface by fastening the Carrier Post to the baseboard
or by using shims.
IMPORTANT NOTE: Sliding Panel Rail Cap should never come in
contact with the Floor Post or Carrier Post. (See “PANEL ADJUSTMENT”)
C
6
Install the Panel
7
Set the panel rail over the floor or carrier post(s) at the floor.
8
Lift the panel(s) up and engage each roller adjusting bolt head
into its hanger lock by pushing bolt against spring lock until it
latches. Adjust roller bolt vertically using the combination
wrench/screwdriver tool provided, to adjust floor clearance and
vertically align panels with wall edge.
9
10
2
Top Track
Shims or
Baseboard
1/2"-5/8"
away from
the Top
Track
mounting
surface
Floor
N
4 9/16" from
End of Top Panel
Ensure the Hanger Locks that are pre-installed in the panel rail are
at the top of the panel(s).
SPECIAL NOTE: To achieve a panel stoping position in line with the end
of the Cushion Capture assembly, the Roller Adjusting Bolt should
engage the Hanger Lock spring 4 9/16" from the the end of the panel.
D
5.1
Panel Adjustment
Roller
Adjusting Bolt
Hanger Lock
10
11
Further adjustment can be achieved by adjusting the Hanger
Lock position in the top rail. Loosen the two clamp screws using
an 90 degree angled Philips screw driver.
12
Hook removable Fascia over main track and snap into place to
top track.
13
Install track end caps to exposed track ends with the four #4 1/2" screws provided, using the wrench/screwdriver tool
provided. (#0-Yellow Robertson drive tip)
Top
Track
Cushion
Capture
Mechanism
Adjust Cushion Capture and Hanger Lock horizontally such that
the Bottom Rail Cap never comes in contact with the Floor or
Carrier Posts.
Panel stopping location can be fine tuned by loosening the two
screws in the cushion capture mechanism and moving to
desired position along the track.
4 9/16"
Loosen Screws A & B
Accessable from Below
11
Hanger
Lock
Loosen Screws
A & B to Adjust
Hanger Lock