Bradley Corporation S19-220B 15-7/8 in. Eye Wash Station Installation Manual


Add to my manuals
4 Pages

advertisement

Bradley Corporation S19-220B 15-7/8 in. Eye Wash Station Installation Manual | Manualzz

Installation

S19-220B

Wall-Mounted Eyewash

Table of Contents

Pre-Installation Information . . . . . . . . . . . . . . 2

Installation Instructions. . . . . . . . . . . . . . . . . . 3

Assembly of Components . . . . . . . . . . . . . . . 4

Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

215-158B Rev. J; ECN 08-503

© 2008 Bradley Corporation

Page 1 of 4 2/13/08

P.O. Box 309, Menomonee Falls, WI USA 53052-0309

PHONE 1-800-BRADLEY FAX (262) 251-5817 bradleycorp.com

S19-220B Installation

Installation

WARNING

Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.

all

W

30

51

. B ox

TE

TH en om

09 , M on ee

U

G

I H

Te

ÄT st-o epor

W

IR perate v t an

IC

TL ch w s immed alfunction

öc hen alv e(s) ea nter dur ch U

Te st le sign

fo tlic hrift.

sc nctio e en b h im d sign iat eek an

Te stbe eglic he S nnem as.

'il y m

FE ent d trie törun es v

édiatem belo b prüf alv ent.

g s es ho e c

b or of

Signed

Unter sc

Signe hrift est

ätigt t m elden.

e v haque sem se qui n a p as fait

Date

Date

Date

Signed

Signed

Signed

Date

Datum

Date

THIS

SIDE

UP

Packing List

Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.

114-051

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY FAX: (262-251-5817) http://www.bradleycorp.com

The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI

Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI

Z358.1.

For questions regarding the operation or installation of this product, visit www.

bradleycorp.com or call 1-800-BRADLEY.

Product warranties may also be found under ”Product Information” on our web site at www.bradleycorp.com.

2 2/13/08 Bradley Corporation • 215-158B Rev. J; ECN 08-503

Installation

Installation

Supplies Required:

• (3) 3/8” wall fasteners and bolts

• Pipe sealant

• Piping to 1/2” IPS water supply inlet on unit

• Piping to 1-1/4” IPS drain outlet for eyewash

• Sign-mounting hardware

NOTE: Local codes may require the installation of a backfl ow prevention valve to complete proper installation. Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.

Backfl ow prevention valves are not included with the fi xture and may be supplied by the contractor or purchased from Bradley Corporation.

Step 1: Install inlet drain fitting

NOTE: The top of the eyewash heads should be

33”–45” (838mm–1143mm) from the floor.

1. Position the inlet drain fitting over the

1-1/4” drain outlet pipe from wall.

2. Using the inlet drain fitting as a template, mark the bolt hole locations on wall OR install three suitable fasteners (supplied by installer) for 3/8” bolts in the wall at the marked hole locations.

3. Bolt the inlet drain fitting to the wall or wall fasteners using 3/8” bolts (supplied by installer).

Step 2: Assemble components

1. Assemble the remaining eyewash components as shown on page 4.

• Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.

• Use a strap wrench around pipes when tightening to prevent pipe marring.

Step 3: Connect water supply

1. Connect the water supply piping to the 1/2”

IPS inlet on the eyewash (piping supplied by installer).

2. Connect the tailpiece to the 1-1/4” IPS drain outlet on the eyewash.

3. Mount the safety sign to the wall using signmounting hardware (supplied by installer).

4. Open the water supply lines. Test for leaks and adequate water flow.

13-5/8"

(346mm)

Ø 10-3/4" (254mm)

15-7/8" (403mm)

4"

(102mm)

7-3/8"

(187mm)

2-1/4"

(57mm)

7-1/2"

(191mm)

Ø 5/16"

(8mm) 5-1/4"

(133mm)

36" (914mm)

Suggested

Height

To Floor

30-1/2"

(775mm)

Suggested

Height

To Floor

4-5/8"

(119mm)

8-1/4"

(210mm)

S19-220B

Bradley Corporation • 215-158B Rev. J; ECN 08-503

NOTE: All dimensions assume standard thread engagement. Variations in manufacturing allow for

+/- 1/8 (3mm) per threaded joint. To fi nd the tolerance of a dimension, add the number of thread joints in between a dimension and multiply it by 1/8 (3mm).

2/13/08 3

S19-220B

Assembly of Components and Parts List

1.8

1.7

1.6

1.5

1

Flow Control

This End

1.4

1.3

114-051

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY FAX: (262-251-5817) http://www.bradleycorp.com

P.O. Box 309, Menomonee Falls, WI 53051

TEST THIS UNIT EACH WEEK

DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.

ESSAI HEBDOMADAIRE

Test-operate valve(s) each week and sign below.

Report any malfunctions immediately.

Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden.

Test le fonctionnement des valves chaque semaine et un rapport immédiatement.

Date

Datum

Date

Signed

Unterschrift

Signe

Date

Date

Date

Signed

Signed

Signed

9

8

Installation

1.2

1.1

1/2" IPS

Supply Inlet

1-1/4" IPS

Drain Outlet

7

4

6

2

3

5

4.1

NOTE: Items 1.1-1.8 come preassembled as Item 1.

4

1 S90-295

1.1 111-061

1.2 124-028

1.3 187-053

1.4 173-009

1.5 S21-071

1.6 113-1159

1.7 S05-091

1.8 107-371

1

1

1

1

1

1

1

1

2

Stainless Steel Bowl Assembly

Inlet Drain Fitting

Gasket

Stainless Steel Receptor

Cup Strainer

Supply Stem

Spacer, Drain

Eyewash

Dust Cover

Prepack S45-122 includes Items 4, 4.1, 5, 6

Prepack S45-123 includes Items 4.1, 5, 6

Prepack S45-1782 includes Items 1.2, 1.4, 1.5, 1.6

2/13/08

2 113-006LQ 1 1/2” NPT Pipe x 3-1/2”

3 169-025 1 Elbow

4 S27-282

4.1 110-215

1

1

1/2” Ball Valve with Nut

Nut only

5 128-135

6 142-002DA 1 Washer

1 Tailpiece 7 269-167

8 114-051

9 204-421

Bradley Corporation • 215-158B Rev. J; ECN 08-503

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement