K.I. JONES ES - (4) CLASSROOMS ROOFING REPLACEMENT 2001 WINSTON DRIVE, FAIRFIELD, CA 94534 aedis architects www.aedisarchitects.com 387 S. 1st Street, Suite 300 San Jose, CA 95113 tel: (408)-300-5160 fax: (408)-300-5121 PROJECT K.I. JONES ES - (4) CLASSROOMS ROOFING REPLACEMENT FAIRFIELD - SUISUN UNIFIED SCHOOL DISTRICT FAIRFIELD - SUISUN UNIFIED SCHOOL DISTRICT CONSTRUCTION DOCUMENTS 4/24/2017 6:05:51 PM \\MICKEY\aedis server\Projects\Fairfield-Suisun\2017025 - KI Jone HS Reroof 4 Reloc\2017025 - Drawings\2017025 - KI Jones ES Reroof 4 Reloc.rvt ABBREVIATIONS & @ A.B. ABV. A.C. ACT ADJ. A.F.F. ALUM. A.P. APPROX. ARCH. AND AT ANCHOR BOLT ABOVE ASPHALTIC CONCRETE ACOUSTIC TILE ADJUSTABLE ABOVE FINISHED FLOOR ALUMINUM ACCESS PANEL APPROXIMATELY ARCHITECT BD. BLDG. BLKG. BM B.M. BOT. BTWN B.W. BOARD BUILDING BLOCKING BEAM BENCH MARK BOTTOM BETWEEN BOTH WAYS CAB. C.B. C.C or O.C. CEM. CER. TILE C.G. C.I. C.J. CLG. CLKG. CLR. CMU CNTR. C.O. COL. CONC. CONST. CONT. CONTR. C.P. CTR. CTSK. C.W. CABINET CATCH BASIN CENTER TO CENTER CEMENT CERAMIC TILE CORNER GUARD CAST IRON CONTROL JOINT CEILING CAULKING CLEAR CONCRETE MASONRY UNIT COUNTER CLEANOUT COLUMN CONCRETE CONSTRUCTION CONTINUOUS CONTRACTOR CONCRETE PIPE CENTER COUNTER SUNK COLD WATER D.A. DBL D.F. D.FIR DTL. DIA. or Ø DIM. DISP. DN DO DR. DS. DWG. DISABLED ACCESS DOUBLE DRINKING FOUNTAIN DOUGLAS FIR DETAIL DIAMETER DIMENSION DISPOSAL DOWN DITTO DOOR DOWNSPOUT DRAWING (E) E. EA. E.J. ELEC. EL. ELEV. ENCL. EQ. EQUIP. E.W. E.W.C. EX. EXP. EXT. EXISTING EAST EACH EXPANSION JOINT ELECTRIC or ELECTRICAL ELEVATION ELEVATOR ENCLOSE and/or ENCLOSURE EQUAL EQUIPMENT EACH WAY ELECTRIC WATER COOLER EXPANSION EXPOSED EXTERIOR F.A. F.D. FDN. F.E. F.E.C. F.H. F.H.C. F.H.S.M.S. F.H.W.S. FIN. FL. or FLR. F.O.C. F.O.F. F.O.M. F.O.S. F.S. FT. FTG. FURR. FIRE ALARM FLOOR DRAIN FOUNDATION FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FIRE HYDRANT FIRE HOSE CABINET FLAT HEAD SHEET METAL SCREW FLAT HEAD WOOD SCREW FINISH FLOOR FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY FACE OF STUD FINISH SLAB FOOT OR FEET FOOTING FURRING GA. GALV. G.B. G.I. GL. GLU-LAM GND. GR. GYP. GAUGE GALVANIZED GRAB BAR GALVANIZED IRON GLASS GLUE-LAMINATED GROUND GRADE GYPSUM H.B. H.C. HDWD. HDWR. H.M. HORIZ. HR. HT. HOSE BIBB HOLLOW CORE HARDWOOD HARDWARE HOLLOW METAL HORIZONTAL HOUR HEIGHT SYMBOL LEGEND BOARD OF TRUSTEES JUDI HONEYCHURCH DAVID C. ISOM JONATHAN RICHARDSON JOAN GAUT JOHN SILVA BETHANY SMITH CHRIS WILSON AARON ORETEGA-ANDRADE (PRESIDENT) (VICE PRESIDENT) (CLERK) (MEMBER) (MEMBER) (MEMBER) (MEMBER) (STUDENT BOARD MEMBER) KATHY MARIANNO PAT SHAMANSKY (MEMBER) (SECRATARY) MAXIMUM MACHINE BOLT MECHANICAL MANUFACTURER MANHOLE MINIMUM MIRROR MISCELLANEOUS MASONRY OPENING MACHINE SCREW MOUNTED METAL MULLION (N) N. N.I.C. NO. or # NOM. N.T.S. NEW NORTH NOT IN CONTRACT NUMBER NOMINAL NOT TO SCALE OBS. O.C. OCC. O.D. O.F.O.S. O.F.C.I. O.H. OPNG. OPP. OBSCURE ON CENTER OCCUPANT(CY) OVERFLOW DRAIN and/or OUTSIDE DIAMETER OUTSIDE FACE OF STUD OWNER FURNISHED and CONTRACTOR INSTALLED OPPOSITE HAND OPENING OPPOSITE P.A.F. PL P.L. P. LAM PLAS. PLYWD. PR. PTD. PTN. POWDER ACTUATED FASTENER PLATE PROPERTY LINE PLASTIC LAMINATE PLASTER PLYWOOD PAIR PAINTED PARTITION Q.T. QUARRY TILE R. or RAD. R.C.P. R.D. R.E. REF. REINF. REQ'D R.H.M.S. R.H.W.S. RM. R.O. RWD. R.W.L. RADIUS REINFORCED CONCRETE PIPE ROOF DRAIN RIM ELEVATION REFERENCE REINFORCING REQUIRED ROUND HEAD METAL SCREW ROUND HEAD WOOD SCREW ROOM ROUGH OPENING REDWOOD RAIN WATER LEADER S S.A.D. S.C. S.C.D. SCHED. S.E.D. S.F. SHEATH. SHT. SIM. S.L.D. S.M. S.M.D. S.M.S. S.O.V. S.P.D. SPEC. SQ. or Ø S.S. S.S.D. STAG. STD. STL. STOR. STRUCT. S.T.S.M.S. SUSP. SOUTH SEE ARCHITECTURAL DRAWINGS SOLID CORE SEE CIVIL DRAWINGS SCHEDULE SEE ELECTRICAL DRAWINGS SQUARE FEET SHEATHING SHEET SIMILAR SEE LANDSCAPE DRAWINGS SHEET METAL SEE MECHANICAL DRAWINGS SHEET METAL SCREW SHUT OFF VALVE SEE PLUMBING DRAWINGS SPECIFICATIONS SQUARE STAINLESS STEEL SEE STRUCTURAL DRAWINGS STAGGERED STANDARD STEEL STORAGE STRUCTURAL SELF TAPPING SHEET METAL SCREW SUSPENDED T.& G. TEL. TERR. THRES. T.J. T.O.B. T.O.C. T.O.S. T.O.W. TYP. TONGUE & GROOVE TELEPHONE TERRAZZO THRESHOLD TOOLED JOINT TOP OF BEAM TOP OF CURB or CONCRETE TOP OF STEEL or SLAB TOP OF WALL TYPICAL U.O.N. UNLESS OTHERWISE NOTED VERT. V.C.P. V.C.T. V.G. V.I.F. V.T.R. V.W.C. VERTICAL VITRIFIED CLAY PIPE VINYL COMPOSITION TILE VERTICAL GRAIN VERIFY IN FIELD VENT THROUGH ROOF VINYL WALL COVERING NFPA 17-A STANDARD FOR WET CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION NFPA 20 STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION 2016 EDITION NFPA 22 STANDARD FOR WATER TANKS FOR PRIVATE FIRE PROTECTION 2013 EDITION W W/ W.C. WD. W.H. W/O W.O. WP. W. PT. W.R. WT. WEST WITH WATER CLOSET WOOD WATER HEATER WITHOUT WHERE OCCURS WATERPROOF / WEATHERPROOF WORKING POINT WATER RESISTANT WEIGHT NFPA 24 STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES 2016 EDITION NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2016 EDITION NFPA 80 STANDARD FOR FIRE DOOR AND OTHER OPENING PROTECTIVES JAN. JT JANITOR JOINT Y K.D. KILN DRIED Z LAB. LAM. LAV. LKR. LT. LABORATORY LAMINATE LAVATORY LOCKER LIGHT T1 A5.01 A9.01 REFER TO ARCHITECTURAL FLOR PLAN SHEETS AND CONSULTANT DRAWINGS FOR ADDITIONAL SYMBOLS AND REFERENCE DESIGNATIONS DIMENSION REFERENCE 10" 10" DISTRICT SUPERINTENDANT KRIS COREY TITLE SHEET PORTABLES ROOF PLANS EXTERIOR DETAILS - ROOF MATERIALS REFERENCE FACE OF OBJECT EARTH GRAVEL / ROCK CENTER LINE OF OBJECT CONCRETE OWNER STAMP CONCRETE BLOCK (CMU) TAGS AND MARKERS FAIRFIELD SUISUN UNIFIED SCHOOL DISTRICT 2001 WINSTON DRIVE FAIRFIELD, CA 94543 PHONE: (707) 399-5148 CONTACT: PAUL SPEED SAND, GROUT, OR PLASTER PLAN REFERECE GRID 0 STEEL PLYWOOD STRUCTURAL GRID LINE INSIDE DIAMETER INSULATION INTERIOR INVERT DRAWING INDEX LOCATION MAP ARCHITECTURAL MAX. M.B. MECH. MFR. M.H. MIN. MIR. MISC. M.O. M.S. MTD. MTL. MUL. I.D. INSUL. INT. INV. CONSULTANT WOOD, CONTINUOUS MEMBER WOOD, BLOCKING STATE WOOD, FINISH GRADE REVISION MARKER 1 CABINET TYPES PLAN KEY NOTES APPLICABLE CODES 1 2016 BUILDING STANDARDS ADMINISTRATION CODE (PART 1, TITLE 24, CCR) 2 2016 CALIFORNIA BUILDING CODE (PART 2, VOLUMES 1 AND 2, TITLE 24, CCR) 3 2016 CALIFORNIA ELECTRICAL CODE (PART 3, TITLE 24, CCR) 4 2016 CALIFORNIA MECHANICAL CODE (PART 4, TITLE 24, CCR) 5 2016 CALIFORNIA PLUMBING CODE (PART 5, TITLE 24, CCR) 6 2016 CALIFORNIA ENERGY CODE (PART 6, TITLE 24, CCR) 7 2016 CALIFORNIA FIRE CODE (PART 9, TITLE 24, CCR) 8 2016 CALGREEN BUILDING STANDARDS CODE (PART 11, TITLE 24, CCR) 9 2016 CALIFORNIA REFERENCED STANDARDS CODE (PART 12, TITLE 24, CCR) 10 TITLE 19, CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS Room name 101 1 101a ROOM LABEL ROOM NAME ROOM NUMBER WALL TYPE MARKER PC - PREFINISHED CABINETS PM - PREFINISHED MOBILE CABINETS PR - PREFINISHED MOVEABLE CABINETS PU - PREFINISHED UTILITY CABINETS PS - SCIENCE CABINETS 2001 WINSTON DRIVE, FAIRFIELD, CA 94543 BUILDING KEY REVISIONS No. NOTE: REFER TO SPECIFICATIONS FOR SPECIFIC CABINET TYPE REQUIREMENTS. DOOR ID DOOR DESIGNATION ROOM NUMBER SECTION REFERENCE Description AREA OF WORK SECTION NUMBER CENTER LINE 1 XX-1 FINISH TAG XX-1 FLOOR FINISH TAG SIM A12.08 REFERENCE LABEL WHERE OCCURES SHEET NUMBER DETAIL REFERENCE DETAIL NUMBER REFERENCE STANDARDS 1 A12.08 SIM REFERENCE LABEL WHERE OCCURES PARTIAL LIST OF APPLICABLE STANDARDS (AS REFERENCED IN 2016 CBC - CHAPTER 35 & CFC): SHEET NUMBER ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PART 36) 2010 EDITION 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS (ASME A17.1-2016/CSA B44-16) 2016 EDITION NFPA 13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS 2016 EDITION NFPA 14 STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS 2016 EDITION NFPA 17 STANDARD FOR DRY CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION ASME 17.1 GENERAL NOTES 1. 2. 3. 4. 5. 2016 EDITION 6. NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS 2016 EDITION NFPA 253 STANDARD METHOD OF TEST FOR CRITICAL RADIANT FLUX OF FLOOR COVERING SYSTEMS USING A RADIANT HEAT ENERGY SOURCE 2015 EDITION NFPA 2001 STANDARD ON CLEAN AGENT FIRE EXTINGUISHER SYSTEMS 2015 EDITION ICC 300 BLEACHERS, FOLDING AND TELESCOPIC SEATING AND GRANDSTANDS 2012 EDITION X 3. 4. 5. 6. 7. 8. 9. 10. 11. MILESTONES SD DD REROOFING SCOPE OF WORK 50% CD 90% CD DSA SUB SHEET TITLE SHEET EXISTING CONDITIONS ADMINISTRATIVE REQUIREMENTS 1. 2. PRIOR TO BIDDING, THE GENERAL CONTRACTOR SHALL VISIT & INSPECT THE SITE TO FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AFFECTING THE NEW WORK. THE GENERAL CONTRACTOR SHALL NOT DISPUTE, COMPLAIN, OR ASSERT THAT THERE IS ANY MISUNDERSTANDING IN REGARDS TO LOCATION, EXTENT, NATURE, OR AMOUNT OF WORK TO BE PERFORMED UNDER THIS CONTRACT DUE TO THE CONTRACTOR'S FAILURE TO INSPECT THE SITE AND/OR FAILURE TO INSPECT THE CONTRACT DOCUMENTS. THE GENERAL CONTRACTOR & SUBCONTRACTORS ARE RESPONSIBLE FOR LOCATING & VERIFYING ALL EXISTING UNDERGROUND UTILITIES IN ALL AREAS OF THE NEW WORK PRIOR TO COMMENCEMENT OF EXCAVATION. EXISTING UTILITIES SHOWN ON THE DRAWINGS ARE APPROXIMATE ROUTING LOCATIONS AS BEST DETERMINED FROM EXISTING DRAWINGS & BY THE SCHOOL DISTRICT, BUT SHOULD NOT BE CONSTRUED TO REPRESENT ALL EXISTING UTILITIES. ANY ALTERATIONS OF EXISTING FACILITIES TO ACCOMMODATE THE INSTALLATION OF NEW WORK SHALL BE REVIEWED BY THE ARCHITECT PRIOR TO COMMENCEMENT OF WORK. ALL EXISTING FINISHES OR MATERIALS DAMAGED OR DEMOLISHED DUE TO NEW CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL STATE OR REPLACED WITH NEW MATERIALS FINISHED TO MATCH EXISTING. CONTRACTOR SHALL COORDINATE ALL WORK TO AVOID DISRUPTION OF STUDENTS OR TEACHERS DURING SCHOOL HOURS. ANY DISRUPTION OF POWER, TELEPHONE, OR HVAC SYSTEMS MUST BE COORDINATED AND APPROVED BY THE DISTRICT REPRESENTATIVE PRIOR TO ANY WORK COMMENCING. COMPLIANCE WITH CFC CHAPTER 33 (FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION) AND CBC CHAPTER 33 (SAFEGUARDS DURING CONSTRUCTION) WILL BE ENFORCED. A COPY OF PART 1 AND 2 CCR SHALL BE KEPT ON SITE AT ALL TIMES. ALL CONSTRUCTION CHANGE DOCUMENTS AND ADDENDA TO BE SIGNED BY AND APPROVED BY THE ARCHITECT AND OWNER. ALL TESTS TO CONFORM TO THE REQUIREMENTS OF SECTION 4-335. TESTS OF MATERIALS AND TESTING LABORATORY SHALL BE IN ACCORDANCE WITH SECTION 4-335. DSA SHALL BE NOTIFIED AT THE START OF CONSTRUCTION AND PRIOR TO PLACEMENT OF CONCRETE PER SECTION 4-331. INSPECTOR SHALL BE APPROVED BY DSA. INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4333(b). THE DUTY OF THE INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4-342. SUPERVISION OF CONSTRUCTION BY DSA SHALL BE IN ACCORDANCE WITH 4-334. CONTRACTOR, INSPECTOR, ARCHITECT, AND ENGINEERS SHALL SUBMIT VERIFIED REPORTS (FORM 6) IN ACCORDANCE WITH SECTION 4-336 AND 4-343. THE ARCHITECT AND THE STRUCTURAL ENGINEERS SHALL PERFORM THEIR DUTIES IN ACCORDANCE WITH SECTIONS 4-333(a) AND 4-341. THE CONTRACTOR SHALL PERFORM HIS DUTIES IN ACCORDANCE WITH SECTION 4-343. DSA IS NOT SUBJECT TO ARBITRATION. 1. TYPE OF EXISTING CONSTRUCTION: 2. NUMBER OF FLOORS: 3. NUMBER OF BASEMENTS: 4. FULLY SPRINKLERED BUILDING: 5. EXISTING OCCUPANCY GROUP: 6. BUILDING AREA IN SQ. FT: 7. YEAR BUILT: V 1 NONE NO E, A & B ±4,670 SQ. FT. SCOPE OF WORK 1. REMOVE EXISTING PORTABLES ROOFING SYSTEM TO EXISTING PLYWOOD DECK AND PROVIDE NEW BUILT UP ROOFING FINISH. 2. REPLACE EXISTING DRYROT AT VARIOUS LOCATIONS DEFERRED APPROVAL DATE NONE. JOB # 04/24/2017 2017025 SHEET # T1 Date GENERAL SHEET NOTES A CONTRACTOR TO PROTECT (E) FLASHING WHENEVER POSSIBLE FOR RE-USE. IF (E) FLASHING IS COMPREISED DUE TO NEW WORK, CONTRACTOR SHALL REPAIR AND RESEAL FLASHING TO ENSURE LONG-TERM WEATHER PROTECTION. ANY UNREPAIRABLE WORK SHALL BE REPLACED IN ACCORDANCE TO ORIGINAL CONSTRUCTION. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS PRIOR TO PERFORMING ANY WORK. aedis architects www.aedisarchitects.com B 387 S. 1st Street, Suite 300 CONTRACTOR TO PATCH AND REPAIR EXISTING CONDITIONS AND FINISHES IMPACTED BY NEW WORK TO MATCH EXISTING ADJACENT GRADE AND FINISHES UNLESS OTHERWISE NOTED. San Jose, CA 95113 tel: (408)-300-5160 C ALL NEW SHEET METAL COUNTERFLASHING SHALL BE A MIN. 24 GA. GALVANIZED STEEL D PROVIDE TAPERED INSULATION (TO COMPLY W/ FLAME SPREAD AND SMOKE DENSITY REQUIREMENTS OF CBC 707.3) TO SLOPE TO DRAIN. E SIZE OF MECHANICAL EQUIPMENT PADS ARE FOR REFERENCE ONLY. THE CONTRACTOR SHALL VERIFY REQUIRED PAD DIMENSION WITH EQUIPMENT MANUFACTURER. fax: (408)-300-5121 PROJECT F ROOF CRICKETS, WHERE INDICATED, SHALL BE PROVIDED AS REQUIRED TO ENSURE A MINIMUM 1/4” PER FOOT VALLEY SLOPE. COORDINATE LOCATIONS OF CRICKETS WITH ROOFTOP EQUIPMENT. G TEMPORARY REMOVAL OF EQUIPMENT TO PERFORM NEW WORK SHALL BE COORDINATED DIRECTLY WITH THE FACILITY AND IS NOT ALLOWED FOR EQUIPMENT WEIGHING 400LBS OR GREATER. ALL EQUIPMENT MUST BE RESECURED PER ORIGINAL APPROVED CONSTRUCTION. H SLOPE AT NEW ROOFING SHALL BE 1/4:12 MINIMUM THROUGHOUT I CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION AGAINST INCLEMENT WEATHER FOR EXPOSED CONDITIONS RESULTING FROM WORK IN PROGRESS AT ANY GIVEN TIME AND SHALL SEQUENCE WORK ACCORDINGLY. J CONTRACTOR SHALL PROTECT ALL EXISTING EQUIPMENT, LINES AND FINISHES TO REMAIN. K REFER TO SHEET A9.01 FOR ADDITIONAL INFORMATION AND SCOPE OF WORK ASSOCIATED WITH NEW ROOFING INCLUDING TRANSITIONS TO EXISTING ITEMS TO REMAIN. L REMOVE (E) 3/4" PLYWOOD AND REPLACE WITH (N) 3/4" PLYWOOD 4'-0" X 8'-0" T.G. JOINTS. (E) MECHANICAL EQUIPMENT AND CURB (E) GAS LINE (E) GUTTER. SEE DETAIL 01/A9.01 (E) SHUT OFF VALVE SWITCH (E) CONDENSATE LINE REMOVE (E) DRY ROT TO NEAREST PANEL EDGE AND REPLACE FULL PANEL W/ NEW TO MATCH EXISTING REMOVE (E) B.U.R. TO (E) 3/4" PLYWOOD DECK AND REPLACE W/ MODIFIED B.U.R. SYSTEM 7 30' - 0" 2" 30' - 0" 2" 30' - 0" 2" FAIRFIELD - SUISUN UNIFIED SCHOOL DISTRICT CONSULTANT ROOF PLAN KEYNOTES 1 2 3 4 5 6 K.I. JONES ES - (4) CLASSROOMS ROOFING REPLACEMENT 30' - 0" STAMP 2 A9.01 STATE 1 6 6 A9.01 1 A9.01 21 22 23 24 38' - 10 7/8" 3 (E) 1/8=12 SLOPE CLASSROOM (E) 1/8=12 SLOPE CLASSROOM (E) 1/8=12 SLOPE CLASSROOM (E) 1/8=12 SLOPE CLASSROOM 4 7 No. Description Date 4 7 1 REVISIONS 7 1 1 3 TYP 1 7 4/24/2017 6:05:51 PM \\MICKEY\aedis server\Projects\Fairfield-Suisun\2017025 - KI Jone HS Reroof 4 Reloc\2017025 - Drawings\2017025 - KI Jones ES Reroof 4 Reloc.rvt A9.01 2 2 2 2 4 4 MILESTONES 6 SD DD 50% CD 5 90% CD 5 5 KEY PLAN 5 DSA SUB AREA OF WORK 3 TYP. SHEET 1 A9.01 PORTABLES ROOF PLANS N PLAN - CLASSROOMS 21, 22, 23 & 24 1 ROOF SCALE: 1/4" = 1'-0" N DATE REROOFING SCOPE OF WORK 04/24/2017 JOB # 2017025 SHEET # A5.01 aedis architects ARMIJO HIGH SCHOOL GYM ROOFING REPLACEMENT www.aedisarchitects.com 387 S. 1st Street, Suite 300 San Jose, CA 95113 tel: (408)-300-5160 fax: (408)-300-5121 PROJECT ARMIJO HIGH SCHOOL GYM ROOFING REPLACEMENT 824 WASHINGTON STREET, FAIRFIELD, CA. 94533 FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT CONSTRUCTION DOCUMENTS 4/24/2017 6:08:18 PM C:\Users\jbrown\Documents\2017026 - Armijo HS Reroof at Gym (CENTRAL)_jbrown36UXL.rvt ABBREVIATIONS & @ A.B. ABV. A.C. ACT ADJ. A.F.F. ALUM. A.P. APPROX. ARCH. AND AT ANCHOR BOLT ABOVE ASPHALTIC CONCRETE ACOUSTIC TILE ADJUSTABLE ABOVE FINISHED FLOOR ALUMINUM ACCESS PANEL APPROXIMATELY ARCHITECT BD. BLDG. BLKG. BM B.M. BOT. BTWN B.W. BOARD BUILDING BLOCKING BEAM BENCH MARK BOTTOM BETWEEN BOTH WAYS CAB. C.B. C.C or O.C. CEM. CER. TILE C.G. C.I. C.J. CLG. CLKG. CLR. CMU CNTR. C.O. COL. CONC. CONST. CONT. CONTR. C.P. CTR. CTSK. C.W. CABINET CATCH BASIN CENTER TO CENTER CEMENT CERAMIC TILE CORNER GUARD CAST IRON CONTROL JOINT CEILING CAULKING CLEAR CONCRETE MASONRY UNIT COUNTER CLEANOUT COLUMN CONCRETE CONSTRUCTION CONTINUOUS CONTRACTOR CONCRETE PIPE CENTER COUNTER SUNK COLD WATER D.A. DBL D.F. D.FIR DTL. DIA. or Ø DIM. DISP. DN DO DR. DS. DWG. DISABLED ACCESS DOUBLE DRINKING FOUNTAIN DOUGLAS FIR DETAIL DIAMETER DIMENSION DISPOSAL DOWN DITTO DOOR DOWNSPOUT DRAWING (E) E. EA. E.J. ELEC. EL. ELEV. ENCL. EQ. EQUIP. E.W. E.W.C. EX. EXP. EXT. EXISTING EAST EACH EXPANSION JOINT ELECTRIC or ELECTRICAL ELEVATION ELEVATOR ENCLOSE and/or ENCLOSURE EQUAL EQUIPMENT EACH WAY ELECTRIC WATER COOLER EXPANSION EXPOSED EXTERIOR F.A. F.D. FDN. F.E. F.E.C. F.H. F.H.C. F.H.S.M.S. F.H.W.S. FIN. FL. or FLR. F.O.C. F.O.F. F.O.M. F.O.S. F.S. FT. FTG. FURR. FIRE ALARM FLOOR DRAIN FOUNDATION FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FIRE HYDRANT FIRE HOSE CABINET FLAT HEAD SHEET METAL SCREW FLAT HEAD WOOD SCREW FINISH FLOOR FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY FACE OF STUD FINISH SLAB FOOT OR FEET FOOTING FURRING GA. GALV. G.B. G.I. GL. GLU-LAM GND. GR. GYP. GAUGE GALVANIZED GRAB BAR GALVANIZED IRON GLASS GLUE-LAMINATED GROUND GRADE GYPSUM H.B. H.C. HDWD. HDWR. H.M. HORIZ. HR. HT. HOSE BIBB HOLLOW CORE HARDWOOD HARDWARE HOLLOW METAL HORIZONTAL HOUR HEIGHT I.D. INSUL. INT. INV. INSIDE DIAMETER INSULATION INTERIOR INVERT JAN. JT JANITOR JOINT K.D. KILN DRIED LAB. LAM. LAV. LKR. LT. LABORATORY LAMINATE LAVATORY LOCKER LIGHT SYMBOL LEGEND GOVERNING BOARD MAX. M.B. MECH. MFR. M.H. MIN. MIR. MISC. M.O. M.S. MTD. MTL. MUL. MAXIMUM MACHINE BOLT MECHANICAL MANUFACTURER MANHOLE MINIMUM MIRROR MISCELLANEOUS MASONRY OPENING MACHINE SCREW MOUNTED METAL MULLION (N) N. N.I.C. NO. or # NOM. N.T.S. NEW NORTH NOT IN CONTRACT NUMBER NOMINAL NOT TO SCALE OBS. O.C. OCC. O.D. O.F.O.S. O.F.C.I. O.H. OPNG. OPP. OBSCURE ON CENTER OCCUPANT(CY) OVERFLOW DRAIN and/or OUTSIDE DIAMETER OUTSIDE FACE OF STUD OWNER FURNISHED and CONTRACTOR INSTALLED OPPOSITE HAND OPENING OPPOSITE P.A.F. PL P.L. P. LAM PLAS. PLYWD. PR. PTD. PTN. POWDER ACTUATED FASTENER PLATE PROPERTY LINE PLASTIC LAMINATE PLASTER PLYWOOD PAIR PAINTED PARTITION Q.T. QUARRY TILE R. or RAD. R.C.P. R.D. R.E. REF. REINF. REQ'D R.H.M.S. R.H.W.S. RM. R.O. RWD. R.W.L. RADIUS REINFORCED CONCRETE PIPE ROOF DRAIN RIM ELEVATION REFERENCE REINFORCING REQUIRED ROUND HEAD METAL SCREW ROUND HEAD WOOD SCREW ROOM ROUGH OPENING REDWOOD RAIN WATER LEADER S S.A.D. S.C. S.C.D. SCHED. S.E.D. S.F. SHEATH. SHT. SIM. S.L.D. S.M. S.M.D. S.M.S. S.O.V. S.P.D. SPEC. SQ. or Ø S.S. S.S.D. STAG. STD. STL. STOR. STRUCT. S.T.S.M.S. SUSP. SOUTH SEE ARCHITECTURAL DRAWINGS SOLID CORE SEE CIVIL DRAWINGS SCHEDULE SEE ELECTRICAL DRAWINGS SQUARE FEET SHEATHING SHEET SIMILAR SEE LANDSCAPE DRAWINGS SHEET METAL SEE MECHANICAL DRAWINGS SHEET METAL SCREW SHUT OFF VALVE SEE PLUMBING DRAWINGS SPECIFICATIONS SQUARE STAINLESS STEEL SEE STRUCTURAL DRAWINGS STAGGERED STANDARD STEEL STORAGE STRUCTURAL SELF TAPPING SHEET METAL SCREW SUSPENDED T.& G. TEL. TERR. THRES. T.J. T.O.B. T.O.C. T.O.S. T.O.W. TYP. TONGUE & GROOVE TELEPHONE TERRAZZO THRESHOLD TOOLED JOINT TOP OF BEAM TOP OF CURB or CONCRETE TOP OF STEEL or SLAB TOP OF WALL TYPICAL U.O.N. UNLESS OTHERWISE NOTED VERT. V.C.P. V.C.T. V.G. V.I.F. V.T.R. V.W.C. VERTICAL VITRIFIED CLAY PIPE VINYL COMPOSITION TILE VERTICAL GRAIN VERIFY IN FIELD VENT THROUGH ROOF VINYL WALL COVERING W W/ W.C. WD. W.H. W/O W.O. WP. W. PT. W.R. WT. WEST WITH WATER CLOSET WOOD WATER HEATER WITHOUT WHERE OCCURS WATERPROOF / WEATHERPROOF WORKING POINT WATER RESISTANT WEIGHT JUDI HONEYCHURCH DAVID C. ISOM JONATHAN RICHARDSON JOAN GAUT JOHN SILVA BETHANY SMITH CHRIS WILSON AARON ORTEGA-ANDRADE DRAWING INDEX LOCATION MAP ARCHITECTURAL REFER TO ARCHITECTURAL FLOOR PLAN SHEETS AND CONSULTANT DRAWINGS FOR ADDITIONAL SYMBOLS AND REFERENCE DESIGNATIONS (PRESIDENT) (PRESIDENT-ELECT) (CLERK) (MEMBER) (MEMBER) (MEMBER) (MEMBER) (STUDENT MEMBER) DIMENSION REFERENCE 10" DISTRICT SUPERINTENDANT KRIS COREY 10" T1 A1.02 A9.01 MATERIALS REFERENCE FACE OF OBJECT CONSULTANT TITLE SHEET PARTIAL SITE PLAN & ROOF PLAN EXTERIOR DETAILS - ROOF EARTH GRAVEL / ROCK CENTER LINE OF OBJECT CONCRETE OWNER CONCRETE BLOCK (CMU) FAIRFIELD SUISUN UNIFIED SCHOOL DISTRICT 2001 WINSTON DRIVE FAIRFIELD, CA 94543 PHONE: (707) 399-5148 CONTACT: PAUL SPEED TAGS AND MARKERS STAMP SAND, GROUT, OR PLASTER PLAN REFERECE GRID 0 STEEL PLYWOOD STRUCTURAL GRID LINE WOOD, CONTINUOUS MEMBER WOOD, BLOCKING WOOD, FINISH GRADE REVISION MARKER 1 PLAN KEY NOTES Room name 101 1 101a STATE CABINET TYPES ROOM LABEL ROOM NAME ROOM NUMBER WALL TYPE MARKER PC - PREFINISHED CABINETS PM - PREFINISHED MOBILE CABINETS PR - PREFINISHED MOVEABLE CABINETS PU - PREFINISHED UTILITY CABINETS PS - SCIENCE CABINETS BUILDING KEY NOTE: REFER TO SPECIFICATIONS FOR SPECIFIC CABINET TYPE REQUIREMENTS. DOOR ID DOOR DESIGNATION ROOM NUMBER REVISIONS No. SECTION REFERENCE SECTION NUMBER CENTER LINE 1 XX-1 FINISH TAG XX-1 FLOOR FINISH TAG SIM A12.08 REFERENCE LABEL WHERE OCCURES T2 CAF T1 SHEET NUMBER T5 DETAIL REFERENCE APPLICABLE CODES T6 DETAIL NUMBER 1 2016 BUILDING STANDARDS ADMINISTRATION CODE (PART 1, TITLE 24, CCR) 2 2016 CALIFORNIA BUILDING CODE (PART 2, VOLUMES 1 AND 2, TITLE 24, CCR) 3 2016 CALIFORNIA ELECTRICAL CODE (PART 3, TITLE 24, CCR) 4 2016 CALIFORNIA MECHANICAL CODE (PART 4, TITLE 24, CCR) 5 2016 CALIFORNIA PLUMBING CODE (PART 5, TITLE 24, CCR) 6 2016 CALIFORNIA ENERGY CODE (PART 6, TITLE 24, CCR) 7 2016 CALIFORNIA FIRE CODE (PART 9, TITLE 24, CCR) 8 2016 CALGREEN BUILDING STANDARDS CODE (PART 11, TITLE 24, CCR) 9 2016 CALIFORNIA REFERENCED STANDARDS CODE (PART 12, TITLE 24, CCR) 10 TITLE 19, CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS 1 A12.08 1. 2. 3. 4. 5. 6. 7. ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PART 36) 2010 EDITION 2017 EDITION 8. NFPA 17-A STANDARD FOR WET CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2016 EDITION NFPA 80 STANDARD FOR FIRE DOOR AND OTHER OPENING PROTECTIVES 2016 EDITION 9. X NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS 2016 EDITION 10. Y NFPA 253 STANDARD METHOD OF TEST FOR CRITICAL RADIANT FLUX OF FLOOR COVERING SYSTEMS USING A RADIANT HEAT ENERGY SOURCE 2015 EDITION STANDARD ON CLEAN AGENT FIRE EXTINGUISHER SYSTEMS 2015 EDITION Z NFPA 2001 11. 12. ADMINISTRATIVE REQUIREMENTS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. REFERENCE LABEL WHERE OCCURES GENERAL NOTES PARTIAL LIST OF APPLICABLE STANDARDS (AS REFERENCED IN 2016 CBC - CHAPTER 35 & CFC): STANDARD FOR DRY CHEMICAL EXTINGUISHING SYSTEMS SIM SHEET NUMBER REFERENCE STANDARDS NFPA 17 Description A COPY OF PART 1 AND 2 CCR SHALL BE KEPT ON SITE AT ALL TIMES. ALL CONSTRUCTION CHANGE DOCUMENTS AND ADDENDA TO BE SIGNED BY AND APPROVED BY THE ARCHITECT AND OWNER. ALL TESTS TO CONFORM TO THE REQUIREMENTS OF SECTION 4-335. TESTS OF MATERIALS AND TESTING LABORATORY SHALL BE IN ACCORDANCE WITH SECTION 4-335. DSA SHALL BE NOTIFIED AT THE START OF CONSTRUCTION AND PRIOR TO PLACEMENT OF CONCRETE PER SECTION 4-331. INSPECTOR SHALL BE APPROVED BY DSA. INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4333(b). THE DUTY OF THE INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4-342. SUPERVISION OF CONSTRUCTION BY DSA SHALL BE IN ACCORDANCE WITH 4-334. CONTRACTOR, INSPECTOR, ARCHITECT, AND ENGINEERS SHALL SUBMIT VERIFIED REPORTS (FORM 6) IN ACCORDANCE WITH SECTION 4-336 AND 4-343. THE ARCHITECT AND THE STRUCTURAL ENGINEERS SHALL PERFORM THEIR DUTIES IN ACCORDANCE WITH SECTIONS 4-333(a) AND 4-341. THE CONTRACTOR SHALL PERFORM HIS DUTIES IN ACCORDANCE WITH SECTION 4-343. DSA IS NOT SUBJECT TO ARBITRATION. ITEMS OF A CIVIL, LANDSCAPE, STRUCTURAL, MECHANICAL, OR ELECTRICAL NATURE MAY NOT APPEAR ON THE ARCHITECTURAL DRAWINGS. SEE APPROPRIATE DRAWINGS FOR THESE ITEMS. DIVISION OF THE STATE ARCHITECT (DSA) APPROVAL OF THIS APPLICATION DOES NOT INCLUDE FUTURE OR N.I.C. ITEMS. ALL DEFERRED APPROVAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT AND THE APPROPRIATE CONSULTING ENGINEER FOR REVIEW & APPROVAL PRIOR TO SUBMITTING TO DSA FOR CHECKING & APPROVAL. THE FIRE SUPPRESSION SYSTEM, I.E. AUTOMATIC SPRINKLERS, HOOD-DUCT SYSTEM, WET STANDPIPES, AND HYDRANTS SHALL NOT BE INSTALLED UNTIL SHOP DRAWINGS HAVE BEEN APPROVED BY THE FIRE & LIFE SAFETY SECTION AT DSA. THE FIRE PROTECTION SIGNALING SYSTEM SHALL NOT BE INSTALLED UNTIL SHOP DRAWINGS, INCLUDING FIRE MARSHAL LISTING NUMBER FOR EACH COMPONENT OF THE SYSTEM, HAS BEEN SUBMITTED AND APPROVED BY THE STATE FIRE MARSHAL AT DSA. FOOD HANDLING FACILITIES SHALL COMPLY WITH ALL LOCAL HEALTH DEPARTMENT REQUIREMENTS & CALIFORNIA UNIFORM RETAIL FOOD FACILITIES LAW. PRIOR TO BIDDING, THE GENERAL CONTRACTOR SHALL VISIT & INSPECT THE SITE TO FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AFFECTING THE NEW WORK. THE GENERAL CONTRACTOR SHALL NOT DISPUTE, COMPLAIN, OR ASSERT THAT THERE IS ANY MISUNDERSTANDING IN REGARDS TO LOCATION, EXTENT, NATURE, OR AMOUNT OF WORK TO BE PERFORMED UNDER THIS CONTRACT DUE TO THE CONTRACTOR'S FAILURE TO INSPECT THE SITE AND/OR FAILURE TO INSPECT THE CONTRACT DOCUMENTS. THE GENERAL CONTRACTOR & SUBCONTRACTORS ARE RESPONSIBLE FOR LOCATING & VERIFYING ALL EXISTING UNDERGROUND UTILITIES IN ALL AREAS OF THE NEW WORK PRIOR TO COMMENCEMENT OF EXCAVATION. EXISTING UTILITIES SHOWN ON THE DRAWINGS ARE APPROXIMATE ROUTING LOCATIONS AS BEST DETERMINED FROM EXISTING DRAWINGS & BY THE SCHOOL DISTRICT, BUT SHOULD NOT BE CONSTRUED TO REPRESENT ALL EXISTING UTILITIES. ANY ALTERATIONS OF EXISTING FACILITIES TO ACCOMMODATE THE INSTALLATION OF NEW WORK SHALL BE REVIEWED BY THE ARCHITECT PRIOR TO COMMENCEMENT OF WORK. ALL EXISTING FINISHES OR MATERIALS DAMAGED OR DEMOLISHED DUE TO NEW CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL STATE OR REPLACED WITH NEW MATERIALS FINISHED TO MATCH EXISTING. CONTRACTOR SHALL COORDINATE ALL WORK TO AVOID DISRUPTION OF STUDENTS OR TEACHERS DURING SCHOOL HOURS. ANY DISRUPTION OF POWER, TELEPHONE, OR HVAC SYSTEMS MUST BE COORDINATED AND APPROVED BY THE DISTRICT REPRESENTATIVE PRIOR TO ANY WORK COMMENCING. COMPLIANCE WITH CFC CHAPTER 33 (FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION) AND CBC CHAPTER 33 (SAFEGUARDS DURING CONSTRUCTION) WILL BE ENFORCED. BL SG T3 T4 MILESTONES MAIN GYM GM2 S N GL SHEET TITLE SHEET AREA OF WORK EXISTING CONSTRUCTION TO REMAIN EXISTING CONDITIONS 1. TYPE OF EXISTING CONSTRUCTION: 2. NUMBER OF FLOORS: 3. NUMBER OF BASEMENTS: 4. FULLY SPRINKLERED BUILDING: 5. EXISTING OCCUPANCY GROUP: 6. BUILDING AREA IN SQ. FT: 7. YEAR BUILT: III-B VARIES 1 NO A,E ±35,100 1952, 1956 DATE SCOPE OF WORK THE SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO, SELECTIVE REMOVAL AND REPLACEMENT OF THE EXISTING LOW ROOF AT THE GYMNASIUM BUILDING. THE SCOPE ALSO INCLUDES REMOVAL AND REPLACEMENT OF WALKWAY OVERHANGS ALONG EXISTING GYMNASIUM BUILDING. EXTERIOR SCOPE FOR WORK INCLUDES, BUT IS NOT LIMITED TO REMOVAL AND/OR REPLACEMENT OF HVAC EQUIPMENT, ELECTRICAL, AND FIRE ALARM. DEFERRED APPROVAL ITEMS NONE JOB # 04/24/2017 2017026 SHEET # T1 Date GENERAL SHEET NOTES aedis architects A CONTRACTOR SHALL MAINTAIN FIRE LANE ACCESS THROUGHOUT PROJECT. B DO NOT INTERRUPT EXISTING UTILITY SERVICES SERVING OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AND COORDINATED WITH THE OWNER. C PROTECT EXISTING & NEW STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, TREES AND SHRUBS FROM DAMAGE DURING CONSTRUCTION. D CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING PROTECTION FOR DISTRICT PROPERTY EXPOSED TO INCLEMENT WEATHER AS A RESULT OF CONSTRUCTION. 387 S. 1st Street, Suite 300 CONTRACTOR TO COORDINATE ALL WORK WITH DISTRICT SCHEDULE INCLUDING TEMPORARY SHUT DOWN OF EXISTING ELECTRICAL, MECHANICAL, AND VENTILATION SYSTEMS DURING CONSTRUCTION. fax: (408)-300-5121 www.aedisarchitects.com E (E) COVERED WALKWAY N.I.C. (E) BUILDING N.I.C. 1 A9.01 7 TYP. +/- 33' - 6" 2 SIM. A9.01 8 SIM. 7 14 1& SIM. A9.01 8 2 2 SIM. A9.01 A9.01 7 +/- 46' - 0" 2 SIM. SIM. +/- 21' - 6" 8 (E) TYP. 8 14 1& 3 A9.01 A9.01 SIM. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING ANY WORK. J CONTRACTOR SHALL PROVIDE ADVANCE NOTICE TO THE ARCHITECT AND/OR OWNER'S REPRESENTATIVE TO INSPECT THE EXISTING DECKING FOR PRE-EXISTING DAMAGE PRIOR TO INSTALLATION OF NEW ROOFING. K REMOVE EXISTING EXPOSED WOOD SUPPORTS FOR EQUIPMENT AND/OR PIPING THROUGHOUT AND REPLACE-IN-KIND UNLESS OTHERWISE NOTED. PROTECT AND REATTACH TO MATCH OR EXCEED PRE-EXISTING CONDITIONS AND INTERVALS. CONSULTANT (E) BUILDING N.I.C. ROOF PLAN KEYNOTES (E) BUILDING N.I.C. 1 2 1 2 A9.01 3 4 SIM. 2 SIM. 7 2 7 TYP. SIM. 2 A9.01 A9.01 3' - 0" OVERHANG 7 TYP. 8 5 6 7 8 SIM. 9 +/- 60' - 0" 2 8 A9.01 10 7 1 &1 4 5 ARMIJO HIGH SCHOOL GYM ROOFING REPLACEMENT FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT 8 A9.01 A9.01 I A9.01 SIM. 9 TYP. 8 CONTRACTOR SHALL PROTECT AND RE-USE EXISTING FLASHING AT WALLS AND CURBS TO RE-ESTABLISH ASSEMBLY PERFORMANCE AND PROTECTION AGAINST WEATHER. SUCH CONDITIONS SHALL SATISFY THE REQUIREMENTS OF THE ROOFING SYSTEM MANUFACTURER AND WITHOUT COMPROMISE TO WARRANTY. PROJECT 2 A9.01 2 8 H 9 TYP. +/- 48' - 0" A9.01 OVERHANG 14 1& 7 TYP. THE SLOPES IDENTIFIED IN THESE PLANS ARE ASSUMED TO BE PRE-EXISTING. THE CONTRACTOR SHALL PROVIDE AND INSTALL REPLACEMENT ROOFING TO ACHIEVE POSITIVE DRAINAGE AS INTENDED THROUGHOUT. PROVIDE 1/4" MIN. SLOPE CRICKETS AT EXISTING EQUIPMENT AND SKYLIGHT CURBS AS NEEDED. 9 TYP. 7 (E) TYP. A9.01 +/- 40' - 6" 1 &1 4 3' - 0" 2 8 2 TYP. 9 8 A9.01 (E) TYP. G SIM. 7 (E) TYP. ALL EXISTING ROOFTOP EQUIPMENT, CONDUITS, SUPPORTS SHALL REMAIN UNLESS OTHERWISE NOTED. CONTRACTOR SHALL PROTECT AND MAINTAIN THESE ITEMS AS NEEDED TO COMPLETE CONSTRUCTION. PROVIDE ROOFING PER DETAILS ON SHEET A9.01. tel: (408)-300-5160 A9.01 +/- 127' - 0 1/32" 8 8 F San Jose, CA 95113 11 A9.01 SIM. 12 13 (E) ENTRANCE CANOPY. (E) SKYLIGHT. PROVIDE '3M SUN CONTROL AFFINITY 30' OR APPROVED EQUAL TO EXISTING GLAZING AND INSTALL PER MANUFACTURER'S RECOMMENDATIONS. (E) ROOF ACCESS HATCH. SEE DETAIL 6/A9.01. REMOVE (E) SURFACE MOUNTED PIPE SUPPORTS ON FACE OF CONCRETE WALL. PATCH AND REPAIR EXISTING ATTACHMENT HOLES. PAINT TO MATCH (E) ADJACENT. (E) ROOF ACCESS LADDER. (E) ROOFTOP PENTHOUSE. SEE DETAIL 4/A9.01 SIM. (E) DOWNSPOUT AND SPLASH PAN. PROTECT AND REINSTALL WHERE OCCURS. MODIFIED BITUMEN BUILT-UP ROOFING SYSTEM, INCLUDING FLASHING AND ACCESSORIES. REMOVE (E) COMPOSITION ROOFING TO (E) CONCRETE DECK AND PREPARE FOR NEW PRIOR TO INSTALLATION. REFER TO SHEET A9.01 FOR TYPICAL ROOFING DETAILS. REMOVE (E) EDGE STOP FLASHING AND PROVIDE EDGE FLASHING WITH ROOFING SYSTEM. PROTECT AND REINSTALL (E) GUTTERS WHERE OCCURS. REMOVE (E) ABANDONED CONDUIT/PIPING IDENTIFIED BY DISTRICT. PATCH AND INFILL (E) PENETRATION INTO BUILDING AND CAP BELOW ROOF DECK U.O.N. REMOVE (E) ABANDONED HOT WATER INSULATED PIPING IDENTIFIED BY DISTRICT, INCLUDING WOOD BLOCKING AND/OR SUPPORTS UNSHARED WITH OTHER ROOFTOP PIPING OR EQUIPMENT. PATCH AND INFILL (E) PENETRATION INTO BUILDING AND CAP IMMEDIATELY OUTSIDE (E) WALL AND BELOW GRADE. (E) ROOFTOP DRAIN. SEE DETAIL 11/A9.01. (E) OVERFLOW SCUPPER. SEE DETAIL 10/A9.01. STAMP 3 7 6 11 7 1 TYP. 2 SIM. A9.01 7 A9.01 7 (E) UPPER ROOF N.I.C. +/- 150' - 6" WASHINGTON STREET (E) POOL 9 TYP. TYP. 2 STATE SIM. 3 A9.01 GRAPHIC KEY 7 8 TYP. 2 (E) POOL REVISIONS 8 (E) TYP. TYP. 7 24 2& 2 SIM. +/- 13' - 9" 1 SIM. (E) BUILDING N.I.C. 7 TYP. A9.01 (E) ROOF EDGE WITH GUTTER Date GUTTER 3 TYP. 8 12 13 10 (E) FLUE, SEE DETAILS 13 & 14/A9.01 12 13 +/- 68' - 4" (E) ROOFTOP DRAIN, SEE DETAIL 11/A9.01 TYP. 9 (E) TREES 3 1 A9.01 4/24/2017 6:08:16 PM C:\Users\jbrown\Documents\2017026 - Armijo HS Reroof at Gym (CENTRAL)_jbrown36UXL.rvt +/- 14' - 4" +/- 98' - 4" 3 4 12 13 BUILDING KEY (E) TENNIS COURTS, N.I.C. 8 +/- 45' - 4" (E) TYP. 7 (E) EXHAUST FAN No. Description SIM. 24 2& (E) TYP. A9.01 (E) CHAIN LINK FENCE A9.01 A9.01 SIM. (E) MECHANICAL EQUIPMENT MILESTONES SD T2 DD 50% CD CAF 90% CD T1 12 13 DSA SUB T5 A9.01 T6 SHEET BL SG T3 PARTIAL SITE PLAN & ROOF PLAN T4 MAIN GYM TEXAS STREET GM2 S N N DATE 04/24/2017 GL PARTIAL SITE PLAN & ROOF PLAN 1 SCALE: 1/16" = 1'-0" JOB # 2017026 SHEET # AREA OF WORK A1.02 METAL EDGE SET IN ROOF CEMENT, NAILED 3" O.C. STAGGERED PRIME METAL FLANGE PRIOR TO STRIPPING 4 LB LEAD JACK FLASHING IN BED OF ELASTOMERIC ROOFING CEMENT, NAIL @ 3" O.C. (E) PASSIVE VENT/AIR INTAKE HPR MODIFIED MEMBRANE WITH A REFLECTIVE SURFACE URETHANE SEALANT, 1/2" BEAD MIN. ALL AROUND LEAD JACK. CANTED 45 DEG. aedis architects HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD BASE FLASHIING PLY 6" MIN. ON FIELD HPR MODIFIED MEMBRANE S.S. HOSE CLAMP BEAD OF ELASTOMERIC ROOFING CEMENT ALL AROUND CONDUIT FLASHING, TYP. BASE FLASHING PLY 6" MIN. ON FIELD RUBBERIZED ASPHALT SEALANT FELT BASE PLIES 8" MIN. HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD www.aedisarchitects.com FELT PLIES (E) 2 1/2" HPR FLASHING FASTENED 8" O.C. HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD HPR MODIFIED MEMBRANE BASE FLASHING PLY 6" MIN. ON FIELD 4" MIN. CONTINUOUS CLEAT FASTENED 6" O.C. 387 S. 1st Street, Suite 300 (E) LIGHT WEIGHT INSULATING CONC. San Jose, CA 95113 NAILED BASE SHEET fax: (408)-300-5121 tel: (408)-300-5160 8" MIN. CANT STRIP PROJECT (E) 1" HPR MODIFIED MEMBRANE ARMIJO HIGH SCHOOL GYM ROOFING REPLACEMENT FELT BASE PLIES (E) STRUCTURAL DECK NAILED BASE SHEET BASE SHEET (E) LIGHT WEIGHT INSULATING CONCRETE (E) GYPSUM CONCRETE ROOF DECK (E) STRUCTURAL DECK (E) CONDUIT PENETRATION PASSIVE VENT/AIR INTAKE 13 SCALE: 1 1/2" = 1'-0" ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING MODIFIED HOT ADHESIVE (E) GUTTER FASTENED 6" O.C. BASE PLIES EXTEND ONE PLY OVER BLOCKING NAILED BASE SHEET (E) GUTTER STRAP (E) LIGHT WEIGHT INSULATING CONCRETE (E) GUTTER BRACKET (E) STRUCTURAL DECK ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING (E) REFRIGERANT PIPING 9 SCALE: 3" = 1'-0" ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING TYPICAL ROOF SECTION, COATED FINISH 5 SCALE: 1 1/2" = 1'-0" FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT EDGE WITH GUTTER 1 ROOF SCALE: 3" = 1'-0" (E) 3' - 6" CONSULTANT COUNTERFLASHING ANCHORED 8" O.C. SET METAL FLANGE IN ROOF CEMENT AND PRIME PRIOR TO STRIPPING RUBBERIZED ASPHALT SEALANT FASTEN PLIES TO CANT DAM WITH FLAT HEAD FASTENER @ 8" O.C. 22 GA. CANT DAM RUBBERIZED ASPHALT SEALANT HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD (E) INTERIOR HANDLE BASE FLASHING PLY 6" MIN. ON FIELD HPR MODIFIED MEMBRANE CANT FASTENED TO NAILER HPR MODIFIED MEMBRANE (E) ROOF DRAIN, SEE DETAIL10/A9.01 BASE FLASHIING PLY 6" MIN. ON FIELD HPR MODIFIED MEMBRANE (E) 8" (E) LIGHT WEIGHT INSULATING CONCRETE 8" MIN. (E) 2 1/2" FELT PLIES (E) STRUCTURAL DECK (E) 2" (E) 2 1/2" HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD TERMINATION BAR FASTENED 8" O.C. NAILED BASE SHEET (E) STRUCTURAL DECK NAILED BASE SHEET SET (E) LEAD FLANGE IN MASTIC, PRIME FLANGE BEFORE STRIPPING (E) LIGHT WEIGHT INSULATING CONCRETE (E) LIGHT WEIGHT INSULATING CONCRETE CAULKING (E) LIGHT WEIGHT INSULATING CONC. (E) RAIN WATER GUTTER ANCHORS BY OTHERS (E) CINDER CONCRETE INFILL (E) STRUCTURAL DECK CANT DAM FASTENED @ 12" O.C. EXTEND PLIES OVER BLOCKING, FASTEN 8" O.C. (E) FLUTE IN WALL SCUPPER (THROUGH WALL) 10 SCALE: 3" = 1'-0" ROOF HATCH 6 SCALE: 3" = 1'-0" LEAD FLASHING 30" SQ. MIN. SET IN MASTIC, WRAPPED DOWN 2" MIN., PRIME TOP SURFACE BEFORE FLASHING TEMPERATURE APPROPRIATE ELASTOMERIC SEALANT DRAWBAND OR WELD UMBRELLA TO STACK HPR MODIFIED MEMBRANE MIN. 48" RUBBERIZED ASPHALT SEALANT UMBRELLA STORM COLLAR SET IN MASTIC, PRIME FLANGE CONTINUOUS BUTYL TAPE EXPANSION FASTENER (E) STRAINER TERMINATION BAR FASTENED 8" O.C. COUNTERFLASHING ANCHORED 8" O.C. (E) CLAMPING RING HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD POLYURETHANE SEALANT BASE FLASHING PLY 6" MIN. ON FIELD TERMINATION BAR FASTENED 8" O.C. THROUGH BUTYL TAPE HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD BASE FLASHING PLY 40" BASE FLASHING PLY 6" MIN. ON FIELD HPR MODIFIED MEMBRANE FELT BASE PLIES HPR MODIFIED MEMBRANE FELT PLIES HPR MODIFIED MEMBRANE (E) LIGHT WEIGHT INSULATING CONCRETE REVISIONS (E) STRUCTURAL DECK (E) LIGHT WEIGHT INSULATING CONCRETE (E) DECK CLAMP (E) STRUCTURE BELOW @ (E) HEAT STACK 15 ROOFING SCALE: 1 1/2" = 1'-0" ROOFING @ (E) ROOF DRAIN 11 SCALE: 3" = 1'-0" ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING FELT PLIES (E) LIGHT WEIGHT INSULATING CONC. NAILED BASE SHEET (E) STRUCTURAL DECK CANT STRIP (E) 1" FIBER GLASS (E) LIGHT WEIGHT INSULATING CONCRETE, TAPERED TO DRAIN ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING HPR MODIFIED MEMBRANE (E) 2 1/2" (E) STRUCTURAL DECK Date BASE FLASHING PLY 6" MIN. ON FIELD (E) BENT PLATE NAILED BASE SHEET No. Description HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD NAILED BASE SHEET NAILED BASE SHEET STATE POLYURETHANE SEALANT FASTENER WITH NEOPRENE WASHER RUBBERIZED ASPHALT SEALANT FELT BASE PLIES 4" MIN. ROOF EDGE EXTRUDED 2 METAL SCALE: 1 1/2" = 1'-0" HEIGHT VARIES HEAT STACK ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING 8" MIN. ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING ROOFING @ (E) PLUMBING STACK 14 SCALE: 1 1/2" = 1'-0" STAMP NAILED BASE SHEET NAILED BASE SHEET ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING SKYLIGHT 7 SCALE: 3" = 1'-0" (E) 1" 4" MIN. FASTENER @ 18" O.C. (BY MANUFACTURER) (E) INTEGRAL CAP FLASHING HPR MODIFIED MEMBRANE FELT PLIES CONCEALED SPLICE PLATE BETWEEN 10' SECTIONS FASTENER WITH NEOPRENE WASHER BASE FLASHING PLY 6" MIN. ON FIELD FELT BASE PLIES EXTRUDED ALUMINUM FASCIA COVER CONTINUOUS BUTYL TAPE HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN ON FIELD (E) 1' - 0" 12" MIN. BASE FLASHING PLY 8" MIN. ON FIELD (E) REGLET FLASHING 4 27/32"2 13/32" (E) PLUMBING VENT STACK HPR MODIFIED MEMBRANE FLASHING PLY 12" MIN. ON FIELD (E) EXTERIOR LOCK PROVISION (E) ROOF HATCH SPECIFY ROLL DOWN LEAD FLASHING 1" MIN DOWN INTO PIPE MILESTONES MOUNTED COUNTERFLASHING 3 REGLET SCALE: 3" = 1'-0" SD DD 50% CD DSA SUB HPR FLASHING FASTENED 8" O.C. HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD (E) GASKET WITH NEW ANCHORAGE BASE FLASHING PLY 6" MIN. ON FIELD FELT BASE PLIES HPR MODIFIED MEMBRANE 8" MIN. NAILED BASE SHEET (E) LIGHT WEIGHT INSULATING CONC. FELT BASE PLIES (E) 1/2" DIA. BOLTS TERMINATION BAR FASTENED 8" O.C. THROUGH BUTYL TAPE CONTINUOUS BUTYL TAPE HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD RUBBERIZED ASPHALT SEALANT HPR MODIFIED MEMBRANE TERMINATION BAR FASTENED 8" O.C. ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING (E) STRUCTURAL DECK COUNTERFLASHING FASTENED 8" O.C. THROUGH BUTYL TAPE POLYURETHANE SEALANT FASTENER WITH NEOPRENE WASHER CANT STRIP POLYURETHANE SEALANT (E) STUDS 16" O.C. WELDED TO TOP BOLTS SHEET EXTERIOR DETAILS - ROOF BASE FLASHING PLY 6" MIN. ON FIELD 8" MIN. (E) 2"x1/4" F.B. STRING TO BE REMOVED AND REINSTALLED AFTER REROOFING (E) 1/8" METAL SCREWS 8" O.C. HEIGHT VARIES (E) METAL EXHAUST FAN COVER (E) 3/4" DIA. RUNGS (E) 1' - 6" 4/24/2017 6:08:18 PM C:\Users\jbrown\Documents\2017026 - Armijo HS Reroof at Gym (CENTRAL)_jbrown36UXL.rvt 90% CD HPR MODIFIED MEMBRANE FELT PLIES (E) LIGHT WEIGHT INSULATING CONC. NAILED BASE SHEET HPR MODIFIED MEMBRANE FLASHING PLY 9" MIN. ON FIELD BASE FLASHING PLY 6" MIN. ON FIELD HPR MODIFIED MEMBRANE FELT PLIES (E) BENT PLATE NAILED BASE SHEET (E) STRUCTURAL DECK (E) LIGHT WEIGHT INSULATING CONCRETE CANT STRIP NAILED BASE SHEET (E) STRUCTURAL DECK ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING (E) ROOF ACCESS LADDER - BASE FLASHING 16 SCALE: 3" = 1'-0" (E) LIGHT WEIGHT INSULATING CONC. (E) 1" FIBER GLASS EXHAUST FAN 12 SCALE: 1 1/2" = 1'-0" ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING SKYLIGHT 8 SCALE: 3" = 1'-0" DATE 04/24/2017 JOB # ALL PLIES SET IN BITUMEN SEE SPECIFICATIONS FOR SURFACING MOUNTED COUNTERFLASHING 4 SURFACE SCALE: 3" = 1'-0" 2017026 SHEET # A9.01 aedis architects CLEO GORDON E.S. ROOFING REPLACEMENT www.aedisarchitects.com 387 S. 1st Street, Suite 300 San Jose, CA 95113 tel: (408)-300-5160 fax: (408)-300-5121 PROJECT CLEO GORDON E.S. ROOFING REPLACEMENT 1950 DOVER AVENUE, FAIRFIELD, CA. 94533 FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT CONSTRUCTION DOCUMENTS 4/24/2017 6:01:05 PM C:\Users\jbrown\Documents\2017028 - Cleo Gordon ES Re-Roofing (CENTRAL)_jbrown36UXL.rvt ABBREVIATIONS & @ A.B. ABV. A.C. ACT ADJ. A.F.F. ALUM. A.P. APPROX. ARCH. AND AT ANCHOR BOLT ABOVE ASPHALTIC CONCRETE ACOUSTIC TILE ADJUSTABLE ABOVE FINISHED FLOOR ALUMINUM ACCESS PANEL APPROXIMATELY ARCHITECT BD. BLDG. BLKG. BM B.M. BOT. BTWN B.W. BOARD BUILDING BLOCKING BEAM BENCH MARK BOTTOM BETWEEN BOTH WAYS CAB. C.B. C.C or O.C. CEM. CER. TILE C.G. C.I. C.J. CLG. CLKG. CLR. CMU CNTR. C.O. COL. CONC. CONST. CONT. CONTR. C.P. CTR. CTSK. C.W. CABINET CATCH BASIN CENTER TO CENTER CEMENT CERAMIC TILE CORNER GUARD CAST IRON CONTROL JOINT CEILING CAULKING CLEAR CONCRETE MASONRY UNIT COUNTER CLEANOUT COLUMN CONCRETE CONSTRUCTION CONTINUOUS CONTRACTOR CONCRETE PIPE CENTER COUNTER SUNK COLD WATER D.A. DBL D.F. D.FIR DTL. DIA. or Ø DIM. DISP. DN DO DR. DS. DWG. DISABLED ACCESS DOUBLE DRINKING FOUNTAIN DOUGLAS FIR DETAIL DIAMETER DIMENSION DISPOSAL DOWN DITTO DOOR DOWNSPOUT DRAWING (E) E. EA. E.J. ELEC. EL. ELEV. ENCL. EQ. EQUIP. E.W. E.W.C. EX. EXP. EXT. EXISTING EAST EACH EXPANSION JOINT ELECTRIC or ELECTRICAL ELEVATION ELEVATOR ENCLOSE and/or ENCLOSURE EQUAL EQUIPMENT EACH WAY ELECTRIC WATER COOLER EXPANSION EXPOSED EXTERIOR F.A. F.D. FDN. F.E. F.E.C. F.H. F.H.C. F.H.S.M.S. F.H.W.S. FIN. FL. or FLR. F.O.C. F.O.F. F.O.M. F.O.S. F.S. FT. FTG. FURR. FIRE ALARM FLOOR DRAIN FOUNDATION FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FIRE HYDRANT FIRE HOSE CABINET FLAT HEAD SHEET METAL SCREW FLAT HEAD WOOD SCREW FINISH FLOOR FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY FACE OF STUD FINISH SLAB FOOT OR FEET FOOTING FURRING GA. GALV. G.B. G.I. GL. GLU-LAM GND. GR. GYP. GAUGE GALVANIZED GRAB BAR GALVANIZED IRON GLASS GLUE-LAMINATED GROUND GRADE GYPSUM H.B. H.C. HDWD. HDWR. H.M. HORIZ. HR. HT. HOSE BIBB HOLLOW CORE HARDWOOD HARDWARE HOLLOW METAL HORIZONTAL HOUR HEIGHT I.D. INSUL. INT. INV. INSIDE DIAMETER INSULATION INTERIOR INVERT MAX. M.B. MECH. MFR. M.H. MIN. MIR. MISC. M.O. M.S. MTD. MTL. MUL. MAXIMUM MACHINE BOLT MECHANICAL MANUFACTURER MANHOLE MINIMUM MIRROR MISCELLANEOUS MASONRY OPENING MACHINE SCREW MOUNTED METAL MULLION (N) N. N.I.C. NO. or # NOM. N.T.S. NEW NORTH NOT IN CONTRACT NUMBER NOMINAL NOT TO SCALE OBS. O.C. OCC. O.D. O.F.O.S. O.F.C.I. O.H. OPNG. OPP. OBSCURE ON CENTER OCCUPANT(CY) OVERFLOW DRAIN and/or OUTSIDE DIAMETER OUTSIDE FACE OF STUD OWNER FURNISHED and CONTRACTOR INSTALLED OPPOSITE HAND OPENING OPPOSITE P.A.F. PL P.L. P. LAM PLAS. PLYWD. PR. PTD. PTN. POWDER ACTUATED FASTENER PLATE PROPERTY LINE PLASTIC LAMINATE PLASTER PLYWOOD PAIR PAINTED PARTITION Q.T. QUARRY TILE R. or RAD. R.C.P. R.D. R.E. REF. REINF. REQ'D R.H.M.S. R.H.W.S. RM. R.O. RWD. R.W.L. RADIUS REINFORCED CONCRETE PIPE ROOF DRAIN RIM ELEVATION REFERENCE REINFORCING REQUIRED ROUND HEAD METAL SCREW ROUND HEAD WOOD SCREW ROOM ROUGH OPENING REDWOOD RAIN WATER LEADER S S.A.D. S.C. S.C.D. SCHED. S.E.D. S.F. SHEATH. SHT. SIM. S.L.D. S.M. S.M.D. S.M.S. S.O.V. S.P.D. SPEC. SQ. or Ø S.S. S.S.D. STAG. STD. STL. STOR. STRUCT. S.T.S.M.S. SUSP. SOUTH SEE ARCHITECTURAL DRAWINGS SOLID CORE SEE CIVIL DRAWINGS SCHEDULE SEE ELECTRICAL DRAWINGS SQUARE FEET SHEATHING SHEET SIMILAR SEE LANDSCAPE DRAWINGS SHEET METAL SEE MECHANICAL DRAWINGS SHEET METAL SCREW SHUT OFF VALVE SEE PLUMBING DRAWINGS SPECIFICATIONS SQUARE STAINLESS STEEL SEE STRUCTURAL DRAWINGS STAGGERED STANDARD STEEL STORAGE STRUCTURAL SELF TAPPING SHEET METAL SCREW SUSPENDED T.& G. TEL. TERR. THRES. T.J. T.O.B. T.O.C. T.O.S. T.O.W. TYP. TONGUE & GROOVE TELEPHONE TERRAZZO THRESHOLD TOOLED JOINT TOP OF BEAM TOP OF CURB or CONCRETE TOP OF STEEL or SLAB TOP OF WALL TYPICAL U.O.N. UNLESS OTHERWISE NOTED VERT. V.C.P. V.C.T. V.G. V.I.F. V.T.R. V.W.C. VERTICAL VITRIFIED CLAY PIPE VINYL COMPOSITION TILE VERTICAL GRAIN VERIFY IN FIELD VENT THROUGH ROOF VINYL WALL COVERING W W/ W.C. WD. W.H. W/O W.O. WP. W. PT. W.R. WT. WEST WITH WATER CLOSET WOOD WATER HEATER WITHOUT WHERE OCCURS WATERPROOF / WEATHERPROOF WORKING POINT WATER RESISTANT WEIGHT JANITOR JOINT Y K.D. KILN DRIED Z LAB. LAM. LAV. LKR. LT. LABORATORY LAMINATE LAVATORY LOCKER LIGHT DRAWING INDEX REFER TO ARCHITECTURAL FLOOR PLAN SHEETS AND CONSULTANT DRAWINGS FOR ADDITIONAL SYMBOLS AND REFERENCE DESIGNATIONS JUDI HONEYCHURCH DAVID C. ISOM JONATHAN RICHARDSON JOAN GAUT JOHN SILVA BETHANY SMITH CHRIS WILSON AARON ORTEGA-ANDRADE DIMENSION REFERENCE 10" DISTRICT SUPERINTENDANT KRIS COREY 10" FACE OF OBJECT T1 A5.01 A9.01 TITLE SHEET PARTIAL SITE PLAN & ROOF PLAN EXTERIOR DETAILS - ROOF EARTH GRAVEL / ROCK CENTER LINE OF OBJECT CONCRETE FAIRFIELD SUISUN UNIFIED SCHOOL DISTRICT 2001 WINSTON DRIVE FAIRFIELD, CA 94543 PHONE: (707) 399-5148 CONTACT: PAUL SPEED CONCRETE BLOCK (CMU) TAGS AND MARKERS STAMP SAND, GROUT, OR PLASTER PLAN REFERECE GRID 0 ARCHITECTURAL MATERIALS REFERENCE OWNER STEEL CONSULTANTS PLYWOOD STRUCTURAL GRID LINE ROOFING WOOD, CONTINUOUS MEMBER THE GARLAND COMPANY, INC. 3800 EAST 91ST STREET CLEVELAND, OH 44105 (925)890-6509 WOOD, BLOCKING WOOD, FINISH GRADE REVISION MARKER 1 CABINET TYPES PLAN KEY NOTES PC - PREFINISHED CABINETS PM - PREFINISHED MOBILE CABINETS PR - PREFINISHED MOVEABLE CABINETS PU - PREFINISHED UTILITY CABINETS PS - SCIENCE CABINETS STATE 2195 UNION AVENUE, FAIRFIELD, CA 94533 Room name 101 1 101a 1 2016 CALIFORNIA BUILDING CODE (PART 2, VOLUMES 1 AND 2, TITLE 24, CCR) 3 2016 CALIFORNIA ELECTRICAL CODE (PART 3, TITLE 24, CCR) 4 2016 CALIFORNIA MECHANICAL CODE (PART 4, TITLE 24, CCR) 5 2016 CALIFORNIA PLUMBING CODE (PART 5, TITLE 24, CCR) 6 2016 CALIFORNIA ENERGY CODE (PART 6, TITLE 24, CCR) 7 2016 CALIFORNIA FIRE CODE (PART 9, TITLE 24, CCR) 8 2016 CALGREEN BUILDING STANDARDS CODE (PART 11, TITLE 24, CCR) 9 2016 CALIFORNIA REFERENCED STANDARDS CODE (PART 12, TITLE 24, CCR) 10 TITLE 19, CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS Description XX-1 FLOOR FINISH TAG SIM A12.08 REFERENCE LABEL WHERE OCCURES SHEET NUMBER SIM D REFERENCE LABEL WHERE OCCURES GENERAL NOTES 2. STANDARD FOR DRY CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION 4. NFPA 17-A STANDARD FOR WET CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2016 EDITION NFPA 80 STANDARD FOR FIRE DOOR AND OTHER OPENING PROTECTIVES 2016 EDITION NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS 2016 EDITION NFPA 253 STANDARD METHOD OF TEST FOR CRITICAL RADIANT FLUX OF FLOOR COVERING SYSTEMS USING A RADIANT HEAT ENERGY SOURCE 2015 EDITION STANDARD ON CLEAN AGENT FIRE EXTINGUISHER SYSTEMS 2015 EDITION 5. 6. PRIOR TO BIDDING, THE GENERAL CONTRACTOR SHALL VISIT & INSPECT THE SITE TO FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AFFECTING THE NEW WORK. THE GENERAL CONTRACTOR SHALL NOT DISPUTE, COMPLAIN, OR ASSERT THAT THERE IS ANY MISUNDERSTANDING IN REGARDS TO LOCATION, EXTENT, NATURE, OR AMOUNT OF WORK TO BE PERFORMED UNDER THIS CONTRACT DUE TO THE CONTRACTOR'S FAILURE TO INSPECT THE SITE AND/OR FAILURE TO INSPECT THE CONTRACT DOCUMENTS. THE GENERAL CONTRACTOR & SUBCONTRACTORS ARE RESPONSIBLE FOR LOCATING & VERIFYING ALL EXISTING UNDERGROUND UTILITIES IN ALL AREAS OF THE NEW WORK PRIOR TO COMMENCEMENT OF EXCAVATION. EXISTING UTILITIES SHOWN ON THE DRAWINGS ARE APPROXIMATE ROUTING LOCATIONS AS BEST DETERMINED FROM EXISTING DRAWINGS & BY THE SCHOOL DISTRICT, BUT SHOULD NOT BE CONSTRUED TO REPRESENT ALL EXISTING UTILITIES. ANY ALTERATIONS OF EXISTING FACILITIES TO ACCOMMODATE THE INSTALLATION OF NEW WORK SHALL BE REVIEWED BY THE ARCHITECT PRIOR TO COMMENCEMENT OF WORK. ALL EXISTING FINISHES OR MATERIALS DAMAGED OR DEMOLISHED DUE TO NEW CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL STATE OR REPLACED WITH NEW MATERIALS FINISHED TO MATCH EXISTING. CONTRACTOR SHALL COORDINATE ALL WORK TO AVOID DISRUPTION OF STUDENTS OR TEACHERS DURING SCHOOL HOURS. ANY DISRUPTION OF POWER, TELEPHONE, OR HVAC SYSTEMS MUST BE COORDINATED AND APPROVED BY THE DISTRICT REPRESENTATIVE PRIOR TO ANY WORK COMMENCING. COMPLIANCE WITH CFC CHAPTER 33 (FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION) AND CBC CHAPTER 33 (SAFEGUARDS DURING CONSTRUCTION) WILL BE ENFORCED. EXISTING BUILDINGS: A A B C D MULTI-PURPOSE, ADMIN., LIBRARY CLASSROOMS CLASSROOM CLASSROOMS MILESTONES C SHEET TITLE SHEET ADMINISTRATIVE REQUIREMENTS 10. 11. No. AREA OF WORK SHEET NUMBER NFPA 17 9. 1 1 A12.08 3. 7. 8. REVISIONS DETAIL NUMBER ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PART 36) 2010 EDITION 6. SECTION REFERENCE EXISTING CONSTRUCTION SECTION NUMBER FINISH TAG PARTIAL LIST OF APPLICABLE STANDARDS (AS REFERENCED IN 2016 CBC - CHAPTER 35 & CFC): 3. 4. 5. NOTE: REFER TO SPECIFICATIONS FOR SPECIFIC CABINET TYPE REQUIREMENTS. DOOR ID BUILDING KEY DETAIL REFERENCE REFERENCE STANDARDS 1. 2. WALL TYPE MARKER XX-1 1. NFPA 2001 ROOM NAME ROOM NUMBER CENTER LINE 2016 BUILDING STANDARDS ADMINISTRATION CODE (PART 1, TITLE 24, CCR) 2 ROOM LABEL DOOR DESIGNATION ROOM NUMBER APPLICABLE CODES X JAN. JT LOCATION MAP SYMBOL LEGEND GOVERNING BOARD CONSULTANT A COPY OF PART 1 AND 2 CCR SHALL BE KEPT ON SITE AT ALL TIMES. ALL CONSTRUCTION CHANGE DOCUMENTS AND ADDENDA TO BE SIGNED BY AND APPROVED BY THE ARCHITECT AND OWNER. ALL TESTS TO CONFORM TO THE REQUIREMENTS OF SECTION 4-335. TESTS OF MATERIALS AND TESTING LABORATORY SHALL BE IN ACCORDANCE WITH SECTION 4-335. DSA SHALL BE NOTIFIED AT THE START OF CONSTRUCTION AND PRIOR TO PLACEMENT OF CONCRETE PER SECTION 4-331. INSPECTOR SHALL BE APPROVED BY DSA. INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4333(b). THE DUTY OF THE INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4-342. SUPERVISION OF CONSTRUCTION BY DSA SHALL BE IN ACCORDANCE WITH 4-334. CONTRACTOR, INSPECTOR, ARCHITECT, AND ENGINEERS SHALL SUBMIT VERIFIED REPORTS (FORM 6) IN ACCORDANCE WITH SECTION 4-336 AND 4-343. THE ARCHITECT AND THE STRUCTURAL ENGINEERS SHALL PERFORM THEIR DUTIES IN ACCORDANCE WITH SECTIONS 4-333(a) AND 4-341. THE CONTRACTOR SHALL PERFORM HIS DUTIES IN ACCORDANCE WITH SECTION 4-343. DSA IS NOT SUBJECT TO ARBITRATION. EXISTING CONDITIONS 1. TYPE OF EXISTING CONSTRUCTION: 2. NUMBER OF FLOORS: 3. NUMBER OF BASEMENTS: 4. FULLY SPRINKLERED BUILDING: 5. EXISTING OCCUPANCY GROUP: 6. BUILDING AREA IN SQ. FT: 7. YEAR BUILT: V 1 NONE NO E, A & B 32,372 SQ. FT. B SCOPE OF WORK 1. REMOVE EXISTING COMPOSITION ROOFING TO EXISTING WOOD DECK AND REPLACE WITH NEW MODIFIED BITUMENT BUILT-UP ROOFING SYSTEM AT BUILDINGS SHOWN PER PLANS. DEFERRED APPROVAL NONE. DATE JOB # 04/24/2017 2017026 SHEET # T1 Date GENERAL SHEET NOTES A CONTRACTOR SHALL MAINTAIN FIRE LANE ACCESS THROUGHOUT PROJECT. B DO NOT INTERRUPT EXISTING UTILITY SERVICES SERVING OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AND COORDINATED WITH THE OWNER. C PROTECT EXISTING & NEW STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, TREES AND SHRUBS FROM DAMAGE DURING CONSTRUCTION. PREVENT MOISTURE INTRUSION DURING CONSTRUCTION. (E) CLASSROOMS N.I.C. D aedis architects www.aedisarchitects.com 387 S. 1st Street, Suite 300 CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING PROTECTION FOR DISTRICT PROPERTY EXPOSED TO INCLEMENT WEATHER AS A RESULT OF CONSTRUCTION. San Jose, CA 95113 tel: (408)-300-5160 2 CONTRACTOR TO COORDINATE ALL WORK WITH DISTRICT SCHEDULE INCLUDING TEMPORARY SHUT DOWN OF EXISTING ELECTRICAL, MECHANICAL, AND VENTILATION SYSTEMS DURING CONSTRUCTION. F ALL EXISTING ROOFTOP EQUIPMENT, CONDUITS, SUPPORTS SHALL REMAIN UNLESS OTHERWISE NOTED. CONTRACTOR SHALL PROTECT AND MAINTAIN THESE ITEMS AS NEEDED TO COMPLETE CONSTRUCTION. PROVIDE ROOFING PER DETAILS ON SHEET A9.01. 31' - 0" TYP. 9'-0" 8'-0" 31' - 0" E TYP. G THE SLOPES IDENTIFIED IN THESE PLANS ARE ASSUMED TO BE PRE-EXISTING. THE CONTRACTOR SHALL PROVIDE AND INSTALL REPLACEMENT ROOFING TO ACHIEVE POSITIVE DRAINAGE AS INTENDED THROUGHOUT. PROVIDE 1/4" MIN. SLOPE CRICKETS AT EXISTING EQUIPMENT AND SKYLIGHT CURBS AS NEEDED. H CONTRACTOR SHALL PROTECT AND RE-USE EXISTING FLASHING AT WALLS AND CURBS TO RE-ESTABLISH ASSEMBLY PERFORMANCE AND PROTECTION AGAINST WEATHER. SUCH CONDITIONS SHALL SATISFY THE REQUIREMENTS OF THE ROOFING SYSTEM MANUFACTURER AND WITHOUT COMPROMISE TO WARRANTY. I CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING ANY WORK. J CONTRACTOR SHALL PROVIDE ADVANCE NOTICE TO THE ARCHITECT AND/OR OWNER'S REPRESENTATIVE TO INSPECT THE EXISTING DECKING FOR PRE-EXISTING DAMAGE PRIOR TO INSTALLATION OF NEW ROOFING. K REMOVE EXISTING EXPOSED WOOD SUPPORTS FOR EQUIPMENT AND/OR PIPING THROUGHOUT AND REPLACE-IN-KIND UNLESS OTHERWISE NOTED. PROTECT AND REATTACH TO MATCH OR EXCEED PRE-EXISTING CONDITIONS AND INTERVALS. TYP. 7' - 10" A9.01 5 TYP. TYP. 7' - 10" 5 TYP. 6 TYP. PROJECT CLEO GORDON E.S. ROOFING REPLACEMENT FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT CONSULTANT 3/4:12 14' - 2" TYP. (E) A.C. PAVING 140'-5" 3/4:12 fax: (408)-300-5121 1 2 3 4 5 TYP. 7' - 10" ROOF PLAN KEYNOTES 6 TYP. 2 TYP. 6 TYP. A9.01 7' - 10" 7' - 10" 14' - 2" 7' - 10" 7' - 10" 8' - 2" TYP. TYP. TYP. TYP. TYP. TYP. TYP. 29'-5" 5 TYP. 1 2 2 A9.01 TYP. 30'-6" A9.01 TYP. STAMP GRAPHIC KEY 7 TYP. A9.01 TYP. 1 A9.01 TYP. 8' - 2" 3/4:12 8'-0" TYP. TYP. A9.01 2 A9.01 TYP. +/- 140' - 6" STATE (E) TURBINE VENT 68'-2" 5 TYP. 5 TYP. +/- 9' - 0" DOVER AVE. 1 1 +/- 31' - 0" 7' - 10" 5 TYP. 7 8 (E) COVERED WALKWAY. (E) WEATHER PROOF J-BOX. (E) DOWNSPOUT. (E) ANTENNAE. PROTECT AND REINSTALL PER MFR'S RECOMMENDATIONS. MODIFIED BITUMEN BUILT-UP ROOFING SYSTEM, INCLUDING FLASHING AND ACCESSORIES. REMOVE (E) COMPOSITION ROOFING TO (E) CONCRETE DECK AND PREPARE FOR NEW PRIOR TO INSTALLATION. REFER TO SHEET A9.01 FOR TYPICAL ROOFING DETAILS. (E) ROOFING EDGE STOP TO BE REMOVED. PROVIDE NEW EDGE WITH ROOFING SYSTEM. PROTECT AND REINSTALL (E) GUTTER WHERE OCCURS. (E) ROOFTOP DRAIN MODIFIED. SEE DETAIL 5/A9.01. EQUIPMENT CURB TO SUPPORT (E) HVAC UNIT. SEE DETAIL 4/A9.01. (E) FLUE, SEE DETAIL 3/A9.01 2 (E) EXHAUST FAN O/ CURB A9.01 TYP. (E) HOODED VENT O/ CURB 6' - 0" 5 TYP. 3/4:12 50'-5" 3/4:12 5 TYP. 5 TYP. +/- 31' - 0" (E) ROOF DRAIN MODIFIED, SEE DETAIL 5/A9.01 (E) ROOF HATCH O/ CURB (E) PROPELLER EXHAUST O/ CURB REVISIONS No. Description Date (E) HVAC UNIT 8 6 A9.01 TYP. 7' - 4" (E) TREES (E) ROOF EDGE W/ GUTTER 5 TYP. GUTTER 126' - 0" 4 4' - 6" 7' - 8" (E) 2 (E) A.C. PAVING 4 (E) UPPER ROOF 2 A9.01 TYP. (E) 4' - 6" 90' - 7" (E) (E) LOWER ROOF 5 TYP. MILESTONES (E) PLAY STRUCTURE SD (E) PLAY STRUCTURE A9.01 TYP. DD 50% CD 8'-8" 6 (E) BUILDING N.I.C. BUILDING KEY 3 TYP. 90% CD DSA SUB (E) LANDSCAPE 2 A9.01 TYP. 9'-5" (E) AREA OF WORK SHEET (E) LOWER ROOF 1 PARTIAL SITE PLAN & ROOF PLAN D (E) A9.01 TYP. 31' - 4" 4/24/2017 6:01:05 PM C:\Users\jbrown\Documents\2017028 - Cleo Gordon ES Re-Roofing (CENTRAL)_jbrown36UXL.rvt 3/4:12 EXISTING BUILDINGS: 5 TYP. A 6 A9.01 TYP. 40' - 0" 9' - 4" A B C D MULTI-PURPOSE, ADMIN., LIBRARY CLASSROOMS CLASSROOM CLASSROOMS 30' - 0" C DATE N PARTIAL SITE PLAN & ROOF PLAN 1 SCALE: 1/16" = 1'-0" B N 04/24/2017 JOB # 2017026 SHEET # A5.01 aedis architects CHARLES L. SULLIVAN M.S. ROOFING REPLACEMENT www.aedisarchitects.com 387 S. 1st Street, Suite 300 San Jose, CA 95113 tel: (408)-300-5160 fax: (408)-300-5121 PROJECT CHARLES L. SULLIVAN M.S. ROOFING REPLACEMENT 2195 UNION AVENUE, FAIRFIELD, CA 94533 FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT CONSTRUCTION DOCUMENTS 4/24/2017 6:00:10 PM C:\Users\jbrown\Documents\2017030 - Charles L Sullivan MS Re-Roofing (CENTRAL) 1_jbrown36UXL.rvt ABBREVIATIONS & @ A.B. ABV. A.C. ACT ADJ. A.F.F. ALUM. A.P. APPROX. ARCH. AND AT ANCHOR BOLT ABOVE ASPHALTIC CONCRETE ACOUSTIC TILE ADJUSTABLE ABOVE FINISHED FLOOR ALUMINUM ACCESS PANEL APPROXIMATELY ARCHITECT BD. BLDG. BLKG. BM B.M. BOT. BTWN B.W. BOARD BUILDING BLOCKING BEAM BENCH MARK BOTTOM BETWEEN BOTH WAYS CAB. C.B. C.C or O.C. CEM. CER. TILE C.G. C.I. C.J. CLG. CLKG. CLR. CMU CNTR. C.O. COL. CONC. CONST. CONT. CONTR. C.P. CTR. CTSK. C.W. CABINET CATCH BASIN CENTER TO CENTER CEMENT CERAMIC TILE CORNER GUARD CAST IRON CONTROL JOINT CEILING CAULKING CLEAR CONCRETE MASONRY UNIT COUNTER CLEANOUT COLUMN CONCRETE CONSTRUCTION CONTINUOUS CONTRACTOR CONCRETE PIPE CENTER COUNTER SUNK COLD WATER D.A. DBL D.F. D.FIR DTL. DIA. or Ø DIM. DISP. DN DO DR. DS. DWG. DISABLED ACCESS DOUBLE DRINKING FOUNTAIN DOUGLAS FIR DETAIL DIAMETER DIMENSION DISPOSAL DOWN DITTO DOOR DOWNSPOUT DRAWING (E) E. EA. E.J. ELEC. EL. ELEV. ENCL. EQ. EQUIP. E.W. E.W.C. EX. EXP. EXT. EXISTING EAST EACH EXPANSION JOINT ELECTRIC or ELECTRICAL ELEVATION ELEVATOR ENCLOSE and/or ENCLOSURE EQUAL EQUIPMENT EACH WAY ELECTRIC WATER COOLER EXPANSION EXPOSED EXTERIOR F.A. F.D. FDN. F.E. F.E.C. F.H. F.H.C. F.H.S.M.S. F.H.W.S. FIN. FL. or FLR. F.O.C. F.O.F. F.O.M. F.O.S. F.S. FT. FTG. FURR. FIRE ALARM FLOOR DRAIN FOUNDATION FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FIRE HYDRANT FIRE HOSE CABINET FLAT HEAD SHEET METAL SCREW FLAT HEAD WOOD SCREW FINISH FLOOR FACE OF CONCRETE FACE OF FINISH FACE OF MASONRY FACE OF STUD FINISH SLAB FOOT OR FEET FOOTING FURRING GA. GALV. G.B. G.I. GL. GLU-LAM GND. GR. GYP. GAUGE GALVANIZED GRAB BAR GALVANIZED IRON GLASS GLUE-LAMINATED GROUND GRADE GYPSUM H.B. H.C. HDWD. HDWR. H.M. HORIZ. HR. HT. HOSE BIBB HOLLOW CORE HARDWOOD HARDWARE HOLLOW METAL HORIZONTAL HOUR HEIGHT I.D. INSUL. INT. INV. INSIDE DIAMETER INSULATION INTERIOR INVERT GOVERNING BOARD MAX. M.B. MECH. MFR. M.H. MIN. MIR. MISC. M.O. M.S. MTD. MTL. MUL. MAXIMUM MACHINE BOLT MECHANICAL MANUFACTURER MANHOLE MINIMUM MIRROR MISCELLANEOUS MASONRY OPENING MACHINE SCREW MOUNTED METAL MULLION (N) N. N.I.C. NO. or # NOM. N.T.S. NEW NORTH NOT IN CONTRACT NUMBER NOMINAL NOT TO SCALE OBS. O.C. OCC. O.D. O.F.O.S. O.F.C.I. O.H. OPNG. OPP. OBSCURE ON CENTER OCCUPANT(CY) OVERFLOW DRAIN and/or OUTSIDE DIAMETER OUTSIDE FACE OF STUD OWNER FURNISHED and CONTRACTOR INSTALLED OPPOSITE HAND OPENING OPPOSITE P.A.F. PL P.L. P. LAM PLAS. PLYWD. PR. PTD. PTN. POWDER ACTUATED FASTENER PLATE PROPERTY LINE PLASTIC LAMINATE PLASTER PLYWOOD PAIR PAINTED PARTITION Q.T. QUARRY TILE R. or RAD. R.C.P. R.D. R.E. REF. REINF. REQ'D R.H.M.S. R.H.W.S. RM. R.O. RWD. R.W.L. RADIUS REINFORCED CONCRETE PIPE ROOF DRAIN RIM ELEVATION REFERENCE REINFORCING REQUIRED ROUND HEAD METAL SCREW ROUND HEAD WOOD SCREW ROOM ROUGH OPENING REDWOOD RAIN WATER LEADER S S.A.D. S.C. S.C.D. SCHED. S.E.D. S.F. SHEATH. SHT. SIM. S.L.D. S.M. S.M.D. S.M.S. S.O.V. S.P.D. SPEC. SQ. or Ø S.S. S.S.D. STAG. STD. STL. STOR. STRUCT. S.T.S.M.S. SUSP. SOUTH SEE ARCHITECTURAL DRAWINGS SOLID CORE SEE CIVIL DRAWINGS SCHEDULE SEE ELECTRICAL DRAWINGS SQUARE FEET SHEATHING SHEET SIMILAR SEE LANDSCAPE DRAWINGS SHEET METAL SEE MECHANICAL DRAWINGS SHEET METAL SCREW SHUT OFF VALVE SEE PLUMBING DRAWINGS SPECIFICATIONS SQUARE STAINLESS STEEL SEE STRUCTURAL DRAWINGS STAGGERED STANDARD STEEL STORAGE STRUCTURAL SELF TAPPING SHEET METAL SCREW SUSPENDED T.& G. TEL. TERR. THRES. T.J. T.O.B. T.O.C. T.O.S. T.O.W. TYP. TONGUE & GROOVE TELEPHONE TERRAZZO THRESHOLD TOOLED JOINT TOP OF BEAM TOP OF CURB or CONCRETE TOP OF STEEL or SLAB TOP OF WALL TYPICAL U.O.N. UNLESS OTHERWISE NOTED VERT. V.C.P. V.C.T. V.G. V.I.F. V.T.R. V.W.C. VERTICAL VITRIFIED CLAY PIPE VINYL COMPOSITION TILE VERTICAL GRAIN VERIFY IN FIELD VENT THROUGH ROOF VINYL WALL COVERING W W/ W.C. WD. W.H. W/O W.O. WP. W. PT. W.R. WT. WEST WITH WATER CLOSET WOOD WATER HEATER WITHOUT WHERE OCCURS WATERPROOF / WEATHERPROOF WORKING POINT WATER RESISTANT WEIGHT SYMBOL LEGEND ARCHITECTURAL JUDI HONEYCHURCH DAVID C. ISOM JONATHAN RICHARDSON JOAN GAUT JOHN SILVA BETHANY SMITH CHRIS WILSON AARON ORTEGA-ANDRADE DIMENSION REFERENCE 10" DISTRICT SUPERINTENDANT KRIS COREY 10" OWNER K.D. KILN DRIED Z LAB. LAM. LAV. LKR. LT. LABORATORY LAMINATE LAVATORY LOCKER LIGHT TITLE SHEET PARTIAL SITE & ROOF PLAN EXTERIOR DETAILS - ROOF MATERIALS REFERENCE FACE OF OBJECT EARTH GRAVEL / ROCK CENTER LINE OF OBJECT CONCRETE FAIRFIELD SUISUN UNIFIED SCHOOL DISTRICT 2001 WINSTON DRIVE FAIRFIELD, CA 94543 PHONE: (707) 399-5148 CONTACT: PAUL SPEED STAMP CONCRETE BLOCK (CMU) TAGS AND MARKERS SAND, GROUT, OR PLASTER PLAN REFERECE GRID 0 STEEL PLYWOOD WOOD, CONTINUOUS MEMBER WOOD, BLOCKING STATE WOOD, FINISH GRADE REVISION MARKER 1 CABINET TYPES PLAN KEY NOTES Room name 101 1 APPLICABLE CODES 1 2016 BUILDING STANDARDS ADMINISTRATION CODE (PART 1, TITLE 24, CCR) 2 2016 CALIFORNIA BUILDING CODE (PART 2, VOLUMES 1 AND 2, TITLE 24, CCR) 3 2016 CALIFORNIA ELECTRICAL CODE (PART 3, TITLE 24, CCR) 4 2016 CALIFORNIA MECHANICAL CODE (PART 4, TITLE 24, CCR) 5 2016 CALIFORNIA PLUMBING CODE (PART 5, TITLE 24, CCR) 6 2016 CALIFORNIA ENERGY CODE (PART 6, TITLE 24, CCR) 7 2016 CALIFORNIA FIRE CODE (PART 9, TITLE 24, CCR) 8 2016 CALGREEN BUILDING STANDARDS CODE (PART 11, TITLE 24, CCR) 9 2016 CALIFORNIA REFERENCED STANDARDS CODE (PART 12, TITLE 24, CCR) 10 TITLE 19, CCR, PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS 101a ROOM NAME ROOM NUMBER WALL TYPE MARKER XX-1 FINISH TAG XX-1 FLOOR FINISH TAG PC - PREFINISHED CABINETS PM - PREFINISHED MOBILE CABINETS PR - PREFINISHED MOVEABLE CABINETS PU - PREFINISHED UTILITY CABINETS PS - SCIENCE CABINETS 2195 UNION AVENUE, FAIRFIELD, CA 94533 NOTE: REFER TO SPECIFICATIONS FOR SPECIFIC CABINET TYPE REQUIREMENTS. DOOR ID SECTION REFERENCE SECTION NUMBER CENTER LINE 1 SIM A12.08 REVISIONS BUILDING KEY No. Description EXISTING CONSTRUCTION AREA OF WORK D REFERENCE LABEL WHERE OCCURES A SHEET NUMBER DETAIL REFERENCE DETAIL NUMBER 1 A12.08 SIM REFERENCE LABEL WHERE OCCURES SHEET NUMBER C GENERAL NOTES 1. PARTIAL LIST OF APPLICABLE STANDARDS (AS REFERENCED IN 2016 CBC - CHAPTER 35 & CFC): ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PART 36) ROOM LABEL DOOR DESIGNATION ROOM NUMBER REFERENCE STANDARDS 2010 EDITION NFPA 17 STANDARD FOR DRY CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION NFPA 17-A STANDARD FOR WET CHEMICAL EXTINGUISHING SYSTEMS 2017 EDITION NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2016 EDITION NFPA 80 STANDARD FOR FIRE DOOR AND OTHER OPENING PROTECTIVES 2016 EDITION 3. NFPA 110 STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS 2016 EDITION 4. NFPA 253 STANDARD METHOD OF TEST FOR CRITICAL RADIANT FLUX OF FLOOR COVERING SYSTEMS USING A RADIANT HEAT ENERGY SOURCE 2015 EDITION STANDARD ON CLEAN AGENT FIRE EXTINGUISHER SYSTEMS 2015 EDITION NFPA 2001 Y T1 A5.01 A9.01 REFER TO ARCHITECTURAL FLOOR PLAN SHEETS AND CONSULTANT DRAWINGS FOR ADDITIONAL SYMBOLS AND REFERENCE DESIGNATIONS 2. 5. X JANITOR JOINT DRAWING INDEX LOCATION MAP STRUCTURAL GRID LINE JAN. JT CONSULTANT 6. B MILESTONES PRIOR TO BIDDING, THE GENERAL CONTRACTOR SHALL VISIT & INSPECT THE SITE TO FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AFFECTING THE NEW WORK. THE GENERAL CONTRACTOR SHALL NOT DISPUTE, COMPLAIN, OR ASSERT THAT THERE IS ANY MISUNDERSTANDING IN REGARDS TO LOCATION, EXTENT, NATURE, OR AMOUNT OF WORK TO BE PERFORMED UNDER THIS CONTRACT DUE TO THE CONTRACTOR'S FAILURE TO INSPECT THE SITE AND/OR FAILURE TO INSPECT THE CONTRACT DOCUMENTS. THE GENERAL CONTRACTOR & SUBCONTRACTORS ARE RESPONSIBLE FOR LOCATING & VERIFYING ALL EXISTING UNDERGROUND UTILITIES IN ALL AREAS OF THE NEW WORK PRIOR TO COMMENCEMENT OF EXCAVATION. EXISTING UTILITIES SHOWN ON THE DRAWINGS ARE APPROXIMATE ROUTING LOCATIONS AS BEST DETERMINED FROM EXISTING DRAWINGS & BY THE SCHOOL DISTRICT, BUT SHOULD NOT BE CONSTRUED TO REPRESENT ALL EXISTING UTILITIES. ANY ALTERATIONS OF EXISTING FACILITIES TO ACCOMMODATE THE INSTALLATION OF NEW WORK SHALL BE REVIEWED BY THE ARCHITECT PRIOR TO COMMENCEMENT OF WORK. ALL EXISTING FINISHES OR MATERIALS DAMAGED OR DEMOLISHED DUE TO NEW CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL STATE OR REPLACED WITH NEW MATERIALS FINISHED TO MATCH EXISTING. CONTRACTOR SHALL COORDINATE ALL WORK TO AVOID DISRUPTION OF STUDENTS OR TEACHERS DURING SCHOOL HOURS. ANY DISRUPTION OF POWER, TELEPHONE, OR HVAC SYSTEMS MUST BE COORDINATED AND APPROVED BY THE DISTRICT REPRESENTATIVE PRIOR TO ANY WORK COMMENCING. COMPLIANCE WITH CFC CHAPTER 33 (FIRE SAFETY DURING CONSTRUCTION AND DEMOLITION) AND CBC CHAPTER 33 (SAFEGUARDS DURING CONSTRUCTION) WILL BE ENFORCED. SHEET TITLE SHEET ADMINISTRATIVE REQUIREMENTS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. A COPY OF PART 1 AND 2 CCR SHALL BE KEPT ON SITE AT ALL TIMES. ALL CONSTRUCTION CHANGE DOCUMENTS AND ADDENDA TO BE SIGNED BY AND APPROVED BY THE ARCHITECT AND OWNER. ALL TESTS TO CONFORM TO THE REQUIREMENTS OF SECTION 4-335. TESTS OF MATERIALS AND TESTING LABORATORY SHALL BE IN ACCORDANCE WITH SECTION 4-335. DSA SHALL BE NOTIFIED AT THE START OF CONSTRUCTION AND PRIOR TO PLACEMENT OF CONCRETE PER SECTION 4-331. INSPECTOR SHALL BE APPROVED BY DSA. INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4333(b). THE DUTY OF THE INSPECTOR SHALL BE IN ACCORDANCE WITH SECTION 4-342. SUPERVISION OF CONSTRUCTION BY DSA SHALL BE IN ACCORDANCE WITH 4-334. CONTRACTOR, INSPECTOR, ARCHITECT, AND ENGINEERS SHALL SUBMIT VERIFIED REPORTS (FORM 6) IN ACCORDANCE WITH SECTION 4-336 AND 4-343. THE ARCHITECT AND THE STRUCTURAL ENGINEERS SHALL PERFORM THEIR DUTIES IN ACCORDANCE WITH SECTIONS 4-333(a) AND 4-341. THE CONTRACTOR SHALL PERFORM HIS DUTIES IN ACCORDANCE WITH SECTION 4-343. DSA IS NOT SUBJECT TO ARBITRATION. EXISTING CONDITIONS 1. TYPE OF EXISTING CONSTRUCTION: 2. NUMBER OF FLOORS: 3. NUMBER OF BASEMENTS: 4. FULLY SPRINKLERED BUILDING: 5. EXISTING OCCUPANCY GROUP: 6. BUILDING AREA IN SQ. FT: 7. YEAR BUILT: V 1 NONE NO E, A & B 38,136 SQ. FT. SCOPE OF WORK DATE 1. REMOVE EXISTING COMPOSITION ROOFING SYSTEM TO EXISTING WOOD DECK AND REPLACE WITH NEW MODIFIED BITUMEN BUILT-UP ROOFING SYSTEM. JOB # DEFERRED APPROVAL NONE. 04/24/2017 2017026 SHEET # T1 Date GENERAL SHEET NOTES A CONTRACTOR SHALL MAINTAIN FIRE LANE ACCESS THROUGHOUT PROJECT. B DO NOT INTERRUPT EXISTING UTILITY SERVICES SERVING OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AND COORDINATED WITH THE OWNER. C PROTECT EXISTING & NEW STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, TREES AND SHRUBS FROM DAMAGE DURING CONSTRUCTION. aedis architects www.aedisarchitects.com D E ION AV TO UN tel: (408)-300-5160 3 TYP. TYP. A9.01 29' - 6" 7' - 11" 40' - 3" CONTRACTOR TO COORDINATE ALL WORK WITH DISTRICT SCHEDULE INCLUDING TEMPORARY SHUT DOWN OF EXISTING ELECTRICAL, MECHANICAL, AND VENTILATION SYSTEMS DURING CONSTRUCTION. F ALL EXISTING ROOFTOP EQUIPMENT, CONDUITS, SUPPORTS SHALL REMAIN UNLESS OTHERWISE NOTED. CONTRACTOR SHALL PROTECT AND MAINTAIN THESE ITEMS AS NEEDED TO COMPLETE CONSTRUCTION. PROVIDE ROOFING PER DETAILS ON SHEET A9.01. PROJECT G THE SLOPES IDENTIFIED IN THESE PLANS ARE ASSUMED TO BE PRE-EXISTING. THE CONTRACTOR SHALL PROVIDE AND INSTALL REPLACEMENT ROOFING TO ACHIEVE POSITIVE DRAINAGE AS INTENDED THROUGHOUT. PROVIDE 1/4" MIN. SLOPE CRICKETS AT EXISTING EQUIPMENT AND SKYLIGHT CURBS AS NEEDED. H CONTRACTOR SHALL PROTECT AND RE-USE EXISTING FLASHING AT WALLS AND CURBS TO RE-ESTABLISH ASSEMBLY PERFORMANCE AND PROTECTION AGAINST WEATHER. SUCH CONDITIONS SHALL SATISFY THE REQUIREMENTS OF THE ROOFING SYSTEM MANUFACTURER AND WITHOUT COMPROMISE TO WARRANTY. CHARLES L. SULLIVAN M.S. ROOFING REPLACEMENT I CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING ANY WORK. J CONTRACTOR SHALL PROVIDE ADVANCE NOTICE TO THE ARCHITECT AND/OR OWNER'S REPRESENTATIVE TO INSPECT THE EXISTING DECKING FOR PRE-EXISTING DAMAGE PRIOR TO INSTALLATION OF NEW ROOFING. K REMOVE (E) WOOD SUPPORTS FOR EQUIPMENT AND/OR PIPING THROUGHOUT AND REPLACE-IN-KIND UNLESS OTHERWISE NOTED. PROTECT AND RERATTACH TO MATCH OR EXCEED PRE-EXISTING CONDITIONS AND INTERVALS. 22' - 5" (E) 5 TYP. 3/4:12 7' - 4" 8 (E) LOWER ROOF 31' - 9" 8 6 A9.01 80' - 0" TYP. 3 3/4:12 1 A9.01 (E) A.C. PAVING 5 TYP. (E) 5 TYP. A9.01 89' - 8" TYP. (E) LOWER ROOF (E) UPPER ROOF (E) 3/4:12 ROOF PLAN KEYNOTES 48' - 3" 1 2 3 4 5 6 (E) 9 2 (E) COVERED WALKWAY. (E) WEATHER PROOF J-BOX. (E) DOWNSPOUT. PROVIDE SPLASH BLOCK WHERE DISCHARGE OCCURS O/ ROOF. (E) ANTENNAE. PROTECT AND REINSTALL PER MFR'S RECOMMENDATIONS. MODIFIED BITUMEN BUILT-UP ROOFING SYSTEM O/ TAPERED INSULATION O/ (E) ROOF (E) ROOFING EDGE STOP TO BE REMOVED. PROVIDE NEW EDGE WITH ROOFING SYSTEM. PROTECT AND REINSTALL (E) GUTTER WHERE OCCURS. (E) ROOFTOP DRAIN MODIFIED. SEE DETAIL 5/A9.01. EQUIPMENT CURB TO SUPPORT (E) HVAC UNIT. SEE DETAIL 4/A9.01. A9.01 7 8 123' - 9" (E) BUILDING N.I.C FAIRFIELD-SUISUN UNIFIED SCHOOL DISTRICT 6 5 TYP. TYP. fax: (408)-300-5121 CONSULTANT 8 5 TYP. San Jose, CA 95113 E 2 TYP. 6 387 S. 1st Street, Suite 300 CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING PROTECTION FOR DISTRICT PROPERTY EXPOSED TO INCLEMENT WEATHER AS A RESULT OF CONSTRUCTION. (E) BUILDING N.I.C. (E) 8 6' - 11" STAMP 4 TYP. 4 TYP. GRAPHIC KEY 3 TYP. (E) BUILDING N.I.C (E) BUILDING N.I.C (E) TURBINE VENT (E) LANDSCAPE 50' - 4" 3/4:12 (E) LANDSCAPE 2 (E) FLUE, SEE DETAIL 3/A9.01 (E) EXHAUST FAN O/ CURB (E) HOODED VENT O/ CURB STATE (E) ROOF DRAIN MODIFIED TYP. 5 TYP. A9.01 TYP. 1 (E) ROOF HATCH O/ CURB 6' - 3" 103' - 10" 5 TYP. (E) PROPELLER EXHAUST O/ CURB (E) HVAC UNIT (E) LANDSCAPE TYP. 2 30' - 8" 35' - 3" (E) A.C. PAVING (E) TREES REVISIONS No. Description (E) ROOF EDGE W/ GUTTER Date 6' - 2" GUTTER (E) BUILDING N.I.C 3/4:12 TYP. 3/4:12 3/4:12 MILESTONES 92 SD A9.01 13' - 3" 140' - 6" BUILDING KEY DD 50% CD EXISTING CONSTRUCTION 90% CD AREA OF WORK 5 TYP. 3' - 0" A SHEET PARTIAL SITE & ROOF PLAN 5 TYP. 5 TYP. 3' - 0" 5 TYP. DSA SUB D (E) SHADE STRUCTURE C 1 1 A9.01 9 2 A9.01 2 B TYP. TYP. A9.01 6' - 2" 4/24/2017 6:00:09 PM C:\Users\jbrown\Documents\2017030 - Charles L Sullivan MS Re-Roofing (CENTRAL) 1_jbrown36UXL.rvt TYP. 6 3/4:12 140' - 6" (E) BUILDING N.I.C 6 TYP. 5 TYP. 3' - 0" 5 TYP. 3' - 0" (E) SHADE STRUCTURE 7 TYP. A9.01 2 A9.01 TYP. N 38' - 1" 71' - 0" 69' -0" 2 A9.01 ROOF PLAN 1 SCALE: 1/16" = 1'-0" TYP. DATE 31' - 0" 30' -0" 9' - 0" 9' - 0" 31' - 0" 04/24/2017 30' -2" N JOB # 2017026 SHEET # A5.01
* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project
advertisement