No.NBCC:SGM:SBG-Delhi:NIT:CBI:AMND:2010/7839
Date: 23.07.2010
Amendment No.- IX
Sub : Construction of CBI Head Office Building in Pocket 5-B, CGO Complex,
New Delhi.
S.H : S/I/T/C of IT Network and online UPS system with Battery back up.
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06.05.2010 & subsequent
amendment No.I dated 19.05.10, Amendment No. II dated 21.05.2010, Amendment
No.III dated 28.05.2010, Amendment No. IV dated 09.06.10, Amendment No. V dated
16.06.2010, Amendment No.VI dated 25.06.2010, Amendment No.VII dated 07.07.2010
& Amendment No. VIII dated 17.07.10, following amendment No. IX is further issued:1.
Bill of Quantity (BOQ), technical specifications & special conditions of contract
(SCC) stands deleted & the same are replaced by revised BOQ (Annexure I)
revised technical specification (Annexure II) & revised SCC (Annexure III).
2.
The queries raised by various bidders during pre-bid meeting held on 05.06.2010
are clarified vide Annexure-IV.
3.
Summary of Node details enclosed as Annexure-V.
4.
Last date of submission of tender documents (old + revised) is extended upto
03:00 P.M. on 05.08.2010 from 30.07.2010. The tenders shall be opened on the
same day at 04.00 PM.
5.
For depositing tender fee in respect of bidders who downloaded the tender
documents from website, please refer SCC clause 7 (Annexure –III).
Other terms and conditions of NIT will remain the same.
SR. GENERAL MANAGER
SBG-DELHI
Copy to:
1.
2.
3.
4.
All the tenderers who purchased tender documents from office of NBCC Ltd.
NBCC Web site.
Manager (F), NBCC Ltd. NBCC Place,Pragati Vihar ,New Delhi.
AGM(T), NBCC Ltd.NBCC Place, Pragati Vihar ,New Delhi.
Volume II- IT System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New Delhi.
ANNEXURE-I
CENTRAL BUREAU OF INVESTIGATION , ENVELOP 5B CGO COMPLEX, LODHI ROAD, NEW DELHI.
TENDER FOR IT LAN SYSTEM WORKS
BILL OF QUANTITIES(REVISED)
Notes
A
B
Makes and Models shall be as per List provided. In case any item is not listed in the approved list the same shall be
Please fill up rate both in figures and words in the Rate column by putting the rate figure first.
S.No. ITEM DESCRIPTION
UNIT
QTY.
1
SITC of LSZH Cat 6 Giga speed unshielded
twisted pair computer cable with 23 AWG solid
copper
conductors
in
existing
concealed/surface
conduits/Raceways
complete as per specifications and as required
for DATA.(As per specifications)
Box
350
2
SITC of LSZH Cat 6 unshielded twisted pair
computer cable with 23 AWG solid copper
conductors in existing concealed/surface
conduits/Raceways
complete
as
per
specifications and as required for VOICE. (As
per specifications)
Box
279
3
SITC of CAT 6 information outlets complying
fully or exceeding with category 6 standards for DATA FIELD SIDE (As per specifications)
Nos.
2369
4
SITC of CAT 6 information outlets complying
fully or exceeding with category 6 standards for DATA RACK SIDE (As per specifications)
Nos.
2369
5
SITC of CAT 6 information outlets complying
fully or exceeding with category 6 standards for VOICE FIELD SIDE (As per specifications)
Nos.
1885
6
Supply of CAT 6 information outlets complying
fully or exceeding with category 6 standards for VOICE RACK SIDE (As per specifications)
Nos.
1885
7
SITC of
Modular Patch Panels for
accommodating 24 port termination and shall
facilitate cross-connection and inter-connection
using modular patch cords and shall conform to
EIA standard, 19-inch relay rack mounting
requirements - For DATA & VOICE (As per
specifications)
Nos.
186
8
SITC of Singlex Faceplate (As per
specifications)
Nos.
693
Rate
Rs.
Amount
Rs.p.
Volume II- IT System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New Delhi.
S.No. ITEM DESCRIPTION
UNIT
QTY.
9
SITC of Duplex Faceplate (As per
specifications)
Nos.
1325
10
SITC of Quad Faceplate (As per specifications)
Nos.
268
11
SITC of Cat 6 Mounting Cords 1 meter length
for the Rack End Connectivity to the Switches,
Both ends shall be RJ 45 with snag less boots Blue in Colour for Data. (As per
specifications)
Nos.
2369
12
SITC of Cat 6 Mounting Cords 1 meter length
for the Rack End Connectivity to the Switches,
Both ends shall be RJ 45 with snag less boots RED in Colour for VOICE. (As per
specifications)
Nos.
1885
13
SITC of Cat 6 Mounting Cords 2 meter length
for the User End Connectivity to the System,
Both ends shall be RJ 45 with snag less boots Grey in Colour for Data (As per specifications)
Nos.
2369
14
SITC of Cat 6 Mounting Cords 1 meter length
for the Servers Rack End Connectivity to the
Switches, Both ends shall be RJ 45 with snag
less boots - Yellow in Colour. (As per
specifications)
Nos.
48
15
SITC of Cat 6 Mounting Cords 2 meter length
for the Servers End Connectivity, Both ends
shall be RJ 45 with snag less boots - Yellow in
Colour. (As per specifications)
Nos.
48
16
SITC of CAT 6 information outlets complying
fully or exceeding with category 6 standards for
servers - Yellow Color. (As per specifications)
Nos.
96
17
SITC of Cat 6 Patch Panels for accommodating
24 port termination and shall facilitate crossconnection and inter-connection using modular
patch cords and shall conform to EIA standard,
19-inch relay rack mounting requirements - For
Server Rack. (As per specifications)
Nos.
4
18
SITC of Cat5 50-Pair riser cable complete as
required. (As per specifications)
Mtrs
4880
Rate
Rs.
Amount
Rs.p.
Volume II- IT System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New Delhi.
S.No. ITEM DESCRIPTION
UNIT
QTY.
19
SITC of MDF 2500 Pair Krone Type. (As per
specifications)
Nos.
1
20
SITC of MDF 100 Pair Krone Type. (As per
specifications)
Nos.
1
21
SITC of 48 Port Loaded Jack Panel - 2U Size
(As per specifications)
Nos.
46
22
SITC of 6 core Indoor Outdoor Armoured
50/125 Multimode, OM3 Fibre Cable (As per
specifications)
Mtrs
1740
23
SITC of 24 port Configurable sliding panel
(Unloaded) (As per specifications)
Nos.
18
24
SITC of 6 Pak duplex loaded LC MM OM3,12
fibre zirconia ceramic sleeve ( as per
specifications)
Nos.
36
25
SITC of blank plate for LIU (as per
specifications)
Nos.
36
26
SITC of LC MM - Pigtails (As per specifications)
Nos.
288
27
SITC of 24 Port Splice Tray (As per
specifications)
Nos.
18
28
SITC of LC-LC 50/125, Multimode, 3 Mtrs
patchcord (As per specifications)
Nos.
48
29
SITC of 42U 800Wx2000Hx800D Networking
Rack with Side Panels 2000Hx800D;
FrontPerforated Single Door and Rear
Perforated Double Door; 4 Castors with Brakes;
4 fans for Cooling; Earthing Strip;10 Hardware
Packets & 5/15A 42U Vertical Power Socket
Strip 10 Socket- 2nos. (As per specifications)
Nos
24
30
SITC of 42U 600Wx2000Hx1200D Server Rack
with Side Panels 2000Hx1200D;
FrontPerforated Single Door and Rear
Perforated Double Door; 4 Castors with Brakes;
4 fans for Cooling; Earthing Strip,10 Hardware
Packets & 5/15A 42U Vertical Power Socket
Strip 10 Socket-2nos. (As per specifications)
Nos.
2
31
SITC of PVC Cable Manager (As per
specifications)
Nos
186
Rate
Rs.
Amount
Rs.p.
Volume II- IT System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New Delhi.
S.No. ITEM DESCRIPTION
UNIT
QTY.
32
SITC of 10 Slot Chasis Core Switch in ACTIVE
ACTIVE Mode - 24 1000BASE-X mini-GBIC
ports, 4 10/100/1000BASE-T ports, option slot
for 10 Gigabit option card, 2 Stacking ports, 1
AC PSU, (As per specifications)
Nos.
2
33
SITC of Distribution Switch - 48 10/100/1000
POE BASE-T, 2 gigabit combo ports (2
unpopulated gigabit SFP and
10/100/1000BASE-T) (As per specifications)
Nos
52
34
SITC of Distribution Switch - 24 10/100/1000
POE BASE-T, 2 gigabit combo ports (2
unpopulated gigabit SFP and
10/100/1000BASE-T) (As per specifications)
Nos
10
35
SITC of Mini-GBIC, SFP, 1000BaseSX, LC
Connector, 550m transmission with 50/125 µm
MMF (As per specifications)
Nos
48
36
Network Management Software along with
LCD Display (As per specifications)
Nos
1
37
UPS - For Server Room and IT Load (As per
specifications)
SITC of 15 KVA/13.5kw, IGBT based 100%
rectifier + inverter, true online double
conversion 3 phase input and 3 phase output
UPS system installed in parellal redundant
mode consisting of the following:
15 KVA/13.5kw UPS module with integrated
100% rectifier + inverter.
SNMP card for UPS monitioring on LAN/WAN
Nos
26
a
b
c
d
e
f
In-built Static switch for bypass & inverter in
each UPS module.
Interconnecting copper cabling (DC cabling)
between UPS, Battery breaker & Batteries of
required length and size.
Sealed Maintenance free batteries for 15 kVA
UPS with 8-10 Mins. backup time on each UPS
module with inerconnectors
UPS overall efficiency should be 93% at 100%
load and 89% at 20% load.
g
Each UPS module should have front panel
mounted graphical LCD with backlight along
with text LCD display should show system
MIMIC diagram with an outlined power path,
current operating mode and event logs. It
should also display UPS status, metering,
battery status, alarm and event queue, active
alarms and UPS configuration.
Rate
Rs.
Amount
Rs.p.
Volume II- IT System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New Delhi.
S.No. ITEM DESCRIPTION
UNIT
QTY.
a
Facility Management Charges (As per
specifications)
Year 1
Lot
1
b
Year 2
Lot
1
c
Year 3
Lot
1
d
Year 4
Lot
1
e
Year 5
Lot
1
39
Annual Maintanance Charges (As per
specifications)
a
Year 2
Lot
1
b
Year 3
Lot
1
c
Year 4
Lot
1
d
Year 5
Lot
1
38
Rate
Rs.
Amount
Rs.p.
Total in Rs.
(In Words_________________________________________________________)
Signature of Tenderer
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
ANNEXURE-II
CENTRAL BUREAU OF INVESTIGATION HEADQUARTERS, ENVELOP 5B, CGO COMPLEX, LODI
ROAD, NEW DELHI.
TENDER FOR IT LAN SYSTEM WORKS
TECHNICAL SPECIFICATIONS(REVISED)
PART 1 – TECHNICAL SPECIFICATIONS OF LAN PASSIVE COMPONENTS
SCS Manufacturers Extended Warranty
A.
A two-part certification program provided by a single manufacturer and that
manufacturer’s certified vendor would cover SCS Systems. Manufacturer shall
administer a follow on program through the Vendor to provide support and service to
the purchaser. The first part is an assurance program, which provides that the
certified system will perform and support the applications for which it is designed,
during the 20-year warrantee of the certified system.
B.
The second portion of the certification is a 20-year warranty provided by the
manufacturer and the vendor on all products within the system (cords,
telecommunications outlet/connectors, cables, cross-connects, patch panels, etc.).
C.
In the event that the certified system ceases to support the certified application(s),
whether at the time of cutover, during normal use or when upgrading (e.g. ATM), the
manufacturer and vendor shall commit to promptly implement corrective action.
D.
The Vendor prior to the structured cabling system being installed, as listed in
ANSITIA/EIA-568-B shall provide documentation proving the cabling system’s
compliance to the End-to-End Link Performance recommendations.
E.
The cabling system must conform to the current issue of industry standard
ANSI/TIA/EIA-568. All performance requirements of this document must be followed.
As well, workmanship and installation methods used shall be equal to or better than
that found in the BICSI (Building Industry Consulting Service International) ITSI
manual.
F.
Purchaser demands strict adherence to the performance specifications listed in
ANSI/TIA/EIA-568-B series standards.
G.
Manufacturer shall maintain ISO Quality Control registration for the facilities that
manufacturer the product used in this cabling system.
Page 1
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Structured Cabling Systems
General
1.
SCS system supporting telecommunications systems shall comply with detailed
specifications in this section and shall consist of cabling that may include data
backbone optical fiber cables, data backbone copper cables, voice backbone copper
cables, patch panels, connecting hardware, horizontal data copper cables, and jacks
at TOs for voice, data, and telecommunications system services. Locations of
equipment shall be as indicated on drawings, unless directed otherwise by Owner’s
Representative.
Manufacturers
2.
Any deviation or substitutions offered as part of this specification must be preapproved by the owner or owners’ representative. Any submittals in response to any
part of this specification that do not meet the product requirements as defined, may
be rejected without further consideration, or may cause monetary charges to be
incurred by the submitter.
3.
Other manufacturers have been approved for certain products required for a
complete system. Those manufacturers are listed in their appropriate sections. Strict
adherence to these approved manufacturers is required.
Systems Testing and Documentation
4.
General Requirements:
A.
Provide installation testing of equipment where required by manufacturer’s
installation instructions.
B.
Provide complete end-to-end testing for all copper and fiber optic systems/channels
based on latest applicable standards. Document all testing and submit with final asbuilt submittal package
C.
For all controls and operating equipment, submit equipment/systems to at least three
complete operational sequences, in which all equipment operations are tested,
observed, and verified.
D.
Prior to substantial completion and project acceptance inspection, submit test reports
to indicated scope of startup and operational tests, with results of testing for each
specified operation.
Copper Cabling System Testing
5.
General: Copper cabling shall be tested and certified after installation as follows and
as required for cable manufacturer’s warranty. Twisted-pair copper cable channels
shall be tested for continuity as specified below, presence of AC/DC voltage, and
performance. All cabling shall be tested for conformance to horizontal cable
specifications as outlined herein, and shall be tested according to test set
manufacturers instructions utilizing latest firmware and software. Testing shall include
all of electrical parameters as specified under Product. All cables and termination
Page 2
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
hardware shall be 100 percent tested by installation contractor for defects in
installation and to verify cable performance under installed conditions. Contractor
shall verify all conductors of each installed cable useable prior to system acceptance.
All cables shall be tested according to contract documents, manufacturer’s warranty
provisions, and best industry practices. If any of these are in conflict, Contractor shall
comply with most stringent requirements. All defects in cabling system installation
shall be repaired or replaced in order to ensure 100 percent useable conductors in all
cables installed, at no additional cost to Owner.
6.
Continuity: Each pair of each installed cable shall be tested using a test unit that
shows opens, shorts, polarity and pair-reversals, crossed pairs and split pairs. The
test shall be recorded as pass/fail as indicated by test unit according to
manufacturers’ recommended procedures, and referenced to appropriate cable
identification number and circuit or pair number. Any faults in wiring shall be
corrected and cable re-tested prior to final acceptance.
7.
Length: Each installed cable link shall be tested for installed length using a TDR type
device. The cables shall be tested from patch panel to patch panel, block to block,
patch panel to outlet or block to outlet as appropriate. The cable length shall conform
to maximum distances set forth in TIA/EIA-568-B standards and all other applicable
standards. Cable lengths shall be recorded, referencing cable identification number
and circuit or pair number. For multi-pair cables, shortest pair length shall be
recorded as length for cable.
8.
Factory testing: Every reel of cable shall be tested by cable manufacturer for all
characteristics specified for cable type in this section. This testing shall be performed
using a sweep test method and include frequencies specified for cable. A test report
shall be available electronically. The test report shall include the reel number, the
date of the test, the Lot number, and test results for Return Loss (RL), Insertion Loss
(Attenuation), Pair-to-Pair NEXT, and Power Sum NEXT Pair-to-Pair ELFEXT and
Power Sum ELFEXT. The test report shall show the “Worst Case Margin” for the
listed transmission characteristics.
9.
Test results: Test results shall be automatically evaluated by equipment, using most
up-to-date criteria from TIA/EIA-568-B standards and all other applicable standards
and result shown as pass/fail. Test results shall be printed directly from test unit or
from a download file using an application from test equipment manufacturer. The
printed test results shall include all tests performed, expected test result and actual
test result achieved.
10.
Test reports: Test reports for all factory testing and field test reports for copper
cabling installation shall be submitted to the Owner’s Representative and
manufacturer prior to commissioning voice and data system and final contract
payment. Refer to Submittals in this Section.
Optical Fiber Cable Testing
11.
General: Optical fiber cabling shall be tested and certified after installation as
described below and as required for cable manufacturer’s warranty. Fiber testing
shall be performed on all fibers in completed end-to-end system. Testing shall consist
of a bi-directional end to end test in accordance with applicable standards, or a bidirectional end to end test performed by EIA/TIA-455-53A and all other applicable
standards. The system loss measurements shall be provided at 850 and 1300
Page 3
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
nanometers for multimode type glass and 1310 and 1550 nanometers for singlemode type glass. These tests shall also include continuity checking of each fiber. For
spans greater than 90 meters, each tested span must test to a value less than or
equal to value determined by calculating a link loss budget. For horizontal spans less
than or equal to 90 meters, each tested span must be less than or equal to 2.0
decibels. The insertion loss for each mated optical fiber connector pair shall not
exceed 0.40 decibels.
12.
Pre-installation testing: Test all optical fiber cable for all fibers prior to installation of
cable.
13.
Performance testing: Where links are combined to complete a circuit between
devices, Contractor shall test each link from end to end to ensure performance of
system. Only a basic link test is required. Contractor can optionally install patch cords
to complete circuit and then test entire channel. The test method shall be same used
for test described above. The values for calculating loss shall be those defined in
applicable TIA/EIA standards.
14.
Attenuation testing:Attenuation testing shall be performed with a stable launch
condition using two-meter jumpers to attach test equipment to cable plant. The light
source shall be left in place after calibration and power meter moved to far end to
take measurements.
15.
Loss budget: Fiber links shall have a maximum loss of:
A.
(Allowable cable loss by kilometer) × (kilometers of fiber in link) + (0.2 decibels) ×
(number of connectors) = maximum allowable loss or (Allowable cable loss per
kilometer) x (length of cable in kilometers) + (0.4 dB x number of mated connectors)
+ (0.3 dB x number of splices) = maximum allowable loss
16.
Link loss: A mated connector-to-connector interface shall be considered a single
connector. Loss numbers for installed link shall be calculated by taking sum of bidirectional measurements and dividing that sum by two. Contractor shall bring all
links not meeting requirements of standard into compliance, at no additional cost to
Owner.
17.
Documentation: Following final documentation shall be submitted to the owner’s
representative prior to commissioning data system and final contract payment
according to Submittals in this section.
A.
Test results: Test results shall be automatically evaluated by equipment, using most
up-to-date criteria from all applicable standards and result shown as pass/fail. Test
results shall be printed directly from test unit or from a download file using an
application from test equipment manufacturer. The printed test results shall include
all tests performed, expected test result and actual test result achieved.
B.
End-to-end loss data
C.
As installed diagrams
Test Documentation
Page 4
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Provide test documentation in 3-ring binders within 2 weeks after completion of project testing.
Binders shall be clearly marked on outside front cover and spine with words Test Results, project
name, and date of completion (month and year). Major heading tabs, Horizontal and Backbone,
shall divide binder. Each major heading shall be further sectioned by test type. Within horizontal
and backbone sections, divide by tabs scanner test results by category, optical fiber attenuation
test results, and continuity test results. Present test data within each section in sequence listed in
administration records. Provide test equipment by name, manufacturer, model number and last
calibration date at the end of document. Unless manufacturer specifies more frequent calibration
cycle, annual calibration cycle shall be required on all test equipment used for this installation.
Test document shall detail test method used and specific settings of equipment during test.
Scanner tests shall be printed on 8 1/2 by 11 inches. Hand written test results (attenuation results
and continuity results) shall be documented on a suitable test form. When repairs and re-tests are
performed, note problem found and corrective action taken, and collocate in binder both failed
and passed test data.
Product Specifications
Communications Termination Blocks and Patch Panels
Modular Patching Systems
A.
Modular Patch Panel Specifications:
1. General specifications:
a) Patch panels shall be 16 gauge steel painted black finish, Metallic high
strength
b) 48 port configurations
c) Straight configuration
d) Removable rear mounted cable management bar
e) Front identification labels, unless specified otherwise
Jacks, outlets, and adapters:
2. Comply with requirements specified for jacks corresponding to the cable and
terminations specified or indicated for the patch panel.
3. Colors: Colors shall be specified or selected by the Owner’s Representative
from the manufacturer’s standard colors.
4. Comply with following standards:
a) TIA/EIA 568-B.1
b) TIA/EIA-568-B.2
Page 5
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
c) ISO/IEC 11801
d) CENELEC EN-50173
e) UL, ULC, ETL and ACMA
5. Application standards: Support application standards specified for related
cabling.
6. Performance specifications: Comply with specifications for related cabling.
Communications Copper Backbone Cabling
General Requirements
A.
Provide Multi-paired trunk backbone cable for all voice backbone applications.
Provide sufficient pair counts to support 100% expansion at the outlet locations.
Special Requirements
Multi Pair Copper Cable General Specifications (Category 5)
B.
Solid copper conductors with high-density polyolefin insulation and overall low smoke
PVC jacket to achieve riser (i.e., non-plenum)
1. IEC 60754—Part 2.
2. IEC 61034—Part 2.
3. IEC 60332—Part 1.
4. Def Stan 713.
C.
Comply with following general physical specifications:
1. Maximum pulling tension: 110 newtons (25 pounds-force)
2. Operating temperature: –20 to 60 degrees C (–4 to 140 degrees F)
D.
Comply with following cable performance specifications. Data shall be
guaranteed performance for worst-case channels utilizing 4-pair series cables with
full cross-connects, CPs, and work area outlets (i.e., 4 connectors in a channel) for
length up to 100 meters (328 feet).
E.
Comply with following standards:
1. TIA/EIA 568-B.1
2. TIA/EIA-568-B.2
3. ISO/IEC 11801
Page 6
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
4. CENELEC EN-50173
F.
Comply with following application standards:
1. Voice, facsimile, modem, Switched 56, T-1, and ISDN
2. RS-232, RS-422, and RS-485
3. IEEE 802.3 1BASE5 and 10BASE-T
4. IEEE 802.5 at 4 megabits per second and 16 megabits per second at 100 meters
(328 feet)
G.
Comply with following application specifications:
1. Operating voltages for dry locations: 0 to 30 Vac at 60 hertz, 0 to 70.7 Vac for
audio frequencies, and 0 to 60 Vdc
2. Operating currents at 25 degrees C (77 degrees F) ambient temperature
a) 1 current-carrying pair per cable: 1.5 amperes on each conductor
b) 2 to 4 current-carrying pairs per cable: 3.36 amperes for all pairs
c) Audio frequencies and 1 current-carrying pair per cable: 1 ampere on each
conductor
Communications Optical Fiber Backbone Cabling
Specifications :50 / 125, OM3, 50-Micrometer Multimode Optical Fiber Cables.
Cable Type : 6 core Indoor Outdoor ArmouredCentral Loose Tube LSZH Fiber Cable.
Standards Compliance :- ETL complied, EN 50173-1:2002, IEC 60794-1, ISO 11801, ITU
G.652.A/B/C/D(low water peak), ITU G.657.A/B(enhanced bend insensitive).
Fire Rating :IEC 60332-1-2, IEC 60754-1, IEC 60754-2 , IEC 61034-2
Physical Properties
Nominal outer diameter
Nominal weight
Maximum installation tensile strength
Short term tensile strength
Permanent tensile strength
Compressive strength (crush)
Impact
Min. bending radius, unloaded/loaded
Temperature
Max. 7.5 mm
Max. 80 kg/km
1500 N
1000 N
700 N
2000 N
20 Nm (no attenuation change, no broken cable elements)
R = 60 mm
Storage: -40 °C to 60 °C (short term up to 70 °C)
Installation: -15 °C to 40 °C , Operation: -40 °C to 70 °C
No water on free end.
WaterPenetration
Page 7
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
TRANSMISSION CHARACTERISTICS
The cable should address the following parameters:
Attenuation
Maximum value of cable at 850 nm
Maximum value of cable at 1300 nm
Maximum value of fiber (for reference only) at 850 nm
Maximum value of fiber (for reference only) at 1300 nm
Inhomogeneity of OTDR trace for any two 1000 meter
fiber lengths
Bandwidth
OFL value at 850 nm
OFL value at 1300 nm
Effective Modal Bandwidth (EMB) Effective Modal
Bandwidth
Group index of refraction at 850 nm
Group index of refraction at 1300 nm
≤ 3.0 dB/km
≤ 1.0 dB/km
≤ 2.5 dB/km
≤ 0.7 dB/km
Max. 0.1 dB/km
≤ 1500 MHz • km
≤ 500 MHz • km
≤ 2000 MHz • km
1.482
1.477
General Specifications: Cables shall be designed for Point-To-Point applications as well as midspan
access and shall provide a high level of protection for optical fiber installed in building environment and
outside plant (OSP) applications. Higher optical fiber count cables shall utilize a sub-unitized design with
color-coded subunits for easy identification. Cable shall support current and next generation LAN, SAN,
and WAN applications through laser-optimized 50/125 micrometer optical fibers. Cable shall support dual
speed 1 gigabit per second/10 gigabits per second ports, allowing incremental upgrades of switches and
serving with less disruption. The cable should support the applications LAN backbones, Telecom access
lines and campus networks.
Construction
Loose Tube
Strength member
Armoring
Sheath
2.8 mm jelly filled loose tube with 6 fibers
Should have a strength member like E-Glass yarns
corrugated steel tape
Min. 1.5 mm black MDPE sheath
Optical Fiber Patching System - Rack-Mount Enclosures
General Specifications: The enclosure shall accommodate fiber adapters in maximum 1.75" (1RU)
space (1 rack space). Adapters shall be pre-installed on bulkheads or mounted on metal plates, and
attached to the empty bulkhead using plastic plungers. The adapter plates shall have a port designation
number near the adapter. The enclosure shall have removable front and rear doors. There shall be
vertical and horizontal cable entrance ports in the top, bottom and sides of the enclosure both front and
rear. All cable entrance ports are designed with a strain relief post with a slot capable of holding a tie
wrap. The enclosure shall provide strain relief in the form of a grounding lug and multiple tie wrap points.
The enclosure will have mounting ears that allow mounting on a 19" rack in either a mid- or flush-mount
configuration. The enclosure shall have dual, adjustable plastic cable management rings made of high
impact UL 94V-0 rated self-extinguishing plastic. The enclosure shall be capable of having a slide feature
attached to it to allow the entire box to be moved in and out of the rack. A port identification label/card
shall be provided. The enclosure shall be made of 18 gauge steel, powder coated black.
Standards Compliance:Meets or exceeds all applicable standards: TIA/EIA-568-B, -606, and -607. UL
Listed. CSA Certified.
Page 8
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Physical Specifications:Enclosures should be 18 gauge steel, should be powder coated, should have
Fiber Management Rings, the self-extinguishing plastic should be rated UL 94V-0.Enclosure should have
slide-rail for easier access and maintenance. Enclosure should have designation labeling allows
identification of port assignments. Enclosures should be capable of storing up to 3 meters of 900 micron
tight buffered fiber per connector. Enclosure should have the metal lid.Enclosure should be capable to
accept up to three splice trays, Fiber management rings are removable to help accommodate larger
quantities of slack storage at the rear of the tray.
Adapter Plates :General Specifications:The fiber optic rack mount adapter plate shall be 12 port of LC adapters &
should provide6/12 ports for ST, FC, SC, LC, MT-RJ connectors. The adapter plates shall be compliant
with TIA/EIA-568-B. The Adapter Plates shall accommodate SC, FC, ST, LC, MT-RJ adapters. The metal
mounting plates shall be made of 16 gauge steel, powder coated black. The adapter plates should offers
flexibility in adding or changing connector style Adapter Plates and should have feature multiple style
adapters. Theadapter plate should have plastic plungers for quick tool-less installation. These plates
should fit perfectly onto line of fiber rack mount enclosures and adapter bracket. For use with ST, FC, SC,
LC, MT-RJ snap-in connector applications.
24 Port Fiber Injection Molded Splice Trays : General Specifications:The fiber splice trays shall be offered in mini and high density versions with
removable clear covers for viewing and inspection of fibers. Incoming fiber shall be secured utilizing a
ratchet action foam rubber padding clamp feature or tie-down points to minimize crushing of fiber. The
trays shall accommodate slack management of both single-mode and multimode 250 or 900µm fiber and
protection of (up to) 12 or 24 fiber heat shrink style fusion splices. Heat shrink splice sleeves shall be
included. The splice tray should have a clear cover allows viewing or inspection of fibers without having to
remove cover. Tray should have multiple tie down holes for securing incoming fiber.
50-Micron Multimode Optical Fiber Cords and Pigtails
General Specifications: To maintain channel integrity, optical fiber patch cords and pigtails shall be
fabricated to meet the performance parameters corresponding to the optical fiber cable approved product
type specified below. Patch cord and pigtail plug connectors shall be equipped with boots, and shall have
same colors as related optical fiber backbone cables, unless specified or indicated otherwise.
Optical fiber patch cords and pigtails shall be available with the following options as specified or indicated:
1. Termination types: LC
2. Connector/cable configuration: duplex
3. Fire ratings: The patch cords shall be constructed of 50µm OFNR rated fiber optic cable
4. Patch cord outside diameters: between 1.6 millimeters (0.063 inches) and 3.0 millimeters(0.118 inches)
5. Pigtails: Tight-buffered optical fiber, maximum 0.9 millimeters (0.035 inches) outside diameter
6. Lengths: As specified or indicated.
7. The patch cords shall be compliant with TIA/EIA-568-B.3
8. Should provide 10-gig performance (at 850 nm)
9. Should be backwards compatible to lower speed applications.
10. The Patch cord should be compatible with 10Mb/100Mb/1Gb/10Gb transceivers.
Page 9
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Communications Copper Horizontal Cabling
Data Communications Horizontal Cabling
Category 6/Class E Unshielded Twisted-Pair (UTP) Cable
A.
General specifications: Cable shall have a round overall cable geometry with nonmetallic cross separator, and 4 pairs of #23 AWG (0.52 millimeters) bare copper.
Cable color shall be specified or selected by Owner’s Representative from
manufacturer’s standard colors. UL Listed and fire ratings IEC 60332-1 (vertical flame
test) & UL1581 FT2 (horizontal flame test). Box of 305 mtrs with bending radius ≥
4xOD (without load). The cable should be from ISO 9001 certified quality
manufacturer.
.
• Insertion Loss (IL) 10-15 dB
• Near End Crosstalk (NEXT) 20-25 dB
• Return Loss (RL) 8-12 dB
B.
Construction specifications (by type):
1. Listed cable: Solid copper conductors with high-density polyolefin insulation and
an overall low smoke zero halogen (LSZH) jacket to achieve a riser rating by
applicable NEC requirements.
C.
Comply with following general physical specifications:
1. Maximum pulling tension: 110 Newton’s (25 pound-force)
2. Operating temperature: –20 to 60 degrees C [–4 to 140 degrees F]
D.
Standards compliance:
3. General standards: Comply with applicable standards
4. Comply with following application standards:
a) Voice, facsimile, modem, Switched 56, T-1, and ISDN
b) RS-232, RS-422, and RS-485
c) IEEE 802.3 1Base5, 10BaseT, 100BaseT, 1000BaseT, and 10GBaseT
d) IEEE 1394B transfer modes S100 and S400
e) IEEE 802.5 (token ring) at 4 megabits per second and 16 megabits per
second at 100 meters (328 feet)
f)
TP-PMD technology at 100 megabits per second
Page 10
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
g) ATM at 155 megabits per second, 622 megabits per second, and 1 gigabit
per second using parallel transmission schemes
h) AES/EBU digital audio and 270 megabits per second digital video
i)
77 channels (550 megahertz) of analog broadband video
5. Comply with following application specifications:
a) Operating voltages for dry locations: 0 to 30 Vac at 60 hertz, 0 to 70.7 Vac
for audio frequencies, and 0 to 60 Vdc
b) Operating currents at 25 degrees C (77 degrees F) ambient temperature
(1) 1 current-carrying pair per cable: 1.5 amperes on each conductor
(2) 2 to 4 current-carrying pairs per cable: 3.36 amperes for all pairs
(3) Audio frequencies and 1 current-carrying pair per cable: 1 ampere on
each conductor
Communications Faceplates and Connectors
Category 6/Class E Outlets
A.
General specifications: Telecommunications jacks shall be 8-position/8-conductor
modular outlets accepting industry standard modular RJ45 type plugs and IDC
terminations. The modular connector shall be individual snap-in style. The connectors
shall also be in compliance with all National Electrical Codes; compliant with FCC
Part 68; UL listed; and independently verified. In addition to Category 6 compliance,
the connector shall have the ability to support high megabit and shared-sheath
applications. The connectors have to be designed with Retention force technology
which protects tines from damage on 4 or 6 pin plugs and helps to achieve plug
insertions >2000 times, Jacks with RFT are extended with life time Warranty. All
plastics used in construction of the connector bodies shall be fire-retardant with a UL
flammability rating of 94V-0.Universal design shall support T568A and T568B wiring
and shall have universal wiring labels, including color-coded insert identification
labels to ensure accurate identification. Color shall be specified or selected by
Owner’s Representative from manufacturer’s standard colors. Provide improved pair
splitters and wider channel for enhanced conductor placement. Jack shall be
backward compatible with lower category cords and cables. Low-profile wire cap
shall protect against contamination and secure connection. Jacks shall be suitable
for:
1. Modular patching applications or as modular TO
2. Installation without special faceplates at either 45- or a 90-degree angle in
manufacturer’s modular faceplates and frames, including those on surfacemounted boxes
B.
Comply with following physical specifications:
Page 11
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
3. Material: High-impact, flame-retardant, UL-rated 94 V-0 thermoplastic
4. Operating temperature: –10 to 60 degrees C (14 to 140 degrees F)
5. Outlet wire contacts: Copper alloy with 1.27 micrometers (50 microfiches) hard
gold plating over 2.54 micrometers (100 micro inches) nickel under plate
6. Connectors: Insulation Displacement Connections shall be industry-standard
110-style Connectors shall accept 0.51 to 0.64 millimeters (0.020 to 0.025
inches), 22 to 24 AWG, stranded conductors or 0.40 to 0.64 millimeters (0.016 to
0.025 inches) 26 to 22 AWG solid conductors with insulation size of 0.76 to 1.17
millimeters (0.030 to 0.046 inches)
C.
Comply with following mechanical specifications:
1. Plug insertion life: 750 insertions minimum
D.
Comply with following electrical specifications:
1. Dielectric withstand voltage: 1000 volts alternating current root mean square, 60
hertz minimum, contact to contact
2. Insulation resistance: 500 mega ohms minimum
3. Current rating: 1.5 amperes at 20 degrees C (68 degrees F) by IEC 60512-3-15b
E.
Comply with following standards:
1. TIA/EIA-568-B.1
2. TIA/EIA-568-B.2
3. ISO/IEC 11801
4. CENELEC EN-50173
5. UL, ETL, CSA, and ACMA
6. FCC 47 CFR 68 F
F.
Application standards: Support application standards specified for related cabling.
G.
Performance specifications: Comply with specifications for related cabling.
H.
Faceplates: - The wall plate housing shall be a one-piece, single-gang flush mount
style that is compatible with British Standard BS 4662 for flush-mount electrical boxes
and BS 5733 for surface mount electrical boxes. It shall provide 1-, 2-, or 4-ports in a
flat design, as well as 1- and 2-ports in an angled design to facilitate optimal cable
management. Should be compatible with 3x3 inches wall Faceplates with color
options available on the wall plates. It must be made of high-impact, fire-retardant
plastic rated UL 94V-0 and compliant with TIA/EIA-568-B specifications.
Page 12
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Communications Patch Cords
Category 6 /Class E Patch Cords
A.
General specifications: Provide 8-position/8-conductor modular RJ45 type plugs
compatible with industry standard modular jacks as used in patch panels or TOs. The
lengths and conductor type (solid or stranded) shall be as specified and confirmed by
Owner’s Representative. Patch cord shall be available in stranded and solid
conductor in specified lengths. The cord color shall be specified or selected by
Owner’s Representative from manufacturer’s standard colors. Patch cords shall be
backward compatible with lower category jacks. Patch cords shall have integral antisnag feature that provides maximum protection from snagging during moves and
rearrangements.
B.
Comply with following physical specifications:
1. Plug material: High-impact, flame-retardant, UL-rated 94 V-0 polycarbonate
2. Operating temperature: –10 to 60 degrees C (14 to 140 degrees F)
3. Contact material: Phosphor bronze
4. Contact plating: 1.27 micrometers (50 micro inches) gold over 2.54 micrometers
(100 micro inches) nickel
5. RoHS Compliant
C.
Comply with following mechanical specifications:
1. Insertion life: 750 insertions minimum
D.
Comply with following electrical specifications:
1. TIA-568-B.2 for Category 6
E.
Comply with following standards:
1. TIA/EIA-568-B.1
2. TIA/EIA-568-B.2
3. ISO/IEC 11801
4. CENELEC EN-50173
5. UL, ETL, CSA, and ACMA
F.
Application standards: Support application standards specified for related cabling.
G.
Performance specifications: Comply with specifications for related cabling.
Page 13
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
TECHNICAL SPECIFICATIONS OF NETWORK ENCLOSURES
Technical details of 19” Floor Mount Standard Enclosure:
1. Scope of Supply:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Front and Rear Perforated doors, 78% Perforation, PU Gasket
Side panel, 1.5 mm with PU Gasket
Full Height 19” angle,
Top and bottom cover,
Socket Strips (5/15 amp, 10 points 2 strips each rack),
Fan Tray with 4 fans with finger guard/ rack,
Heavy Duty castors 1000KG Load Bearing Capacity with leveling feet,
Earthling kit,
Stationery shelf 2no. / racks,
Keyboard tray 1 no./rack,
Vertical cable managers on both sides
Horizontal cable managers (5No. / Rack),
Hardware pack of 20 (5pack. / Rack)
All Products should be certified according to ISO 9001, 14001 and UL Listed.
2. Technical Specification:
a)
Basic Structure: Frame Of sturdy frame section construction. All profile edges are radiuses.
The corners are stiffened with welded MS die-cast, copper coated, corner connectors, removable
top & Bottom cover with Cable entry provision. Frames are bayable, scalable and modular. Load carrying
capacity: 1000 kg.
b)
Perforated Doors: 78% perforation, sheet steel, with foamed seal polyurethane gasket, square
section tubular frame, rod-type 3 point lock system and double-bit inserts to DIN 43668 with handle
c)
19” ANGLES: Zinc Plated. Mounted on Installation bracket for stability and strength. 2 mm thick.
d)
Roof panel: with foamed-on seal, removable. Cable entry provision & fan mounting provision. 1.5
mm thick
e)
Surface Finish: Nano Coated, electro-dipcoat primed to 20 microns and powder coated with
textured polyester RAL 9005 to 80 to 120 microns.
f)
Side panels: 1.5mm sheet steel vented at bottom, with foamed-on seal and fixing screws. All
parts have been prepared for the attachment of earth straps.
g)
Approvals
-
UL, Underwriters Laboratories /US
Page 14
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
PART 2 – TECHNICAL SPECIFICATIONS OF LAN ACTIVE COMPONENT
Technical Specifications for MODULAR CORE SWITCH
Should have minimum 10 slots in chasis and Should be on ACTIVE – ACTIVE mode
Manufacturer Model & Part Code
Port density
Minimum of 48 ports of Gigabit Fiber Ports distributed over two modules.
Support for minimum dedicated 4 ports of 10G interface for future expansion
Should be scalable to support minimum 350 Gigabit ports (mix of Fiber and copper)
Support for 1000SX, 1000 LX, 1000BX , 10G SR/LR/ER/Copper
Switching capacity
Should support throughput minimum 350 Millionpps
Switching Fabric should be minimum 700 Gbps or more with non blocking architecture.
Chasis should be scalable to minimum 1 Terabyte
The switch should support for both ipv4 and ipv6 in hardware and software including Management
protocols
All modules including Power supplies and Fan trays should be field replaceable.
Operating System & Redundancy
The Switch should have Operating System offering modularity / upgradeability for memory protection
between processes, and ability to re-start failed processes in real-time to protect from software crash.
The Core Switching system should not have any Single point of Failure.
Should have Redundant CPU, Switching Fabric, PSU, Fan from Day 1.
Switch should also support software maintenance without any Downtime.
All modules should be hot swappable for Hardware maintenance without any Downtime.
MAC Address Support
64 K MAC address
Switching Features
IEEE 802.1Q VLAN - 4096 VLANs support and 4096 Vlan ID support
Should support port based, protocol based VLAN, MAC based VLAN, private vlans or equivalent
Suggest IEEE 802.3x (full duplex)
Support Multi-Link port groups with LACP, Minimum 32 Load sharing Groups should be possible.
At least 32 K L3 Routes in hardware
Support IPv4 Static Routes, IPv4 loopback interfaces, RIPv2, OSPF , VRRP/HSRP, PIM-SM, OSPF v2
graceful protocol restart
Support IPV6 Static Routes, RIPng, OSPFV3 and BGP
Should support capability with BGP on Day One and ISIS with future software/license upgrade.
Support broadcast & multicast storm suppression
IEEE 802.1D , 802.1W, 802.1S
Should support programmable uplink redundant port or equivalent feature.
Support minimum 32 spanning tree instances
Should support PVST+ encapsulation with RSTP algorithm or equivalent
Support STP Root Guard/Equivalent
Should support BPDU Guard feature on edge port or Equivalent
Each port supports 8 hardware based queues
Packet tagging based on 802.1p or DSCP preference
Page 15
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
QoS profile should be configurable based on Physical port, Source and Destination Mac, Source and
Destination IP, TCP/IP ports, Diffserv, 802.1p, COS, TCP Flag and VLAN.
IPv6 Classification and Marking in Hardware from day 1
should support policy based selective traffic rate limiting with Configurable bandwidth granularity of 64
KBps
Shall provide local and remote Port Mirroring (Support RSPAN) with one to one and one to many
IGMP v1, v2, v3 & MLD v1, v2, MVR
Support Jumbo Frame upto 9K bytes for all ports
Security
Should support dynamic arp inspection and User selectable address learning mode per port and per
vlan
DHCP Option 82 & Trusted DHCP Server Support
Should support MAC address tracking and notification via snmp and Syslog of any MAC address
addition or deletion in the network
L2 to L4 ACL providing filtering based on source/destination MAC address, source/destination IP
address, port, protocol, VLAN)
Access profiles for telnet, ssh2, snmp
Should support Private Vlans or equivalent on access and 802.1q trunk ports
CPU Dos protection and Control Plan traffic flood protection
Should support minimum 20 K hardware based ACL rules. Should support Time Based ACL
Support IPv4 & IPv6 ACL’s for L2/L3/L4 entries
Should support Secure Shell (SSHv2) Protocol, HTTPS(SSL), SCP-2, TACACS +
Local authentication database and RADIUS Authentication for 802.1x login
IEEE 802.1x user authentication with web based and Guest VLAN provision
Support management using CLI, GUI using Web interface (https).
Should be able to track Windows users across the network and display the mapping between domain
login username ,ip address , mac address and port number
Management
should be GUI Based Management. Support for XML-API or equivalent
The embedded event & log manager based on defined events/errors, custom actions can be executed
on the local system natively. Triggers for actions as well as the individual steps themselves can be
defined & this kind of procedure produces true plug-and-play operations
Should support feature to monitor Network Health by detecting remote switch cpu or link failure
Support CLI (Command Line Interface) configuration mode.
Should support scriptable CLI and web based management
Should offer inbuilt mechanism for measuring frame delay and delay variance across network nodes
Should support Multiple images and configuration onboard, with ability to restore back to alternate
configuration or firmware image in case of software corruption
Should offer L2 ping , L2 traceroute and Multicast Traceroute
Should support ASIC based traffic flow analysis with netflow/sflow/ipfix
Inbuilt Web based bandwidth utilization monitoring
Support Configuration via the console port & support configuration logging
Should have management port ( RJ-45) or equivalent
Support System configuration with SNMP v1, 2 and 3
Shall support IPv4 & IPv6 network management tools like Ping, traceroute, BOOTP relay, RMON ,
DHCP, DNS, SNMP and SNTP.
Power & Environment
Auto-ranging 90-240VAC, 50-60 Hz
Page 16
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Adequate internal Fans to support non A.C & relatively negligible air flow environments
Operating Temperature Range: 0° C to 40° C (32° F to 104° F)
Operating Humidity: 10% to 90% relative humidity, non-condensing
RoHS& WEEE compliant
ISO certification
The OEM/manufacturer should have require site industry certifications for ISO 9001 & 14000.
Tech Specs for 48 port Gigabit L3 Copper Switch
Manufacturer Model & Part Code
Port density in each switch
Minimum of 48 ports of 10/100/1000 Base-T RJ45 with auto polarity & auto speed support
Should have dedicated stacking ports of 40 GBPS or more bandwidth
Support for 2 or more 10 G ports in future expansion
Architecture & Performance
Non-Blocking Architecture & switching fabric
Each switch should support 176 Gbps or more with non blocking architecture with minumum100 Million
pps
Support for 1000SX, 1000 LX, 1000BX, 10G SR/LR/ER/Copper
Should have support for future Redundant Power Supply (inbuilt or external)
Should have inbuilt fan cooling
MAC Address Support
Upto 8 K MAC address support
Layer 3 features
Direct L3 route entry in Hardware
like IPv4 & IPv6 static routes, RIP v1/V2 , RIPng, day 1
Should support seamless addition of multiple L3 interface through secondary ipaddress on a single port
in future
The switch should be upgradable to OSPF, Graceful protocol restart for OSPFv2, PIM-SM,
VRRP/HSRP for redundancy
The switch should support Policy Based Routing
The switch should support both ipv4 and ipv6 in hardware. IPv6 features should not be limited to
hardware support & IPv6 management, it should offer switching, dynamic routing and management
also.
L2 support
IEEE 802.1Q VLAN 2048 VLANs support and 2048 Vlan ID support
Should support policy based Traffic Redirection
Should support Flex link or Software configurable redundant ports
Should support MAC address tracking and notification of any MAC address addition or deletion in the
network
Should support minimum 64 groups of LACP 802.3ad
should support UDLD or equivalent
IGMP v1, v2, v3 & MLD v1, v2, MVR
Support for rfc 1573, 1650, 2925, 2668, 1354, 2710, 3810
IEEE 802.1w Rapid Spanning Tree Protocol, 802.1s Multiple Spanning Tree Protocol, PVST+
Page 17
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Support minimum 16 Spanning tree instances
Management
Configuration logging
BootP and or TFTP Firmware upgrades Support, DHCP,DNS client
It shall be possible to add or remove a switch to the stack without rebooting all the switches in the stack
Inbuilt Web based bandwidth utilization monitoring
Should support Per command authorization via TACACS+/Radius
Should offer inbuilt mechanism for measuring frame delay and delay variance across network nodes
Should support ability to monitor CPU process and utilization percentage.
Should offer L2 ping , L2 traceroute
Multiple Images, Multiple Configs
Should be compatible with SNMP v1, v2, v3 base devices , SNTP with Time zone Support
Shall have Command-line interface (CLI)-based management to provide detailed out-of-band
management
Shall support IPv4 & IPv6 network management tools like Ping, traceroute, BOOTP relay, DHCP, DNS,
SNMP and SNTP.
Shall haveA SIC based traffic flow analysis with Netflow/Sflow/IPFIX
Shall have Remote Monitoring (RMON) software agent to support four RMON groups (history,
statistics, alarms, and events) for enhanced traffic management, monitoring, and analysis
Should have management Port/RJ45 Port/
QOS
The switch should support Policy-Based Quality of Service (QoS) at wire-speed to allocate bandwidth,
and prioritize traffic
IPv6 Classification and Marking
Should support Configurable multicast session limit per port
802.1p prioritization
Should support policy based selective traffic rate limiting with Configurable bandwidth granularity of 64
KBps
802.1p/Tos/Diffserv marking and mapping
Shall provide local and remote Port Mirroring, one to one and one to many
L2, L3, L4 (TCP/UDP) traffic classification
Strict priority queuing, Weighted round-robin Queuing.
Broadcast, multicast storm control per port
8 hardware queues per port should be supported
The switch should support Jumbo frames
Ingress Policing and Egress Shaping
Security
Shall be TACACS+ /RADIUS enabled
Should support Private Vlans or equivalent on access and 802.1q Ports
Access profiles for telnet, ssh2, snmp
The switch should have capability to bind IP and MAC to PORT.
CPU DoS Protection &DDoS protection
Minimum 2K hardware based extended ACLS with time Based ACL Support.
Radius Authentication & Accounting, TACACS + or equivalent
Secure Shell (SSHv2) Protocol, HTTPS(SSL)
IP Route Filtering and DHCP snooping
DHCP Option 82 & Trusted DHCP Server Support
Local authentication database and RADIUS Authentication for 802.1x login
Page 18
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
IEEE 802.1x user authentication with web based and Guest VLAN provision
Switch needs to have console port and dedicated Ethernet port for administration & management,
SNMP v2v3
Support management using CLI, GUI using Web interface (https).
Support SFTP/TFTP for upgrading the operating System and or accessing switch directory file system
Should Support Port based Security
Shall have Dynamic Address Resolution Protocol (ARP) inspection with user selectable learning modes
ACLs/Filters based on source and destination MAC addresses, IP addresses or TCP/User Datagram
Protocol (UDP) ports for IPv4 & IPv6
Should be able to track Windows users across the network and display the mapping between domain
login username ,ip address , mac address and port number
Power & Environment
Auto-ranging 90-240VAC, 50-60 Hz
Operating Temperature Range: 0° C to 40° C (32° F to 104° F)
Operating Humidity: 10% to 90% relative humidity, non-condensing
RoHS& WEEE compliant
ISO certification
The OEM/manufacturer should have require site industry certifications for ISO 9001 & 14000.
Tech Specs for 24 port Gigabit L3 Copper Switch
Manufacturer Model & Part Code
Port density in each switch
Minimum of 24 ports of 10/100/1000 Base T RJ45 with auto polarity & auto speed support
Should have dedicated stacking ports of 40 GBPS or more bandwidth
Support for 2 or more 10 G ports in future expansion
Architecture & Performance
Non-Blocking Architecture & switching fabric
Each switch should support 88 Gbps or more with non blocking architecture with minimum 50 Million
pps
Support for 1000SX, 1000 LX, 1000BX, 10G SR/LR/ER/Copper
Should have support for future Redundant Power Supply (inbuilt or external)
Should have inbuilt fan cooling
MAC Address Support
Upto 8 KMAC address support
Layer 3 features
Direct L3 route entry in Hardware
like IPv4 & IPv6 static routes, RIP v1/V2 , RIPng, day 1
Should support seamless addition of multiple L3 interface through secondary ipaddress on a single port
The switch should be upgradable to OSPF, Graceful protocol restart for OSPFv2, PIM-SM,
VRRP/HSRP for redundancy
The switch should support Policy Based Routing
Page 19
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
The switch should support both ipv4 and ipv6 in hardware. IPv6 features should not be limited to
hardware support & IPv6 management, it should offer switching, dynamic routing and management
also.
L2 support
IEEE 802.1Q VLAN - 1024 VLANs support and 1024 Vlan ID support
Should support policy based Traffic Redirection
Should support Flex link or Software configurable redundant ports
Should support MAC address tracking and notification of any MAC address addition or deletion in the
network
Should support minimum 64 groups of LACP 802.3ad
should support UDLD or equivalent
IGMP v1, v2, v3 & MLD v1, v2, MVR
Support for rfc 1573, 1650, 2925, 2668, 1354, 2710, 3810
IEEE 802.1w Rapid Spanning Tree Protocol, 802.1s Multiple Spanning Tree Protocol, PVST
Support minimum 8 Spanning tree instances
Management
Configuration logging
BootP and or TFTP Firmware upgrades Support, DHCP,DNS client
It shall be possible to add or remove a switch to the stack without rebooting all the switches in the stack
Inbuilt Web based bandwidth utilization monitoring
Should support Per command authorization via TACACS+/Radius
Should offer inbuilt mechanism for measuring frame delay and delay variance across network nodes
Should support ability to monitor CPU process and utilization percentage.
Should offer L2 ping and L2 traceroute
should offer inbuilt tool for multicast trace
Multiple Images, Multiple Configs
Should be compatible with SNMP v1, v2, v3 base devices , SNTP with Time zone Support
Shall have Command-line interface (CLI)-based management to provide detailed out-of-band
management
Shall support IPv4 & IPv6 network management tools like Ping, traceroute, BOOTP relay, DHCP, DNS,
SNMP and SNTP.
Shall haveA SIC based traffic flow analysis with Netflow/Sflow/IPFIX
Shall have Remote Monitoring (RMON) software agent to support four RMON groups (history,
statistics, alarms, and events) for enhanced traffic management, monitoring, and analysis
Should have management Port/RJ45 Port
QOS
The switch should support Policy-Based Quality of Service (QoS) at wire-speed to allocate bandwidth,
and prioritize traffic
IPv6 Classification and Marking
Should support Configurable multicast session limit per port
802.1p prioritization
Should support policy based selective traffic rate limiting with Configurable bandwidth granularity of 64
KBps
802.1p/Tos/Diffserv marking and mapping
Shall provide local and remote Port Mirroring, one to one and one to many
L2, L3, L4 (TCP/UDP) traffic classification
Strict priority queuing, Weighted round-robin Queuing.
Page 20
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Broadcast, multicast storm control per port
8 hardware queues per port should be supported
The switch should support Jumbo frames
Ingress Policing and Egress Shaping
Security
Shall be TACACS+ /RADIUS enabled
Should support Private Vlans or equivalent
Access profiles for telnet, ssh2, snmp
The switch should have capability to bind IP and MAC to PORT.
Minimum 2K Hardware based extended ACLs with Time Based ACL support
Radius Authentication & Accounting, TACACS +
Secure Shell (SSHv2) Protocol, HTTPS(SSL)
IP Route Filtering and DHCP snooping
DHCP Option 82 & Trusted DHCP Server Support
If any non 802.1x compliant switch/Hub is connected to any port, all ports of that Hub/Switch should
pass thru 802.1x Authentication individually
Local authentication database and RADIUS Authentication for 802.1x login
IEEE 802.1x user authentication with web based and Guest VLAN provision
Switch needs to have console port and dedicated Ethernet port for administration & management,
SNMP v2v3
Support management using CLI, GUI using Web interface (https).
Support SFTP/TFTP for upgrading the operating System and or accessing switch directory file system
Shall have Dynamic Address Resolution Protocol (ARP) inspection with user selectable learning modes
ACLs/Filters based on source and destination MAC addresses, IP addresses or TCP/User Datagram
Protocol (UDP) ports for IPv4 & IPv6
Should be able to track Windows users across the network and display the mapping between domain
login username ,ip address , mac address and port number
Power & Environment
Auto-ranging 90-240VAC, 50-60 Hz
Operating Temperature Range: 0° C to 40° C (32° F to 104° F)
Operating Humidity: 10% to 90% relative humidity, non-condensing
RoHS& WEEE compliant
ISO certification
The OEM/manufacturer should have require site industry certifications for ISO 9001 & 14000.
NOTE – BIDDERS SHOULD DISCLOSE THE ITEM’S COUNTRY OF ORIGIN AND MANUFACTURING.
Page 21
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
NETWORK MANAGEMENT SYSTEM
Features
1. Should be of same make of the offered switches
2. Management station should be enabled to manage up to 2000 Network nodes and 250 active
devices from day 1.
3. It shall be possible to manage, configure, administer, monitor, and troubleshoot all the switches
from a central Network Management System (NMS).
4. The offered NMS shall be suitable for deploying on Microsoft Windows 2003 Server or Linux
server on Intel based Hardware.
5. It shall be possible to monitor real time device status and network traffic for individual devices and
ports. The NMS shall also have the capability to record and display historical trends of the
network traffic.
6. It shall be possible to create, configure, manage and troubleshoot VLANs and inter-VLAN
communication from the NMS.
7. It shall be possible to define and implement Access Control Lists / security filtering rules to allow /
block at subnet, host, and TCP/UDP port level from the NMS.
8. The NMS shall have the various diagnostic functionalities such as ICMP ping, trace route, DNS
lookup, packet capture & protocol analysis for network troubleshooting.
9. The NMS shall have the capability to discover the network devices and compute the relationship,
graphically display / map the network topology, display views of the network.
10. It shall be possible to have the Dynamic VLAN configuration done centrally from the NMS.
11. Should be able to implement User-based policies based on security level, and job requirements
as defined within a Lightweight Directory Access Protocol (LDAPv3) compliant directory.
12. Should be able to implement application-based policies defined based on an application’s
requirements, such as latency tolerance or time-of-day/day-of month requirements. Application to
be identified by information within a traffic flow Differentiation can be based on: Ether-type, VLAN
ID, 802.1p, Source or Destination Port Number, Source or Destination IP Address, Pre-marked
DSCP, Protocol Type, Type of Service, URL, and Deep Packet Filters.
13. Complete reporting status for policies deployed throughout network
14. Should support User Based Policies, Policies specifically configured to control user network
access and resource access at the entry point of the network. User Based Policies may be QoS
and / or security policies. User Based Policies can applied on an individual user or on a group /
department of users
15. Should be able to define how much bandwidth an application should be allowed in terms of a
committed rate and burst size.
16. Should provide scalability and reliability for large networks and interoperate with various
management standards, including: DiffServ, IEEE 802.1p
17. Supports policies for access control, based on user profile and RADIUS authentication.
18. LCD TV for NMS control of following configuration to be included :High Definition Liquid Crystal Display 42 Inch
Product specification
1
Screen Size (Diagonal)
42- inch Diagonal
2
Contrast Ratio
Min. 1000:1
3
Power source
AC100-240V, 50/60Hz
4
Color system
PAL/SECAM
5
Receiving system
BG/I/DK/L/L'
6
Receiving channel
VHF2-13, UHF14-69, CATV(X-Z+2, S1-S4)
7
Audio output
Min. 8 w x 2
Page 22
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
8
HDMI
1
9
S-Video
1
10
D-Sub 15
1
11
HD Component
1
12
AV input
1
13
21pins Euro Scart
2 x w/RCA adapter
14
PC Sereo Mini phone jack
1
15
Earphone jack
1
RCA
Page 23
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
PART 3 - STATIC UNINTERRUPTIBLE POWER SUPPLY
GUIDE SPECIFICATION
PART 1 - GENERAL
1.01 SUMMARY
A. This specification describes a three-phase continuous duty, on-line, double conversion, and
solid-state uninterruptible power system, hereafter referred to as the UPS. The UPS shall
operate in conjunction with the existing building electrical system to provide power
conditioning, back up and distribution for critical electrical loads. The UPS shall consist of the
UPS module with static bypass, battery backup, and other features as described in this
specification.
1.02 UPS SYSTEM DESCRIPTION
A. UPS System Components: The UPS system shall consist of the following main components:
1. UPS module containing a Rectifier, Inverter, Battery Charger, Static Bypass, and associated
Control and Monitor Panel.
2. Battery string(s) in Line-and-Match Battery Cabinets or racks.
3. Optional Line-and-Match cabinet(s).
B. UPS Module Modes of Operation: The UPS Module shall operate as frequency independent
(class VFI-SS-111), fully automatic online system in the following modes:
1. Normal: Utilizing commercial AC power, the critical load shall be continuously supplied by
the Inverter. The Inverter shall power the load while regulating both voltage and frequency. The
Rectifier shall derive power from the commercial AC source and shall supply DC power to the
Inverter. Simultaneously, the Battery Charger shall charge the battery.
2. Battery: Upon failure of the commercial AC power, the critical load shall continue to be
supplied by the Inverter, which shall obtain power from the batteries without any operator
intervention. There shall be no interruption to the critical load upon failure or restoration of the
commercial AC source.
3. Recharge: Upon restoration of the AC source, the Charger shall recharge the batteries and
simultaneously the Rectifier shall provide power to the Inverter. This shall be an automatic
function and shall cause no interruption to the critical load.
4. Bypass: If the UPS module must be taken out of the Normal mode for overload, load fault, or
internal failures, the static bypass switch shall automatically transfer the critical load to the
commercial AC power. Return from Bypass mode to Normal mode of operation shall be
automatic.
Page 24
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
Technical Compliance Statement
S.No.
Features
1
System
Configuration
2
Technology
3
Normal:
4
Power Failure:
Qualifying Minimum Requirements
The UPS systems 2x15kva should
operate in parallel redundant load
sharing mode and all UPS systems
should share the load equally. In case
any UPS fails, the other UPS should
take over 100% loads instantaneously
without break.
The UPS should be Digital Signal
Processing CAN bus Technology, True
On-line Double Conversion, using IGBT
as switching devices for both Rectifier
and Inverter.
The rectifier/charger shall be a highfrequency
PWM
design,
using
Insulated Gate Bi-polar Transistors
(IGBTs). Rectifier rated for 100%
continues duty application first converts
100% incoming AC power into
controlled
DC
power,
thereby
addressing input side power problems.
This controlled DC is further fed to
Inverter to regenerate new and clean
AC output power after voltage and
frequency conversions. Therefore, UPS
should be designed to deliver 100%
rated output power as CVCF (Constant
Voltage constant frequency) even after
disabling static bypass path. As long as
UPS system is healthy incoming AC
supply should never be allowed to
reach
connected
load
without
regeneration of new & clean AC power.
The rectifier derives power from AC
Input source and supplies DC power to
the Inverter while simultaneously
charging battery bank.
Upon detecting a power failure
condition, the rectifier shall isolate itself
from the main input and the battery
bank shall discharge into the inverter to
keep the load up and running. Battery
run time shall be as defined in this
specification. Upon restoration of
power, the UPS modules shall
automatically,
and
without
user
intervention, return to the Normal Mode
of operation as outlined above.
Page 25
Vendor
Compliance
Yes/No
Specifications
offered
by
vendor
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
5
Emergency
6
7
Input Source
Input Voltage
Input
Voltage
Tolerance
Input Frequency
Input Frequency
Tolerance
Input Power factor
at nominal voltage
and full load
8
9
10
11
12
In the event of an output bus failure or
an extreme overload condition, the load
shall be transferred, seamlessly and
without interruption, to a fully rated
static switch.
Mains/Local DG Set Compatibility
415 VAC 3 phase, 4 wires
415 VAC, - 20% to +20%
50 Hz
45 HZ TO 65 HZ
0.99 Irrespective of load condition
>
5%
>
5%
> 6% - 25% LOAD
Input THDi
100%
50%
LOAD
LOAD
Automatic phase sequence correction
facility to be provided.
(In case
standard UPS MODEL do not meet this
requirement, Vendor should provide
Contactor Logic outside the UPS)
15 KVA/ 13.5 KW, Since power density
is critical, UPS with higher kva rating
with lower output power factor will not
be considered
380-400- 415 VAC Three phase
± 1% - For 100% static load ,
±
1% For 100% balanced load,
±
1% - For 100% un-balanced load
150% for 1 min / 125% for 10 min
> 96%
13
Phase Sequence
correction
14
Rated
Capacity
15
Output Voltage
16
Output
Voltage
Regulation
17
18
Over Load Rating
Inverter Efficiency
19
Overall efficiency
>
93%
>
91%
> 89% - 25% LOAD
Desired Backup
Each UPS will have independent
Sealed Maintenance Free battery
banks to give 8-10 minutes backup on
full load. Battery should be provide
built-in with UPS, Battery in external
battery cabinet/racks not acceptable
20
Output
100%
50%
Page 26
LOAD
LOAD
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
21
Battery
management
22
Battery type
23
POWER
MANAGEMENT
SOFTWARE
24
RS232 interface
25
SNMP
26
Certification
Product
EMC
Safety
ISO Certificate
27
Audible noise
28
Cooling
29
Protections
Battery
Management
for:
Periodic
Battery
Test
Controlling Charging Time and Current
Increase
in
Battery
Life
Faster recharging than average boost
charging
when
required.
Protection: Battery low Cut-off without
draining current
Sealed Maintenance Free
The UPS should have Power
management software and interface
cable, providing complete power
monitoring and control capabilities to
system administrators. It should
Safely shutdown & restart Windows
Clients · Give comprehensive power
status data displays · Analyze power
conditions with voltage logging· Should
support OS/2, UNIX, Sun Solaris,
Novell NetWare, Novell, Manage Wise,
(MS DOS and Windows 3.x as Novell
Clients), Windows NT and Macintosh.
1 No. RS232 interface to be provided
Web
monitoring:
Remote
UPS
monitoring shall be possible via a web
browser such as Internet explorer.
Remote Monitoring of UPS System
through LAN should be possible using
Ethernet and TCPIP Protocol.
IEC 62040-3
EN 50091-2 Class A
IEC 62040-1-1, IEC 60950, EN 620401-1
ISO19001 & ISO4001 Certificate to be
enclosed
<50 db(A)
Natural / Microprocessor controlled
forced air-cooling.
All standard protections to be provided
like:
Rectifier Over voltage
Rectifier Over current
Battery MCB
Battery Low
Battery Charging Current Limit
Input under voltage
Input Over voltage
Output Overload
Output short circuit
Earth Fault Protection
Page 27
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
30
LCD Front Panel
31
Foot print of UPS
with battery
Semiconductor Fuses at Inverter
Output
Inverter Over Temperature
Front Panel Mounted graphical LCD
with Backlight along with text. LCD
display shows a system mimic diagram
with an outlined power path, current
operating mode and event logs.
It also displays UPS status, metering,
battery status, alarm/event queue,
active alarms and UPS configurations
Should be less than 500 mm x 800 mm
Page 28
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
AMC and Facility management:
a)
b)
The cost of post warranty Comprehensive Annual Maintenance (AMC) should be
quoted. Service Level required should be based on 99.9% uptime. Draft SLA and
Escalation Matrix should be submitted along with the Bid document. The
Comprehensive AMC should include comprehensive maintenance of SMF batteries
supplied with UPS System.
The cost of Facility Management Services (FMS) should be quoted as per BOQ.
c)
The rates quoted for Facility Management Charges and Comprehensive Annual
Maintenance Charges shall be considered for overall financial evaluation of the bid,
however NBCC/CBI reserve the right to award the same under the same contract
agreement or under supplementary agreement either with CBI or NBCC.
d)
For facility management services, the CBI requires Onsite Support Engineers at site
The facility management should cover the
Following activities on 24*7*365 basis:
User Administration
System Administration
Server and Storage Administration
Backup and Restore operations
Network Monitoring
Performance management
Disaster Recovery Management
Processes & Drills
e)
Since Server center requires 24X7 monitoring, the vendor should quote for one on-site
engineer per shift for three shifts from Monday to Sunday for the purpose of support and
monitoring
Page 29
Volume II – IT LAN System Works
CBI HEADQUARTERS, Envelop 5B, CGO Complex, Lodi Road, New delhi.
CENTRAL BUREAU OF INVESTIGATION HEADQUARTERS, ENVELOP 5B, CGO COMPLEX, LODI
ROAD, NEW DELHI.
TENDER FOR IT LAN SYSTEM WORKS
LIST OF APPROVED MAKES
Category / Sub Category
Category 6 jacks
Universal Modular Patch Panel
Category 5 Multi Pair Cable non-Plenum
50 Micron multi mode fiber topic cable
Indoor Outdoor
50 Micron patch Cords
High Density Pre-terminated
Patching System
Optical
Pre-terminated 12 port LC Module
Category 6/Class E LSZH rated cable
Category 6/Class E Outlets
Faceplates
Category 6 /Class E Patch Cords
Networking Enclosures
Active Component – Core and Distribution
Switches
Online UPS
SMF Batteries
Approved Makes
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
ADC KRONE, BELDEN, MOLEX, LEVITON, PANDUIT,
R&M, SIEMON, SYSTIMAX OR TYCO
APW PRESIDENT OR RITTAL
ALCATEL LUCENT, AVAYA NORTEL, CISCO,
EXTREME, HP OR JUNIPER
APC, EATON, EMERSON OR MITSUBISHI
AMCO, QUANTA, ROCKET OR UPLUS
We have noted the above and confirm that our tender is based on the approved makes indicated above
Signature of Tenderer
Page 30
ANNEXURE-III
NATIONAL BUILDINGS CONSTRUCTION CORPORATION LIMITED
(A GOVT. OF INDIA ENTERPRISE)
SPECIAL CONDITIONS OF CONTRACT
(REVISED)
These Special conditions of contract shall be read in conjunction with General Conditions of
contract (Value-I), Instructions to Tenders (ITT), Notice Inviting Tender (NIT), Bill of Quantities
(BOQ), Tender Drawings, Technical specifications & Other Tender Documents. The Provision in
Special Conditions of contract shall take precedence over General Condition of contract.
The following clauses of Special conditions of Contract (SCC) shall be applicable for this contract.
1. Submission of Tenders: The tenders are to be submitted in three separate sealed
Envelopes/Covers marked as under:
ENVELOPE-1:
The Envelope-1 shall contain the followings:
•
Earnest Money Deposit (EMD) as per NIT.
•
The DD of Rs. 2,000/- deposited as tender fee for the purchase of tender
documents, if the tenders are downloaded from the Website.
•
Letter for un-conditional acceptance of the Tender conditions (GCC & SCC) as per
the Pro-forma given in the Instructions to Tenderers at page-6 of the GCC.
•
Details of balance work in hand (appendix N of GCC)
•
Affidavit (as per appendix O of GCC)
•
Volume-I (ITT, General conditions of contract) duly filled in, signed and stamped on
each page by the tenderer/authorized representative of the tenderer. Cutting or
over-writing, if any shall be signed and stamped by the person signing the tender.
All pro-forma forming part of tender documents shall be filled in, signed and
stamped by the tenderers.
•
Volume-II: NIT, SCC and Corrigendum/Addendum, Technical specifications Tender
drawings if any.
•
Copy of power of attorney/partnership deed, duly attested by a Notary public
authorizing the person who signs the tender.
•
Any other information as required to be submitted along with the tender.
•
Documents in support of meeting eligibility criteria as per NIT.
•
This envelope shall be marked as:
ENVELOPE-1 “EMD, ACCEPTANCE LETTER, TENDER FEE RECEIPT”
FOR (NAME OF WORK AS MENTIONED IN “NOTICE INVITING TENDER”)
NIT NO.: ________________________________
DUE ON: _______________________________
FROM: (NAME OF THE CONTRACTOR) ______________________
ENVELOPE-2
This Envelope shall contain the following duly sealed & signed.:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
•
A brief description/profile on the bidder’s firm.
Signed and stamped complete tender document with unpriced bill of quantities mentioning
Make and Model Number of offered products in each category.
A detailed compliance statement on the specification (point wise) of the proposed solution
along with deviations if any.
A list of full set of User Manuals, Reference Manuals etc. in the form of hardcopy and
CD/DVD.
Network/Schematic Diagram of proposed ICT Solution.
A detailed description of work plan with Project Bar Chart.
Support Escalation Matrix, Maintenance and SLA details.
Certification/Undertaking document from the OEM for providing ongoing product and
software service & support for next Five years.
Authorization to bid from original Equipment Manufacturer.
All products and solution offered should be reputed and standards brands.
Country of Origin and Manufacturing of each equipment should be mentioned in a separate
sheet.
Clarifications of pre-bid meeting held on 05.06.10.
Summary of Node details.
This envelope shall be marked as
ENVELOPE-2 “TECHNICAL BID”
FOR (NAME OF WORK AS MENTIONED IN “NOTICE INVITING TENDER”)
NIT NO.: ________________________________
DUE ON: _______________________________
FROM: (NAME OF THE CONTRACTOR) ______________________
ENVELOPE-3 :
This envelope shall contain the following:
•
Volume-III (Schedule of rates/Bill of quantities duly filled with quoted price both in figure &
word), cutting or over-writing, if any shall be signed and stamped by the person signing the
tender.
•
This envelope shall be marked as:
ENVELOPE-3: Price Bid for (Name of work as mentioned in “Notice Inviting Tender”)
NIT NO.: ________________________________
DUE ON: _______________________________
FROM: (NAME OF THE CONTRACTOR) ______________________
2. Time is the strict essence of the contract. Suppliers may take all the
factors/expenditures/consequences involved in completing the works within stipulated
period of the contract like working round the clock, co-ordinating between different
agencies, obtaining approval of samples of materials, procuring the materials, variation in
the items of the works etc. The decision of the NBCC will be final & binding on the supplier
and no claim whatsoever in the matter shall be entertainable/payable to supplier by NBCC.
3. The rate quoted by the party shall be including all taxes, duties, excise etc. & nothing
extra shall be paid. Invoice will be submitted showing DVAT amount separately.
4. The tenderer will ensure to place the orders to procure all the materials well in time to
ensure completion of work in time. The work is to be executed for 02 Basements & 12
storeyes above ground.
5. The supplier shall install & commission entire equipments & system as a whole in
completion form, at the designated place and as per direction of Engineer-in-Charge. The
rates quoted by tenderer shall be deemed to be inclusive of all expenditure to be incurred
in such activities. No extra payment/claim shall be payable/entertainable on this account.
6. The clause No. 28.3, 28.4, 28.5 of GCC is deleted.
GCC FOR INTERNET DOWNLOADED TENDER DOCUMENTS:
7. Tender fee: In addition to the documents as listed in the Notice Inviting Tenders (NIT),
the bidders who downloaded the Tender documents before or upto the last date of sale of
tender from the Website are required to deposit the requisite tender fee of Rs. 2000/(Non-refundable) by way of a DD issued by the Bank on or before the last date of sale of
tender favouring NBCC Ltd. drawn from any nationalized or approved scheduled bank and
payable at New Delhi and the same shall be enclosed in Envelope-I along –with other
documents.
8. GCC for internet downloaded Tender Documents: In case the tenderer is using the
tender documents downloaded from the website, he shall also down load the “General
Conditions of Contract” (GCC)2010 available on our website www.nbccindia.gov.in
under the link “Tender Notice” as Terms & Conditions. The tenderer shall & stamp each
page of the GCC and submit the same as prescribed therein.
SR. GENERAL MANAGER
SBG-DELHI,
NBCC Ltd.
ANNEXURE-IV
Subject: Clarification of Pre-bid meeting for IT LAN NETWORK held on 05-06-2010 at 3.00 PM
Sl.
No.
I
Queries
II.
1)
M/s AGC Networks Limited
For the insurance will our company project
standard and will work or we need to have
specific insurance for this project only,
please clarify.
Can we have a centralized UPS in place of
scattered?
2)
III.
1)
2)
3)
4)
5)
6)
Clarification by NBCC
M/s Tacker Technologies (P) Limited
Request for extension of submission date Please refer to the
atleast five days.
latest corrigendum
Project Specific
Contractor’s All Risk
Insurance Policy is
required
UPS is centralized but
distributed floor wise
M/s Allied Digital Services Limited
Core Switch
Original Clause
Suggested Clause
Support for XML-API Request to remove Final Tender
or equivalent
this feature.
specifications shall
prevail
Add Clause
Switch
should Final Tender
support
service specifications shall
module like firewall, prevail
IPS, Load Balancer,
wireless controller
etc.
Add clause
Core
switches Final Tender
should work in specifications shall
Active-Active mode. prevail
Add Clause
Core Switches have Final Tender
MPLS feature from specifications shall
day one.
prevail
1000 Bx
1000 BX/1000 LH
Final Tender
specifications shall
prevail
Support
for Should
have Final Tender
minimum dedicated minimum 4 ports of specifications shall
4 ports of 10G 10G SR interface
prevail
interface for future
expansion
1
Remarks
7)
8)
9)
10)
11)
12)
13)
64K Mac Address
32K Mac Address
Final Tender
specifications shall
prevail
Should
support Should
support Final Tender
minimum 20 K minimum 10 K specifications shall
hardware based ACL hardware based ACL prevail
Rules.
Rules.
SCP-2
SCP-2 or equivalent Final Tender
specifications shall
prevail
Access Switch 24/48
port
1000 Bx
1000 Bx/1000LH
Final Tender
specifications shall
prevail
The switch should The switch should Final Tender
be upgradable to have RIP, RIP V2, specifications shall
OSPF,
Graceful OSPF OSPF V3, BGP, prevail
protocol restart for BGPv4, IS-IS Routing
OSPF v2, PIM-SM, protocols
VRRP/HSRP
for
redundancy
Switch needs to Switch needs to Final Tender
have console port have console port or specifications shall
and
dedicated dedicated Ethernet prevail
Ethernet port for port
for
administration
& administration
&
Management
management.
Shall have a SIC Shall have traffic Final Tender
based traffic flow flow analysis with specifications shall
analysis
with Netflow/S flow/IPFIX
prevail
Netflow/Sflow/IPFIX
14)
15)
16)
17)
Support for rfc Remove the RFs
1573, 1650, 2925,
2668, 1354, 2710,
3810
Auto ranging 90-240 Auto ranging 100V AC, 50 -60 Hz
240V AC, 50-60 Hz
Our final Tender
specifications shall
prevail
Final Tender
specifications shall
prevail
Should
have Should
support Final Tender
dedicated stacking stacking capacity.
specifications shall
ports of 40 GBPS or
prevail
more bandwidth
Network
Management
Software
Should be able to Should support to Final Tender
2
18)
implement
user
based policies based
on security level and
job requirements as
defined
within
Lightweight
Directory
Access
Protocol (LDAP V3)
complaint directory.
Should be able to
implement
application based
policies
defined
based
on
an
application’s
requirements, such
as latency tolerance
or time of day/day
of
month
requirements.
Adding
more
products
Date of Extension
IV.
1.
implement
user
based policies based
on security level and
job requirements as
defined within a
Lightweight
Directory
Access
Protocol (LDAP V3)
compliant directory.
Should support able
to
implement
application based
policies
defined
based
on
an
application’s
requirements, such
as latency tolerance
or time of day/day
of
month
requirements.
Please add product
like 3 Com which
can enhance the
competition
and
NBCC can enjoy the
maximum
discounting.
Please extend the
date of submission
till 17th May 2010.
specifications shall
prevail
Final Tender
specifications shall
prevail
Final Tender documents
shall prevail
Please refer to the
latest corrigendum
M/s
HCL
Info
systems Limited
Clarify over payment terms
The
following
percentage of contract
rates for the various
items included in the
contract
shall
be
payable against the
stage of work shown
herein.
a) 75% after initial
inspection
and
delivery at site in
good condition on
pro-rata basis.
b) 15%
after
3
2.
3.
4.
5.
6.
7.
completion
of
installation in all
respects.
c) Balance 10% will
be
paid
after
testing,
commissioning and
handing over to
the
client
for
beneficial use.
Extension for bid submission for another 7- Please refer to the
10 days from the date.
latest corrigendum
Manufacture
Please refer Tender
For such large project stability of OEM and documents
their seriousness in India and credential
needs to be checked. At least last 5 years
continuous presence of OEM in India along
with atleast 5 order copies of 50 lacs each
from Government/PSU sector need to be
submitted by OEM. Documentary evidence
to be given that all components are from
the same manufacture.
24 port configurations
Please refer to the
Specs asks for 24 port patch panel, but BOQ amended Tender
asks for 72 ports patch panel in 2U, What is Specifications.
really needed? Maximum configuration
possible is 48 Port in 2U
Removable
rear
mounted
cable
management bar
Why removable ? It should be proper
integrated cable manager and not a bar.
UL, ULC and ACMA]
Final Tender
Jacks are UL listed. Metal panel does not specifications shall
qualify for UL
prevail
2 to 4 current carrying pairs per cable 3.36 Final Tender
amperes for all pairs
specifications shall
Although we comply to three standards. prevail
BAS has no relation with structured cabling.
Aluminium armor
Final Tender
Wrong specification. Metal armouring can specifications shall
not be used for indoor riser cable. It should prevail
be aramid yarn or E Glass yarn. Further
although the specs asks for indoor
armoured type of cable, the BOQ asks for
outdoor type cable. Please change outdoor
to indoor in BOQ as we understand that
this cable shall be used for floor to floor
4
8.
9.
connectivity.
Fixed front faceplate panel------------ at rear Please refer to the
of assembly and include-------------MTP amended Tender
adapters at rear of assembly.
Specifications.
Specs are all complied. However section A
& B point out towards plug & play system
which need to be installed in a fiber
panel/LIU. However section C asks for a
different kind of panel/LIU which is pre
connectorised. It is extremely surprising
that no plug and play solution has been
asked for in the BOQ is it required?, if not,
please delete all these specs from the
tender and put in specs of regular LIU,
adaptor, connector/Pigtail and patch cords.
Unshielded Twisted Pour (UTP) cable
Please refer to the
amended Tender
Specs asks for 23 AWG Cable but BOQ asks Specifications.
for 24AWG Cable. Please change 24 AWG
to 23 AWG in BOQ. The most important
criteria of ETL test report (for all Cat6
components) along with Zero bit error
report is missing. Without these reports
being asked for a manufacturer can supply
poor quality cables based on self claims.
This ETL report shall also clarify whether all
components are being manufactured by
the OEM or is it outsourced.
Interior Loss (IL) 10-15 Db
10.
11.
12
This loss is for what frequency range?
Please specify.
Listed CMR Cable
Please refer to the
amended Tender
We would like to offer fire retardant grade Specifications.
PVC instead of low smoke type. Please
amend. However, if customer is insistent
on low smoke, it should be properly
defined as LSZH (low smoke zero halogen)
type.
BAS Applications
Please refer to the
amended Tender
BAS has no relation with structured cabling. Specifications.
Please delete entire section.
UTP Cable
Please refer latest
5
tender documents.
Spine is used for Cat 6 cables only.
Performance as per Cat 5e standard is
achieved
without
spine
by
all
manufacturers.
Category 6/Class E outlets
Final Tender
General Specifications
specifications shall
prevail
Telecommunication Jacks shall be 8
position/8 conductor modular outlets------------------------------------------ design shall
support
13
Nothing in the specifications is generic. It is
a copy paste from Leviton’s data sheets.
Please have the entire specs scrapped and
make it generic. Once again, the most
important performance criteria of ETL test
report has not been asked for.
Listed CMR Cable
Please refer to the
amended Tender
We would like to offer fire retardant grade Specifications.
PVC instead of low smoke type. Please
amend. However, if customer is insistent
on low smoke, it should be properly
defined as LSZH (low smoke zero halogen)
type.
Comply with specifications for related
cabling
BAS has no relation with structured cabling
Please delete entire section.
V
1.
SHYAM TELECOM LIMITED
Option be allowed to be quoted for OEMs Final Tender
of the sub-systems of the LAN (like cabling specifications shall
products/switches/UPS .
prevail
VI
1)
WIPRO LIMITED
Clarify the payment terms applicable for Please refer tender
tender
documents
Extend the tender for 5 days
Please refer to the
latest corrigendum
2)
VII
TECHNET SOFTWARE SOLUTIONS (P)LTD.
6
1)
CAT 6 for Data, CAT 5e for Voice
2)
Racks to have 4 fans and not 6
VIII
1)
INTEC INFONET
Manufactures
2.
3.
4.
5.
Final Tender
specifications shall
prevail
Please refer to the
amended Tender
Specifications.
Final Tender documents
shall prevail
For such large project stability of OEM and
their seriousness in India and credential
needs to be checked. Atleast last 5 year’s
continuous presence of OEM in India
alnogwith atleast 5 order copies of 50 lacs
each from Government/PSU sector need to
be submitted by OEM.
Documentary
evidence to be given that all components
are from the same manufacturer.
Modular Patch Panel specifications
Please refer to the
24 Port Configuration
amended Tender
Specs asks for 24 port patch panel, but BOQ Specifications.
asks for 72 port patch panel in 2U. What is
really needed? Maximum configuration
possible is 48 Port in 2U.
Removable
rear
mounted
cable
management bar
Why removable? It should be proper
integrated cable manager and not a bar.
UL, ULC and ACMA
Final Tender
specifications shall
Jacks are UL listed. Metal panel does not prevail
quality for UL.
BAS application specifications
Please refer to the
amended Tender
Although we comply to these standards. Specifications.
BAS has no relation with structured cabling.
50 Micrometer Multimode Optical Fiber Final Tender
cables
specifications shall
Aluminium Armor
prevail
Wrong specification. Metal armouring can
not be used for indoor riser cable. It should
be aramid yarn or E Glass yarn. Further
although the specs asks for indoor
armoured type of cable. The BOQ asks for
outdoor type cable. Please change outdoor
7
6.
7.
to indoor in BOQ as we understand that
this cable shall be used for floor to floor
connectivity.
Modular Optical Fiber Patching System
Please refer to the
amended Tender
Specs are all complied. However, section A Specifications.
& B point out towards plug & Ply system
which need to be installed in a fiber
panel/LIU. However, Section C asks for a
different kind of panel/LIU which is preconnectorised. It is extremely surprising
that no plug and play solution has been
asked for in the BOQ. Is it required? If not,
please delete all these specs from the
tender and put in specs of regular LIU,
adaptor, connector/pigtail and patch cords.
Twisted pair (UTP) cable
Final Tender
specifications shall
Specs asks for 23 AWG Cable but BOQ asks prevail
for 24AWG Cable. Please change 24 AWG
to 23 AWG in BOQ. The most important
criteria of ETL test report (for all Cat 6
components) along with Zero bit error
report is missing. Without these reports
being asked for a manufacturer can supply
poor quality cables based on self claims.
This ETL report shall also clarify whether all
components are being manufactured by
the OEM or is it outsourced
Insertion Loss (IL) 10-15 Db
This loss is for what frequency range?
Please specify.
Listed CMR Cable
8.
9.
We would like to offer fire retardant grade
PVC instead of low smoke type. Please
amend. However, if customer is insistent
on low smoke, it should be properly
defined as LSZH (low smoke zero halogen)
type.
BAS Application specifications
Please refer to the
amended Tender
BAS has no relation with structured cabling Specifications.
Please delete entire section.
Twisted pair (UTP) cables
Refer latest tender
8
10.
11
12.
13.
IX
1.
2.
3.
4.
5.
6.
Spine is used for Cat 6 cables only. specifications.
Performance as per Cat 5e standard is
achieved
without
spine
by
all
manufacturers.
Listed CMR Cable
Please refer to the
amended Tender
We would like to offer fire retardant grade Specifications.
PVC instead of low smoke type. Please
amend. However, if customer is insistent
on low smoke, it should be properly
defined as LSZH (low smoke zero halogen)
type.
Class E Outlets
Final Tender
specifications shall
Nothing in the specifications is generic. It is prevail
a copy paste from one OEM’s datasheets.
Please have the entire specs scrapped and
make it generic. Once again, the most
important performance criteria of ETL test
report has not been asked for.
BAS applications
Please refer to the
amended Tender
BAS has no relation with structured cabling. Specifications.
Please delete entire section.
GCC Clause 37 Payment
Please refer to the
tender documents.
Please explain the payment terms for this
tender.
INFONET
Cable cat 6 23 AWG copper is mentioned in
specification whereas 24 AWG copper is
mentioned in BOQ.
CMR, Non plenum cable is mentioned in
specification whereas BOQ asks only for
plenum cable.
Multipair cable in specification is
mentioned as Cat5 whereas BOQ asks for
Cat 3
Jack Panel port mismatch with 24 Port and
72 port.
Please refer to the
amended Tender
Specifications.
Final Tender
specifications shall
prevail
Final Tender
specifications shall
prevail
Final Tender
specifications shall
prevail
Final Tender
specifications shall
prevail
List of approved makes
shall prevail
Core switch in specification ask for 10 slot
modular chassis but BOQ asks for 24 port
SFP Switch.
Inclusion of BELDON as OEM in preferred
make for copper.
9
X.
1.
TEXCEL INFOTECH PRIVATE LIMITED
Should be able to track Windows users
across the network and display the
mapping between domain login username,
ip address, mac address and port number
Final Tender
specifications shall
prevail
Please delete this point.
Should offer inbuilt mechanism for
measuring frame delay and delay variance
across network nodes
Please delete this point.
Should offer L2 Ping, L2 traceroute and
Multicast Traceroute
Please delete this point
RoHS & WEEE Complaint
2.
Please remove WEE.
48 Port Gigabit L3 Switch
Should have dedicated stacking ports of 40
GBPS or more bandwidth.
Our final Tender
specifications shall
prevail
Please delete this point.
Should support seamless addition of
multiple L3 interface through secondary ip
address on a single port
In future
Please Delete this point.
Should offer L2 ping, L2 traceroute
Please delete this point
Should be able to track Windows users
across the network and display the
mapping between domain login username,
ip address, Mac address and port number
Please Delete this point
10
RoHS & WEEE Complaint
Should offer inbuilt mechanism for
measuring frame delay and delay variance
across network nodes.
Please Delete this point
3
24 PORT GIGABIT LAYER 3 PORT
Should support seamless addition of
multiple L3 interface through secondary ip
address on a single port
Final Tender
specifications shall
prevail
Please remove this point
Should offer L2 ping and L2 traceroute
Please remove this point
Should offer inbuilt mechanism for
measuring frame delay and delay variance
across network nodes
Please remove this point
RoHs & WEEE complaint
Please remove WEE
XI
1.
2.
XII
1.
2.
SPARK TECHNOLOGIES LTD.
Appendix No.)O&M ARE Missing in tender
doc downloaded from website.
We request for UPS ________cage to be
added separately as it is not recommended
to used __________base for bigger UPS
ABS INDIA
We request you to kindly add AlcatelLucent in the approved makes of Active
component – core and Distribution
switches .
Modular Core switch – security
Should support minimum 20K hardware
based ACL rules
Can be collected from
NBCC office
Our final Tender
specifications shall
prevail
Please refer to final
tender documents
Final Tender
specifications shall
prevail
11
3.
As per industry standards, 2000 ACL rules
are appropriate. Please confirm whether
20000 or 2000 ACL is required. We request
you to please change it to 2000 ACL rules.
48 Port Gigabit L3 Copper switch – Port
density in each switch.
Final Tender
specifications shall
prevail
Should have dedicated stacking ports of 40
GBPS or more bandwidth.
Stacking port of 40 GBPS is a proprietary
term for a specific make. We request you
please change it to Dedicated stacking of 40
GBPS or more instead of above point.
4.
Tech. Specs for 24 port Gigabit L3 copper
switch – Port density in each switch
Final Tender
specifications shall
prevail
Should have dedicated stacking ports of 40
GBPS or more bandwidth.
Stacking port of 40 GBPS is a proprietary
term for a specific make. We request you
please change it to Dedicated stacking of 40
GBPS or more instead of above point.
5.
6.
7.
XIII
1)
Minimum 400 Million pps throughput of Final Tender
core switch is amended to minimum 350 specifications shall
million pps throughput
prevail
Please confirm that 350 Mpps throughput
is requijred for both IPv4 and IPv6
Should have 176 GBPS or more with non
blocking architecture
Final Tender
specifications shall
prevail
We request you to kindly change it from
176 to 140 Gbps as the above point is
proprietary to a specific make
OS could be modular or OS imagers.
Final Tender
specifications shall
prevail
SIEMENS ENTERPRISE COMMUNICATIONS
PVT.LIMITED
Manufactures
Final Tender
specifications shall
12
3.
For such large project stability of OEM and
their seriousness in India and credential
needs to be checked. Atleast last 5 year’s
continuous presence of OEM in India
alnogwith atleast 5 order copies of 50 lacs
each from Government/PSU sector need to
be submitted by OEM.
Documentary
evidence to be given that all components
are from the same manufacturer.
Modular Patch Panel specifications
24 Port Configuration
Specs asks for 24 port patch panel, but BOQ
asks for 72 port patch panel in 2U. What is
really needed? Maximum configuration
possible is 48 Port in 2U.
Removable rear mounted cable
management bar
Why removable? It should be proper
integrated cable manager and not a bar.
UL, ULC and ACMA
4.
Jacks are UL listed. Metal panel does not
quality for UL.
BAS application specifications
2.
5.
6.
prevail
Our final tender
specifications shall
prevail
Final Tender
specifications shall
prevail
Our final tender
specifications shall
Although we comply to these standards. prevail
BAS has no relation with structured cabling.
Micrometer Multimode Optical Fiber cables Final Tender
Aluminium Armor
specifications shall
prevail
Wrong specification. Metal armouring can
not be used for indoor riser cable. It should
be aramid yarn or E Glass yarn. Further
although the specs asks for indoor
armoured type of cable. The BOQ asks for
outdoor type cable. Please change outdoor
to indoor in BOQ as we understand that
this cable shall be used for floor to floor
connectivity.
Modular Optical Fiber Patching System
Our final tender
specifications shall
Specs are all complied. However, section A prevail
& B point out towards plug & Ply system
which need to be installed in a fiber
panel/LIU. However, Section C asks for a
different kind of panel/LIU which is preconnectorised. It is extremely surprising
13
7.
that no plug and play solution has been
asked for in the BOQ. Is it required? If not,
please delete all these specs from the
tender and put in specs of regular LIU,
adaptor, connector/pigtail and patch cords.
Twisted pair (UTP) cable
Our final tender
specifications shall
Specs asks for 23 AWG Cable but BOQ asks prevail
for 24AWG Cable. Please change 24 AWG
to 23 AWG in BOQ. The most important
criteria of ETL test report (for all cat 6
components) along with Zero bit error
report is missing. Without these reports
being asked for a manufacturer can supply
poor quality cables based on self claims.
This ETL report shall also clarify whether all
components are being manufactured by
the OEM or is it outsourced
Insertion Loss (IL) 10-15 Db
This loss is for what frequency range?
Please specify.
Listed CMR Cable
8.
9.
10.
We would like to offer fire retardant grade
PVC instead of low smoke type. Please
amend. However, if customer is insistent
on low smoke, it should be properly
defined as LSZH (low smoke zero halogen)
type.
BAS Application specifications
Please refer to final
tender document.
BAS has no relation with structured cabling
Please delete entire section.
Twisted pair (UTP) cables
Refer final tender
Spine is used for Cat 6 cables only. specifications
Performance as per Cat 5e standard is
achieved
without
spine
by
all
manufacturers.
Listed CMR Cable
Our final tender
specifications shall
We would like to offer fire retardant grade prevail
PVC instead of low smoke type. Please
amend. However, if customer is insistent
on low smoke, it should be properly
defined as LSZH (low smoke zero halogen)
14
11
12.
13.
XIV
1.
type.
Class E Outlets
Final Tender
specifications shall
Nothing in the specifications is generic. It is prevail
a copy paste from one OEM’s datasheets.
Please have the entire specs scrapped and
make it generic. Once again, the most
important performance criteria of ETL test
report has not been asked for.
BAS applications
Please refer to final
tender document.
BAS has no relation with structured cabling.
Please delete entire section.
GCC Clause 37 Payment
Please refer to tender
document.
Please explain the payment terms for this
tender.
CCS COMPUTERS PRIVATE LIMITED
As per clause C of eligibility criteria the Please refer to tender
bidder should have one similar work document.
costing not less than 80% of estimated cost
(Rs.328 Lakhs)
We request you to consider overall project
value rather than considering only cabling
& switches.
XV
1.
SWAFE BUSINESS PROCESS MANAGEMENT
PVT. LIMITED
Requesting to add our brand (SWAFE) as Please refer to tender
UPS manufacturer in the tender.
document.
XVI
1.
TRITRONICS (INDIA) PVT. LIMITED
In addition to the makes mentioned, kindly Please refer to tender
include Tritronics (TINY TRITON) make or document.
equivalent also, as this will allow wider
participation and competition which may
be advantageous to the department.
XVII
ELECTRONICS & CONTROLS POWER
SYSTEMS PVT. LIMITED
Request to add on our Brand/make Please refer to tender
(Electronics & Controls Power system document.
Pvt.Ltd.) for the supply of uninterrupted
Power Supply (UPS).
Introduce our Brand: We are equivalent to Please refer to tender
1.
2.
15
3.
4.
those which are mentioned in the tender.
Can we do/quote separately for
Uninterrupted power Supply (UPS)
Latest power solution/Technology i.e.
Modular UPS is available in the market over
Parallel Floor Mounted UPS
document.
Please refer to tender
document.
Final Tender
specifications shall
prevail
XIX
1.
R&M INDIA PRIVATE LIMITED
Kindly request you to add R&M name in the Please refer to tender
RFQ for the Possive cabling solution.
document.
XX
1.
COMMSCOPE
For Cat 5e cable to comply with IEC60332
2.
3.
4.
5.
XXI
1.
2.
3.
Refer final tender
specifications.
Do you want low smoke zero halogen
cables?
Do you require low smoke zero halogen
(LSZH) Patch Cords also?
In the bid document compliance for Cat 5e
and/or Cat 6, you have ask for warranty
also, do you require only product warranty
only valid for 20 years or you will require
channel performance and link performance
warranty also including the product
warranty valid for 20 years?
If you expect the solution to perform and
deliver Cat 5e/Cat 6 performance even in
the 15th or 20th year. Please clarify do you
think asking for only a compliant solution in
the tender is five?
25 year warranty? It’s vendor specific or
what. We provide 20 years warranty?
Please refer final
tender specifications
Please refer final tender
specifications
Please refer final tender
specifications
Please refer final tender
specifications
TRIMAX IT INFRASTRUCTURE & SERVICES
LIMITED
There is mention of Indoor fiber cable with Final Tender
aluminium armour. But the indoor cable specifications shall
doesn’t come with armour.
prevail
Kindly make the amendments.
In the RFP technical specification of certain Final Tender
items doesn’t correlate to each other eg. specifications shall
MTP fibre cabling system.
prevail
Kindly note and confirm.
RFP contains conventional fiber cabling Final Tender
system line items, but technical specifications shall
16
specification speak about MTP fiber cabling prevail
system.
4.
5.
6
7.
8.
9.
Kindly clarify
Fiber cable mentioned in the specs is 50 Final Tender
microns. Multi Mode, but the MTP module specifications shall
specs speak about Single Mode.
prevail
Kindly clarify.
Line item fully loaded 72 port patch panel is Final Tender
mentioned in RFP, Specification of the specifications shall
same is not available mentioning either prevail
cable cat 5c or cat6.
Kindly clarify
To re-work the Bill of Material based on Final Tender
MTP fiber connectivity, we request you to specifications shall
please provide the above said requisite prevail
information and clarification.
a) Complete Campus/floor drawings.
b) Schematic connectivity.
Kindly restrict the bidder to quote the
components only of the approved vendor
list and as per Technical specification.
Kindly approved Emerson for UPS, 3 Com
and D-link for Active Networking
Component. WQ for Rack and Digilink and
Dax for Passive Component as all the
requested make are of well recognized and
also approved in DGS & D.
Kindly provide the amended Approved
Vendor list.
As per clause No.2 of ITT EARNEST MONEY
DEPOSIT- Earnest Money Deposit of
amount
as
mentioned
in
NIT/ITT/Memorandum to Form of Tender”
required to be submitted along with the
tender shall be in the form of Demand
Draft payable at place as mentioned in
NIT/ITT in favour of NBCC Limited from any
Scheduled bank or bank Guarantee from
any Nationalized or approved Scheduled
Banks as per Appendix M in the enclosed
format –
Final Tender
specifications shall
prevail
Please refer the latest
tender document
Please refer tender
document
Kindly confirm that we can deposit Earnest
17
10
Money in form of Bank Guarantee apart
from the above please also confirm about
the validity of Bank Guarantee as EMD.
As per the scope of work, we have to laid Please collect a copy
Cable in the existing concealed/surface from CBI site office
conduit/Raceways.
Please provide the
layout diagram showing about laying of
concealed/surface conduit/Raceways.
XXII
1.
NUMERIC POWER SYSTEMS LIMITED
Kindly include ‘Numeric’ make in the tender Please refer the latest
so that we get a chance to participate in tender document
this project.
XXIII
1.
APW PRESIDENT SYSTEMS LIMITED
As discussed in the pre-bid meeting that
Wall mount racks will no longer be required
in this project as assured by you.
Load bearing capacity mentioned under the
scope of supply (Point B: Technical details
of 19” Floor mount standard enclosure on
page No.13) is 750 kg where as under
technical specification point A on page
No.14 the load bearing capacity is
mentioned as 1000 kg.
Please clarify on the same.
The Tender language for 19” Floor standing
enclosure on Page No.14 of tender
document point A and B seems to be the
catalogue language of a specific enclosure
brand. Following are the few lines taken
from the document.
2.
3.
Please refer latest
tender document.
Refer latest tender
document
Please refer the latest
tender document
i)
4.
Basic Structure: “9 x folded
rolled hollow frame section
punched in 25mm DIN Pitch
pattern.
ii)
Perforated
doors
:
“Polyurethane gasket” “Square
section tabular frame with
punching in DIN Pitch pattern”
and “ergo form Handle”. If you
search for ‘ergo form handle’ in
the Internet, it will show a
specific brand enclosure.
Approval
required
mentioned
for Please refer the latest
enclosures are not relevant in our country. tender document
18
It looks as if it is intentionally specked to
keep us out as there are only two brands in
the racks category, which is not fair
practice.
Point No.4. “approvals” on the page no.13
of the tender document as mentioned
below:
5
6.
The product should be approved by the
following approved organizations:
-UL, Underwriters Laboratories/USA
-CSA, Canadian Standard Association,
Canada
-VDE, Verband Deutsche Elektrotechniker
-TUV, Technisher Uberwachungsverein
ISO Certification requirement (in floor Please refer the latest
standing rack) of ISO 14001 and ISO 18001 tender document
is absolutely not required for the product
(Network enclosures) enquired in the
tender. These certification are of relevance
when we inspect some industrial
factory/plant for their environmental and
worker friendly culture/practices.
ISO 14001 is for ensuring Environmental
Management system.
OHSAS 18001 is for ensuring Occupational
Health and Safety Assessment System.
Requirement of UL Certification is not Please refer the latest
mandatory for the product sold in our tender document
country. It looks as if this certification
requirement is also intentionally put in the
tender to keep only one bidder for the said
tender, which is totally unfair and against
the open tender norms. Specification
written in the tender clearly shows
language of the “product catalogue of a
specific rack brand’
XXIV MOLEX (INDIA) PRIVATE LIMITED
1.
For such large projects stability of OEM and Terms as per tender
their seriousness in India and credential documents shall prevail
needs to be checked. Atleast last 5 year’s
continuous presence of OEM in India
alnogwith atleast 5 order copies of 50 lacs
each from Government/PSU sector need to
19
2.
3.
4.
5.
6.
7.
be submitted by OEM.
Documentary
evidence to be given that all components
are from the same manufacturer.
In the specifications of Modular Patching
Please refer latest
systems – item A 1 (b), 24 port Panel has
tender specifications.
been asked for. But BOQ asks for 72 port
patch panel in 2U. What is really needed?
Maximum configuration possible is 48 Port
in 2U. and standard size is 24 port panel.
In the specifications of Modular patching
systems – item A 1 (d), Removable rear
mounted cable management bar has been
asked for:
It should be proper integrated cable
management tray and not a bar.
BAS application specifications have no
relation with structured cabling, thus they
should not be part of technical
specifications.
In the specification of Communications
Optical Fiber Backbone Cabling Serial no.B,
- Aluminium armour has been asked for.
Metal armoring can not be used for indoor
riser cable because it conducts electricity
and bend radius will be less. It should be
aramid yarn or E Glass yarn. Further,
although the specs asks for indoor
armoured type of cable, the BOQ asks for
outdoor type cable. Plz change ‘outdoor to
‘indoor’ in BOQ as we understand that this
cable shall be used for floor to floor
connectivity.
In the specification of Modular optical fiber
patching system – Section A & B point out
towards plug & play system which need to
be installed in a fiber panel/LIU. However,
section C asks for a different kind of
panel/LIU which is pre-connectorised. It is
extremely surprising that no plug and play
solution has been asked for in the BOQ. Is
it required ? If not, please delete all these
specs from the tender and put in specs of
regular LIU, adaptor, connector/pigtail and
patch cords.
For category 6/class E Unshielded Twisted-
Final Tender
specifications shall
prevail
Final Tender
specifications shall
prevail
Final Tender
specifications shall
prevail
Final Tender
specifications shall
prevail
Please refer final tender
20
Pair (UTP) cable – serial no.A – General
specifications – Specs asks for 23 AWG
cable but BOQ asks for 24 AWG cable.
Please change 24 AWG to 23 AWG in BOQ.
The most important criteria of ETL test
report (for all Cat 6 components) along
with zero bit error report which is missing
in specifications. Without these reports
being asked for, a manufacturer can supply
poor quality cables based on self claims.
This ETL report shall also clarify whether all
components are being manufactured by
the OEM or is it outsourced.
8.
9.
10.
XV
1.
In serial No.B-1 – Construction
specifications – it should be completely
mentioned as LSZH (Low smoke Zero
Halogen) instead of Low Smoke only.
For Category 5e/Class E Unshielded Twisted
Pair (UTP) cable – General specifications –
integral cross member pair separator has
been asked for. Separator is used for Cat 6
cables only. Performance as per Cat 5e
standard is achieved without separator by
all manufacturers.
Again in construction specifications – it
should be completely mentioned as LSZH
(Low smoke Zero Halogen) instead of Low
smoke only.
For Category 6/Class E outlets – The
specifications are not generic. Please have
these specifications modified and make it
generic. Once again, the most important
performance criteria of ETL test report has
not been asked for.
For Category 6/Class E Patch Cords – LSZH
(Low Smoke Zero Halogen) type should be
specified, because horizontal cable has
been specified as Low smoke.
R&M
In the section ‘Product specifications’
clause A sub clause 4e ACMA certification:
as R&M is a European company, the
product performance tested by the
European organization not by an American
specifications
Refer final tender
document
Final Tender
specifications shall
prevail
Please refer latest
tender document.
Final Tender documents
shall prevail
21
2.
3.
company. So we requested is that it has to
be ACMA/3P
In the section ‘Communication optical fiber
Backbone’ cabling it is not specified
whether the fiber should be OM3 or OM2
as both are 50 micron.
In the section ‘Communications Faceplates
and Connectors’ clause A ‘Jacks with RFT’ is
brand specific.
Final Tender
specifications shall
prevail
Final Tender
specifications shall
prevail
To all the American standards/certifications
equivalent European standards/certificateions should be acceptable.
22
ANNEXURE - V
CBI HEAD QUARTER NODE DETAIL SUMMARY
Data
Quad
Face
Plate
Cat6
IO
Cat5e
IO
Data
Flexi
Jack
Panel
Voice
Flexi
Jack
Panel
48 Riser
Jack
Panle
Cat3
50 Pair
Riser
Cable
52
2
56
56
3
3
2
150
190
74
114
16
205
147
9
6
3
240
2
58
108
20
204
162
9
7
4
2
2
70
106
29
215
164
9
7
36
2
2
104
110
29
255
165
11
123
34
3
4
75
102
29
215
160
186
124
24
6
6
45
109
23
186
Seventh
180
58
16
1
1
117
43
17
9
Eight
212
111
34
2
2
81
95
10
Nine
160
88
34
2
2
52
11
Tenth
403
398
32
0
16
12
Eleven
78
72
19
10
Total =
2369
1520
333
32
Voice
Intercom Direct
Line
48 Port
Switch
OFC
LIU
42U
Rack
1
1
1
1
180
1
4
1
2
340
170
1
4
1
2
4
360
160
1
4
1
2
7
4
380
150
1
5
1
2
9
7
4
400
140
1
4
1
2
154
8
7
4
420
5
4
5
180
75
8
3
2
220
140
1
4
1
1
26
212
147
9
7
4
460
135
1
4
1
2
72
26
160
124
7
6
3
360
130
1
3
1
1
5
363
34
403
430
17
18
9
1125
125
1
8
1
3
12
10
51
17
78
101
4
5
3
425
120
2
4
1
51
693
1325
268
2369
1885
103
83
46
4880
48
18
24
S
No.
Floor
1
Ground
56
56
0
0
0
2
2
First
205
113
32
2
2
3
Second
204
124
36
2
4
Third
215
126
36
5
Fourth
255
127
6
Fifth
215
7
Sixth
8
Rax
Cable Singlex Duplex
TV
Face
Face
Plate
Plate
2500 Optical 24 Port
Riser Fiber Switch
MDF Cable
1
1
100
1740
10
A-PDF Merger DEMO : Purchase from www.A-PDF.com to remove the watermark
No.NBCC:SGM:SBG-Delhi:NIT:CBI:AMND:2010/7803
Date: 17.07.2010
Amendment No.- VIII
Sub : Construction of CBI Head Office Building in Pocket 5-B, CGO Complex,
New Delhi.
S.H : S/I/T/C of IT Network and online UPS system with Battery back up.
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06.05.2010 & subsequent
amendment No.I dated 19.05.10, Amendment No. II dated 21.05.2010, Amendment
No.III dated 28.05.2010, Amendment No. IV dated 09.06.10, Amendment No.V dated
16.06.2010, Amendment No.VI dated 25.06.2010 & Amendment No.VII dated
07.07.2010, following amendment No. VIII is further issued:-
1. Last date of submission of tender documents is extended upto 03:00 P.M. on
30.07.2010 from 19.07.2010. The tenders shall be opened on the same day at
04.00 PM.
Techno-Commercial clarifications sought during pre-bid meeting being replied separately.
Other terms and conditions of NIT will remain the same.
SR. GENERAL MANAGER
SBG-DELHI
A-PDF Merger DEMO : Purchase from www.A-PDF.com to remove the watermark
No.NBCC:SGM:SBG-Delhi:NIT:CBI:AMND:2010/7742
Date: 07.07.2010
Amendment No.- VII
Sub : Construction of CBI Head Office Building in Pocket 5-B, CGO Complex,
New Delhi.
S.H : S/I/T/C of IT Network and online UPS system with Battery back up.
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06.05.2010 & subsequent
amendment No.I dated 19.05.10, Amendment No. II dated 21.05.2010, Amendment
No.III dated 28.05.2010, Amendment No. IV dated 09.06.10, Amendment No.V dated
16.06.2010 Amendment No.VI dated 25.06.2010, following amendment No. VII is further
issued:-
1. Last date of submission of tender documents is extended upto 03:00 P.M. on
19.07.2010 from 08.07.2010. The tenders shall be opened on the same day at
04.00 PM.
Techno-Commercial clarifications sought during pre-bid meeting being replied separately.
Other terms and conditions of NIT will remain the same.
SR. GENERAL MANAGER
SBG-DELHI
A-PDF Merger DEMO : Purchase from www.A-PDF.com to remove the watermark
No.NBCC:SGM:SBG-Delhi:NIT:CBI:AMND:2010/7686
Date: 25.06.2010
Amendment No.- VI
Sub : Construction of CBI Head Office Building in Pocket 5-B, CGO Complex,
New Delhi.
S.H : S/I/T/C of IT Network and online UPS system with Battery back up.
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06.05.2010 & subsequent
amendment No.I dated 19.05.10, Amendment No. II dated 21.05.2010, Amendment
No.III dated 28.05.2010, Amendment No. IV dated 09.06.10 & Amendment No.V dated
16.06.2010, following amendment No. VI is further issued:-
1. Last date of submission of tender documents is extended upto 03:00 P.M. on
08.07.2010 from 28.06.2010. The tenders shall be opened on the same day at
04.00 PM.
Techno-Commercial clarifications sought during pre-bid meeting being replied separately.
Other terms and conditions of NIT will remain the same.
(NEELESH SHAH)
SR. GENERAL MANAGER
SBG-DELHI
A-PDF Merger DEMO : Purchase from www.A-PDF.com to remove the watermark
No.NBCC:SGM:SBG-Delhi:NIT:CBI:AMND:2010:/7587
Date: 16.06.2010
Amendment No.- V
Sub : Construction of CBI Head Office Building in Pocket 5-B, CGO Complex,
New Delhi.
S.H : S/I/T/C of IT Network and online UPS system with Battery back up.
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06.05.2010 & subsequent
amendment No.I dated 19.05.10, Amendment No. II dated 21.05.2010, Amendment
No.III dated 28.05.2010 & Amendment No. IV dated 09.06.10, following amendment No.
V is further issued:-
1. Last date of submission of tender documents is extended upto 28.06.2010 at 3.00
PM. The tenders shall be opened on the same day at 4.00 PM.
Other terms and conditions of NIT will remain the same.
(Neelesh Shah)
Sr. General Manager
SBG-Delhi
A-PDF Merger DEMO : Purchase from www.A-PDF.com to remove the watermark
No.NBCC:SGM:SBG-Delhi:NIT:CBI:AMND:2010:7524
Date: 09.06.2010
Amendment No.–IV
Sub : Construction of CBI Head Office Building in Pocket 5-B, CGO Complex,
New Delhi.
S.H : S/I/T/C of IT Network and online UPS system with Battery back up.
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06.05.2010 & subsequent
amendment No.I dated 19.05.10, Amendment No. II dated 21.05.2010 & Amendment
No.III dated 28.05.2010, following amendment No. IV is further issued:-
1. Last date of submission of tender documents is extended upto 17.06.2010 at 3.00
PM. The tenders shall be opened on the same day at 4.00 PM.
Other terms and conditions of NIT will remain the same.
(Neelesh Shah)
Sr. General Manager
SBG-Delhi
A-PDF Merger DEMO : Purchase from www.A-PDF.com to remove the watermark
No.NBCC:SGM:SBG-Delhi:NIT:CBI:AMND:2010:7438
Date: 28.05.2010
Amendment No. –III
Sub : Construction of CBI Head Office Building in Pocket 5-B, CGO Complex,
New Delhi.
S.H : S/I/T/C of IT Network and online UPS system with Battery back up.
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06.05.2010, amendment
No.I. & Amendment No.II, following amendment No. III is hereby issued:1. Pre-bid meeting is postponed and will now be held at 03:00 P.M. on 05.06.2010 at
CBI site office, 5 B, CGO Complex, Lodhi Road, New Delhi.
2. Last date of submission of tender documents is extended upto 10.06.2010 at 3.00
PM. The tender shall be opened on the same day at 4.00 PM.
Other terms and conditions of NIT will remain same.
(Neelesh Shah)
Sr. General Manager
SBG-Delhi
NATIONAL BUILDINGS CONSTRUCTION CORPORATION LTD.
(A Govt. of India Enterprise)
SBG-DELHI,
Pragati Vihar,
New Delhi-03
Tele-fax : 011-24369644
No.NBCC:SGM-Delhi:NIT:CBI:AMND:2010
May 21, 2010
AMENDMENT NO.II
Sub: Construction of CBI Head Office Building in Pocket 5B, CGO Complex, New Delhi
SH: S/I/T/C of IT Network and online UPS System with Battery back up
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06-05-2010 following amendment
No.II is hereby issued in technical specifications:1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
“Support IPV6 Static Routes, RIPng, OSPFV3 and BGP” is amended to “Should Support
IPV6 Static Routes, RIPng, OSPFV3 and BGP on Day one”. In the Core Switch (Refer Page
15)
“Should support capability with BGP, ISIS with future software/license upgrade” is
amended to “Should have capability with BGP on Day one”. In the Core Switch (Refer
Page 15)
“48 port gigabit fiber module distributed over two modules” is amended to “on single
module or distributed over two modules”. In the Core switch (Refer Page 15)
“Minimum 400 million pps throughput” of core switch is amended to “minimum 350 million
pps throughput”. (Refer Page 15)
“private vlan” is amended to “private vlan or equivalent”. (Refer Page 15, 16, 18 and 20)
“out of band management port” is amended to “management port” only. (Refer Page 16,
18 and 20)
Switching fabric of 48 port access switch “should have 200 Gbps or more with non
blocking architecture with minumum130 Million pps” is amended to “should have 176
Gbps or more with non blocking architecture with minumum 100 Million pps”. (Refer Page
17)
“support for future redundant power supply” is amended to “support for future in built or
external redundant power supply”. (Refer Page No. 17 and 19)
“IEEE 802.1Q VLAN 4096 VLANs support and 4096 Vlan ID support” is amended to “IEEE
802.1Q VLAN 2048 VLANs support and 2048 Vlan ID support” in the 48 port access
switch. (Refer Page no. 19)
“minimum 32 Spanning tree instances” is amended to “minimum 16 Spanning tree
instances” in the 48 port access switch. (Refer Page no. 17)
“IEEE 802.1Q VLAN 4096 VLANs support and 4096 Vlan ID support” is amended to “IEEE
802.1Q VLAN 1024 VLANs support and 1024 Vlan ID support” in the 24 port access
switch. (Refer Page No. 19)
“minimum 32 Spanning tree instances” is amended to “minimum 8 Spanning tree
instances” in the 24 port access switch. (Refer Page No. 19)
Switching fabric of 24 port access switch “should have 128 Gbps or more with non
blocking architecture with minimum 95 Million pps” is amended to “should have 88 Gbps
or more with non blocking architecture with minimum 50 Million pps”. (Refer Page No. 19)
14.
LEVITON, MOLEX AND TYCO are added in LAN PASSIVE Component in LIST OF APPROVED
MAKES. (Refer Page 25)
Other terms and conditions shall remain the same.
SR.GENERAL MANAGER
SBG-DELHI
NATIONAL BUILDINGS CONSTRUCTION CORPORATION LTD.
(A Govt. of India Enterprise)
SBG-DELHI,
Pragati Vihar,
New Delhi-03
Tele-fax : 011-24369644
No.NBCC:SGM:SBG-Delhi:NIT:CBI:AMND:2010 :7370
Dated: 19.05.2010
Amendment No. –I
Sub : Construction of CBI Head Office Building in Pocket 5-B, CGO Complex, New Delhi.
S.H : S/I/T/C of IT Network and online UPS system with Battery back up.
Refer our NIT No.NBCC:SGM:Delhi:NIT:CBI:2010/7286 dated 06.05.2010 following
amendment No. I is hereby issued:1)
Sale of Tender Documents is extended upto 28.05.2010.
2)
Pre-bid meeting shall be held on 29.05.2010 at 3.00 PM at NBCC site office, CBI Head
Office Building, Pocket 5-B, CGO Complex, New Delhi.
3)
Last date of submission of tender documents is extended upto 02.06.2010 at 3.00 PM. The
tender shall be opened on the same day at 4.00 PM.
Other terms and conditions of NIT will remain same.
Neelesh Shah
Sr.General Manager
SBG-Delhi