Data Warehouse Software Maintenance Strategy

Data Warehouse
Software Maintenance Strategy
BI Best Practice Team
Jason Gartner, Scott Maberry and Bill O’Connell
June 2005
June 2005
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Table of Contents
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse ............................. 3
Overview......................................................................................................................................... 3
Organizational Readiness................................................................................................................ 3
The Data Warehouse System .......................................................................................................... 4
Maintaining the Data Warehouse.................................................................................................... 5
Software Maintenance for IBM Products ....................................................................................... 7
Planning and applying software maintenance to the Data Warehouse ........................................... 8
Summary ....................................................................................................................................... 10
Acknowledgements....................................................................................................................... 11
Appendix A – Software Maintenance Scenarios .......................................................................... 12
Appendix B – Overview of Software Maintenance Tasks............................................................ 14
Appendix C - Building a Software Validation Test Suite............................................................. 16
Intended Audience
Primary
Data Warehouse Program Managers
Data Warehouse Technical Architects
Secondary
Data Warehouse Database Administrators
Data Warehouse Hardware/Software Support Specialists
Page 2 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Adopting a Software Maintenance Strategy for a DB2 UDB
Data Warehouse
Overview
The purpose of this paper is to discuss software maintenance strategies for the data warehouse.
Though composed of multiple technologies, the data warehouse will be referred to as a “system”
maintained by skilled professionals. The role of the Data Warehouse Technical Architect will be
discussed as the technical leader not only during design and implementation, but also during
software maintenance so the technical wellbeing of the data warehouse is maintained. When
applying software maintenance to the data warehouse, this paper will discuss optimal practices
and encourage organizations to take an “adopter” strategy in the interest of maintaining service
level agreements. The central principle of the strategy is to follow IBM’s recommendations on
specific combinations of database and operating system software release levels. Finally,
organizations will be encouraged to build and maintain a software validation test suite to identify
and resolve issues before they are introduced to the production system.
This paper is intended for Data Warehouse Program Managers and Data Warehouse Technical
System Architects. Key roles such as Data Warehouse Database Administrators and Data
Warehouse Hardware Support Specialists will also benefit from the discussion.
Organizational Readiness
Business users rely on the data warehouse as an essential tool needed to accomplish their daily
tasks; therefore, a commitment to the availability and stability of the data warehouse is
paramount. Often, the business and technical owners of the data warehouse will define a service
level agreement that defines the expected levels of availability and performance. To deliver the
agreed level of service, any change to the data warehouse must be carefully planned, performed
and tested so that the expectations of business users are met.
Many IT organizations are structured such that the technical team that maintains the data
warehouse is often a “virtual team” composed of personnel from several areas of the IT
organization (e.g. UNIX Administration, Storage Administration, Database Administration,
Applications Development). When it comes to design, implementation and ongoing changes to
the data warehouse, all components that interact directly with the system must be considered.
Given this, the role of a Data Warehouse Technical Architect is important for the overall
technical wellbeing of the data warehouse. This role spans all functional areas (e.g. operating
system, database, ETL, applications) and is critical in the process of understanding all system
components, evaluating proposed changes and assessing the impact on the data warehouse. A
Data Warehouse Technical Architect will have the leadership skills such that they can coordinate
across organizational boundaries and will be empowered by management to do so. Where
possible, a “dedicated team” reporting to a Data Warehouse Program Manager is ideal. This
organization creates a team where all the required skills to maintain each component of the
system is represented, has an in-depth knowledge and share a common technical leader – the
Data Warehouse Technical Architect. The data warehouse is a system - have a Data Warehouse
Page 3 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Technical Architect lead the technical team during the deployment and maintenance of this
critical business system.
For more information on the topic of organizational readiness, ask your IBM Representative for
a copy of the whitepaper titled, “Data Warehouse Organizational Structures” by Wendy Lucas of
the IBM BI Best Practices Team.
The Data Warehouse System
The data warehouse is a system composed of hardware, software and various operating
environments maintained by skilled professionals. When considering a change to the data
warehouse, the impact of the change to the system must be assessed. For example, consider the
following categories of software:
• Relational Database Management System and Tools
• Operating System and Tools
• Extract, Transfer and Load Tools
• Query Tools
• Applications
Since the data warehouse is a system, software and hardware components interact with each
other. Consider the following touch points:
Applications,
Query Tools,
ETL Tools
1
Database
2
3
Memory
4
5
O/S
Filesystem
I/O Subsystem
1.
2.
3.
4.
5.
Applications, Query Tools and ETL Tools to Database
Database to Memory
Database to Operating System
Database to File System
Database to I/O Subsystem
Page 4 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Data Warehouses have many other touch points, but experience has shown that the touch points
listed above are most important when making changes to software release levels. The various
software components typically come from more than one software company; therefore, the Data
Warehouse Technical Architect must assess the dependencies for each of the components and the
impact of a planned change to the overall system.
The data warehouse is also composed of numerous hardware components. The major categories
of components include servers, disk and tape storage and networking switches. Support for new
hardware often requires upgrades to the operating system. Over time, firmware and/or device
drivers are required to be updated. As the data warehouse grows, additional servers or disk
capacity may need to be installed to support the system. As these changes are made, the Data
Warehouse Technical Architect must assess the software dependencies and the impact of any
planned changes on all the components.
As the data warehouse becomes more integrated into the fabric of a business, the availability
requirements approach that of a mission critical system. To maintain the required availability of
the system for business users, the process of installing, testing and promoting changes to the
production system is critical. To facilitate this process, various operating environments are
necessary including development, system test, and production. All of these environments should
be included in the initial architecture of the data warehouse. Some organizations have found
multiple test environments (i.e. Functional/Performance Test and Application Unit Test) to be
useful to the data warehouse support team. Refer to Appendix C for a detailed discussion on
validation testing and test environments.
Maintaining the Data Warehouse
Maintaining the data warehouse involves various changes. Take for example:
• Creation and alteration of data tables (i.e. their definition, layout and content)
• Amendment of access rules (i.e. authentication, authorization)
• Addition of items for performance reasons (e.g. indexes, materialized query tables,
multidimensional clustering)
• Changes to database configuration parameters and parameters for the applications and
utilities
• Changes to software release levels
This document concentrates on changes to software release levels that could be needed for a
variety of reasons, such as:
• Adding new applications that have specific software prerequisites
• Supporting new releases of a software product that adds features or functions
• Resolving a problem that is discovered
• Applying maintenance to stay within recommended or supported levels of software
• Supporting new hardware devices
Page 5 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Regardless of the reason for making a software change, the decisions of how and when to make
these changes must be determined by each organization. For the purpose of this paper, it is useful
to characterize the software maintenance strategies as follows:
• Early Adopters
• Adopters
• Late Adopters
The “Early Adopter” is the organization that is willing to make software changes as they become
available because they need/want the latest software functionality and maintenance. The motto of
the Early Adopter is “when can I get it?” In this case, the organization either desires the latest in
functionality or has selected a proactive strategy to apply software maintenance to avoid known
issues before they encounter them. While having the latest functions and fixes, this strategy is
not without risk since stability can be impacted by unsuspectingly introducing new problems.
The “Adopter” is the organization that makes software changes when there is a reason to believe
that the changes will not introduce issues or impact stability. The motto of the Adopter is “let’s
wait and see.” With this strategy, the organization benefits from the experience of other
organizations that have already made similar changes and achieved stability. This strategy
postpones the benefits associated with new software functions that are included in new software
releases. While not that far behind, the adopter waits to install software maintenance until
recommended.
Finally, the “Late Adopter” is the organization that only makes software changes when
absolutely necessary and adheres to the motto of, “if isn’t broken, don’t fix it!” Making
infrequent changes certainly reduces the chance of introducing issues or instability; however,
sometimes the Late Adopter finds that they are out of support or have missed opportunities
associated with new software release levels (e.g. performance improvements). When problems
do occur or new functions are needed, this strategy results in significant changes being required,
often associated with a business critical need.
EARLY ADOPTER
Installs the latest software
Description release levels when
available
“When can I get it”
Motto
Pros
Cons
Has the latest in software
function and fixes
May unsuspectingly
introduce issues
ADOPTER
LATE ADOPTER
Installs the IBM
recommended software
release levels
“Let’s wait and see”
Only installs new software
release levels when
absolutely necessary
“If it isn’t broken, don’t fix
it”
Benefits from additional
testing by IBM and the
experiences of other
customers
Must exercise patience to
gain access to new features
and functions
Limits the number of
changes
Page 6 of 21
© Copyright IBM Corporation 2005
Upgrades become more
significant and possibly at
unplanned times
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
An organization may select a strategy based on the operational environment. For example, an
“Early Adopter” strategy may be appropriate for a Functional/Performance Test environment
that is primarily used by the database administrator and system administrator to perform initial
system testing of new releases of database or operating system software. An “Adopter” strategy
may be more appropriate for the production data warehouse. Refer to Appendix C for a detailed
discussion of operational environments.
Software Maintenance for IBM Products
As discussed, the data warehouse is a system and anything that interacts with it must be
considered when making changes. For IBM software, DB2 UDB and the AIX operating system
are critical software components to consider. To assist organizations, IBM recommends specific
software release levels for DB2 UDB and AIX. The purpose of making these recommendations
is to support the shared goal of data warehouse stability. IBM has an internal test suite of data
warehouse workloads where combinations of DB2 UDB and AIX are rigorously tested.
Recommendations concerning software release levels are made based on IBM internal testing
and the experiences of data warehousing organizations that are “Early Adopters.” The
recommended software release levels are reviewed monthly and generally revised every three to
six months. As such, an organization seeking to be an “adopter” would generally apply software
maintenance to DB2 UDB and/or AIX no more than every six months, but no less than once per
year.
The Recommended Base Software Stack for Business Intelligence (BI) Warehouses on AIX can
be found at: http://www-1.ibm.com/support/docview.wss?rs=71&uid=swg21179515
Additionally, a list of known issues for DB2 UDB on various releases of the AIX operating
system can be found at: http://www-1.ibm.com/support/docview.wss?rs=0&uid=swg21165448
For Linux, the Recommended Base Software Stack for Business Intelligence (BI) Warehouses
can be found at: http://www-1.ibm.com/support/docview.wss?rs=0&uid=swg21192752
As recommendations change, e-mail notification is available by registering for IBM’s “My
Support” at https://www.ibm.com/support/mysupport/us/en. To receive e-mail updates, add DB2
to the profile (Selection Path: Software: Data & Information Management: Databases: DB2
Universal Database for Linux, UNIX and Windows), subscribe to e-mail and select the “flashes”
category.
DB2 UDB software release levels are identified by version number, release number and fix pack
level. It is useful to note that certain combinations DB2 UDB Version, Release, Fix Pack levels
are functionally equivalent. For example, a new DB2 release can be equivalent to the previous
release at the current fix pack level. A new DB2 UDB fix pack level is generally available every
three months. The AIX operating system is identified by version, release and maintenance level
(ML). A new AIX maintenance level is generally available every six months.
Page 7 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Both DB2 UDB and AIX have the concept of APARs (Authorized Problem Analysis Report).
An APAR is a recognized problem that requires a specific fix. With DB2 UDB, a group of
APARs are included in a fix pack level. Alternatively, an individual DB2 APAR can be
requested from IBM through a special build process when circumstances dictate that it is not
feasible to wait until the availability of the next fix pack or to install the latest fix pack. The
special build will include the specific fix to the problem. A special build must be used carefully
since only limited testing is performed by IBM prior to making it available. Special builds can be
delivered as a fix pack image or as individual files. It is recommended that the fix pack image is
requested. A fix pack image requires more time to prepare for delivery, but software
management is improved. Late Adopters Beware: applying individual fixes through the special
build process may not be feasible if the installed fix pack level is more than two to three levels
behind what is currently available. Support for a special build ends one month after the fix for
the APAR has been released in an official fix pack.
Planning and applying software maintenance to the Data
Warehouse
At the conclusion of applying software maintenance, the goal is for the system to maintain its
functionality, stability and performance characteristics. As much as possible, apply software
maintenance as a planned project using recommended software release levels. The planning
process is led by the Data Warehouse Technical Architect, but includes the participation of the
entire technical team (e.g. Data Warehouse DBA, Database Hardware/Software Support
Specialist). The results of the planning process should be a detailed project plan that includes
tasks associated with preparation, installation and validation testing. Refer to Appendix B for an
overview of software maintenance tasks.
During the planning process and ultimately the installation, consider these guiding principles:
• Adhere to change management policies and procedures. Standard practices such as
making one change at a time certainly apply. Realizing that a change to one software
product can impact another even though the effected product did not change leads one to
test thoroughly after any change.
• When a decision is made to install new software release levels, continue moving forward
by identifying and addressing any functionality, stability, or performance issues that may
arise. In the case of an issue that cannot be resolved in a predetermined timeframe, have a
plan to back-out all changes and return the system to its original state. Installation of
prerequisites for a software product may influence the sequence in which changes are
made.
• Install the recommended AIX maintenance level first when making multiple software
changes. Following a period of time with no issues, install the recommended DB2 UDB
fix pack level. AIX maintenance should be installed in an “applied” mode and only
“committed” following a determination that the software maintenance will not have to be
backed-out.
Page 8 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
•
•
•
•
Plan to keep the software release levels for the data warehouse “current” using the
software release levels recommended by IBM for data warehousing. Recommended
software release levels will generally be within one to two levels of the latest available
level.
Avoid installing software release levels that are more current than shown on the IBM
recommended base software stack website. This will reduce the chance of unsuspectingly
introducing issues.
Avoid the temptation to install a more current software release level than recommended
with the purpose of avoiding an upgrade sometime in the future. Install what has been
tested and known to work together.
Understand your risk. Several factors influence the degree of risk associated with
software maintenance including the amount of time to plan, number of dependencies on
other products and amount of time available for testing. Low risk changes have few, if
any, dependencies and require less time to plan and test. Higher risk changes, such as
major releases changes require more time to plan and test than lesser DB2 fix pack or
AIX Maintenance Level changes.
o Version and release changes (DB2 and AIX) – Version and full release changes
have the highest degree of risk and the most dependencies with other products. In
general, wait until the first DB2 fix pack or AIX maintenance level after general
availability of a new version or release.
o Fix Pack Changes – Risk depends upon the new function included in the fix pack.
Unless the new function is absolutely required, follow the “recommended levels”
to avoid fix packs that have major functional enhancements.
o APARs, special builds – Individual fixes have a lower risk because only limited
software code is changed, but note that less testing is done by IBM than for full
fix packs, releases or versions.
Once planned and installed, the testing of new software maintenance is critical. The goal of
software testing is to identify any problems with functionality, issues with stability or
degradation of performance. While IBM tests the recommended software release levels for DB2
UDB and AIX, this should not be considered a substitute for thorough testing by each
organization. Through experience, organizations know their workload and the conditions that
make the system most susceptible to issues. Organizations are encouraged to develop a
validation test suite to exercise these functions in test environments. Consider beginning, or
enhancing an existing test suite, for use with the next installation of software maintenance. Over
time, a robust validation test suite will evolve that will save testing effort and increase the
confidence that applying software maintenance will meet the goal of functionality, stability and
performance. Refer to Appendix C for more details on building a validation test suite.
Page 9 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Summary
The availability of the data warehouse for business users is of the utmost importance. To achieve
this goal, view the data warehouse as a system and assign a Data Warehouse Technical Architect
to oversee its technical wellbeing. When making software changes to the data warehouse,
become an “Adopter” by following the recommendations for IBM products. Avoid being a “Late
Adopter” by including software maintenance in the list of planned projects for the data
warehouse. Finally, build, maintain and enhance a software validation test suite to identify and
resolve issues before they are introduced to the production system.
Page 10 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Acknowledgements
Authors
Jason Gartner, IBM Manager, DB2 UDB System Verification Test
Scott Maberry, IBM Business Intelligence Architect
Bill O’Connell, IBM Distinguished Engineer, Business Intelligence Chief Technology
Officer
Special Contributions
Chris Klein, Experian DB2 Database Administrator
Appendix on Software Maintenance Tasks
Wes Rhodes, IBM Managing Consultant and Executive Project Manager, Business
Consulting Services
Appendix on Software Validation Test Suites
Peer Reviews
Chub Varga, IBM Business Intelligence Architect
David Bryant, IBM Business Intelligence Technical Advocate
Hok Chou, IBM Business Intelligence Solutions Architect
Ken Jesberger, IBM Business Consulting Services
Pavel Sustr, IBM DB2 Advanced Technical Expert
Renson Clouden, IBM DB2 Lab Services
Rich Koch, IBM DB2 Technical Specialist
Page 11 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Appendix A – Software Maintenance Scenarios
The following scenarios represent common situations where various software release levels and
combinations of IBM software are being used. In response to these scenarios, the “recommend
software release levels” will be referenced. These recommended software release levels can be
found at the following IBM websites:
• Recommended Base Software Stack for Business Intelligence (BI) Warehouses on AIX
http://www-1.ibm.com/support/docview.wss?rs=71&uid=swg21179515
• Recommended Base Software Stack for Business Intelligence (BI) Warehouses on Linux
http://www-1.ibm.com/support/docview.wss?rs=0&uid=swg21192752
Scenario 1
• Maintenance Strategy: Adopter
• Situation: You are using the recommended software release levels and a problem is
discovered
• Description: DB2 is at the recommended fix pack level on the recommended AIX
maintenance level. A problem is discovered that is resolved with a specific fix to DB2 or
AIX. The fix is included in a more recent DB2 fix pack or AIX maintenance level.
• Recommendation: In general, maintain DB2 and AIX at the recommended levels and
only apply the specific fix. For DB2, discuss the possibility of a special build with your
IBM Support Analyst. The special build would be installed on top of the installed
recommended fix pack level and would only include the requested fixes. Carefully
consider the use of special builds as there is limited testing performed by IBM. Consider
how important the fix is to the system and whether there is a workaround. If there is an
applicable workaround, use the workaround until the fix is included in a fix pack that is
recommended. Discuss the relative risk that a specific fix may pose with your IBM
Support Analyst. Not all fixes have the same amount of risk. For AIX, request the
specific PTF (program temporary fix) and apply it to the installed recommended AIX
maintenance level. In both cases, a more recent DB2 fix pack or AIX maintenance level
might be available, but should only be installed after they become part of the
recommended software release levels.
Scenario 2
• Maintenance Strategy: Late Adopter
• Situation: You are installed below the recommended software release levels and a
problem is discovered
• Description: DB2 is below the recommend fix pack level on a maintenance level of AIX
below what is recommended. A specific fix to DB2 is required that is included in both the
recommended and latest DB2 fix pack.
• Recommendation: In general, upgrade AIX to the recommended maintenance level first.
After operating without incident, upgrade DB2 to the recommended fix pack level. Avoid
upgrading to the latest AIX maintenance level or DB2 fix pack level until they become
part of the recommended software release levels.
Page 12 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Scenario 3
• Maintenance Strategy: Early Adopter
• Situation: You are installed above recommended software release levels and a problem
is discovered
• Description: DB2 is installed above the recommended fix pack level on a maintenance
level of AIX at or above the recommended level. The fix to DB2 is included in a newly
announced fix pack.
• Recommendation: When operating above the recommended software release levels,
each situation is different and needs be assessed based on the unique circumstances. In
general, however, maintain the installed DB2 fix pack level and only apply the specific
fix to DB2 by discussing a special build with your IBM Support Analyst. A special build
would be installed on top of the installed fix pack level. The special build would only
include requested fixes. If, however, the latest fix pack level includes APARs only, a
different recommendation might be made after assessing the situation.
Scenario 4
• Maintenance Strategy: Adopter to Early Adopter
• Situation: You are installed at or below recommended software release levels and newly
announced features are required
• Description: DB2 is at the recommended fix pack level on the recommended AIX
maintenance level. Newly announced DB2 features are absolutely required by the project
and are available in the newly announced DB2 fix pack.
• Recommendation: When considering software release levels above what is the
recommended, validate that the new features are truly an absolute requirement and cannot
be delayed until the fix pack becomes part of the recommended software release levels. If
it is determined that the new features are required, install the newly announced fix pack
on the currently recommended AIX maintenance level or the AIX maintenance level
specified as the minimum prerequisite. When applying software more current than
recommended, consider having a Functional/Performance Test environment where DBAs
and System Administrators are the primary users. Be sure to include extra time in the
project plan to perform additional testing. In the event of issues, plan to move forward by
resolving any problems that may arise by applying special builds until the environment
provides the required function, stability and performance. As always, have a back-out
plan to return the system to its original state in case a problem cannot be resolved within
a predetermined timeframe.
Page 13 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Appendix B – Overview of Software Maintenance Tasks
The following is an overview of common tasks to consider when developing a project plan for
applying software maintenance to a DB2 UDB data warehouse running on the AIX operating
system:
Planning Tasks
1. Validate the current implementation adheres to best practices
2. Determine if any contract resources will be required to complete the project.
3. Review and document all installed software and their current levels.
4. Review the IBM website for DB2 UDB for AIX operating system prerequisites.
o http://www-1.ibm.com/support/docview.wss?rs=71&uid=swg21181544
5. Review the IBM website for recommended levels of DB2 UDB and AIX.
o http://www-1.ibm.com/support/docview.wss?rs=71&uid=swg21179515
6. Review DB2 fix pack readme file for installation instructions, known problems and
workarounds, and reference information.
o http://www-306.ibm.com/software/data/db2/udb/support/
7. Contact your other software vendors, as appropriate, to determine support and stability
for their products with the planned software release levels. While all software that
interacts with the data warehouse is important, ETL tools require special attention since
they are more tightly integrated with the database than with other products.
8. Contact the IBM Support Center if you are running a special build to determine if an
updated version of the special fixes is needed. This is required so no special fixes are lost.
9. Develop a detailed project plan that identifies what tasks must be completed, when they
must be completed and who is responsible for performing them.
10. Define a plan for how and when to back-out software changes should an irresolvable
problem occur.
11. Develop a test plan and test cases that will exercise the changes and will help to identify
unexpected changes in system functionality, stability or performance characteristics.
Preparation Tasks
1. Database Administrator - Run performance related baseline test cases before applying
any software changes so a before and after comparison is available. (Note: Understanding
the initial configuration settings and a log of any subsequent changes is important).
2. AIX Administration - Download fix pack image from IBM
3. AIX Administration – Upload and stage fix pack image to server(s)
4. AIX Administration - Prepare fix pack image (extract installation files from tar image)
5. Database Administrator – Backup the database
Page 14 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
High-Level Installation Tasks
The following are typical tasks, but they can vary with each fix pack or special build:
1. AIX Administrator and Database Administrator – Review and follow all tasks and
considerations documented in the fix pack readme file
2. AIX Administrator – Commit current AIX levels (this will allow a back-out of the new
AIX maintenance level if problems occur)
3. AIX Administrator - Apply AIX prerequisites, as required (apply only; not commit)
4. AIX Administrator - Commit current DB2 fix pack (this will allow a back-out of the new
DB2 fix pack level if problems occur)
5. AIX Administrator and Database Administrator – Stop all DB2 processes
a. Deactivate all databases and stop DB2
b. Stop administration server
c. Unload unused shared libraries from memory (slibclean)
d. Stop all instances using DB2 (e.g. Fault Monitor)
e. Clean all DB2 interprocess communications (IPCs) for the instance to be updated
f. Verify no DB2 processes are running
6. AIX Administrator - Apply DB2 fix pack image to all servers (apply only; not commit)
7. * AIX Administrator and Database Administrator - Update the instance to the new level
of DB2 (db2iupdt)
8. * AIX Administrator and Database Administrator – Update the administration server
instance (dasupdt)
9. Database Administrator - Verify the level of DB2 applied (lslpp and db2level - this must
match the fix pack level being applied)
10. Database Administrator - Start DB2 and the administration server (verify successful
startup without errors from db2diag.log)
11. Database Administrator – Connect to each database and rebind bind files (e.g. databases,
packages, utilities)
* Note: Some Database Administrator tasks are shared with the AIX Administrator due to
root access being required
Validation Testing Tasks
Refer to Appendix C for a detailed discussion of software validation testing.
1. Database Administrator - Verify basic database functionality is working (e.g.
administration tools, runstats, selects from partitioned tables, etc.)
2. Application Team - Perform application testing
Page 15 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Appendix C - Building a Software Validation Test Suite
INTRODUCTION
Business users have a common request of their IT organizations - deliver systems that are
available when required and consistently provide the expected level of performance. Changes to
a system, however, can produce instability, performance degradation and even downtime. This
experience can be avoided when organizations establish and maintain a testing program that
seeks to discover and address issues resulting from changes before they can effect the production
system. As organizations move toward a zero tolerance for instability of the data warehouse, a
complete reevaluation of the testing process is required.
WHY DO PROBLEMS OCCUR?
So why do problems occur? In short: for large scale, generalized applications, it is impossible to
test for every data combination on every hardware/software platform available. The function
may perform correctly in the software developer’s test environment, but encounter unexpected or
untested conditions when integrated with other software products (e.g. ETL tools), different
software release levels (e.g. operating system levels) or hardware combinations. This same
experience may result when unique workload conditions exists.
Since software will never be perfect, then organizations must take measures to ensure the
stability of their systems. This is not to suggest that software developers should not to strive to
deliver higher quality code, but rather to suggest that unforeseen problems can accompany
software. Therefore, the need for rigorous testing is critical. All too often, however, new releases
of software are promoted to production environment without:
- Thorough testing of basic software functions
- Retesting of previously experienced problems
- Stressing the new software to assess the performance impact of data volume and
workload characteristics
WHAT SHOULD THE IT ORGANIZATION DO?
IT organizations that commit to delivering and maintaining systems that are available when users
require and meet expected levels of performance will seek ways to identify potential issues early.
Since problems can be caused by a number of factors, IT organizations need to address both
technical and organizational factors. Consider the following suggestions:
1. Accept complete ownership for the stability of the data warehouse. Change the culture of
the organization so every group associated with the data warehouse takes responsibility
for the stability of their portion of the environment and participates in delivering the
overall stability of the system to users.
2. Standardize the testing processes to maintain the consistency and repeatability of the
tests. Establish a validation testing program to discover problems early. Realize that the
amount of testing required for new software release levels may be only slightly different,
but just as important, from the testing when an application is first deployed. Over time,
maintain and enhance the test suite, as appropriate.
Page 16 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
3. Create the role of an Application Change Control Coordinator to set the testing strategy
and lead the overall testing effort.
4. Determine and adhere to the criteria for how, which, when and where changes will be
introduced.
5. Create and track an inventory of current software release levels along with a roadmap for
future deployments.
HOW DOES AN ORGANIZATION START?
When building a validation test suite, organizations can borrow strategies and disciplines that
have been used for years in the mainframe environment. This section will identify several areas
that are helpful to begin or improve a testing program. In summary, organizations need to:
1. Identify everything that needs to be tested
2. Establish the appropriate operational environments
3. Create standardized test suites for functional/performance testing
4. Define the promotion strategy for software changes
5. Have a tested back-out plan
1. Identify everything that needs to be tested
While it sounds fairly simple, identifying everything that needs to be tested involves a lot of
work. The following is only a partial list of the broad categories to consider:
- Query workload mix
- Trickle feed process
- Switching views
- Loads
- Backup/recovery
- Maintenance such as Reorgs and Runstats
- Crash recovery
- Apply/revoke permissions
For each of the above categories, several specific tests may be required to validate that software
changes continue to provide the functionality or stability of processes in each category.
In addition to the above, a list of every system function (e.g. AIX, DB2) that is important must
be identified and added to a checklist. Every time a new release is installed, each item on the
checklist needs to be validated to determine that it is working properly. When upgrading to a
new software release, any new functions that will be used need to be added to the checklist.
Finally, develop a list of items that will be monitored. While tests are running, items like
processor and memory usage, database resources, and I/O and network bandwidth will need to be
monitored to compare the difference from one software release level to the next. This ability to
assess and compare pre-change and post-change behavior implies maintaining some degree of
historical information about the relevant statistics.
Page 17 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
2. Establish the appropriate operational environments
For years, three operating environments have been referenced – development, system test and
production. What has not been specifically called out, however, is that many organizations
deploy multiple test environments. Consider the following possible operating environments.
• DEVELOPMENT: Application Development - The Application Development
environment is for the ongoing development of applications. Since this environment
supports a user population, it is treated as if it was production. In other words,
“development” should not be where new software releases are initially installed and
tested.
• TEST: DBA & System Administration Functional/Performance Test – When new system
software needs to be installed and tested, the process begins in the DBA & System
Administration Functional/Performance Test environment. In other words, this is the
environment where new releases of the operating system and database management
system are initially installed. This environment is a scaled down version of the production
system and uses static test data. In this way, test results can be compared to previous tests
run on older levels of software, but against the same data. Therefore, this environment
not only validates that specific functions are working properly, but also validates that
performance characteristics have not adversely changed. Since DBAs and System
Administrators are the primary users, upgrades to this environment can be done at any
time. Further, if changes to this environment introduce any issues, the problem
identification and resolution is done without impacting application developers or business
users.
• TEST: Application Unit Test – After application software code has been developed with
some initial testing, the application is promoted from Application Development to the
Application Unit Test environment. This environment is treated as if it was production
because it has a user population. Having passed the functional and performance testing,
new software releases are introduced to variable workload characteristics in this
environment. Problems can be discovered in this environment because it more closely
mimics the production system. As issues are discovered, the key is to develop a feedback
loop so a test is created and included when the next new software release is installed.
When the root cause of a problem is not clear, DBAs are good resources to assess the
problem and isolate it to application or system software. The Application Unit Test
environment is also a scaled version of the production system so the efforts of volume
testing with the new software release levels can be assessed.
• TEST: System Integration Test – The final test environment for new applications or
system software releases is the System Integration Test environment. This environment is
treated as if it was production because it has a user population. System Integration Test
closely mirrors production in that it regularly experiences data refreshes and mimics the
production workload characteristics and mix. Again, it is proportionally scaled to the
production system so that the impact of data and workload volume can be assessed.
• PRODUCTION – By the time new releases of software reach production, the objective
is for any issues to have been identified and resolved. Through a rigorous testing process,
the quest to deliver production systems that are available when required by users that
meet performance expectations is achievable.
Page 18 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
Each organization will have different requirements that will influence the appropriate number of
operating environments to establish. The size of the test environments are based on having
enough data with a proportional amount of processing capacity to simulate the conditions that
will be encountered in production (i.e. all the data types and combinations). For System
Integration Test, however, an additional requirement of simulating the volume of workload that
the production system encounters needs to be considered. The requirement is to have enough
capacity (data and processing) to fully simulate key productions events (e.g.
daily/weekly/monthly loads, heavy processing over a given time period) so that they behave the
same way they would in production; therefore, the size of the System Integration Test
environment varies by organization and is determined by whatever is needed to represent
production as closely as possible.
3. Create standardized test suites for functional/performance testing
Without a formal and standardized process, testing will only reflect individual characteristics and
experiences of those doing the testing. This will lead to an inconsistent and incomplete testing
process. Therefore, testing should be standardized with the creation and maintenance of a test
suite. To begin the initial testing of new software releases, the DBA/SysAdmin Functional Test
environment should be used. DBAs should have a checklist of key features (e.g. administration
commands) that need to be tested. While some of the functions can be scripted, others will
require manual testing. Functional testing will continue with a series of predefined test cases that
validate proper functioning of tasks that are performed by the data warehouse applications. These
tests are created and maintained so that they are repeatable each time a new software release
level is installed. In addition to testing the functionality of a product, this process seeks to assess
how software components react to each other throughout the software stack. In other words, does
the function perform properly based on the specific levels of software installed in the
environment and is there any change to the performance characteristics for a given test.
A key role of the Functional/Performance Test environment is to conduct and assess
performance testing scenarios. Since standard test data is used, the performance characteristics of
the tests can be compared to previous tests to determine if they are still the same. A workload
can be established and individual queries measured based on a specific load. Either in-house
scripts or actual workload simulation tools can be used to mimic workload volume for a desired
period of time. The key to this type of testing is two-fold:
1. Have an environment that is proportionally scaled (i.e. calibrated) and configured (i.e.
parameters) like the production system in terms of both processing capacity and amount
of data. With this correlation, the test system will react like the production system so the
type of adjustments that may be required for production can be evaluated. Software
changes can often result in altered system responsiveness that will require tuning
adjustments. For example, bufferpools may need to be modified.
2. Create a suite of activities that mimics the workload mix for a given day in production.
Application developers can be helpful in determining the workload mix. A prerequisite
for this is that the data in the test environment be representative of the conditions that
exist in production. Knowing the data is a must to determining how much will be
required to create a representation of the data conditions that exist in the production
environment.
Page 19 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
4. Define the promotion strategy for software changes
New software releases are initially installed in the Functional/Performance Test environment.
After passing functional and performance testing, the new software releases can be promoted to
the Application Unit Test environment that more closely mimics production. Following a period
of time with no issues, the new software release levels can be then promoted to the System
Integration environment. This environment introduces many variables; it is never exactly the
same because a subset of current production data is used. In this environment, however, very
specific and critical tests are performed. For example, large load and trickle feed processes
should be tested in this environment. Any process with an element of complexity or variability
should be tested in the System Integration environment. Additionally, application programmers
use the integration environment and become another source of random workload creation and
testing. Again, this environment mimics production workload and is scaled proportionally to the
production system based on processing capacity and the amount of data. Changes are ready to be
promoted to the production environment when they can run in this environment without incident
for up to four weeks.
5. Have a tested back-out plan
In the event that problems cannot be resolved within a predetermined timeframe, have a back-out
plan to restore the system to its original state. This plan should include a determination of when
to back-out the change and revert to the original state. When making changes, however, always
assume a problem is going to occur and include additional time in the maintenance window to
resolve it.
HOW CAN ORGANIZATIONS IMPROVE CURRENT TESTING EFFORTS?
The development of testing programs is a process that should be continually improved based on
experience. When assessing your testing program, ask these questions:
1. At the completion of installing of a new software release:
- “What could have been done to make this change more stable?”
- “What could have been done to have more thoroughly tested this change?”
2. When problems are found in production:
- “How did the problem get into production?”
- “Why wasn’t the problem found in test?”
- “What other tests can be defined and added to the test suite to test for this problem?”
The answers to these questions will lead organizations to:
- Establish a feedback loop to the Problem Management System so a problem is tracked
- Make a commitment to root cause analysis so the real cause of a problem is understood.
Often, a unique set of circumstances or specific sequence is required for the problem to
occur
- Develop a test case to add to the test suite when the problem is resolved
Identify and resolve issues that are discovered in the test systems. The elusive problems need to
be fully investigated. In scaled down test environments, some problems may only surface
irregularly, but appear more frequently in a large scale production environment. Defining a
scenario to test for these problems is of great value.
Page 20 of 21
© Copyright IBM Corporation 2005
Adopting a Software Maintenance Strategy for a DB2 UDB Data Warehouse
While every possible scenario cannot be tested, those that can should have a test that is included
in the test suite. This will prevent the same problem from reoccurring when future changes are
made. In some cases, however, a certain degree risk must be accepted. A sensible
implementation plan will balance the need for diligence with determining what risks can be
mitigated and which will be accepted.
WHAT ARE THE BENEFITS TO THE ORGANIZATION?
The stress of problems takes its toll on the business, business users and IT staff. Consider the
value when the IT organization delivers a stable system:
- Business user productivity is maintained
- Reputation of IT is enhanced
- Staff productivity increases by avoiding unscheduled support time
- Job satisfaction and quality of life improves with fewer issues to resolve during non-work
hours
These benefits are not without cost. Establishing the necessary operating environments can be a
significant cost. Staff time to build and maintain the test suites can be a significant cost. These
costs, however, must be weighed against the equally significant business cost of instability and
downtime.
The effort associated with validation test suites should not minimized. Changes to the
organization and established processes will be required and are challenging. The effort to look
for root cause analysis requires a commitment of precious time. Thoroughly evaluating new
software releases requires a commitment of time while still needing to address other business
needs.
In spite of the time, effort and cost to build the test suite, the value of delivering stable systems
outweigh the costs. Assess your organization. How much time is spent in unscheduled support
activities following software release changes? By tracking unscheduled support time against the
time to build and maintain a test suite, some organizations have justified the cost. From a return
on investment perspective, it is possible that some organizations will obtain the value at a net
zero cost. In other words, they get the value for free. The alternative is to run the risk of
production problems where anxious users will be hovering in the office, believing that the world
is coming to an end and having no reluctance to make those nighttime phone calls. What is the
value of avoiding problems?
CONCLUSION
Delivering systems that are available when required by users that meet performance expectations
takes a commitment to invest time, effort and budget. It also takes a willingness to allow more
time to get a software change promoted to a production environment; however, a significant
amount of wasted time, effort and cost can be avoided when rigorous testing occurs. A process
that focuses on avoiding problems by creating a software validation test suite complemented by
an organization’s commitment to stable systems will provide substantial and lasting business
value.