Miele | 52833705USA | Installation Plan | Miele 52833705USA Installation Plan

Installation Plan
Tumble dryer
PT 8337 EL (Electrically Heated)
en - US
21.15
M.-Nr. 10 123 660
U.S.A.
Miele, Inc.
National Headquarters
9 Independence Way
Princeton, NJ 08540
Phone: 800-991-9380
609-419-4241
Fax:
www.mieleusa.com
Technical Service & Support
Nationwide
Phone: 800-991-9380
Fax:
800-220-1348
proservice@mieleusa.com
It is essential to read the operating and installation instructions before installing,
commissioning or using the machine.
This avoids the risk of accidents or damage.
All rights reserved.
2
M.-Nr. 10 123 660
PT 8337 EL - measurements in inches
3
PT 8337 EL - measurements in inches
4
PT 8337 EL - measurements in inches
5
Standard installation
PT 8337 EL - measurements in inches
6
Option: Installation on concrete platform (BS)
PT 8337 EL - measurements in inches
7
PT 8337 EL - measurements in millimeters
8
PT 8337 EL - measurements in millimeters
9
PT 8337 EL - measurements in millimeters
10
Standard installation
PT 8337 EL - measurements in millimeters
11
Option: Installation on concrete platform (BS)
PT 8337 EL - measurements in millimeters
12
Technical datasheet
Tumble dryer:
Heating:
PT 8337
Electric (EL)
Legend:
en - US
Abbreviations in bold type:
Connection required
Abbreviations in circle with dashes:
Connection optional or required depending on model version
Optional extras:
BS
Concrete base
Quality and density of concrete must comply with load.
Concrete base must be firmly secured to floor!
Recommended height
Minimum height
Minimum width
Minimum depth
4”
2”
35 3/8”
43 1/4”
100 mm
50 mm
900 mm
1100 mm
3 AC 208 V
60 Hz
52582 BTU/h
3 x 65 A
4 x AWG 6
15.4 kW
Machine connections:
Electrical
connection
Standard voltage
Frequency
Rated load
Fuse rating
Connection cable, min. cross-section
4 x 10 mm²
Connection cable to be ordered separately
Convertible to
Frequency
Rated load
Fuse rating
Connection cable, min. cross-section
3 AC 220 - 240 V
60 Hz
59070 69654 BTU/h
3 x 65 A
4 x AWG 6
17.3 20.4 kW
4 x 10 mm²
Connection cable to be ordered separately
Electrical connection must comply with national regulations.
Connection using multi-pole wall socket in compliance with IEC/EN 60309 and IEC/EN 60947 is
recommended in order to simplify electrical tests.
If machines are hard-wired, a multi-pole switch must be provided on site.
A wall socket or isolator must be accessible after installation.
Installation plan: PT 8337 EL
Date: 18-May-2015
Page: 13
Equipotential
bonding
Connection with male thread
Connection with washers and nut.
3/8“ x 1 3/8“
3/8”
10 mm x 35 mm
M 10
AC 230V
5 x AWG 14
5 x 1.5 mm²
Max. nominal air flow in vented mode
Max. permissible pressure loss
21188.8 cu ft/h
0.03 psi
600 m³/h
200 Pa
Connection on machine side (ext. diameter)
Connection pipe provided on site (int. diameter)
Max. temperature
6”
6”
176 °F
150 mm
150 mm
80 °C
82.3 in²
531 cm²
6 3/8“
6 1/4“
161 mm
160 mm
1/4“ x 1 5/8“
3/8” x 2“
6 mm x 40 mm
10 mm x 50 mm
1/4“ x 1 5/8”
3/8” x 2”
6 mm x 40 mm
10 mm x 50 mm
1/4” x 1 5/8”
3/8” x 2”
6 mm x 40 mm
10 mm x 50 mm
Accessories not included
If necessary, equipotential bonding with good galvanic
contact must be provided in accordance with all
appropriate national and local regulations.
Peak load
energy
management
Control contact voltage
Connection cable, min. cross-section
Connection cable to be ordered separately
Connection via a flexible supply lead with a separate
isolator is recommended. The isolator should be visible
and easily accessible after machine installation.
Air outlet
As relative humidity inside the vent duct can be as high as
100%, suitable measures must be taken to prevent a
backflow of condensate into the machine.
Air intake
Standard connection: Air intake from installation site
Unobstructed air intake into room recommended
(corresponding to 3 times the vent cross-section of
machine)
A sufficient supply of fresh air should be ensured to
replace the air extracted.
Alternative connection: Ducted air intake (from outside
building)
Connector on machine (int. diameter)
Connection pipe provided on site (ext. diameter)
Lid removal exposes live components! For safety
reasons, the pipe connected for central air intake should
be at least 35.43” [900 mm] long and secured with two
screws.
Fittings
(supplied)
Without base:
2 × clamps
2 × screws DIN 571 (Ø x length)
2 × rawl plugs (Ø x length)
Machine should be bolted to the floor.
Fixing materials for floor screed have to be provided on
site.
On concrete platform:
2 × clamps
2 × screws DIN 571 (Ø x length)
2 × rawl plugs (Ø x length)
Machine must be bolted to the platform!
Fixing materials for floor screed have to be provided on
site.
Miele base UG 8350:
4 x fixing sets
(to secure machine to base)
4 x screws DIN 571 (Ø x length)
4 x rawl plugs (Ø x length)
Machine must be secured to base!
Fixing materials for floor screed have to be provided on
site.
Installation plan: PT 8337 EL
Date: 18-May-2015
Page: 14
Machine data
Machine width
Machine depth
Machine height
Casing width
Casing depth
35 5/8“
40 3/4”
55 1/8”
35 3/8”
36 5/8”
906 mm
1035 mm
1400 mm
900 mm
930 mm
Minimum width of delivery access to installation site
Recommended rear wall gap (measured to front of machine)
Min. wall gap (to rear edge of lid)
36 1/4“
59“
19 3/4“
920 mm
1500 mm
500 mm
Net weight
Dynamic floor load, max.
Average heat dissipation (depends on ambient room
temperature and selected program)
Noise level
Sound pressure level
(measured at a distance of 39.37” from the machine and at a
height of 63”).
364 lbs
419 lbf
2013 BTU
165 kg
1860 N
590 W
67.6 dB (A)
55 dB (A)
Installation should only be carried out by authorized installers in accordance with all local and national regulations!
Follow installation instructions when installing machine. All rights reserved.
Installation plan: PT 8337 EL
Date: 18-May-2015
Page: 15
Download PDF

advertising