Texas Instruments | Migrating from TMS320C6211 to TMS320C6211B | Application notes | Texas Instruments Migrating from TMS320C6211 to TMS320C6211B Application notes

Texas Instruments Migrating from TMS320C6211 to TMS320C6211B Application notes
Application Report
SPRA393 – May 2003
TMS320C6211 to TMS320C6211B Migration Guide
C6000 Hardware Applications
ABSTRACT
This document describes migration from the TMS320C6211 to the TMS320C6211B. The
objective of this document is to indicate differences between the two devices and show how
handle these differences. Depending on the board layout and any system level timing
assumptions, a migration may or may not require any changes. If changes are required, some
systems may be able to implement any necessary timing changes through software control,
whereas others may require hardware changes.
1
2
3
4
5
Contents
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Asynchronous Memory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1 Table 1, Parameters 4 and 7: For EDx, Input Hold Time is Increased by 1 ns . . . . . . . . . . . . .
2.2 Table 1, Parameter 10: For AWE, Output Hold is Reduced by 0.3 ns . . . . . . . . . . . . . . . . . . . .
2.3 ARDY Performance Improvement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Synchronous-Burst Memory and Synchronous DRAM Memory . . . . . . . . . . . . . . . . . . . . . . . . .
Host Port Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1 Cycle Performance Differences . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1
2
2
2
2
2
3
3
3
List of Tables
Table 1
Table 2
Table 3
1
Asynchronous Memory Timing Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Synchronous-Burst Memory and Synchronous DRAM Timing Changes . . . . . . . . . . . . . . 3
Host Port Interface Timing Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Introduction
The TMS320C6211B slightly differs from the TMS320C6211. The differences are all timing of
signal pins changes. Specifically, the changes are confined to the external memory interface
(EMIF) and the host port interface (HPI). All other device parameters are identical between the
two devices. Thus, board-level changes may not be necessary to move from the TMS320C6211
to the TMS320C6211B.
To appropriately consider the impact of these timings changes, it is necessary to understand the
current interface timings for a given system. A timing analysis of the affected signals should be
done to calculate the amount of available margin in the affected interfaces.
Previously implemented workarounds to C6211 errata need not be undone when migrating to
C6211B. Revision 3.1 of the C6211B is compatible with all recommended workarounds shown in
TMS320C6211/TMS320C6211B Digital Signal Processors Silicon Errata (SPRZ154)
Trademarks are the property of their respective owners.
1
SPRA393
2
Asynchronous Memory
Table 1 lists the asynchronous memory timing parameters that changed from C6211 to C6211B.
The input hold requirement for data and ARDY increase from 1 ns to 2 ns, and the output hold
time for AWE decreased from 1.5 ns to 1.2 ns. If there is not available margin in the current
setup to absorb the timing change, the programmable settings can be changed to accommodate
the new timing parameters.
Table 1. Asynchronous Memory Timing Changes
No.
Parameter
C6211 Min
C6211B Min
Unit
4
th(AREH–EDV) Hold time, EDx valid after ARE high
1
2
ns
7
th(EKOH–ARDY) Hold time, ARDY valid after ECLKOUT high
1
2
ns
10
td(EKOH–AWEV) Delay time, ECLKOUT high to AWE valid
1.5
1.2
ns
2.1
Table 1, Parameters 4 and 7: For EDx, Input Hold Time is Increased by 1 ns
• If a timing analysis shows there is at least 1ns of extra hold time provided to the C6211, then
no change is required for the C6211B.
•
2.2
If this extra hold time is not available, then the asynchronous read hold period should be
extended. This can be adjusted in the appropriate CE Space Control Register (CExCTL).
Note that this assumes the memory continues to assert valid data as long as OE remains
asserted
Table 1, Parameter 10: For AWE, Output Hold is Reduced by 0.3 ns
• If a timing analysis shows the interface exceeds the memory’s write strobe length
requirement by 0.3 ns or more, then no change is required.
•
2.3
If this extra strobe time is not available, then the programmed write strobe length should be
extended. This can be adjusted in the appropriate CE Space Control Register (CExCTL).
Note that the asynchronous setup time is measured from address/control/data valid to AWE
low and is the same for C6211 and C6211B. Therefore, no changes to the programmed write
setup time are necessary, despite the change in AWE timing.
ARDY Performance Improvement
For ARDY input hold time, no change is required. The timing change may alter the cycle which
the DSP recognizes the ARDY assertion. If valid data is driven on ED before ARDY is asserted,
this timing change will not impact the data sampled by the DSP, but may cause the
asynchronous cycle on the C6211B to complete one clock earlier than the C6211.
3
Synchronous-Burst Memory and Synchronous DRAM Memory
Table 2 lists the synchronous-burst memory and Synchronous DRAM timing parameters that
changed from C6211 to C6211B. Synchronous-burst and synchronous DRAM memory cycles
are not programmable. If the timing analysis shows an extra 1ns of input hold is provided to the
DSP and 0.3ns to the memory, then no changes are necessary. If the timing analysis shows the
system is not tolerant of the timing changes, then board level changes are necessary to support
correct operation. In most SDRAM systems it is unlikely that these will cause an issue because:
2
TMS320C6211 to TMS320C6211B Migration Guide
SPRA393
On output hold from the DSP (Table 2, parameters 1–5 and 8–12), in typical systems the
SBSRAM or SDRAM will require less input hold than the DSP provides.
On input hold from the DSP (Table 2, Parameter 7), in typical systems the output hold from the
SBSRAM or SDRAM plus the round trip delay from the DSP’s ECLKOUT to return data from the
SBSRAM or SDRAM will meet this requirement. In general, as the system is more heavily
loaded the easier this requirement is met.
Table 2. Synchronous-Burst Memory and Synchronous DRAM Timing Changes
No.
Parameter
7
th(EKOH–EDV) Hold time, EDx valid after ECLKOUT high
1–5, 8–12 td(EKOH–xxxx) Delay time, ECLKOUT high to signals valid
4
C6211 Min
C6211B Min
Unit
1
2
ns
1.5
1.2
ns
Host Port Interface
Table 3 lists the HPI timing parameters that changed from C6211 to C6211B. These host port
timing changes should not impact any systems. Only the maximum output hold of the
C6211B is reduced compared to the C6211. Since output hold timing verification must be
calculated from the worst-case (minimum) time, this change does not alter that timing analysis.
Also, the delay time changes all represent an improvement when compared to the C6211.
Therefore, no changes are required to handle the HPI timing differences.
Table 3. Host Port Interface Timing Changes
No.
Parameter
C6211B Max
Unit
9
toh(HSTBH–HDV) Output hold time, HD valid after HSTROBE high
15
12
ns
5
Td(HCS–HRDY) Delay time, HSTROBE to HRDY
15
12
ns
15
12
ns
15
12
ns
6–7, 15–17 Td(HSTBx–xxxx) Delay time, HSTROBE to signals valid
20
4.1
C6211 Max
Td(HASL–HRDYH) Delay time, HAS low to HRDY high
Cycle Performance Differences
While these timing changes do not impact functionality, it should be noted that HPI cycles may
not be identical on the C6211 and C6211B. Performance improvements and bug fixes may
cause data to be presented at a different time and different burst lengths to be supported. Both
C6211 and C6211B adhere to the same behavioral specification (with the exceptions noted in
the silicon errata). Therefore, if the host interface does not depend on cycles appearing a certain
way, this change will not adversely impact the interface.
5
Conclusion
When migrating from the TMS320C6211 to the TMS320C6211B, the only changes to consider
are timing changes to the EMIF and HPI. With an interface timing analysis for these two ports,
the impact of the DSP timing changes can be considered. In the case where no conflicts are
created, no changes are necessary to migrate. If the changes cause timing violations, then
system software or hardware will need to be altered to address the violation.
TMS320C6211 to TMS320C6211B Migration Guide
3
IMPORTANT NOTICE
Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications,
enhancements, improvements, and other changes to its products and services at any time and to discontinue
any product or service without notice. Customers should obtain the latest relevant information before placing
orders and should verify that such information is current and complete. All products are sold subject to TI’s terms
and conditions of sale supplied at the time of order acknowledgment.
TI warrants performance of its hardware products to the specifications applicable at the time of sale in
accordance with TI’s standard warranty. Testing and other quality control techniques are used to the extent TI
deems necessary to support this warranty. Except where mandated by government requirements, testing of all
parameters of each product is not necessarily performed.
TI assumes no liability for applications assistance or customer product design. Customers are responsible for
their products and applications using TI components. To minimize the risks associated with customer products
and applications, customers should provide adequate design and operating safeguards.
TI does not warrant or represent that any license, either express or implied, is granted under any TI patent right,
copyright, mask work right, or other TI intellectual property right relating to any combination, machine, or process
in which TI products or services are used. Information published by TI regarding third–party products or services
does not constitute a license from TI to use such products or services or a warranty or endorsement thereof.
Use of such information may require a license from a third party under the patents or other intellectual property
of the third party, or a license from TI under the patents or other intellectual property of TI.
Reproduction of information in TI data books or data sheets is permissible only if reproduction is without
alteration and is accompanied by all associated warranties, conditions, limitations, and notices. Reproduction
of this information with alteration is an unfair and deceptive business practice. TI is not responsible or liable for
such altered documentation.
Resale of TI products or services with statements different from or beyond the parameters stated by TI for that
product or service voids all express and any implied warranties for the associated TI product or service and
is an unfair and deceptive business practice. TI is not responsible or liable for any such statements.
Mailing Address:
Texas Instruments
Post Office Box 655303
Dallas, Texas 75265
Copyright  2003, Texas Instruments Incorporated