BUNN ICB Twin, 120/240V SST ICB Infusion Series Twin Coffee Brewer 120/240V SST Programming Manual

Add to my manuals
14 Pages

advertisement

BUNN ICB Twin, 120/240V SST ICB Infusion Series Twin Coffee Brewer 120/240V SST Programming Manual | Manualzz

ICBA, ICBB,ICBC, ICB-DV, ICB Twin New Infusion Series

®

INSTALLATION & OPERATING GUIDE BUNN-O-MATIC CORPORATION

POST OFFICE BOX 3227 SPRINGFIELD, ILLINOIS 62708-3227 PHONE: (217) 529-6601 FAX: (217) 529-6644

www.bunn.com

To ensure you have the latest revision of the Operating Manual, Illustrated Parts Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.

54212.0000B 04/18 ©2017 Bunn-O-Matic Corporation

BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY

Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows: 1) Airpots, thermal carafes, decanters, GPR servers, iced tea/coffee dispensers, MCR/MCP/MCA single cup brewers, ther mal servers and ThermoFresh® servers (mechanical and digital) 1 year parts and 1 year labor.

2) All other equipment - 2 years parts and 1 year labor plus added warranties as specified below: a) Electronic circuit and/or control boards - parts and labor for 3 years.

b) Compressors on refrigeration equipment - 5 years parts and 1 year labor.

c) Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis - parts and labor for 4 years or 40,000 pounds of coffee, whichever comes first.

These warranty periods run from the date of installation BUNN warrants that the equipment manufactured by it will be commercially free of defects in material and workmanship existing at the time of manufacture and appearing within the applicable warranty period. This warranty does not apply to any equipment, component or part that was not manufactured by BUNN or that, in BUNN’s judgment, has been affected by misuse, neglect, alteration, improper installation or operation, improper maintenance or repair, non periodic cleaning and descaling, equipment failures related to poor water quality, damage or casualty. In addition, the warranty does not apply to replacement of items subject to normal use including but not limited to user replaceable parts such as seals and gaskets. This warranty is conditioned on the Buyer 1) giving BUNN prompt notice of any claim to be made under this warranty by telephone at (217) 529-6601 or by writing to Post Office Box 3227, Springfield, Illinois 62708-3227; 2) if requested by BUNN, shipping the defective equipment prepaid to an authorized BUNN service location; and 3) receiving prior authorization from BUNN that the defective equipment is under warranty.

THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY, WRITTEN OR ORAL, EX PRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY

OR FITNESS FOR A PARTICULAR PURPOSE. The agents, dealers or employees of BUNN are not authorized to make modifications to this warranty or to make additional warranties that are binding on BUNN. Accordingly, statements by such individuals, whether oral or written, do not constitute warranties and should not be relied upon.

If BUNN determines in its sole discretion that the equipment does not conform to the warranty, BUNN, at its exclusive op tion while the equipment is under warranty, shall either 1) provide at no charge replacement parts and/or labor (during the applicable parts and labor warranty periods specified above) to repair the defective components, provided that this repair is done by a BUNN Authorized Service Representative; or 2) shall replace the equipment or refund the purchase price for the equipment.

THE BUYER’S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS EQUIPMENT, WHETHER DERIVED FROM WARRANTY OR OTHERWISE, SHALL BE LIMITED, AT BUNN’S SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND.

In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.

392, A Partner You Can Count On, Air Infusion, AutoPOD, AXIOM, BrewLOGIC, BrewMETER, Brew Better Not Bitter, Brew WISE, BrewWIZARD, BUNN Espress, BUNN Family Gourmet, BUNN Gourmet, BUNN Pour-O-Matic, BUNN, BUNN with the stylized red line, BUNNlink, Bunn-OMatic, Bunn-O-Matic, BUNNserve, BUNNSERVE with the stylized wrench design, Cool Froth, DBC, Dr. Brew stylized Dr. design, Dual, Easy Pour, EasyClear, EasyGard, FlavorGard, Gourmet Ice, Gourmet Juice, High Intensity, iMIX, Infusion Series, Intellisteam, My Café, Phase Brew, PowerLogic, Quality Beverage Equipment Worldwide, Respect Earth, Respect Earth with the stylized leaf and coffee cherry design, Safety-Fresh, savemycoffee.com, Scale-Pro, Silver Series, Single, Smart Funnel, Smart Hopper, SmartWAVE, Soft Heat, SplashGard, The Mark of Quality in Beverage Equipment Worldwide, ThermoFresh, Titan, trifecta, TRIFECTA (sylized logo), Velocity Brew, Air Brew, Beverage Bar Creator, Beverage Profit Calculator, Brew better, not bitter., Build-A-Drink, BUNNSource, Coffee At Its Best, Cyclonic Heating System, Daypart, Digital Brewer Control, Element, Milk Texturing Fusion, Nothing Brews Like a BUNN, Picture Prompted Cleaning, Pouring Profits, Signature Series, Sure Tamp, Tea At Its Best, The Horizontal Red Line, Ultra are either trademarks or registered trademarks of Bunn-O-Matic Corporation. The commercial trifecta® brewer housing configura tion is a trademark of Bunn-O-Matic Corporation.

Page 2 54212 031314

INTRODUCTION

This equipment will brew coffee into an awaiting server or airpot. The brewer may have an auxillary hot water faucet. It is only for indoor use on a sturdy and level counter or shelf. Please install in an area where there are no water jet devices.

The Infusion Series, similar to the DBC BrewWISE, incorporates a wireless interface system that allows the MHG or DBC Grinders to load certain information into the "programming chip" located inside the handle of the funnel. This information includes what flavor of coffee is being ground and what batch size will be brewed (half or full). Once the correct flavor name and amount of coffee is ground, the funnel is loaded into the brewer. The information from the funnel handle is then transferred into the brewer. The brewer then takes this information and dispenses the amount of water preset in the brewer for that particular flavor of coffee and batch size. The brewer can also be programmed to adjust different functions of the brewing process, such as brew temperature, brew volumes, bypass percentages, pulse brew, etc. This allows the operator to program a certain "recipe" for each coffee flavor to be brewed.

The Infusion Series Coffee Brewer is able to brew both hot tea and coffee with recipe settings and has the following features: By-Pass, Pre-Infusion and Pulse Brew, BrewWISE, and LCD for digital readout and pro gramming along with the Smart Funnel options for coffee. Other features are Energy Savings mode, BUNNLink compatible, Smart Reader compatible, Freshness Timer and USB port for users to save and load recipes or new software onto brewer.

CONTENTS

Warranty .............................................................................................................2

Introduction ........................................................................................................3

User Notices .......................................................................................................4

CE/North American Requirements ......................................................................5

Electrical Requirements ......................................................................................6

Plumbing Requirements .....................................................................................7

Tank Drain ...........................................................................................................7

Operating Controls ..............................................................................................8

Initial Set-Up .......................................................................................................9

Viewing Assigned Recipes, Asset, & Serial Number ...........................................9

Coffee Brewing ..................................................................................................10

Cleaning ............................................................................................................11

Glossary ............................................................................................................11

Programming ....................................................................................................13

ICB-DV ................................................................................................................... Dual Voltage Machine ICBA .............................................................................................................................. 230 Volt Machine ICBB .............................................................................................................................. 200 Volt Machine ICB Twin ............................................................................................................... 120/208-240V or 230V Page 3 54212 051217

USER NOTICES

Carefully read and follow all notices in this manual and on the equipment. All labels on the equipment should be kept in good condition. Replace any unreadable or damaged labels.

As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow prevention to comply with federal, state and local codes. For models installed outside the U.S.A., you must comply with the applicable Plumb-

#00656.0001

FOR USE ONLY ON AN INDIVIDUAL BRANCH CIRCUIT RATED 20 AMPS #00985.0000

#00658.0000

#00986.0000

#03408.0000

WARNING

• FILL WATER TANK BEFORE ENERGIZING • DO NOT OVERLOAD CIRCUIT • KEEP AWAY FROM COMBUSTIBLES • DO NOT DEFORM PLUG OR CORD

SEE INSTRUCTIONS

• FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE, FIRE OR SHOCK • BREWER ENERGIZED UNLESS UNPLUGGED #06064.0000

#03409.0000

#37881.0000

120/208V 120/240V 120V #34056.0001

#00824.0002

#51453.0000

Optional Field Wiring

120 V, 14 A, 1700 W 1PH, 2-Wire + GND, 60HZ #29710.0016

WARNING

HOT WATER HOT WATER

#29007.0005

#00824.0001

Page 4 #39175.0000

54212 022818

CE REQUIREMENTS

• This appliance must be installed in locations where it can be overseen by trained personnel.

• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.

• Appliance shall not be tilted more than 10° for safe operation.

• An electrician must provide electrical service as specified in conformance with all local and national codes.

• This appliance must not be cleaned by water jet.

• This appliance can be used by persons aged from 18 years and above if they have been given supervision or instruction concerning use of the appliance in a safe way and if they understand the hazards involved. • Keep the appliance and its cord out of reach of children aged less than 18 years.

• Appliances can be used by persons 18 years and above with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved.

• Children under the age of 18 years should be supervised to ensure they do not play with the appliance.

• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.

• Machine must not be immersed for cleaning.

• Cleaning and user maintenance shall not be made by children unless they are older than 18 years and supervised.

• This appliance is intended to be used in household and similar applications such as: – staff kitchen areas in shops, offices and other working environments; – by clients in hotels, motels and other residential type environments; – bed and breakfast type environments.

• This appliance not intended to be used in applications such as: – farm houses; • Access to the service areas permitted by Authorized Service personnel only.

• The A-Weighted sound pressure level is below 70 dBA.

NORTH AMERICAN REQUIREMENTS

• This appliance must be installed in locations where it can be overseen by trained personnel.

• For proper operation, this appliance must be installed where the temperature is between 41°F to 95°F (5°C to 35°C).

• Appliance shall not be tilted more than 10° for safe operation.

• An electrician must provide electrical service as specified in conformance with all local and national codes.

• This appliance must not be cleaned by pressure washer.

• This appliance can be used by persons aged from 18 years and above if they have been given supervision or instruction concerning use of the appliance in a safe way and if they understand the hazards involved. • Keep the appliance and its cord out of reach of children aged less than 18 years.

• Appliances can be used by persons 18 years and above with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved.

• Children under the age of 18 years should be supervised to ensure they do not play with the appliance.

• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.

• Machine must not be immersed for cleaning.

• Cleaning and user maintenance shall not be made by children unless they are older than 18 years and supervised.

• This appliance is intended for commercial use in applications such as: – staff kitchen areas in shops, offices and other working environments; – by clients in hotel and motel lobbies and other similar types of environments; • Access to the service areas permitted by Authorized Service personnel only.

Page 5 54212 051217

ELECTRICAL REQUIREMENTS Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.

WARNING - The brewer must be disconnected from the power source until specified.

WARNING - The power cord must be

Plug Cap).

UL Listed, Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, Rated 90° C, and the attachment plug cap must be UL Listed, in order to avoid a hazard.

The Power Supply Cord must be at least 3 feet long and maximum 6 feet long (measured from Strain Relief to end of the Attachment L2 RED WHITE NEUTRAL L1 BLACK L2 RED L2 NEUTRAL WHITE N L1 BLACK L1 POWER CORD G GREEN

120/208-240V 3 WIRE + GROUND

WHITE NEUTRAL L1 BLACK NEUTRAL WHITE N L1 BLACK L1 POWER CORD G GREEN

120V 2 WIRE + GROUND

L2 RED L1 BLACK L2 RED L2 L1 BLACK L1 POWER CORD GREEN G

240V 2 WIRE + GROUND

DUAL VOLT TOGGLE SWITCH

N BLUE L1 BROWN NEUTRAL BLUE N L1 BROWN L1 POWER CORD GREEN/YELLOW G

220-240V 2 WIRE + GROUND ELECTRICAL HOOK-UP (All Models) CAUTION

– Improper electrical installation will damage electronic components. Damage caused by incor rect electrical connections is not covered by warranty.

1. An electrician must provide electrical service.

2. Determine the available on-site electrical service.

3. (DV models only) Select the desired unit voltage based on the available on-site electrical service.

4. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

5. Remove the front access panel to gain access to the terminal block.

6. Feed the power cord through the strain relief and connect it to the terminal block(s).

7. Connect the power cord to the terminal block as shown.

8. Before proceeding, verify the voltage at the field wiring terminal block.

9. (DV models only) Set voltage switch to the appropriate position and replace the access panel.

10. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial Set-Up.

Page 6 54212 051217

PLUMBING REQUIREMENTS

These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi (0.138 and 0.620 mPa) from a 1/2˝ or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (0.620 mPa) to reduce it to 50 psi (0.345 mPa). The water inlet fitting is .75-11.5 NH (HOSE THREAD). For convenience an elbow adaptor is provided to convert to a 1/4˝ flare fitting. Bunn-O-Matic does not recommend the use of a reverse-osmosis or deionized water supply to this equipment. REQUIRED: 1.0 gpm (3.78 lpm) flow rate from water supply line. NOTE - Bunn-O-Matic recommends 3⁄8" copper tubing for all installations from the 1⁄2" water supply line. A tight coil of tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow pre vention to comply with federal, state and local codes. For models installed outside the U.S.A., you must comply with the applicable Plumbing /Sanitation Code for your area.

Plumbing Hook-Up

1. Flush the water line.

2. Securely attach the adaptor elbow assembly to the water supply line.

3. Securely attach adaptor elbow assembly to the the .75-11.5 NH (HOSE THREAD) fitting at the rear of the brewer.

4. Turn on the water supply.

TANK DRAIN

1. Loosen screws that secure the front access panel. Remove the panel.

2. Tighten the white shutoff clamp on the long hose between tank and inlet solenoid.

2. Disconnect the hose clamp and hose from inlet solenoid.

3. Place the end of the drain hose in a container that has a minimum capacity of [3.5 gallons/13.25 L Singles] [6.0 gallons/22.7 L-Twins].

4. Release the white clamp to drain water from the tank.

5. When tank is empty, replace the hose onto solenoid, and tighten the clamp.

6. Replace the front panel and tighten screws.

Page 7 54212 051217

A

OPERATING CONTROLS

B F D A E BREW A

I O

ENABLE BREW BREW B BREW C BREW A

I O

ENABLE BREW BREW B BREW C E G C

A. ENABLE BREW ON/OFF SWITCH

H

NOTE –

G C

For Singles, refer to left side of Twins

Pressing the "ENABLE BREW ON/OFF" switch (indicator on) enables the brew circuit (on that side of Twins), and energizes the tank refill circuit. Pressing the switch again (indicator off) stops tank refilling and brewing. Stop ping a brew cycle after it has been started will not stop the flow of water into the server until the funnel is empty. Pressing this switch during programming of the brewer will exit the setup and return to the main screen. NOTE – Hot water will be available at the faucet in a limited amount when the "ENABLE BREW ON/OFF" switch is in the "OFF" position because the tank will not refill.

B. PROGRAMMING (left)

This hidden switch can be used to scroll backwards through the function list while in programming mode.

C. BREW (A,B,C)

When the "ENABLE BREW ON/OFF" switch is ON and the main screen is visible, momentarily pressing and releasing this switch will begin a brew cycle on the selected side.

D. PROGRAMMING (right)

Pressing and holding this switch allows entry into the programming menus. Pressing and releasing the switch steps through each function screen while in the programming mode.

E. BATCH SELECTOR SWITCHES

Pressing the switch corresponding to the Half or Full batch selects the amount of product to be brewed on the selected side. Pressing a different switch after a brew cycle has been initiated does not change the brew batch in progress. Light indicates the selected batch to brew. Also used in programming to adjust settings on both batch sizes.

F. FUNCTION SCREEN

This is the display which shows the various functions of the brewer and allows the programming to be ac complished.

G. FUNNEL SENSING COIL

These are used to "receive" information from the Smart Funnel handle, recipe cards, and ad cards.

H. FUNCTION SCREEN SWITCHES

Left Dot: This is used to select options (NO/-) that appear on the display during programming.

Center Dot: This is used to select options (DONE) that appear on the display during programming.

Right Dot: This is used to select options (YES/+) that appear on the display during programming.

Page 8 54212 042018

INITIAL SET-UP

1. Insert an empty funnel into the funnel rails of the brew station(s).

2. Place an empty server(s) under the funnel(s).

3. Connect the brewer to the power source. Make sure the corresponding "ENABLE BREW ON/OFF" switch is ON (LED will be lit).

4. Water will flow into the tank and stop when the tank is filled to its capacity. Display will show PLEASE WAIT... TANK FILLING until tank is filled with water.

5. Wait approximately twenty-five minutes for the water in the tank to heat to the proper temperature. Display will show READY TO BREW...WATER TEMP: 200° when tank is at operating temperature. Some water may drip from the funnels during this time; this is due to expan sion and should not occur thereafter.

6. Place a small vessel beneath the faucet and open the faucet handle. Release it when you hear the tank refill ing.

7. Water volumes and flow settings have been preset at the factory. Refer to programming manual should the volume need to be increased or decreased.

8. The brewer is now ready for use in accordance with the instructions for Coffee Brewing.

VIEWING ASSIGNED RECIPES, ASSET & SERIAL NUMBER

1. Make sure the "ENABLE BREW ON/OFF" switch is OFF (LED will not be lit).

2. Press and hold "BREW A" switch. The display will show the name of the recipe assigned to Brew A along with "SWITCH NOT ON". This is to indicate that a brew cannot be initiated while the "ENABLE BREW ON/ OFF" switch is OFF on this side.

3. Repeat for BREW B and BREW C.

4. (Twins only) Repeat steps 1 -3 for other side.

5 Make sure the "ENABLE BREW ON/OFF" switch is OFF. To view the asset number of the machine, press and hold the left hidden button until the display reads: ANXXXXXX...ASSET NUMBER. Release the left hidden button.

6. After a 5 second delay, the display will read: ICBXXXXXXX. This is the serial number of the machine.

Page 9 54212 051217

COFFEE BREWING

WITHOUT A SMART FUNNEL AND MHG or DBC GRINDER:

1. Begin each brew cycle with a clean empty brew funnel.

2. Insert a BUNN filter into the funnel.

3. Pour the fresh coffee into the filter and level the bed of grounds by gently shaking.

4. Slide the funnel into the funnel rails of the selected side until it stops.

5. Place an empty server under the funnel.

6. The "ENABLE BREW ON/OFF" switch for the selected side must be ON. Select the desired batch size.

7. Momentarily press and release the assigned BREW button. There may be certain situations in which the brew cycle will not begin when BREW is pressed: a. SWITCH NOT ON - "ENABLE BREW ON/OFF" switch must be ON.

b. BREW TEMPERATURE TOO LOW - wait until heated, or cancel BREW LOCKOUT option.

c. CHECK FUNNEL - remove funnel, empty previously brewed grounds and replace with fresh.

d. DISABLED - select different brew button or batch size.

8. If none of the above messages are displayed, the display will read NOW BREWING and show the time remain ing in the brew cycle.

9. Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops.

WITH A SMART FUNNEL AND G9-2T DBC or MHG GRINDER:

1. Select the small batch size on the grinder.

2. Insert a BUNN filter into the funnel.

3. Grind the selected amount of fresh coffee into the Smart Funnel using the G9-2T DBC or MHG with Smart Funnel operation and level the grounds by gently shaking.

4. Slide the funnel into the funnel rails of the selected side. The brewer will read the coffee name and size ground through the chip in the funnel handle.

NOTE - The brewer will automatically match the brew batch size to the grinder batch size: GRINDER Small Medium Large BREWER Half Batch Full Batch *Full Batch *If BREW is pressed with a large grinder batch, the display will read: INCORRECT GRIND...BATCH SIZE WRONG, and then PRESS BREW TO BREW ANYWAY.

5. Place an empty server under the funnel.

6. The "ENABLE BREW ON/OFF" switch for the selected side must be ON.

7. Momentarily press and release the assigned BREW button. There may be certain situations in which the brew cycle will not begin when BREW is pressed: a. SWITCH NOT ON - "ENABLE BREW ON/OFF" switch must be ON.

b. BREW TEMPERATURE TOO LOW - wait until heated or cancel BREW LOCKOUT option.

c. CHECK FUNNEL - remove funnel, empty previously brewed grounds and replace with fresh.

d. INCORRECT GRIND - Indicates a large batch was ground using the grinder. Check batch size.

8. If none of the above messages are displayed, the display will read NOW BREWING and show the time remain ing in the brew cycle. Arrows will point to the side that is brewing. If both sides are brewing simultaneously, the arrows will alternate from left to right on the display.

9. Carefully remove the brew funnel and discard the grounds and filter only after visible dripping stops.

Page 10 54212 051217

CLEANING

1. The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment. Do NOT clean this equipment with a water jet device.

2. Check and clean each sprayhead. The sprayhead holes must always remain open.

NOTE - Any buildup on the sprayhead may restrict water flow, and impact your coffee brewing. For consis tently great coffee, clean sprayheads weekly. Upon visual inspection it may appear that light passes through all holes in the sprayhead plate, but a thin film of residue can pass light and still impede water flow.

3. Remove sprayhead from brewer. Disassemble by removing the seal.

4. Use the pointed end of sprayhead cleaning tool to remove any mineral deposits from the sprayhead holes.

5. Insert the long end of sprayhead cleaning tool into the sprayhead fitting, and rotate several times to remove any mineral deposits from the fitting.

6. Insert the short end of sprayhead cleaning tool into the bypass fittings, and rotate several times to remove any mineral deposits from the fitting.

7. Reassemble sprayhead and reattach. Sprayhead only needs to be hand tightened.

Refer to programming manual for calibration routine to verify sprayhead flow rate matches programmed flow rate. Machine may need to be re-calibrated due to lime build up. If machine is cleaned and build up removed, machine must be re-calibrated to achieve desired volumes.

Page 11 54212 051217

PROGRAMMING

Using the menu-driven display on the front of the brewer, the operator has the ability to alter or modify various brewing parameters such as brew temperatures, brew volumes, dilution volumes, pulse brew, etc. This allows for the precise brewing of various flavors of tea and coffee.

Programming of the brewer is achieved by entering a certain function. Then, by the use of hidden programming switches and the brew/function switches, the operator can customize the brewing process to their specifications.

PROGRAMMING SWITCHES

To access the programming mode, and to scroll through the different function screens, hidden programming switches are used. There are five of these switches that will be used for the setup of the brewer.

B

ICB, ICB-DV & HV

a B C

ICB-TWIN HV

a BREW A

I O

ENABLE BREW BREW B BREW C BREW A

I O

ENABLE BREW BREW B BREW C c

a) Right Programming (hidden) switch (just to the right of the display): This is used to access the program-

ming mode, and is also used to scroll forward through the function list.

b) Left Programming (hidden) switch (just to the left of the display): This is used to scroll backwards through

the function list.

c) Brew A,B,C (Left Dot, Center Dot, Right Dot - Twins Only): Used to select options that appear on the display

during programming.

Page 12

For more advanced PROGRAMMING information, refer to programming manual at www.bunn.com

54212 042018

PROGRAMMING

The programming of the brewer is divided into four main catagories: Recipes, Calibration, Settings, and Service.

The following function screens are in order of appearance. Each screen will have instructions on how to access and the procedures for programming the various functions of the brewer.

IMPORTANT PROGRAMMING NOTES - READ CAREFULLY -

To exit the programming mode at any time, press and release either ON/OFF pad located on the front switch panel. The display will return to the MAIN SCREEN.

If none of the five programming switches are pressed within one minute during the setup of the brewer, the programming of the function screen that is being set will be exited and the display will return to the MAIN

SCREEN.

Always remember to place a container and funnel under the sprayhead when operating the brewer during the set-up of CALIBRATE FLOW, and testing the brew and bypass valves in SERVICE TOOLS/TEST OUTPUTS.

MAIN SCREEN

READY TO BREW WATER TEMP: 200°

For additional information, you can download the programming manual at www.bunn.com

This screen will be shown when the brewer is ready for use. The screen displays the water temperature in the tank. When the water in the tank reaches the correct set temperature, the display will change from HEATING to READY TO BREW.

PROGRAMMING LOCKOUT SWITCH is located on the main circuit board.

This switch can be set to prevent access to the programming settings of the brewer. Once all the cor rect brew settings are programmed, the operator can set the switch to the "ON" position to prohibit anyone from changing the settings. With the switch in the "ON" position, the programming menus can still be accessed to view the current settings. However, no changes will be saved.

PROGRAMMING LOCKOUT SWITCH MEMORY P3048 Page 13 54212 051217

PROGRAMMING (cont.)

PROGRAMMING FUNCTIONS - FLOW CHART RECIPES << SELECT >> CALIBRATION << SELECT >> SETTINGS << SELECT >> SERVICE << SELECT >>

For more advanced PROGRAMMING information, refer to programming manual 53867.0000 at

www.bunn.com

Page 14 54212 051217

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement