Gibraltar Building Products RE23BR 2 in. x 3 in. x 10 ft. Steel Drip Edge Flashing in Brown Instructions / Assembly

Gibraltar Building Products RE23BR 2 in. x 3 in. x 10 ft. Steel Drip Edge Flashing in Brown Instructions / Assembly
INSTALLATION GUIDELINES
DRIP EDGE/GUTTER APRON
Aluminum flashing expands and contracts with temperature changes.
It must be "hung" rather than "attached" to accomodate this movement.
PRE-DRILL HOLES
Over Driven
1/32"
KE
RA
DRIP EDGE
GUTTER APRON
EAVE
Begin installation along the eaves, starting at a corner and working your way around, overlapping
each succeeding piece of drip edge by 2-3 inches.
After the eave drip edge has been installed, apply the underlayment/ice-water barrier.
Once the underlayment has been installed, apply the drip edge to the rakes. Make box corners by
wrapping the rake edge around the eave metal.
Depending on local wind conditions, roof edge should be nailed every 16" - 24".
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
These installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed professional,
and to check with your local building inspector or building permit office for approvals and possible variations that may apply.
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement