a
a
d
d
m
mProduct
n
n Content
ta
ta
SS
TM
1.1, 1 x Rail
t
ar dard
m 2.1, 4 xnHanger
ta
SS
TM
rt
d
ar
SS
t
ar dard
m n
ta
2.2, 8 x Long Door Screw
a
m3.1, 6 xnWalldSpacer
ta
SS
TM
3.2, 6 x Anchor
TM
SS
a
m
TM
rt
d
ar
d
n
a
SSt
TM
(For concrete wall)
t
t
d
r
r
r
rd
a (For wood
a
a
a
m nd stud) m nd
ta
ta
3.3, 6 x Lag Bolt
SS
M
T
Stopper
4.1, 4 x Door
t
ar dard
m 4.3, 4 xnRubber End
ta
4.4, 2 x Floor Guide
4.2, 1 x Hex Key
SS
TM
SS
TM
t
ar dard
m n
ta
SS
TM
t
t
ar dard
ar dard
m 1, Penciln
m n
ta
ta
2, Phillips Screwdriver
Tools Needed
SS
TM
3, Wrench
t
a4, rPlumbdBobard
m 5, Leveln
a
6, tDrill
SS
rt
TM
d
SS
TM
t
rd
ar 7, Tape
a
m 8, nDrilldBit
ta9, Drill Bit
SS
rt
a
d
n
m
TM
d
SSta
TM
16”
B
t
ar dard
m n
ta
SS
rt
a
m
TM
d
ar
d
n
a
SSt
TM
TM
Instructions
TM
t
ar dard
m n
ta
SS
SS
16”
TM
C 1/” t
t
d
r
r
ar dard
a da
m n
m n
H H+1/” ta
ta
SS
1/”
3/”
rt
a
m
TM
E
d
ar
d
n
a
SSt
TM
SS
TM
F
rt
a
m
t
r
a dard
m n
ta
SS
TM
t
ar dard
m n
ta
rt
TM
d
SS
t
ar dard
m n
ta
SS
TM
rt
2
d
ar
d
n
a
SSt
TM
t
r
a dard
m n
ta
SS
TM
t
ar dard
m n
ta
SS
SS
TM
t
ar dard
m n
ta
A Concrete wall Installation.
SS
TM
t
ar da
m n
ta
SS
TM
TM
t
ar da
m n
ta
Install the anchor to holes on the concrete wall first,
then install carriage bolt to anchor.
SS
TM
t
r
a dard
m n
ta
SS
B Drywall Installation.
t
ar dard
m n
ta
TM
SS
TM
t
r
a
m nda
ta
SS
TM
Install the lag bolt to wood stud or head board directly.
t
ar dard
m n
ta
SS
TM
t
ar da
m n
ta
SS
TM
t
t
t
d
r
r
ar dardInsert door stoppers
a
ar intodrail.
a Install doorm
stoppers da
m n 3 between A-B
mC-D D-Eand
n F-G. Door stopper is used nto
prevent the hangers
ta
ta coming out of the rail. ta
SS
SS
* Header Board and Lag Bolts
for installing Header Board
are not included in kit.
TM
d
TM
We provide 2 kinds of screws for you to install rail onto
concrete wall or drywall.
TMA
B
t
t
d
r
r
rd
a
ar dH+1/”
a
a
m nd
m n
ta
ta
SS
SS
Level can make the
rail horizontal.
It is very important to determine whether you will be installing
a Header Board prior to installing the track.
Due to many overlapping factors such as the location of wall
studs (Our rail come with pre-drilled holes every 16” on center),
the weight of a barn door and the various types of trim used in
M
homes,Twe
recommend using a HeaderTMBoard in all situations.
Please install a 1” x 4” or 1” x 6” Header Board above the door
opening directly into studs.
Header Board must be solid wood and measure at least the full
length of the track or longer.
t
ar dard
m n
ta
SS
TM
a
a
a
d
d
d
m
m
Place
the
rail
against
the
wall,
and
use
a
pencil
to
n
an
anshould be.
where the t
holes
ta 1 mark
t
Make sure the height of holes on the wall is H+1/”.
m
A Total Rail length is 96”.
B The gap between each pre-drilled hole is 16”.
C Distance from door top side to holes on the wall is 1/”.
D Distance from the bottom of the door to the floor is ⁄”.
E Door height is H.
F The height of holes on the wall is H+1/”.
t
ar dard
m n
ta
SS
A 96”
16”
16”
16”
D ⁄”
t
r
a dard
m n
ta
SS
a
d
n
m
SSta
Measurements
rt
TM
d
SS
C
M
TD
E
t
ar dard
m n
ta
Do not screw it in
place at this stage
SS
rt
TM
d
SS
F
M
G T
t
ar da
m n
ta
SS
rt
TM
a
d
n
m
SS4 ta
t
ar dard
m n
/”
ta
SS
TM
t
ar dard
m n
ta
SS5
TM
rt
a
m
d
ar
TM
d
r
a
1/”
3/”
a
m
d
n
a
t
SS
6 rt
a
m
TM
d
ar
TM
t
ar dard
m n
ta
SS
rt
SSta
t
ar dard
m n
ta
SS
TM
/”
t
ar dard
m n
ta
SS
TM
rt
a
m
d
ar
d
n
a
SSt
TM
t
ar dard
m n
ta
SS
TM
t
ar dard
m n
ta
TM
d
S
/” S
TM
t
ar dard
m n
ta
SS
rt
TM
d
a
d
m
n
ta7 Hang the door over thetarail
SS
a
d
n
TM
t
ar dard
m n
ta
SS
TM
t
ar dard
m n
ta
SS
TM
SS
m
TM
t
ar dard
m n
ta
SS
TM
t
ar dard
m n
ta
SS
TM
a
a
a
d
d
d
m
m
Install
the
floor
guide.
Put
floor
guide
on
the
floor
first
n
an and make a mark so thattathen
position
ta 10 totipfixof athesuitable
t
floor guide can work well in the slot.
SS
TM
t
ar dard
m n
ta
SS
TM
t
ar dard
m n
ta
SS
SS
TM
Turn the rubber ends approximately 180 degrees so
TM
t
ar dard
m n
ta
SS
TM
SS
TM
t
ar dard
m n
ta
SS
TM
SS
TM
TM
t
ar dard
m n
ta
SS
rt
TM
d
SS
TM
t
ar dard
m n
ta
SS
rt
TM
d
TM
SS
TM
t
ar dard
m n
ta
SS
TM
t
ar dard
m n
a
t
1”
SS
TM
t
r
a dard
m n
ta
SS
TM
t
ar da
m n
ta
SS
TM
t
ar da
m n
ta
SS
TM
t
r
a
m nda
ta
SS
TM
Door
t Sliding
t Hardware
t
d
r
r
r
a da
a dard
ar da
m n
m n
m n
Manual
(8.0ft)
a
a
t
ta
t
SS
TM
SS
TM
t
ar dard
m n
ta
SS
rt
SS
TM
SS
TM
Email: [email protected]
the 2 door stoppers
find adsuitable position, t
t thetodoor
t9 Adjust
d
r
r
r
Use
the
hex
key
to
screw
a darstoppers in place.ar dard
a da
m n
m n
m n
ta
ta
ta
SS
SS
Use drill bit to drill holes on the floor where the mark is
and then install the floor guide.
and the rail.
t8 thatrdthey are stuck between
t the door
t
d
r
r
r
r
a da
a da
a dard
m n
m n
m n
ta
ta
ta
The rubber ends are used to protect the door from
touching the rail when sliding the door. You need
to drill holes on the door top side, please drill the
holes /” away from the edge of the door. Then
install the rubber ends on the door.
d
n
a
SSt
m
Install the hangers onto the door according to
the measurements in the pictures below.
Maximum door thickness is 1/”. If your door’s
thickness is less than 1/”, please add some bolt
washers or cut the long door bolts to a suitable
length to fit the door.
nd
SSta
rt
a
d
n
m
Use router or circular saw to create a kerf at bottom
of the door, along the center to allow the tip of the
TM
TM
T-shaped
floor guide to fit in between,
to keep your
door stable and prevent the door bottom swinging
back and forth when you slide it open and closed.
TM
d
t
ar dard
m n
ta
t
ar da
m n
ta
SS mart SS
SS
TM
TM
TM
t
t
d
r
r
a
ar dtandard
m nda
m n a
ta
ta
SS
rt
TM
d
SS
rt
TM
">