Construction Metals RE22BRU 2 in. x 2 in. x 10 ft. Galvanized Steel Eave Drip Flashing in Royal Brown Instructions

Construction Metals RE22BRU 2 in. x 2 in. x 10 ft. Galvanized Steel Eave Drip Flashing in Royal Brown Instructions
INSTALLATION GUIDELINES
GALVANIZED ROOF EDGE
PRE-DRILL HOLES
KE
RA
ROOF EDGE
ROOF EDGE
Begin installation along the eaves, starting at a corner and working your way
around, overlapping each succeeding piece of drip edge by 2-3 inches.
EAVE
Over Driven
1/32"
After the eave drip edge has been installed, apply the underlayment and/or
ice-water barrier.
Once the underlayment has been installed, apply the drip edge to the rakes. Make
box corners by wrapping the rake edge around the eave metal.
Depending on local building codes and wind conditions, roof edge should be
nailed every 4 in. - 24 in.
CAUTION!
Working above grade is inherently dangerous, be sure that proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and eye protection are absolutely required.
These installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed professional,
and to check with your local building inspector or building permit office for approvals and possible variations that may apply.
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement