Roof Zone 65002 User manual

Roof Zone 65002 User manual
TM
Folding Warning Line System
Part #65002 & 65003
www.roofzone.com
Set Up:
1) Pull Up
2) Pull Out
3) Push Down
Break Down:
1) Pull Out
2) Pull Up
3) Lock Closed
CAUTION: READ AND FOLLOW INSTRUCTIONS CAREFULLY BEFORE USE!
The following are basic warning line setup instructions. For complete guidelines,
see OSHA 1926.501 and 1926.502 Fall Protection Standard and your local
and state requirements.
Part #08245
TIE DOWN ENGINEERING • 255 Villanova Drive SW • Atlanta, GA 30336
www.tiedown.com (404) 344-0000 Fax (404) 349-0401
E1420; 060115
1. The warning line shall be erected around all sides of the roof work area.
2. When mechanical equipment is not used, the warning line shall be erected
not less than 6 feet from the roof edge.
3. When mechanical equipment is being used, the warning line shall be
erected not less than 6 feet from the roof edge which is parallel to the
direction of mechanical equipment operation, and not less than 10 feet
from the roof edge which perpendicular to the direction of mechanical
equipment operation.
4. Flags shall be rigged/supported so that its lowest point is no less than 34"
and its highest point is no more that 39" from the walking/working surface.
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement