GE ZV925SL1SS, ZV925SL3SS Installation guide

GE ZV925SL1SS, ZV925SL3SS Installation guide
Installation
Instr ct
®
36" Island Chimneg
ZV925
i 49-80329-4
i
Vent Hood
Installation Instructions
AIAm^n_ll_lf"
BEFORE YOU BEGIN
Read these instructions
carefullg.
,
IMPORTANT- Save these
completelg
and
instructions for local
inspector's use.
"IM PORTANT- Observe all governing codes and
ordinances.
, Note to Installer - Be sure to leave these instructions
with the Consumer.
, Note to Consumer - Keep these instructions for
future reference.
, Skill Level - Installation of this vent hood requires
basic mechanical and electrical skills.
, Completion time - i to 3 hours.
, Proper installation is the responsibilitg of the installer.
, Product failure clue to improper installation is not
covered under the Warrantg.
ACAUTION:
Due to the weight and size of these vent hoods and
to reduce the risk of personal injurg or damage to the
product, THREE PEOPLEARE REQUIRED FOR PROPER
INSTALLATION.
APRUDENCE :
A cause du poids et des dimensions du ces hottes et
pour r6duire les risques de blessures ou de dommages
du produit, IL FAUT TROIS PERSONNESPOUR FAIRE
UNE INSTALLATION CORRECTE.
AWARNING:
To reduce the risk of fire or electrical shock, do not use
this range hood with ang external solid-state speed
control device. Ang such alteration from original factorg
wiring could result in damage to the unit and/or create
an electrical safetg hazard.
VERTISSENENT
:
Pour r6duire le risque d'incendie ou de choc 61ectrique,
il ne faut pas utiliser cette hotte avec un r6gulateur
de vitesse 61ectronique externe. Toute modification de
ce tgpe du branchement d'usine peute endommager
I'appareil ou cr6er un risque de choc 61ectrique.
TO REDUCE THE RISK OF FIRE, USEONLY METAL
DUCTWORK.
r ,a: ToREDUCE
THE
RISK
OF
FIRE,
ELECTRICAL
SHOCKOR INJURY,OBSERVETHE FOLLOWING:
A. Use this unit onlg in the manner intended bg the
manufacturer. If gou have ang questions, contact the
manufacturer.
B. Before servicing or cleaning unit, switch power off at the
service panel and lock service panel to prevent power from
being switched on accidentallg. If the service panel cannot
be locked, fasten a tag or prominent warning label to the
panel.
AAVERTISSEMENT:
POURRI_DUIRELE RISQUED'INCENDIE,DECHOC
I_LECTRIQUE
OU DEBLESSURES,
IL FAUTOBSERVER
LES
REGLESSUIVANTES:
A. Utilisez cet appareil uniquement de la [email protected] [email protected] par
le fabricant. En cas de question, consultez le fabricant,
B. Avant toute intervention ou nettoyage, coupez
I'alimentation &lectrique au disjoncteur et verrouiller
le panneau du disjoncteur pour @iter la mise sous
tension accidentelle. S'il n'est pas possible de verrouiller
le panneau du disjoncteur, attachez un placard ou une
@[email protected] au panneau.
• For general ventilating use onlg. Do not use to exhaust
hazardous or explosive materials or vapors.
• Structural framing, installation work and electrical wiring
must be done bg qualified person(s)in accordance with
all applicable codes and standards, including fire-rated
construction.
• Sufficient air is needed for proper combustion and
exhausting of gases through the flue (chimneg) of fuel
burning equipment to prevent back drafting. Follow the
heating equipment manufacturer's guidelines and safetg
standards such as those published bg the National Fire
Protection Association (NFPA),and the American Societg
for Heating, Refrigerationand Air Conditioning Engineers
(ASHRAE),
and the local code authorities. When applicable,
install ang makeup (replacement) air sgstem in accordance
with local building code requirements. Visit GffAppliances.
cam for available makeup air solutions.
• Local codes varg. Installation of electrical connections
and grounding must complg with applicable codes. In
the absence of local codes, the vent should be installed
in accordance with National Electrical CodeANSI/NFPA
70-1990 or latest edition.
A,,-^,
l-rl,,_ !_i
_lsL%_U|IUI_i:
To reduce risk of fire and to properlg
exhaust air, be sure to duct air outside. Do not vent exhaust
air into spaceswithin walls or ceilings or into attics, crawl
spaces or garages.
APRUDENCE :, fautprendre
soind'installer
un conduit vers I'[email protected] [email protected] le risque d'incendie
et pouvoir @acuer I'air correctement. II ne faut pas @acuer
I'air dans I'espaceentre les parois d'un mur, un plafond ou un
grenier, un espace sanitaire ou un garage.
Design Information
CONTENTS
Design Information
Step 10, Install Upper Duct Cover ...............................................
16
Product Dimensions...............................................................................
3
Step 11, Install Lower Duct Cover ...............................................
17
Step 12, Install Duct Cover Trim ...................................................
17
Advance Planning
Step 13, Install Metal Filter ..............................................................
17
Advance Planning ..................................................................................
/4
Step
14,
Finalize
Installation
...........................................................
17
Power Supplg ...........................................................................................
4
Duct Fittings ............................................................................................
5
Installation Instructions--Recirculating
Step 1, Mount Template ...................................................................
18
Installation Preparation
Step 2, Adjust Frame Height ...........................................................
18
Installation Height .................................................................................
6
Step 3, Install Air Deflector, Cut Duct
Tools and Materials Required...........................................................
7
for Recirculating Operation ............................................
19
Remove the Packaging .......................................................................
7
19
Step 4, Install Upper Support Frame..........................................
Parts Provided ..........................................................................................
8
Step 5, Install Lower Structure to Upper Structure ............
20
Installation Preparation
Step 6, Install Blower/Motor ...........................................................
20
Construct Ceiling Support ...........................................................
9-11
Step 7, Install Hood Attachment Screws .................................
21
Installation Instructions--Vented to the Outside
Step 8, Mount the Hood onto the Support .............................
21
21
Step 1, Mount Template ...................................................................
12
Step 9, Connect Cables .....................................................................
22
Step 2, Adjust Frame Height ...........................................................
12
Step 10, Connect Electrical .............................................................
Step 3, Cut Duct to Length for Vented Installation ............
13
Step 11, Prepare the Duct Covers...............................................
23
Step 4, Install the Support Frame ................................................
13
Step 12, Install Upper Duct Cover ...............................................
23
24
Step 5, Install Hood Attachment Screws .................................
13
Step !3, Install Lower Duct Cover ...............................................
24
Step 6, Mount the Hood onto the Support .............................
1/4
Step 14, Install Duct Cover Trim ...................................................
Step 7, Connect Cables .....................................................................
1/4
Step 15, Install Filters.........................................................................
25
Step 8, Connect Electrical ................................................................
15
Step 16, Finalize Installation ...........................................................
25
Step 9, Prepare the Duct Covers..................................................
16
PRODUCT DIMENSIONS
*Height
to
ceiling
24" min.*
30" max.*
/
T_
27 9/16"
_
.......
£ 2 3/4"
_ ................35 7/8"' ................ i
* The supplied duct cover fits 7'-11" to 9' ceiling
heights. For 9'-1" to 10'-1" ceilings, order ZX92510.
These vent hoods are supplied with a support frame
for ceiling heights of 7'-11" to 10'-1".
Decorative duct covers conceal the ductwork
from the top of the hood to the ceiling.
running
ZX92510 accessorg is available for ceiling heights of
9'-1" to 10L1 ''.
* Exact installation
height depends
on ceiling height.
NOTE: Installation height should be measured from
the cooking surface to the bottom of the outer glass
portion of the hood.
This hood must be installed 24" min. and 30" max.
above the cooking surface. The cooking surface
should be at least 36" above the floor.
This hood mag be vented to the outdoors,
installed for recirculating operation.
or it can be
This hood can be installed over ang Monogram
electric or gas cooktop. It cannot be installed over a
Monogram Professional cooktop or range.
Advance Planning
ADVANCE PLANNING
POWER SUPPLY
Ductwork Planning
,These vent hoods are equipped for 8" round
ductwork.
IMPORTANT -(Please
, Determine the exact location of the vent hood.
FOR PERSONAL SAFETY,THIS APPLIANCE lUST
PROPERLYGROUNDED.
, Plan the route for venting exhaust to the outdoors.
, Use the shortest and straightest duct route
possible. For satisfactorg performance, duct run
should not exceed 100 ft. equivalent length for ang
duct configurations.
, Refer to "Duct Fittings" chart to compute the
maximum permissible length for duct runs to the
outdoors.
, Use rigid metal ductwork onlg.
, Install o roof cap with damper at the exterior
opening. Order the cap and ang transitions needed
in advance.
,When applicable, install ang makeup (replacement)
air sgstem in accordance with local building code
requirements. Visit GEAppliances.com for available
makeup air solutions.
Ceiling Framing for Adequate Support
,These vent hoods are heavg. Adequate structural
support must be provided. The ceiling structure
must be capable of supporting the weight of the
hood and ang inadvertent user contact loads
(approximatelg 200 pounds). The hood support
frame will be supported bg 2 x 4 cross framing.
, Installation will be easier if the vent hood is
installed before the cooktop or countertop
installed.
below is
Accessorg Duct Cover
.All models are shipped with a duct cover for ceiling
heights of 7'-11" to 9'.
ZX92510 accessory 36-3/4" duct cover is
available to reach 9'-1" to 10'-1" ceiling heights.
The accessory should be ordered with the hood
and be on site before final framing and wall
finishing.
read carefully)
AWARNING:
AATTENTION
BE
: POUR
DES
RAISONS
DE
SECURITE, CET APPAREIL DOlT ETRE CORRECTEMENT
HIS A LATERRE.
Remove house fuse or open circuit breaker before
beginning installation.
Do not use an extension cord or adapter plug with
this appliance. Follow National electrical codes or
prevailing local codes and ordinances.
Electrical Supplg
This vent hood must be supplied with 120V, 60Hz,
and connected to an individual, properly grounded
branch circuit, and protected by a 15 or 20 amp
circuit breaker or time delay fuse.
, Wiring must be 2 wire with ground.
, If the electrical supply does not meet the above
requirements, call a licensed electrician before
proceeding.
, Route house wiring in the ceiling, as close to the
installation location as possible. Allow additional
length from ceiling joists to reach the junction
box on the bottom of the hood support frame.
, Connect the wiring to the house wiring in
accordance with local codes.
Grounding Instructions
The grounding conductor must be connected to
a ground metal, permanent wiring system, or an
equipment-grounding
terminal or lead on the hood.
I
Themproper
connection
of
equipment-grounding
conductor can result in a risk
of electric shock. Check with a qualified electrician
or service representative if gou ore in doubt
whether the appliance is properly grounded.
AAVERTISSEMENT :
Le mauvais branchement du fil de mise 6 la terre
peut causer un choc 61ectrique. En cas de doute,
consultez un 61ectricien qualifi6 ou un technicien
pour d6terminer si I'appareil est 6 la terre.
Advance Planning
Total
DUCT FITTINGS
Duct Piece
Use this chart to compute
maximum permissible lengths for
duct runs to outdoors.
Dimensions
Equivalent
Length*
Round,
straight
1 ft. foot
(per
length)
3-1/4" x 12"
straight
1 ft.
(per foot
length)
guantitg
Used
90 ° elbow
NOTE: Do not exceed maximum
permissible
!7ft.
equivalent lengths!
45 ° elbow
!0 ft.
Maximum duct length:
lO0 foot for range hoods.
90
° elbow
3-1/4"
x 12"
43 ft.
If flexible metal ducting is used,
all the equivalent feet values in
the table should be doubled.
The flexible metal duct should
3-i/4" x 12"
45 ° elbow
26 ft.
be straight and smooth and
extended as much as possible.
90
° flatxelbow
3-i/4"
12"
102 ft.
8"
round
to transition
3-!/4"
x !2"
2 ft.
3-i/4" x 12" to 8"
round transition
5 ft.
8" round
to 3-1/4" x 12"
transition 90° elbow
6 ft.
3-1/4" x 12" to 8" round
round transition 90 ° elbow
13 ft.
wall
cap
Round
with damper
32 ft.
Flexible ducting:
DO NOT use flexible plastic
ducting.
NOTE: Ang home ventilation
sgstem, such as a ventilation
hood, mag interrupt the proper
flow of combustion air and
exhaust required bg fireplaces, gas
furnaces, gas water heaters and
other naturallg vented sqstems.
To minimize the chance of
interruption of such naturalkd
vented sgstems, follow the
heating equipment manufacturer's
guidelines and safetg standards
such as those published bg NFPA
and ASHRAE. When applicable,
install ang makeup (replacement)
air s.gstem in accordance with local
building code requirements. Visit
GEAppliances.com
for available
makeup air solutions.
_,_,_
3-1/4,,×
12,,
wallcap
with damper
75 ft.
Round
roof
cap
44 ft.
*Actual length of straight duct plus duct fitting
equivalent. Equivalent length of duct pieces are
based on actual tests conducted bLIGE Evaluation
Engineering and reflect requirements for good
venting performance with ang ventilation hood.
Total Duct Run
Equivalent
Length
Installation Preparation
Ceiling
Height
7'-!!"
8'
8'-!"
8'-!"
Possible Hood
Installation
Height (inches)
26
27
24
28
Mounting
Frame
Height (inches)
8'12"
25
34 1/2
B
8'-2"
29
30 1/2
A
For optimum performance, the hood must be 24"
min. and 30" max. above the cooking surface.
8'13"
26
34 1/2
B
8'-3"
30
30 1/2
A
Use the chart on this page to accurately determine
installation height and support frame adjustment,
and to select the correct size top trim piece (A, B, C
or D).
8'-4"
27
34 1/2
B
8'-5"
24
38 1/2
C
8'-5"
28
34 1/2
B
8'-6"
25
38 1/2
C
D _
8'-6"
29
34 1/2
B
8'-7"
26
38 1/2
C
8'-7"
30
34 1/2
B
8'-8"
27
38 1/2
C
8'-9"
24
42 1/2
D
8'-9"
28
38 1/2
C
8'-10"
25
42 1/2
D
8'-10"
29
38 1/2
C
8'-11"
26
42 1/2
D
8'-11"
30
38 1/2
C
9'
27
42 1/2
D
9'11"
24
46 1/2
E
9'11H-<
28
42 1/2
D
9'12"
25
46 1/2
E
9'12"
29
42 1/2
D
9'13"
26
46 1/2
E
9'13"
]0
42 1/2
D
9'1/4"
27
46 1/2
E
9'-5"
24
50
F
9'-5"
28
46 1/2
E
9'-6"
25
50 1/2
F
9'-6"
29
46 i/2
E
9'17"
26
50 1/2
F
9'17"
]0
46 1/2
E
9'-8"
27
50 1/2
F
9'19"
24
5/-4
G
9'-9"
28
50 1/2
F
25
54-
G
9'110 H
29
50 1/2
F
9'-11"
26
54 1/2
G
9'-11"
DETERMINE INSTALLATION
HEIGHT
. Decorative duct covers are provided
ductwork running to the ceiling.
to conceal the
. This hood can be installed for recirculating
operation. No kits required.
The hood installation height, from the cooking
surface to the bottom of the hood, depends upon
ceiling height.
...........................
J_i
C _-_
_ ..........................................
B _
;_:;
.........................
A
ZX92510 Accessory Duct cover includes a 36-3/41'
long duct cover and 3 sets of duct cover top trim
pieces labeled E, F, G.
9'-
10"
3o i/2
3o i/2
Trim Piece
Needed
A
A
34 1/2
B
so i/2
A
1/2
1/2
1/2
1/2
F
]0
50
i0'
27
54 1/2
G
i0'-1"
28
54 1/2
G
Installation Preparation
TOOLS AND MATERIALS REQUIRED
3/8" swivel
socket or pivoting
hex socket wit.h 6"
(NOTSUPPLIED)
_
tnppe_
Ducttape
s
Keg hole saw
Pencil and tape measure
Electric or batterg-operated
drill and 3/16" bits, Phillips and
flat blade screwdriver bits.
8" round metal
duct, length to
suit installation.
Safetg glasses
/
Spirit level
Flashlight
Wire nuts
Saber saw
or sawsall
Step ladder
Phillips and
flat blade
drivers
©
Strain relief for
junction cover.
!20V 60Hz. !S or 20 Amp,
2-wire with ground, properlg
grounded branch circuit.
Carpenter's square
Pliers
Metal snips
REMOVE THE PACKAGING
IkCAUTION:
LIFTTHE HOOD
BOX BY THE CENTER METAL
BY THE GLASS SIDES.
,_PRU
DENCE
OUT OF THE
PORTION. DO NOT
LIFT
: LEVEZLA HOTTEA
L'EXTERIEUR DE LA BO/TE PAR LA PORTION METAL
CENTRAL. NE LEVEZ PAS PAR LES COTES DE VERRE.
, CAUTION:
Wear
gloves
to protect
against sharp edges.
APRUDENCE
: Portez
desgants pour
6viter les blessures caus6es par les tranchants.
, Grasp the hood bg the metal insert in the center
and lift straight up and out of the box.
, Remove and properlg discard the plastic wrapping.
, Remove parts box, duct covers and other
packaging.
Installation Preparation
PARTS PROVIDED
Locate the parts packed with the hood.
Stainless steel filter
Air deflector for
recirculating installation
HARDWARE
1 charcoal filter for
recirculating installation
PACKAGE
Locate and check
contents. Screws
shown actual size.
6 ceiling
mounting
screws
Telescoping
support frame
L_
12 sheet
metal
screws
42 screws total:
,24 support frame
screws
,10 hood attachment
screws
,2 upper duct cover
attachment screws
2 Duct cover
,4 recirculating
brackets
deflector screws
,2 duct cover bracket
attachment screws
Note: Some additional
hardware/screws
..................... J_
....
jd _
Upper duct cover trim pieces
2 each of 4 sizes
12 cage
nuts
2 thumb
screws
Lower duct cover trim pieces
included.
T
24. _/4"
Template
23-1/4"
2
Decorative duct covers
(14" wide, 12-3/16"deep when assembled)
Installation
Preparation
CONSTRUCT CEILING SUPPORT
Plan the Location
of the Hood and Ductwork
, The hood should extend beyond the front and rear
, Use a plumb bob to check the location. The
countertop/cooktop
below the hood must be
centered with the hood.
edge of the cooking appliance.
, The duct in the ceiling must be centered over the
cooktop.
Ceiling
,
ducting
centerline
Front
Align with
center of
_--_2
7-9/16"
I
_Cooktop
cooktop
_
_______Countertop
Side view
Ceiling Support Structure
, At the hood location, install 2 x 4 cross framing
between ceiling joists as shown. (2x4's are required to
support the weight of the hood.)
, Arrange cross framing in the ceiling to suit the
existing structure.
, Your ceiling joists will be like one of the following
examples.
10-1/16"
Installcross-framing
EXAMPLE A
duct/cooktop
symmetrically over -_
centerline
i
16" joist 4- ....
spacing
1
7-1/16"
2x4 cross
framing
I
Align duct
to center of
cooktop
Top view - ceiling joists parallel to front of hood
9
_' Cooktop
outline
Installation Preparation
CONSTRUCT CEILING SUPPORT
CONTINUED
EXAMPLE B
10-1/16" install
16" joist -spacing
cross-framing
symmetrically
÷over duct/cooktop
centerline
2x4 cross
7- ......
7-1/16"-
\
Align duct
to center
Cooktop
outline
of cooktop
Top view - ceiling joists run perpendicular
to front of hood
EXAMPLEC
10-1/16" install cross-framing
symmetrically
over duct/
cooktop centerline
2x4 cross
framing
16"joist
spacing
Align duct
to center
of cooktop
\
Cooktop
outline
Top view - ceiling joists at angle to front of hood
10
Installation Preparation
CONSTRUCT CEILING SUPPORT
CONTINUED
, Secure each 2 x 4 block with at least four (4), #10
2 x 4 min.
wood screws, Y' long (not supplied). Use 8 wood
screws total for the two supports.
, The cross framing must be accurately aligned to
assure correct positioning of the hood.
, The cross framing must be level in all directions.
Check with a spirit level and adjust if necessarg.
cross framing
',xx\
IMPORTANT: The ceiling structure must be capable
of supporting the weight of the hood (approximatelg
200 pounds) and ang inadvertent user contact loads.
The hood support frame will be supported bg the
2 x 4 cross framing.
ht
adjustment
screws
Ductwork
for Installations
Vented to the Outdoors
, Use the shortest and straightest duct route possible.
For sutisfuctorg performance, duct run should not
exceed 100 feet equivalent length for ang duct
configuration.
, Refer to "Duct Fittings" chart to compute the
maximum permissible length for duct runs to the
outdoors.
/
_::::::_ i
,
Ceiling joist
//
/
8"
Duct
Vent straight up
through the ceiling
, This vent hood must use 8" round rigid duct.
, Install the house ductwork to run horizontollg
between ceiling joists or straight up through the
roof.
Finish the Ceiling
, Finish the ceiling surface. Be sure to mark location
of the ceiling joists and cross framing. Check to be
sure the ceiling is level; use shims if necessarg.
11
Installation
instructions
INSTALLATION-VENTEDTO THE OUTSIDE
ISTEP 11 MOUNT TEMPLATE
, Align the template with the marks on the ceiling
and tape in place.
- Be sure the template is oriented correctlg with the
front of the hood.
, Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
, Center punch all hole locations.
, Drill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximatelg 1-1/2" deep.
, Drive 4 hex head wood screws into the center of
the ceiling joists and cross framing. Leave a 1/4"
gap to allow the screw head to engage the keghole
slots on the support frames.
, Cut the 8-1/2" duct opening through the sheet rock.
_-
• .......J
.J
STEP 21 ADJUST FRAME HEIGHT
,Measure exact ceiling height.
, Find the exact frame height
required on the chart on page 6.
, Remove 2 screws on each of the
4 sides of the frame to loosen the
upper structure, lower structure
and blower/motor.
o
o
o°m
o
o
o
o_
2-3/4'24" min.
30" max.
,Adjust the height "X', according to
the chart on page 6. Use a total of
32 screws (8 screws on each side)
Ceiling
heii ht
o
Eo
<_
°o
o
°o
o
o
o
o
o
o
to secure the upper structure,
lower structure and blower/
o
o
o
o
o
motor together.
°o
°o
o
o
o
_i
__
Oo
12
o
o
o
_20
rl
o
_
o
•
Installation
Instructions
INSTALLATION-VENTEDTO THE OUTSIDE
[STEP 3 CUT DUCT TO LENGTH FOR
VENTED INSTALLATION
,, Measure from
house duct to
ISTEP 51 INSTALL HOOD ATTACHMENT
SCREWS
House
duct
exhaust opening.
, Cut the 8" duct
/
z
f
length to size.
, Slip duct over the
exhaust opening.
, Seal the connection
J
Duct
length
Install 4
screws
#
with duct tape.
/
J
/
5
, Install 4 hood attachment
screws in the bottom
the support as shown. Leave 1/4" gap between
screw head and support flange.
ISTEP 4 INSTALL THE SUPPORT FRAME
, Raise the support toward
the ceiling.
_
, Thread the house wiring
through one of the large
holes, preferablg on the
left side.
, Carefullg engage the
ceiling mounting screws
to the keghole slots AND
the house duct in the top
of the frame.
, Tighten the 4 mounting
screws against the frame.
, Install 2 safetg screws.
, Use duct tape to seal the
duct connection at the top.
Safetg
screws
Keghole
slots
House
wiring
slots
13
of
Installation
instructions
INSTALLATION-VENTEDTO THE OUTSIDE
jSTEP 7i CONNECT CABLES
[STEP 6 MOUNT THE HOOD
ONTO THE SUPPORT
,AWARNING:
Two
people
are required to
lift and position the hood onto the support.
,&AVERTISSEMENT
/
: II faut deux
Retainer
personnes pour lever et mettre en place a hotte sur
le support de montage.
clip
"-4
, Join the two cable connectors
at the front of the
hood. Secure the cables behind the retainer clip.
, Lift the hood to the bottom of the support,
engaging the keghole slots to the 4 mounting
screws.
, Tighten the 4 mounting
, Install 6 additional
screws.
screws as shown.
14
Installation
Instructions
INSTALLATION-VENTEDTO THE OUTSIDE
STEP 8] CONNECT ELECTRICAL
Verifg thot power is turned
, Removejunction
left side.
off ot the source.
AWARN ING: Ifhouse
wiring isnot2-wire
with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be sure
to use U.L approved anti-oxidant compound and
aluminum-to-copper
connectors.
AAVERTISSEMENT
box cover and knockout on the
Knockout
J-Box
cover\\
:
Si la maison n'est pas cablee avec deux ills et un
fil de terre, I'installateur doit installer un fil de terre.
Quand les ills sont en aluminium, il faut prendre soin
d'utiliser des connecteurs aluminium a cuivre avec
une pate antioxgdante approuv6e par U.L
, Secure the house wiring to the junction
a strain relief.
box with
House wiring,
J-Box
cover
, Connect white leads to branch circuit white lead.
, Connect black leads to branch circuit black lead.
, Connect green/gellow leads to branch circuit green
lead or bore ground lead.
, Secure all connections
electrical connector.
with wire nuts on each
, Push wires into junction box and replace cover.
Be sure wires are not pinched.
, Secure J-Box cover with original screw.
15
Installation
Instructions
INSTALLATION-VENTEDTO THE OUTSIDE
ISTEP 9] PREPARE THE DUCT COVERS
ISTEP 10] INSTALL UPPER DUCT COVER
, Remove the plastic protective covering on all
, Place the tall duct covers onto the top of the
duct pieces.
, Install 3 cage nuts on each inside section of
the top duct cover. The cage nuts fit into the
rectangular slots, clips facing outward.
, Install 3 cage nuts on each side of the lower
duct covers.
Rectangular
slots
hood. This section has venting holes on one end.
NOTE: If gou are installing this hood for
recirculating operation, place the duct covers
onto the hood with the venting slots at the top.
If the hood is vented to the outside, the holes
should be positioned on the bottom.
, Secure the sides with 6 screws installed through
the cage nuts.
'Nut
N
%
, Raise the assembled duct covers to the top,
against the ceiling.
Support
frame
, Hatch mounting
holes, one on each side. Install
screws through the duct and into the support.
16
Installation
Instructions
INSTALLATION-VENTEDTO THE OUTSIDE
ISTEP 111 INSTALL LOWER DUCT COVER
STEP 12 INSTALL DUCT COVER TRIM
Front bottom duct cover section
(snap into place and secure
with 6 screws - 3 per side)
Plan diagram
top view
....................
_ront bottom
duct
, Install side brackets to secure the lower duct
II
I
coversections
tightlg against the upper duct.
, Hold lower trim strips (narrow pieces) with hooks
facing down. Place the hooks inside the slots and
slide downward.
, Select the correct size upper trim strips and press
into place.
[STEP 13] INSTALL METAL FILTER
IMPORTANT: Check to be sure that the main ON/
OFF switch next to the motor is in the ON
position.
Filter lock
, Place rear duct cover onto the hood.
, Place front duct cover onto the hood.
, Secure the duct covers with 6 screws.
, Tip the filter into the left or right side of the
opening. Lift the filter to the opposite side and
into the filter lock.
, To remove the filter, pull the filter lock downward.
[STEP 14] FINALIZE INSTALLATION
, Remove all tape and packing material.
, Refer to the Owner's Manual for operating instructions.
17
Installation
instructions
INSTALLATION-R ECIRCULATING
ISTEP 11 MOUNT TEMPLATE
, Align the template with the marks on the ceiling
and tape in place.
- Be sure the template is oriented correctlg
with the front of the hood.
, Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
, Center punch all hole locations.
, Drill pilot holes in the 4 screw locations. Use a 3/16"
bit and drill approximatelg 14/2" deep.
, Drive 4 hex head wood screws into the center of
NOTE: Do not cut the
duct opening shown
on the template for
this recirculating
installation.
the ceiling joists and cross framing. Leave a 1/4"
gap to allow the screw head to engage the keghole
slots on the support frames.
/
STEP 21 ADJUST FRAME HEIGHT
,Measure exact ceiling height.
, Find the exact frame height
required on the chart on page 6.
, Place the support on a work
surface. Remove 2 screws on
each of the 4 sides of the frame
to loosen the upper structure,
lower structure and blower/
motor.
2-3/4'24" min.
30" max.
,Adjust the height "X', according
to the chart on page 6.
,Use a marker pen to indicate
where screw holes should align
in the assembled upper, lower
and blower/motor pieces.
Ceiling
height
Markz_
each
piece to
indicate
where
screw
holes
align.N_
NOTE: Low ceilings mag require that
the lower portion of the support frame be
removed. The upper support frame mag be
secured directlg to the blower/motor. Refer
to the chart on page 6 for gour ceiling
height and to be sure the duct cover trim
piece will fit.
18
ol
ol
ol
o
o
o
ol
ol
o
o
ol
ol
o
o
ol
ol
ol
ol
ol
ol
ol
ol
ol
om
o
o
o
o
o
o
o
o
o
o
o,
o
o,
o
X
Installation
instructions
INSTALLATI0 N-R ECIRCULATING
STEP 3 INSTALL AIR DEFLECTOR,
CUT DUCT FOR RECIRCULATING
OPERATION
ISTEP 41 INSTALL UPPER SUPPORT FRAME
, Raise the upper support
toward the ceiling.
, Thread the house wiring
through one of the large
holes, preferablg on the
left side.
, Temporarilg, slide the
air deflector into the
support frame.
, Carefullg engage the
ceiling mounting screws
to the keghole slots in
the top of the frame.
, Tighten the 4 mounting
screws against the frame.
, Install 2 safetg screws.
FRONT
Safetg
screws
Keghole
slots
, Measure duct length
between the deflector and
over the exhaust opening.
, Cut duct piece to length
and set aside,
Duct
length
House
wiring
FRONT.
Slide air deflector
into
the support frame.
Secure the deflector
to the support with
4 screws.
Install the duct
piece to the
bottom of the
deflector and seal
the connection
with duct tape.
19
slots
Installation instructions
INSTALLATI0 N-R ECIRCULATING
[STEP 5 INSTALL LOWER STRUCTURE
TO UPPER STRUCTURE
ISTEP 61 INSTALL BLOWER/MOTOR
Raise the blower/
m
. Slide lower frame into
o
motor piece toward the
assembled frame.
T-
the upper frame. Hatch
the marked alignment
holes.
. Carefullg raise the motor
to the marked reference
point while making sure
the duct piece slips over
the blower outlet flange.
. Secure the upper and
lower frame with 16
screws, 4 on each side
of the frame.
. Secure the blower/motor
to the frame using 16
screws, 4 on each side.
. Use tape to seal the duct
connection.
c
c
i
i
0 i
°o
o
*a
o
o
c
i
c
c
i
i
c
c
i
i
c
i
o
o
c
c
__
o
°o
o
c
c
c
c
o
20
Installation
instructions
INSTALLATI0 N-R ECIRCULATING
jSTEP 9 i CONNECT CABLES
[STEP 7 INSTALL HOOD ATTACHMENT
SCREWS
/
Retainer
clip
-..4
li
/
, Install 4 hood attachment
screws in the bottom
of the support as shown. Leave 1/4" gap between
screw head and support flange.
, Join the two cable connectors
hood. Secure the cables behind the retainer clip.
[STEP 8 MOUNT THE HOOD ONTO THE
SUPPORT
,&WARNING:
Two people are required to
lift and position the hood onto the support.
,,_VERTISSEM ENT
: II faut deux
personnes pour lever et mettre en place a hotte sur
le support de montage.
, Lift the hood to the bottom
of the support, engaging
the keghole slots to the 4
[:l:l:l!k_J:,l
" Tighten the
FI
I_J :I:HI
kt-_ :l:Jll
mou, ,,n crews.
4 mounting
1
:1:1//_¢_ I:1
screws._
3
, Install 6 additional
at the front of the
screws as shown.
21
Installation
Instructions
INSTALLATI0 N-R ECIRCULATING
ISTEP 101 CONNECT ELECTRICAL
Verify that power is turned
, Removejunction
left side.
off at the source.
AWARN ING: Ifhouse
wiring
isnot2-wire
with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be sure
to use U.L approved anti-oxidant compound and
aluminum-to-copper
connectors.
AAVERTISSEMENT
box cover and knockout on the
Knockout
J-Box
cover\\
:
Si la maison n'est pas cablee avec deux ills et un
fil de terre, I'installateur dolt installer un fil de terre.
Ouand les ills sont en aluminium, il faut prendre soin
d'utiliser des connecteurs aluminium a cuivre avec
une pate antioxgdante approuv6e par U.L
, Secure the house wiring to the junction
a strain relief.
Housewiring_
I
.
box with
_ _J
I
, Connect white leads to branch circuit white lead.
, Connect black leads to branch circuit black lead.
, Connect green/gellow leads to branch circuit green
lead or bare ground lead.
, Secure all connections
electrical connector.
with wire nuts on each
, Push wires into junction box and replace cover.
Be sure wires are not pinched.
, Secure J-Box cover with original screw.
22
Installation
Instructions
INSTALLATI0 N-R ECIRCULATING
ISTEP 111 PREPARE THE DUCT COVERS
ISTEP 12] INSTALL UPPER DUCT COVER
, Remove the plastic protective covering on all duct
, Place the tall duct covers onto the top of the
pieces.
, Install 3 cage nuts on each inside section of
the top duct cover. The cage nuts fit into the
rectangular slots, clips facing outward.
, Install 3 cage nuts on each side of the lower
duct covers.
Rectangular
slots
hood. This section has venting holes on one end.
NOTE: If gou are installing this hood for
recirculating operation, place the duct covers
onto the hood with the venting slots at the top.
If the hood is vented to the outside, the holes
should be positioned on the bottom.
, Secure the sides with 6 screws installed through
the cage nuts.
'Nut
N
%
, Raise the assembled duct covers to the top,
against the ceiling.
Support
frame
, Hatch mounting holes, one on each side. Install
screws through the duct and into the support.
2]
Installation
Instructions
INSTALLATI0 N-R ECIRCULATING
ISTEP 13] INSTALL LOWER DUCT COVER
STEP 14 INSTALL DUCT COVER TRIM
Front bottom duct cover section
Isnap into place and secure with
6 screws - ] per side}
Plan
diagram top
view
__
ot om
, Install side brackets to secure the lower duct
II I
cover
sections
tightlg against the upper duct.
, Hold lower trim strips (narrow pieces} with hooks
facing down. Place the hooks inside the slots and
slide downward.
, Select the correct size upper trim strips and press
into place.
, Place rear duct cover onto the hood.
, Place front duct cover onto the hood.
, Secure the duct covers with 6 screws.
24
Installation
instructions
INSTALLATI0 N-R ECIRCULATING
INSTALL FILTERS
[STEP 16] FINALIZE INSTALLATION
IMPORTANT: Check to be sure that the main ON/
OFF switch next to the motor is in the ON position.
Charcoal
, Remove all tape and packing material.
, Refer to the Owner's Manual for operating instructions.
filter
, Install the black charcoal filter into the center
opening. Secure the filter with thumbscrews on
each side.
Metol filter
Filter lock
, Tip the filter into the left or right side of the
opening. Lift the filter to the opposite side and
into the filter lock.
, To remove the filter, pull the filter lock downward.
25
Notes
26
Notes
27
Note: While performing installations described in this book,
safetg glasses or goggles should be worn.
For Monogram®
local service in your area, call
1.800.4¢¢.18¢5.
Note: Product improvement is a continuing endeavor at
General Electric. Therefore, materials, appearance and
specifications are subject to change without notice.
Monogram:
[49-80329-4
02-13
I
GE
Printed in Mexico
GE Appliances
& Lighting
Appliances
General
Electric
Company
Louisville, KY40225
monogram.cam
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement