CommScope SYSTIMAX 360 360G2-4U-MOD-SD Instruction Sheet
CommScope SYSTIMAX 360 360G2-4U-MOD-SD is a 4U sliding front access combination shelf designed for indoor use or outdoor use in a protective enclosure. It can be mounted onto a standard 19-inch, 23-inch, or ETSI equipment rack. The product features a modular design, allowing for the installation of various termination cartridges, bezels and panels, splice organizers, and splice carriers. It also supports the use of InstaPATCH adapter panels for easy patching and reconfiguration. The shelf provides ample space for cable management and includes cable protectors to prevent damage to fiber cables.
Advertisement
Advertisement
860452168
Issue 7, April 2014 www.commscope.com
SYSTIMAX 360
™
360G2 4U Sliding Front Access
Combination Shelf Instructions
General
The SYSTIMAX 360 ™ 360G2 4U sliding, front access fiber optic combination shelf mounts onto a standard
19-inch (483mm), 23-inch (584mm) or ETSI equipment rack. This product is intended for indoor use or may be used outdoors in a suitable protective enclosure.
Ordering information is listed below:
Material ID
760193896
760101089
Part No.
360G2-4U-MOD-SD
360G2-4U IP-SD
Description
360G2 4U sliding modular cassette shelf
360G2 4U sliding adapter panel shelf
SYSTIMAX 360 ™ 360G2 4U Sliding, Front Access Fiber Optic Combination Shelf
This product is covered by one or more of the following U.S. patents or their foreign equivalents:
7,113,667 B2, 7,200,314 B2
© 2014 CommScope, Inc. All rights reserved Page 1 of 21
Material ID
760101410
760027516
760031849
760031856
760039859
760039867
760148502
760032102
760032110
760039875
760039883
760107482
760107490
760107508
760107516
760107524
760128942
860452168
Instruction Sheet www.commscope.com
How to Contact Us
• To find out more about CommScope ® products, visit us on the web at http://www.commscope.com/
• For technical assistance:
Within the United States, contact your local account representative or technical support at
1-800-344-0223. Outside the United States, contact your local account representative or
PartnerPRO ™ Network Partner.
Within the United States, report any missing/damaged parts or any other issues to CommScope
Customer Claims at 1-866-539-2795 or email to [email protected]. Outside the United
States, contact your local account representative or PartnerPRO Network Partner.
Tools Required
• Screw-starter
• Flat-blade screwdriver
• Isopropyl alcohol
• Lint-free wipes or tissues
Ordering Information
For most versions of this shelf, termination cartridges, bezels and panels, splice organizers and splice carriers
(example: Splice Wallet ® , RoloSplice ® ) are optional and must be ordered separately. Build-out blocks, couplers, splicing materials and equipment used with this shelf must always be ordered separately.
Separately orderable accessories are available for this shelf. Ordering information is listed below.
760128959
Product No.
360G2-4U-FLK
RS-00
RS-4AM-12SF
RS-4AF-16SF
RS-2AM-12SF
RS-2AF-16SF
360-LP-STACK-SPT
MODG2-BLANK
MODG2-MGS
G2-SRF
G2-23BRKT
DP360-BLANK
DP360-2MPO
DP360-4MPO
DP360-6MPO
DP360-8MPO
SMB-KIT-8-1/2-360G2
SMB-KIT-4-3/4-360G2
Description
4U Flip label kit
RoloSplice (unpopulated, splice trays available separately)
RoloSplice , 2U version, equipped w/ mechanical splice trays
RoloSplice , 2U version, equipped w/ fusion splice trays
RoloSplice , 1U version, equipped w/ mechanical splice trays
RoloSplice , 1U version, equipped w/ fusion splice trays
Stackable fusion splice tray kit
G2 Modular blank panel bezel (package of 4)
G2 Modular MGS bezel (package of 4)
Liquid-tight cable fitting kit for small-diameter cables
Frame mounting bracket kit for 23” frames and ETSI frames
360 InstaPATCH ® blank panel (pkg of 4)
360 InstaPATCH 2MPO adapter panel (MOD shelves only)
360 InstaPATCH 4MPO adapter panel (MOD shelves only)
360 InstaPATCH 6MPO adapter panel (MOD shelves only)
360 InstaPATCH 8MPO adapter panel (MOD shelves only)
360G2 Fitment - InstaPATCH attachment bracket (2), shelf mounted, four 1/2 inch fittings per bracket and (2) expanded cable protector covers
360G2 Fitment - InstaPATCH attachment bracket (2), shelf mounted, two 3/4 inch fittings per bracket and (2) expanded cable protector covers continued on page 3
Page 2 of 21
www.commscope.com 860452168
Instruction Sheet
Material ID
760122895
760122903
760122911
760122929
760122937
Product No.
BAF-1/2-NPT
BAF-3/4-NPT
BAF-1-NPT
BAF-1-1/4-NPT
BAF-1-1/2-NPT
Description
Bracket for armor fitting, 1/2 NPT
Bracket for armor fitting, 3/4 NPT
Bracket for armor fitting, 1 NPT
Bracket for armor fitting, 1-1/4 NPT
Bracket for armor fitting, 1-1/2 NPT
!
CAUTIONS
• Isopropyl alcohol is flammable, and can cause eye irritation on contact. If eye contact occurs, flush with water for at least 15 minutes. In case of ingestion, consult a physician. Use only in well ventilated areas.
• Disconnected optical components may emit invisible optical radiation that can damage your eyes.
Never look directly into an optical component that may have a laser coupled to it. Serious and permanent retinal damage is possible. If accidental exposure to laser radiation is suspected, consult a physician for an eye examination.
• Wearing safety glasses during installation of this shelf is recommended. Although standard safety glasses provide no protection from potential optical radiation, they offer protection from accidental airborne hardware and cleaning solvents.
Page 3 of 21
860452168
Instruction Sheet www.commscope.com
Step 1 – Verify Parts and Install Labels
1. Verify parts shipped with this unit against the parts listed in the table below.
2. Apply shelf ID labels to bulkhead, located approximately as shown, one on each side of panel (outside and inside).
Shelf assembly
Pull to open, push to close latch
Shelf ID label
Bulkhead
Cable protectors
Front door
Loose Parts Furnished with Shelf
Quantity
1
2
3
4
2
2
3
1
6
11
4
1
Description
Front door
Hardware bezel cover
Label hangers
Flip label holder
Oblong fiber rings
Round fiber rings
LH cable protectors
RH cable protectors
Flat tie holders
12-24 x 1/2 screws
M6 x 12 screws
Instruction sheet
Hardware bezel cover
Oblong fiber ring
Page 4 of 21
www.commscope.com 860452168
Instruction Sheet
Step 2 – Configure Mounting Brackets and Mount Shelf to Equipment Rack
Configuration for 19” Rack Configuration for 23” Rack Configuration for ETSI Rack
Front
For ETSI configuration only, use these holes to secure mounting bracket on right side
Side View
1. Configure mounting brackets to match type of equipment rack to be used as shown above.
2. Align tabs on mounting brackets (two per bracket) with the holes on the front of equipment rails.
Note : If tabs do not insert into holes in equipment rails without interference, DO NOT FORCE as damage to shelf will result. In this case, tabs must be bent back or trimmed off to eliminate interference. This situation is usually caused by equipment racks/cabinets being improperly assembled. Great care should be taken when assembling racks/cabinets to assure that the rails are properly aligned. Use of an alignment tool is recommended.
3. Install shelf to front of equipment rails using four 12-24 x 1/2-inch screws (provided) for 19-inch (483mm) rack and 23-inch (584mm) racks and four M6 x 12 screws for ETSI racks. See figure below.
Page 5 of 21
860452168
Instruction Sheet www.commscope.com
Step 3 – Install Building Cables/Outside Plant Cables (OSP)
Note: All fiber installation shall be done with the internal mechanism pulled out from the outer shelf enclosure and fully lowered, as shown in the following illustrations.
WARNING: : Use of spiral wrap (such as RICHCO part no. HR8R-1/2) for protection of fibers entering the shelf is strongly recommended. Movement of internal mechanism may damage stray fibers if proper precautions are not taken..
Step 3A – Rear/Bottom Cable Entry Configuration
Upper cable entry
Splice organizer mounting panel
Fiber slack storage
(spool counter-clockwise)
12A1 clamp
Bldg or OSP cable
Spiral wrap
(for protection) procedures for metallic or armored cables.
Fiber slack storage
(spool clockwise)
1. Prepare fiber optic building cables or outside plant (OSP) cables. See 636-299-110-5 for cable preparation
2. Secure incoming cables to 4U shelf per the following methods:
• Building cables – use two cable-ties anchored through slots provided in shelf sidewall and cinch cableties against outer jacket of cable.
• InstaPATCH ® respectively).
or ReadyPATCH cables – use SYSTIMAX ® shelf mounted bracket (SMB) or rack mounted bracket (RMB) per instructions included with the kits (860448471 and 860380781
• OSP cables – use 12A-type clamps installed in sidewall of shelf. Use 12A1 clamp for metallic cables and 12A2 clamp for nonmetallic cables. Ground metallic cables to the equipment rack or other suitable ground (refer to 636299110-5 for details).
Note: The SMB kit, RMB kit, and 12A-type clamps are ordered separately.
Page 6 of 21
www.commscope.com 860452168
Instruction Sheet
3. Locate cable-tie anchoring positions provided in upper sidewalls of shelf.
4. Route buffered building cables or PVC protected OSP fibers into shelf through oblong openings provided in upper rear corner of sidewalls. Use of protective spiral wrap around these fibers is highly recommended .
Secure fiber bundle to the sidewall using cable-ties and anchor position located in item 3. Tighten cable-ties sufficiently to restrict fiber movement but do not over tighten and cause damage to fibers.
5. Route fiber bundle into slack fiber management rings, as shown in Figure 5, so that approximately 1/2 to 1 inch (13 to 25mm) of protected fiber bundle passes through first ring. Enough slack should be left between first fiber ring and restrained portion of bundle so that a loop is formed when mechanism is pushed back into shelf. Spool as much slack fiber into rings as will be needed for subsequent splicing operations.
6. If no other cables are to be installed, proceed to Step 4 .
Page 7 of 21
860452168
Instruction Sheet
Step 3B – Rear/Top Cable Entry Configuration
Lower cable entry www.commscope.com
Bldg of OSP cable
Splice organizer mounting panel
Fiber slack storage
(spool counter-clockwise)
12A1 clamp
Spiral wrap
(for protection)
Fiber slack storage
(spool clockwise)
1. Prepare fiber optic building cables or outside plant (OSP) cables. See 636299110-5 for cable preparation procedures for OSP cables.
2. Secure incoming cables to 4U shelf per the following methods:
• Building cables – use two cable-ties anchored through slots provided in shelf sidewall and cinch cableties against outer jacket of cable.
• InstaPATCH or ReadyPATCH cables – use SYSTIMAX shelf mounted bracket (SMB) or rack mounted bracket (RMB) per instructions included with the kits (860448471 and 860380781 respectively).
• OSP cables – use 12A-type clamps installed in sidewall of shelf. Use 12A1 clamp for metallic cables and 12A2 clamp for nonmetallic cables. Ground metallic cables to the equipment rack or other suitable ground (refer to 636299110-5 for details).
Note: The SMB kit, RMB kit, and 12A-type clamps are ordered separately.
3. Locate cable-tie anchoring position provided in floor of shelf.
4. Route buffered building cables or PVC protected OSP fibers into shelf through oblong openings provided in lower rear corner of sidewalls. Use of protective spiral wrap around these fibers is highly recommended .
Secure fiber bundle to the floor of shelf using cable-ties and anchor positions located in item 3. Tighten cable-ties sufficiently to restrict fiber movement but do not over tighten and cause damage to fibers.
5. Route fiber bundle into slack fiber management rings, as shown above, so that approximately 1/2 to 1-inch
(13 to 25mm) of protected fiber bundle passes through first ring. Enough slack should be left between first fiber ring and restrained portion of bundle so that a loop is formed when mechanism is pushed back into shelf. Spool as much slack fiber into rings as will be needed for subsequent splicing operations.
6. Install cable protector kit (provided) and jumper bend limiter kit (provided) as desired.
7. If no other cables are to be installed, proceed to Step 4.
Page 8 of 21
www.commscope.com 860452168
Instruction Sheet
Step 4 – Install Termination Devices
Note: Modular cassettes, bezels, and adapter panels are normally ordered separately from the shelf. Some customer specific versions of this shelf come pre-terminated and will not require these steps.
Step 4A – G2 Modular Cassette Application
1. Starting at location A (the left-most position), plug a cassette into the bulkhead cutout until it snaps into place, as shown in figure above.
2. Remove cassette cover and spool out enough length from the pigtails that they may be routed into the slack fiber management rings and have sufficient length for subsequent splicing operations. Spool fiber into slack management rings as shown. Replace cover.
3. Repeat items 1 and 2 for the next five consecutive cassette locations (locations B through F).
4. Starting at location G (seventh location from the left side), repeat items 1 and 2 for all remaining locations
(locations G through M).
5. Pigtails from locations A through F are to be spooled into the first set of slack fiber management rings (four rings on the left-hand side of the shelf). Fibers from locations G through M are to be spooled into the second set of slack fiber management rings (four rings on the right-hand side of the shelf).
Page 9 of 21
860452168
Instruction Sheet
Step 4B – G2 Bezel Application
Splice tray
Splice wallet
Spool clockwise through fiber rings www.commscope.com
Bulkhead
Spool clockwise through fiber rings
G2 Bezel
(location A) G2 Bezel
(location G)
1. Starting at location A (the left-most position), plug a bezel into the bulkhead cutout until it snaps into place, as shown in figure above.
2. Terminate a fiber pigtail into bezel, color keying as required. Repeat for remaining locations. Bundle all pigtails together with a suitable device that will not damage the fibers (e.g. twist tie or hook-and- loop strip) at approximately 1-foot (305mm) increments.
3. Spool fiber bundle into slack fiber management rings in a clock-wise direction as shown.
4. Repeat items 1 through 3 for the next five consecutive bezel locations (locations B through F).
5. Starting at location G (seventh location from the left side), repeat items 1 through 4 for all remaining locations (locations G through M).
6. Pigtails from locations A through F are to be spooled into the first set of slack fiber management rings (four rings on the left-hand side of the shelf). Fibers from locations G through M are to be spooled into the second set of slack fiber management rings (four rings on the right-hand side of the shelf).
Page 10 of 21
www.commscope.com
Step 4C – Adapter Panel Application
860452168
Instruction Sheet
1. Starting at location A (the left-most position), plug an adapter panel into the bulkhead cutout, as shown in figure above.
2. Terminate a fiber pigtail into adapter panel, color keying as required. Repeat for all remaining locations.
Bundle all pigtails together with a suitable device that will not damage the fibers (e.g. twist tie or hook-and- loop strip) at approximately 1-foot (305mm) increments.
3. Spool fiber bundle into slack fiber management rings in a clock-wise direction as shown.
4. Repeat items 1 through 3 for the next five consecutive adapter panel locations (locations B through F).
5. Starting at location G (seventh location from the left side), repeat items 1 through 4 for all remaining locations
(locations G through M).
6. Pigtails from locations A through F are to be spooled into the first set of slack fiber management rings (four rings on the left-hand side of the shelf). Fibers from locations G through M are to be spooled into the second set of slack fiber management rings (four rings on the right-hand side of the shelf).
Page 11 of 21
860452168
Instruction Sheet
Step 4D – InstaPATCH Plus Module Application
www.commscope.com
Note: InstaPATCH or ReadyPATCH cables use SYSTIMAX shelf mounted bracket (SMB) kit or rack mounted bracket (RMB) kit per instructions provided in 860448471 and 860380781 respectively.
1. Starting at location A (the left-most position), plug module into bulkhead cutout, as shown in figure above.
2. Mate MPO connector(s) on module with those on trunk cable or ruggedized fan out.
3. Dress cable(s) thru fiber management rings, approximately as shown. Create loops with cable, where appropriate, to manage excess slack.
4. Repeat items 1 through 3 for all remaining positions.
Note : If desired, splice organizer management panel assembly may be easily removed since it is not used in this application. To accomplish this, remove 4 screws at base of the door support bracket. It may also be beneficial to temporarily remove some of the fiber management rings if they interfere with module insertion or extraction. Simply grasp rings firmly and pull in an upward motion until they pop out.
Page 12 of 21
www.commscope.com
Step 4E – 360 InstaPATCH Plus Module Application
860452168
Instruction Sheet
Note: InstaPATCH or ReadyPATCH cables use SYSTIMAX shelf mounted bracket (SMB) kit or rack mounted bracket (RMB) kit per instructions provided in 860448471 and 860380781 respectively.
1. Starting at location A (the left-most position), plug module into bulkhead cutout, as shown in figure above.
2. Mate MPO connector(s) on module with those on trunk cable or ruggedized fan out.
3. Dress cable(s) thru fiber management rings, approximately as shown. Create loops with cable, where appropriate, to manage excess slack.
4. Repeat items 1 through 3 for all remaining positions.
Note : If desired, splice organizer management panel assembly may be easily removed since it is not used in this application. To accomplish this, remove 4 screws at base of the door support bracket. It may also be beneficial to temporarily remove some of the fiber management rings if they interfere with module insertion or extraction. Simply grasp rings firmly and pull in an upward motion until they pop out.
Page 13 of 21
860452168
Instruction Sheet www.commscope.com
Step 5 – Splicing Provisions
Note: Splice organizer trays and splice carriers are normally ordered separately from the shelf. Some customer specific versions of this shelf come pre-populated with these items and will not require these steps. Splicing operations are not covered in this document.
Splice Wallet
Splice Wallet is to be mounted within areas of splice organizer mounting panel indicated by four indented alignment marks (in two places). See figure above.
1. Using a lint-free wipe and isopropyl alcohol, clean and degrease area of splice organizer mounting panel where Splice Wallet will be mounted.
2. Peel off paper backing from hook-and-loop strip on base of Splice Wallet . Orient opening flap toward top of shelf and center between alignment marks on panel. Press the Splice Wallet firmly into place and hold for several seconds to assure that adhesive makes good contact.
The Splice Wallet is designed to accommodate all splice trays sold by SYSTIMAX , including:
• Mechanical (Rotary)
• Fusion
• Mass Fusion.
In order to function properly, all positions must be populated with splice trays, whether or not they are to be used. Splice trays are mounted with adhesive pads provided on leaves of Splice Wallet .
Splice Wallet may be temporarily removed from splice organizer mounting panel (by releasing the hook-andloop fastener) for splicing operations or splice trays may be populated with splices before the trays are mounted into the Splice Wallet .
Page 14 of 21
www.commscope.com 860452168
Instruction Sheet
RoloSplice
1. Assemble components for mounting in the illustrated position, if required. See figure above.
2. Install plastic fasteners into splice organizer mounting panel as shown.
3. Assemble base of RoloSplice onto plastic fasteners and push in plungers to fasten.
Note: The RoloSplice is designed to accommodate all splice trays sold by SYSTIMAX , including:
Mechanical (Rotary)
Fusion
Mass Fusion.
Splice trays may be assembled onto pivoting trays of RoloSplice by slightly bending pivot tray sufficiently to allow splice tray to be snapped in between engaging features.
RoloSplice may be temporarily removed from splice organizer mounting panel (by releasing the plastic fasteners) for splicing operations or splice tray/pivot tray assemblies may individually removed and populated with splices before being placed back into the assembly.
UHD Stackable Splice Trays
Notes :
• Stackable splice tray kit (MID 760148502) is ordered separately from shelf. Refer to instructions enclosed with that kit for all details not covered here.
• Hinged rear panel assembly must be removed, as shown below.
• Sliding function of shelf must be defeated when using these trays.
Remove components
Bulkhead
Sliding internal mechanism (floor)
Remove locknuts
(3 places)
1. Slide internal mechanism (floor) of shelf fully out to expose three locknuts (as shown on previous page) and remove them.
2. Remove components from shelf and return internal mechanism to closed position.
3. Remove all fiber management rings from floor area behind bulkhead.
4. Snugly fasten two quick-release fasteners on bulkhead.
Page 15 of 21
860452168
Instruction Sheet
Adapter panel
www.commscope.com
Splice tray
Buffer tube
.25”
(6mm)
Cable ties
OSP or indoor/outdoor cable
Notes :
• It is recommended that splicing operations be performed on a work surface outside the shelf, prior to tray installation. Approximately 5 feet (1.5 meters) of buffer tube length should be prepared with an additional 3 feet (1 meter) of fiber exposed for splicing. Slack buffer tube length should allow tray to be removed from shelf for subsequent adds, moves or repairs.
• It is recommended that buffer tubes be brought into shelf through upper cable entry openings at rear to provide maximum clearance possible between trays and fiber.
• Bundle buffer tubes together with hook-and-loop fasteners or cable ties within interior of shelf to protect adapter panel pigtails.
5. Using a lint-free wipe and isopropyl alcohol, clean area where splice tray is to be located.
6. Peel off paper backing from splice tray. Center over shelf chassis floor so that tray butts up against rearmost sheet metal edge, approximately 0.25 inch (6mm) from rear of sliding mechanism and press down firmly to adhere tray.
7. Route buffer tube(s) to tray, as shown above. Buffer tube slack shall be spooled around perimeter of tray and restrained with cable ties at tie-down points provided, as necessary.
8.
Each splice tray will accommodate up to 48 fusion splices. If more splice capacity is required, additional trays may be stacked and attached together. Up to eight trays may be used for a
total
capacity of 384 splices.
Page 16 of 21
www.commscope.com 860452168
Instruction Sheet
Plastic snap rivets
Bundle buffer tubes on interior of shelf
3 trays stacked
Fiber Management When Using Stackable Splice Trays
1. Trim all pigtail lengths to 3 feet (1 meter) or less.
2. Perform fusion splicing operations per best practices and snap splice sleeves into holders provided inside of tray.
3. Wind and dress fibers from buffer tube(s) into tray.
4. Wind and dress pigtails into tray.
5. After tray is fully populated, snap on clear plastic top cover.
6. Terminate a fiber pigtail into panel, color keying as required. Repeat for all remaining locations.
7. Repeat items 1-6 for any/all additional trays.
Step 6 – Return Internal Mechanism to Normal Position and Secure
Pivot internal mechanism up into position parallel to shelf bottom and slide inside shelf outer enclosure, as shown in figure on previous page.
!
CAUTION: Assure that no fiber slack becomes pinched or bent.
1. Secure bulkhead with two captive fasteners.
2. Align front door with front hinge slots, insert, close door, and rotate door fasteners to secure.
3. This completes the installation of the 360G2 extended depth, front access fiber optic combination shelf.
Page 17 of 21
860452168
Instruction Sheet
Step 7 – Install Front Loose Parts
www.commscope.com
1. Install left hardware bezel cover by inserting two tabs on shelf into openings on bottom of bezel cover.
2. Push bezel cover towards mounting rail until bezel overrides lock on shelf and snaps into place.
3. Fasten upper latch of bezel cover to shelf mounting bracket.
4. To remove bezel cover, depress upper latch to free from mounting bracket.
5. Pull bezel towards front to override lock on shelf.
6. Release bezel from shelf tabs.
7. Repeat items 1-3 to install right hardware bezel cover to shelf.
Page 18 of 21
www.commscope.com
Step 8 – Install or Remove Front Door
860452168
Instruction Sheet
1. To install front door, position door at 45° and align door clasps on lower corners of door to hinges on panel and push in on each corner to engage the two parts.
2. Swing door up and down freely to verify proper installation.
3. Swing door up to the closed position and push in on upper corners to engage latches and secure door.
4. To open front door, pull on upper corners of door to disengage latches, then swing open.
5. To remove front door, open door and position it at 45°. Slide door to either side to disengage clasp from hinge.
6. Remove protective film from inside and outside of door.
7. To close door, push on upper corners of door, engaging tabs to door latch.
Note: Take special care when removing door to prevent scratches, damage, or loss.
Page 19 of 21
860452168
Instruction Sheet
Step 9 – Install Rear Loose Parts
www.commscope.com
1. To install rear door, align door clasps on lower corners of door to hinges on panel and push in on each corner to engage the two parts.
2. Swing door up and down freely to verify proper installation.
3. Swing door up to the closed position and push in on upper corners to engage latches and secure door.
4. To open rear door, pull on upper corners of door to disengage latches, then swing open.
5. To close rear door, push on upper corners of door to secure latch
6. To remove rear door, open door and hold it close to bottom hinge, then pull door to disengage clasp from hinge. Repeat for other side and door will be free from shelf.
Note : Take special care when removing door to prevent scratches, damage, or loss.
7. Install cable protectors. Align tabs to shelf and align plunger. Press firmly to engage.
Page 20 of 21
www.commscope.com
Step 10 – Install Fiber Designation Label
Label holder
860452168
Instruction Sheet
Trough door
Label hanger
(3 places)
1. To print a designation label, go to http://www.commscope.com/Resources/Labeling-Templates and scroll down to 360G2 Panels and Shelves and select the appropriate label template.
2. Open trough door to 90°, orient the three provided label hangers as shown, and insert them into openings in rib on trough door as shown.
3. Orient label holder perpendicular to label hangers with slots aligned with hangers. Insert edge of label holder into hangers so that slots slide over the hangers. The label holder should pivot on the hangers freely.
4. Apply labels on surface of flip label holder facing door to be seen when door is closed.
Page 21 of 21

Public link updated
The public link to your chat has been updated.
Advertisement