ABB TRIO-20.0-TL-OUTD-X-US-480 Manual
Add to My manuals10 Pages
ABB TRIO-20.0-TL-OUTD-X-US-480 solar inverter is designed to convert DC power generated by photovoltaic panels into AC power for grid connection. With advanced grid protection features, it ensures compliance with HECO's ultra-fast trip transient over-voltage and frequency voltage ride-through requirements. Its user-friendly interface enables easy parameter setting via the inverter's display or Aurora Manager Lite software. Maximize your solar power generation and contribute to a stable grid with this reliable and efficient inverter.
advertisement
ABB solar inverters
Programming for HECO compliance
TRIO-20.0/27.6-TL-OUTD-X-US-480
Contents
1. Introduction ..................................................................................................................................................2
2. Parameter setting via inverter’s display .......................................................................................................2
3. Parameter setting via software tool Aurora Manager Lite ............................................................................3
Appendix A: How to connect the laptop PC to the inverter ............................................................................6
Appendix B: How to launch Aurora Manager LITE ..........................................................................................7
1. Introduction
This instruction provides the method to reprogram the ABB TRIO-20.0/27.6-TL-OUTD-X-US-480 to the Hawaii Electric Company,
Inc. (HECO) ultra-fast trip transient over-voltage requirements (TrOV-2) and frequency voltage ride through (FVRT) mitigation requirements as described in the document “Appendix IIA Full Ride Through Settings for O’ahu, Maui, Hawai’i” dated January,
2015. Details of these requirements are available on the HECO website at: http://www.hawaiianelectric.com/vcmcontent/
StaticFiles/pdf/TrOVandFVRT_Public_Feb2015.pdf.
Every operation performed on the TRIO-20.0/27.6-TL-OUTD-X-US-480 shown in this instruction must be performed following existing regulations and safety instructions and carried out in compliance with the instructions provided in the product manual located at http://www.abb.com/solarinverters/.
2. Parameter setting via inverter’s display
HECO requirement settings can be set via the TRIO’s LCD display using the service menu (accessible using the buttons on the inverter’s LCD panel) as shown in Figure 1 below. Note: to obtain the second level password, call ABB solar inverter post-sales technical support at 1-877-261-1374, 6 a.m. - 6 p.m. MST.
Figure 1 - Service menu
After entering the second level password, the list of inverter grid parameters can be accessed using the UP and DOWN buttons.
Once the parameter indicated in the center column (Inverter parameter) of Table 1 below is highlighted, press ENTER. Then, use the UP/DOWN buttons to increase or decrease the parameter’s value. Select the new setting value shown in the right column.
Once all settings have been changed, press ENTER to confirm.
HECO parameter Inverter parameter
OVR2
UVR2
OFR2
UFR2
OVR1
UVR1
OFR1
UFR1
OVR2
UVR2
OFR2
UFR2
UVR1
OVR1
OFR1
UFR1
Set U>>
Set U<<
Set F>>
Set F<<
Set U>
Set U<
Set F>
Set F<
Set time U>>
Set time U<<
Set time F>>
Set time F<<
Set time U<
Set time U>
Set time F>
Set time F<
Table 1 - inverter grid parameters and associated HECO settings
Setting value
332.5V
138.5V
64Hz
56Hz
304.7V
243.V
63Hz
57Hz
160ms (default value)
160ms (default value)
160ms (default value)
160ms (default value)
20s
920ms
20s
20s
2 TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance
3. Parameter setting via software tool Aurora Manager Lite
Aurora Manager Lite is a free ABB software which communicates with the ABB TRIO inverter by reading the inverter data, settings and sending commands. Contact ABB solar inverter post-sales technical support at 1-877-261-1374 to obtain the software and any required password.
To use the Aurora Manager Lite software, it is necessary to connect a laptop PC to the inverter. The computer must communicate through an RS485 line using an RS485-to-USB adapter. ABB recommends the ABB Aurora Adapter in order to avoid compatibility issues; however, equivalent devices may be used. For details connecting the ABB Aurora Adapter to the inverter, refer to Appendix
A: How to connect the laptop PC to the inverter on page 6 of this instruction.
For the procedure to access the Aurora Manager Lite software, refer to Appendix B: How to launch Aurora Manager LITE on page
7 of this instruction.
When multiple TRIO inverters are daisy chained, it is possible to change the parameters on all inverters connected in the chain at one time. Once the laptop PC is connected to the daisy chain, Aurora Manager Lite will scan for all inverters and list each by model and serial number on the left side of the screen. Verify that each inverter in the daisy chain is identified in the list. Refresh the list if necessary. All inverters in the daisy chain must be set to communicate through Aurora Protocol. If set to Modbus, each inverter will need to be changed to Aurora Protocol or individually updated to HECO parameters.
Once the laptop PC is connected to the inverter, click on the Setup tab as shown in Figure 2 below.
Figure 2 - Click on the Setup tab
TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance 3
Next, click on the AC side tab, then the Grid protection tab, as shown in Figure 3 below. Voltage and Frequency grid parameters are all now accessible.
Figure 3 - Click on the AC side tab, then the Grid protection tab
To set the HECO parameters outlined in Table 1 on page 2 of this instruction, the boxes in the New columns must be changed as shown in Figure 4 below:
Figure 4 - Change information in the New columns
4 TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance
Rather than changing the settings for each individual TRIO inverter in a daisy chain configuration, select Apply setup changes to
ALL connected units at the top of the screen, as shown in Figure 5 below.
Figure 5 - Apply setup changes changes to ALL connected units
TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance 5
Appendix A: How to connect the laptop PC to the inverter
Figure 6 - Communication board showing RS485 PC/SERV port above and terminal block below
To use the Aurora Manager LITE software, connect the laptop PC to the inverter on the RS485 PC/SERV port of the communication board using an USB-RS485 Adapter (the ABB PVI-USB-RS232_485 Converter is recommended). The following steps must be performed:
− Switch OFF the inverter using the DC disconnect
− Remove the wiring box cover by unscrewing the six (6) lateral screws
− Remove the mylar cover on the communication board
− Connect the RS485 cables on the PC/SERV port (see top blue rectangle box in Figure 6 above) using an RJ45 plug, or the terminal block (see bottom blue rectangle box in Figure 6 above) by wiring the GND COM, PC +T/R and PC –T/R as shown in
Figure 7 below.
Figure 7 - Connect the RS485 cable wires as shown
6 TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance
Appendix B: How to launch Aurora Manager LITE
Aurora Manager LITE software is available at no cost from ABB and allows the installer or customer to monitor the plant, as well as change inverter settings.
To launch this software, once the inverter is connected to a laptop PC as described in Appendix A, access the COM settings as shown in Figure 8 below:
Figure 8 - Launch Aurora Manager LITE software
To determine which COM port to use, once the inverter is connected to the laptop PC through the adapter, this can be determined by opening the computer’s Control Panel and clicking on the Device Manager tab and then on the Ports (COM & LPT) tab, as shown in Figure 9 below.
Figure 9 - Access the laptop PC Control Panel (Device Manager) to determine which COM port to use
7 TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance
This action will provide a list of active COM ports, which should include the RS485/USB adapter and list its associated COM port number (typically the associated COM is the one with the highest number). Baud rate remains 19200. See Figure 10 below.
Figure 10 - List of active COM ports
By clicking on Apply and then OK, the COM settings are confirmed.
At this point on the main screen, it is possible to scan for inverters connected to the laptop PC, as shown in Figure 11 below.
Figure 11 - Scan for inverters connected to the laptop PC
Once the inverter(s) are found, select an inverter, and additional TAB selections will appear, as shown in Figure 12.
Figure 12 - Additional TAB selections will appear
TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance 8
From the Configuration drop-down menu, click on Set-up area access , as shown in Figure 13 below.
Figure 13 - Access the Setup area access
The following menu will appear, as shown in Figure 14 below.
Figure 14 - Setup menu
Fill in all fields, and finish by inserting the PASSWORD obtained from ABB solar inverter post-sales technical support and then clicking OK to confirm. New features will be available in the software. Press the REFRESH button and click on any inverter icon in the list, and new TABs will then appear, as shown in Figure 15 below. These new tabs are available for all inverters listed and are to be used to change the iinverter parameters as discussed in section 3 - Parameter setting via software tool Aurora Manager Lite on page 3 of this instruction.
Figure 15 - Software features available
9 TRIO 20.0/27.6-TL-OUTD-US-480 | Programming for HECO compliance
For more information please contact: www.abb.com/solarinverters
© Copyright 2015 ABB. All rights reserved.
Specifications subject to change without notice.
advertisement