AERTECNICA TUBO STUDIO TS1 Use And Maintenance Manual

AERTECNICA TUBO STUDIO TS1 Use And Maintenance Manual

AERTECNICA TUBO STUDIO TS1 is a central power unit for vacuuming dust and small solid objects. It's designed for home use with a network of vacuum sockets installed throughout the house. This unit connects to a dust intake line, capturing debris. Larger particles fall into the container, while a filter cartridge traps suspended dust. Micro dust is then expelled outside, ensuring cleaner air. The unit features a powerful motor, a filter cartridge that can be regenerated, and a dust container that needs periodic emptying.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

AERTECNICA TUBO STUDIO TS1 Use & Maintenance Manual | Manualzz

USE AND MAINTENANCE MANUAL

CENTRAL POWER UNIT

USE AND MAINTENANCE MANUAL

INDEX

GENERAL INFORMATION

2 General warnings

2 Warranty english

3 Safety

3 Certifications

3 Identification

3 Manufacturer

4 Identification plate

4 TUBÒ system description

5 Part description

6 Technical features

6 Handling the packaging

6 Opening the packaging

7 Foreseen use

7 Incorrect use

7 Starting/stopping

MAINTENANCE

12 Container emptying

13 Filter cartridge replacement

14 Filter cartridge regeneration

15 Central power unit disposal

15 Central power unit inspection

16 Troubleshooting

INSTALLATION

8 Positioning the central power unit

8 Central power unit installation

allowances

9 Bracket fastening

10 Dust inlet line connection

10 Exhaust conveyor line connection

11 Electrical connection

1 User and maintenance manual

GENERAL WARNINGS

Manual use

The installation, user and maintenance manual is an integral and essential part of the central power unit and must be read carefully as it contains important information concerning operator safety, foreseen operation and the correct maintenance of the central power unit.

WARRANTY

Warranty conditions for EEC countries

Aertecnica guarantees the proper operation of the purchased central power unit for a 24 month period starting from the documented purchase date.

If there is not any documentation that proves the purchase date (invoice or fiscal receipt), the 24 month period will refer to the date it was sold by AERTECNICA.

The warranty conditions are those provided by current

European legislation and in any case the following are not covered by the warranty:

Liability

The central power unit must only be implemented for the use for which it was explicitly designed (see paragraph

FORESEEN USE).

Any other use is considered incorrect and therefore dangerous (see paragraph INCORRECT USE) .

The central power unit should not be used by people with reduced physical, sensorial or mental capacities, by children or by people without product experience or knowledge, unless they are supervised or have been instructed in the use of the central power unit by a person responsible for their safety.

Faults, damage or breakage caused by incorrect electric connection during or after installation.

Faults, damage or breakage caused by the malfunctioning of other components in the system, (e.g., vacuum sockets), if these components are not from AERTECNICA.

Faults, damage or breakage caused by pipe clogging.

Faults, damage or breakage caused by carelessness, negligence, inability or incorrect use.

Materials, components and accessories, including electric and electronic ones, when the damage is not related to original manufacturing defects or when the damage is due to component wear.

english

The manufacturer shall not accept any contractual and extra contractual liability due to damage caused by errors in using and installing the central power unit or due to failure to observe the instructions provided by the manufacturer.

The warranty will lapse in the case of tampering, repairs carried out by unauthorised individuals or when nonoriginal spare parts are used.

Other additional warranty conditions will only and exclusively be the responsibility of the party proposing them.

For all disputes, the court of Forlì-Cesena (Italy) shall have exclusive jurisdiction and Italian legislation shall apply.

NOTE

AERTECNICA reserves the right to modify the product and the related technical documentation without incurring any obligation to third parties.

No part of this manual may be reproduced, copied or distributed in any manner without written authorisation from AERTECNICA.

EXTRA EEC warranty conditions

For countries that are not part of the EEC, the warranty shall be the responsibility of the importing company and the warranty conditions shall be those foreseen by the applicable regulations in the country of export.

This manual is printed on 100% recycled paper

2

SAFETY

This sign is used in the manual to point out all operations that must be strictly followed to guarantee personal safety as well as the safety of others and the central power unit.

Product certification for the singlephase power unit range for the residential market sector, series:

STUDIO TS english

HAZARD: this indicates that attention must be paid in order to prevent events that could cause serious accidents that harm people or their health.

IDENTIFICATION

This user and maintenance manual is an inherent part of the central power unit:

HAZARDS OF AN ELECTRIC NATURE: make sure that the central power unit is connected with the relative cable to a standard compliant earthing system. Complete disconnect the voltage from the central power unit for maintenance operations.

SERIES: STUDIO TS

MODELS: TS1 - TS2 - TS4

CRUSHING HAZARD: when handling and installing the central power unit it is recommended to use suitable equipment for lifting and securing it to prevent the central power unit from falling accidentally.

MANUFACTURER

AERTECNICA S.p.A.

Via Cerchia di Sant’Egidio,760

47521 Cesena (FC) ITALY

Tel. +39 0547/637311

Fax +39 0547/631388 [email protected]

www.aertecnica.com

HAZARD OF DAMAGING THE CENTRAL POWER

UNIT: follow the provided instructions for use to prevent consequences that could damage the central power unit.

INHALATION OF HARMFUL ELEMENTS AND

DUST: protect respiratory organs by using protective masks when emptying the dust containers and when replacing the filter cartridge so the collected dust is not inhaled.

Technical Service

The Technical Service Centre can be contacted for all technical problems and in order to request spare parts.

For all communications concerning the central power unit, the user should always provide the following data: central power unit model serial number year of manufacturing date of purchase and a detailed description of the discovered problems.

DUST SENSITIVITY: this means that hand protection must be used to prevent harming operators who are sensitive to the collected dust.

When replacing the central power unit’s spare parts it is recommended to use original spare parts; AERTECNICA declines all liability concerning decreased performance or damage to the central power unit due to the use of non-original spare parts.

CERTIFICATIONS

Aertecnica S.p.A is a company certified with:

Quality system

UNI EN ISO 9001

Environmental management system

UNI EN ISO 14001

3 User and maintenance manual

IDENTIFICATION PLATE

For these models, the identification plate is located on the body of the central power unit as shown in the figure.

The necessary identification data are: model, serial number and year of manufacturing.

TS2

TS00100

2010

1600

DESCRIPTION OF THE TUBÒ

VACUUM SYSTEM

The purchased central power unit is the main component of TUBÒ, AERTECNICA’s advanced vacuum system.

The TUBÒ system consists of the central power unit, vacuum sockets installed in the building’s walls, the hose that is inserted in the vacuum sockets based on the room to be cleaned and a set of cleaning accessories suitable for all residential needs.

A network of plastic pipes installed under the floor and in the walls of the building form the dust intake line that is connected to the central power unit.

The filter cartridge can be regenerated by washing it periodically (based on its use; see paragraph FILTER

CARTRIDGE REGENERATION).

These timescales are approximate for normal vacuum system use. In the case of intense use of the system and a large amount of vacuumed dust, the timescale will be shortened.

The collected dust reaches the central power unit; the large dust particles fall into the collection container whereas a filter cartridge retains the suspended dust; the micro dust (invisible to the eye and not filtered by the cartridge) is discharged outside through the air exhaust line, guaranteeing home hygiene and preventing the dust from recirculating in homes.

The dust container must be emptied periodically (approx.

2-3 times a year; see paragraph CONTAINER EMPTYING).

The filter cartridge should be replaced with a new one every 2-3 years (based on its use; see paragraph FILTER

CARTRIDGE REPLACEMENT).

english

The system can reach all areas of the home, both inside as well as outside depending on the position of the vacuum sockets installed in the building. The recommended hose is 9 m. long, which makes it possible to cover a circular area of approx. 40 m

2

(a reduction in the radius of the circumference is due to obstacles in the room (furniture) that make it necessary for the tube to follow a curved path).

4

english

PART DESCRIPTION

"

!

#!

#$

#

$

##

#%

#"

#&

#'

STUDIO TS2

#&

%

$

STUDIO TS4

*

#)

&

(

'

Legend

1 - Sound-proofed motor chamber

2 - Electric motor

3 - Motor air intake

4 - Dual right/left dust inlet

5 - Air Exhaust line (only TS4)

6 - Power supply

7 - Operation Signal input

8 - Green Led On: power unit on

9 - Green Led On: power unit running

5

10 - Fuse

11 - Filter cartridge

12 - Fixing Knob

13 - Fixing bracket

14 - Locks lever

15 - Cone conveyor

16 - Ergonomic handles

17 - Dust container

18 - Dust inlet closing cap

User and maintenance manual

#(

!

TECHNICAL FEATURE

Model

Power supply

Motor power

Frequency

Motor rpm

Turbine stages

SOFT START starting

Socket power supply

Vacuum power

Max. air flow rate

Max. vacuum

Filter cartridge surface

Filter cartridge material

Dust container capacity

Height

Diameter

Weight

Volt (Vac)

Watts (W)

H n°

Air Watts m 3 /h mbar cm

Z rpm

Volt (Vcc)

2 litres cm cm kg

CMT800 Compatibility

CM8890 Remote Panel Kit

Compatibility

CM186 Wireless system

Compatibility

Right and left dust inlet

Right air exhaust

Noise dB

Silencer as standard equipment

1 Exhaust conveyor line with CM640 convey (Optional)

STUDIO TS1

220/240

1.260

50/60

43.507

1

YES

12

504

207

270

4000

POLYESTER

15

64

28

13

YES

YES

YES

YES

YES 1

57

NO

STUDIO TS2

220/240

1.600

50/60

46.480

1

YES

12

653

195

313

8000

POLYESTER

15

90

28

16

YES

YES

YES

YES

YES 1

55,6

NO

STUDIO TS4

220/240

1.650

50/60

31.014

2

YES

12

690

238

320

8000

POLYESTER

23

103

32

18

YES

YES

YES

YES

YES

58

YES english

HANDLING THE PACKAGING

The central power unit is delivered inside cardboard packaging to make it easier to transport.

It is recommended to not remove the packaging until installation to prevent damaging it.

OPENING THE PACKAGING

When opening the central power unit packaging, follow the instructions indicated on the sides of the cardboard box.

To lift and transport the central power unit, use the handles positioned on the sides of the packaging (1) .

#

NOTE

The packaging elements that accompany the central power unit upon delivery are inert solid waste that must be disposed of according to current applicable regulations.

6

FORESEEN USE

The central power unit was designed exclusively for vacuuming dust or small sized solid bodies.

The dust container must be emptied each time that it is filled.

The filter cartridge must be regenerated periodically and must be replaced every 2-3 years or immediately if it breaks.

When replacing spare parts, use original Aertecnica spare parts.

TURNING ON/OFF

Turning on the centralised vacuum system depends on the type of hose and the installed vacuum socket model.

There are two types of hoses:

TYPE 1: hose with an activator union.

The central power unit turns on when the union (B) is inserted in the vacuum socket (A).

INCORRECT USE

Use personal protection garments before carrying out operations such as emptying the dust container or replacing/cleaning the filtering cartridge.

english

In order to guarantee proper operation of the central power unit and to prevent the relative warranty coverage from lapsing, follow the instructions provided below:

Do not vacuum lighted cigarettes, hot embers or burning material: these materials may cause a fire to start that would damage the hoses and the central power unit.

Do not vacuum cloths, rags, fabrics or textile material: these materials could obstruct the hoses or damage the central power unit .

Do not vacuum liquids, materials saturated with liquids or very moist materials: these materials could cause the electric system to short circuit, prevent the proper passage of the dust or damage the sockets and the central power unit.

Liquid can be vacuumed using a special accessory (art.

AP372; art. AP373).

Do not allow children to play with the vacuum sockets, opening and closing them continuously or inserting toys or solid items of unsuitable dimensions.

Do not vacuum the dust using multiple sockets at the same time(Aertecnica produces central power units that can be used by multiple operators at the same time in the TRIFASE line).

Do not use the system with the central power unit turned on without the filter cartridge inserted.

Do not block the air exhaust line.

Do not block the air sockets for electric motor cooling.

Do not use the cleaning accessories to vacuum parts of the body.

Do not leave the central power unit powered when it is not used for prolonged periods of time.

TYPE 2: hose with a switch.

The central power unit is turned on using the switch on the hose itself.

Insert the hose-socket union with the special plates (D) in correspondence of the contacts (E) inside the socket.

To turn off the central power unit: with the TYPE 1 hose, remove the hose from the vacuum socket (A); with the TYPE 2 hose, move the switch to the OFF position.

A

TYPE 1

A

TYPE 2

B

C

E

E

D

7 User and maintenance manual

CENTRAL POWER UNIT POSITIONING

The central power unit is installed in service rooms (for example, store-rooms, garages, cellars) that are aired and protected from extreme temperature changes.

The 220/240 power supply line and the vacuum socket consent line for activating the centralised vacuum system must be prepared near the central power unit.

The installation area must be sufficiently spacious and well-lit to be able to replace the filter cartridge and the dust container.

B

The following table specifies the main reference allowances for correct central power unit installation.

C

D english

E

L

M

P

H

I

F

G

Q

C

D

E

A

B

M

Q

STUDIO TS INSTALLATION ALLOWANCES (in mm.)

STUDIO TS1 STUDIO TS2

143

400

298

400

330

280

250

330

280

250

314

124

650

90

100

47

1500 floor level

321

124

900

80

100

47

1400 floor level

8

STUDIO TS4

360

350

260

320

280

370

200

1040

100

125

51

1400 floor level

BRACKET FASTENING

1A

- WITH WALL STIRRUP

Fix the stirrup to the wall

1B

- WITH SCREW ANCHORS M6 Ø12

Drill. Using a water level, check that the fixing is level with the wall.

english

2

- Shift the locking lever

3

- Pull off the support from the guides

4

Fit the vibration blocks to the support

5A

- WITH WALL STIRRUP

Fasten the bracket to the wall using the supplied screws

5B

- WITH SCREW ANCHORS

Fix the support using proper anchors (not included)

6

- Remove the dust container

7

- Secure the power unit to the support

8

- Make sure the locking lever locks in position

9

- Refit the dust container

9 User and maintenance manual

CONNECTION

DUST INLET LINE

All of the central power units have a dual dust inlet to permit the connection of the socket line hose on both sides of the central power unit, making installation easier.

Select the most convenient central power unit dust inlet to connect the dust inlet line

Check that the dust inlet not in use is closed. Place the provided pressure cap (T).

SLEEVE MOUNTING

Assemble the rubber sleeve (M) on the dust inlet using the two provided clamps (F ) and connect it to the inlet hose.

M

F

M

F F

T

F F

M

T english

AIR EXHAUST CONNECTION

It is recommended to install an exhaust hose that is no longer than 5 metres.

If the exhaust line is longer, use a hose with a diameter of

ø 63 or larger and install a silencer of a suitable diameter.

Always position the silencer near the exhaust grille.

AIR EXHAUST LINE COMPONENTS

1 - silencer ø100

2 - conical increase ø50F - ø82F

3 - exhaust grille ø82

4 - outlet hole ø82

ø 50

1

300 mm

ø100

ø 50

4

ø 82

3

ø 82

2

ø50 mm.

10

ELECTRICAL CONNECTION

DANGER OF ELECTROCUTION

Make sure that the electric line is dimensioned to support the central power unit power and check that the mains network corresponds to the voltage specified on the identification plate.

The central power unit electric power supply system must be installed by qualified personnel in compliance with current applicable regulations.

The manufacturer declines all liability for poor operation or damage to people and/or property due to connection to a non-compliant electric system

NOTE CONNECTION OF THE CENTRAL POWER UNIT TO THE

POWER SUPPLY LINE

The power supply cable (8) with Schuko plug (7) for the central power unit is supplied as standard equipment with the central power unit .

english

CONNECTION OF THE CENTRAL POWER UNIT TO THE

SOCKET LINE

A socket cable connection (3) is supplied .

To make the socket line connection, wire the central power unit connection cable as shown at the (5) number.

GENERAL COMPONENTS

1 - pre-wired sheathing 2x1 ø16 for socket line 12v

2 - electric junction box

3 - 12v socket cable line

4 - 12v signal input

5 - connection of 12v socket line with socket cable

ELECTRICAL DANGER

If the power supply cable is damaged, it must be replaced by AERTECNICA or its

Technical Service Centre or in any case by a specialised technician in order to prevent all electrical hazards.

6 - 220/240V power outlet

7 - Schuko plug

8 - Electrical cable

9 - Power supply

10 -Socket frame

6

7

8

2

4

9

1

3

10

5

11 User and maintenance manual

MAINTENANCE

3 - Empty the dust container

Careful maintenance prolongs the life-time of the central power unit and guarantees better performance.

NOTE

Before starting with any maintenance operation, disconnect the central power unit from the power supply.

The central power unit must not be operated without the filter cartridge inserted. Failure to observe this rule could cause damage to the motor that is not covered by the warranty.

CONTAINER EMPTYING

1 - Rotate both handles upwards simultaneously andremove the dust container

4 - Reassemble the dust container paying attention to the seal position (G) and close the handles.

english

G

G

2 - Lift out the conveying ring

12

FILTER CARTRIDGE REPLACEMENT

Before starting with any maintenance operation, disconnect the central power unit from the power supply.

3 - Insert a new cartridge (N) and tighten the knob completely (P).

english

It is recommended to replace the filter cartridge every

2-3 years.

This period may change depending on the degree of system use.

ATTENTION

When carrying out this operation, it is easy to come into contact with the dust collected on the cartridge walls.

Before removing the filter cartridge, it is recommended to wear suitable personal protective garments.

1 - Open the dust container rotating the handles (M)

N

P

4 - Rehook the dust container and close the handles (M).

M M

M M

2 - Unscrew the knob (P) that fastens the cartridge (C) and remove it from its housing

NOTE

The central power unit must not be operated without the filter cartridge inserted. Failure to observe this rule could cause damage to the central power unit motor.

C

USE ONLY ORIGINAL AERTECNICA

SPARE PARTS

P

13 User and maintenance manual

FILTER CARTRIDGE REGENERATION

(for all central power unit models)

Periodic filter cartridge regeneration improves overall centralised vacuum system productivity.

With normal system use, the cartridge should be checked every 4 months.

1 - Vacuum the dust collected on the saturated cartridge walls using the system itself.

NOTE

To effectively regenerate the saturated cartridge and keep the centralised vacuum system operating, it is recommended to insert a new filter cartridge immediately, restart the system and vacuum the largest dust particles from the saturated cartridge using the system itself.

2 - After an initial brief cleaning, wash the filter cartridge with a jet of water that is not too strong and remove the dust that penetrated between the walls.

english

ATTENTION

When carrying out this operation, it is easy to come into contact with the dust collected on the cartridge walls.

Before removing the filter cartridge, it is recommended to wear suitable personal protective garments.

3 - Allow the cartridge to dry completely

NOTE

The central power unit must not be operated without the filter cartridge inserted. Failure to observe this rule could cause damage to the central power unit motor.

USE ONLY ORIGINAL AERTECNICA

SPARE PARTS 4 - Make sure that there are not any tears or cuts on the cartridge walls. In this case the damaged cartridge must be replaced with a new one.

14

english

CENTRAL POWER UNIT DISPOSAL

(for all central power unit models)

At the end of its life cycle, the machine must be disposed of in compliance with current applicable regulations.

The following table specifies the material with which the central power unit is built.

TYPE OF MATERIAL

PLASTIC AND RUBBER

PRESENCE IN dust container cup, tangential openings under motor gasket motor ring filter cartridge fixing bracket antivibration bracket rubber sleeves fastening bracket adhesives hooks, handles gaskets silencer

GALVANISED COMPONENTS screws and rivets

WINDINGS

ELECTRICAL COMPONENTS

METAL COMPONENTS

PACKAGING electric motor and wiring electronic card turbine motor led electric wires socket cable line schuko plug upper body clamps and pivots box interpads bags

IMPORTANT

The material listed below must be divided and stored to be recycled or disposed of in compliance with the environmental regulations valid in the country of use.

SPECIFICS

30% talc filled polypropylene polypropylene thermoplastic rubber nylon poliestere + ABS nylon 30% caricato vetro rubber

SBR/NR rubber nylon

PVC nylon mousse e pivilene polystyrene galvanized steel copper misc material misc material misc material rcopper copper copper painted steel galvanized steel cardboard cardboard polyethylene

DISPOSAL

The regulations that govern the disposal and demolition of the central power unit, its components and the possible polluting material and substances change depending on the country of final use.

It is recommended to contact authorised organisations and agencies and to respect the current applicable legal regulations

CENTRAL POWER UNIT INSPECTION

The general centralised vacuum system inspection must be done after the final assembly of all vacuum sockets and the selected central power unit.

CHECK 1

Activate the central power unit with all sockets closed, jumpering the 12V socket line.

Inserting the vacuum gauge in the dust inlet that is not used or in any vacuum socket, check the vacuum value obtained by the central power unit, which will stop automatically after 15 seconds. Note the value that was reached (value 1) .

Disconnect the tubing from the central power unit and insert a vacuum gauge in its place. Activate the central power unit jumpering the 12V socket cable line; check the vacuum value obtained by the central power unit, which will stop automatically after 15 seconds. Note the value that was reached (value 2) .

Check that the difference between values 2 and 1 does not exceed 15 mbar.

If the value is higher, this means that there are leaks that must be found and repaired.

CHECK 2

Compare value 2 with the vacuum value indicated in the technical features table for the central power unit model that was purchased.

Check that the difference between the two values does not exceed 10% of the table value.

If the value is higher, contact the Aertecnica Service Centre.

15 User and maintenance manual

NOTE the values indicated in the table refer to a power supply voltage of 240 V at 50 Hz. If the mains voltage is less, use the following formula: every 10 volt = 10 mbar (example with the TP1 central power unit: 270 mbar at 240 V = 250 mbar at 220 V).

VACUUM TEST - FOR ALL CENTRAL POWER UNITS

1 -Insert the hose in the furthest socket and activate the central power unit.

2 -Insert the vacuum gauge (AT010) in the socket adjacent to the one occupied by the hose; if the vacuum value is correct (RANGE between 100 and

150 mbar) the hand will point to the green zone. In this case, the test is positive. Otherwise, contact the Aertecnica Service Centre.

TROUBLESHOOTING

PROBLEM

THERE IS NO AIR INTAKE FROM

ALL THE SOCKETS

THERE IS NO AIR INTAKE FROM

A SOCKET

CAUSE

Power supply cable disconnected

12V socket cable line not connected or incorrectly connected

The motor overheated.

The motor temperature exceeded 80 °C.

SOLUTION

Connect the power supply cable

Connect the 12V socket cable line or check the wiring

Check if the air exhaust line is free or if the two air exhaust openings are blocked.

Wait for the motor to cool down.

Make sure the filter cartridge is not saturated. In this case, perform maintenance. Wait for the motor to cool down.

Rehook the container correctly.

The dust container is not correctly hooked

The microswitch or the electric contacts in a vacuum socket are damaged.

Call a specialised technician.

LOW AMOUNT OF AIR INTAKE There is clogging in the system Call a specialised technician.

english

The filter cartridge is saturated Perform cartridge maintenance.

Multiple vacuum sockets are being used at the same time on the system

The central power unit may only be used by one operator at a time.

The dust container gasket is damaged or out of position

The air exhaust line is clogged

Check the position of the dust container gasket.

Check if the air exhaust line is free or if two air exhaust openings are blocked.

The hose is partially obstructed Free the obstruction from the hose.

The cap was not inserted correctly into the dust inlet not being used in the central power unit

Check that the dust inlet that is not being used is closed with the special cap.

THE CENTRAL POWER UNIT ALWAYS

REMAINS ACTIVATED EVEN WITH

THE SOCKETS CLOSED

The microswitch or the electric contacts in a vacuum socket are damaged.

Call a specialised technician.

The central power unit power supply cable is disconnected

Call a specialised technician.

THE LED OF THE POWER UNIT IS OFF

The protective fuse burnt out.

Call a specialised technician..

The electronic card is defective Call a specialised technician.

Call a specialised technician for other causes that are not covered in this manual

16

advertisement

Key Features

  • Powerful motor
  • Dual dust inlet
  • Filter cartridge regeneration
  • Dust container emptying
  • Silent operation
  • CMT800 compatible
  • CM8890 Remote Panel Kit compatible
  • CM186 Wireless system compatible
  • Soft Start
  • Dust container capacity: 15 liters

Frequently Answers and Questions

How often should I replace the filter cartridge?
It is recommended to replace the filter cartridge every 2-3 years, depending on how often you use the system. The filter cartridge can be regenerated by washing it periodically.
Can I use the system with multiple sockets simultaneously?
No, AERTECNICA STUDIO TS1 models are designed for single user operation. For multiple operator systems, please consider AERTECNICA's TRIFASE line.
What should I do if there is no air intake from a specific socket?
Check if the microswitch or the electric contacts in the vacuum socket are damaged. If so, call a specialized technician for assistance.

Related manuals

Download PDF

advertisement