Fujitsu Brocade FC switch DCX-4S Manual


Add to my manuals
10 Pages

advertisement

Fujitsu Brocade FC switch DCX-4S Manual | Manualzz

53-1001249-02

December 19, 2008

DCX-4S Rack Mount Kit

Installation Procedure

Supporting Brocade DCX-4S Backbone

53-1001249-02

*53-1001249-02*

December 19, 2008

Copyright © 2008 Brocade Communications Systems, Inc. All Rights Reserved.

Brocade, Fabric OS, File Lifecycle Manager, MyView, and StorageX are registered trademarks and the Brocade B-wing symbol, DCX, and SAN

Health are trademarks of Brocade Communications Systems, Inc., in the United States and/or in other countries. All other brands, products, or service names are or may be trademarks or service marks of, and are used to identify, products or services of their respective owners.

Notice: This document is for informational purposes only and does not set forth any warranty, expressed or implied, concerning any equipment, equipment feature, or service offered or to be offered by Brocade. Brocade reserves the right to make changes to this document at any time, without notice, and assumes no responsibility for its use. This informational document describes features that may not be currently available.

Contact a Brocade sales office for information on feature and product availability. Export of technical data contained in this document may require an export license from the United States government.

The authors and Brocade Communications Systems, Inc. shall have no liability or responsibility to any person or entity with respect to any loss, cost, liability, or damages arising from the information contained in this book or the computer programs that accompany it.

The product described by this document may contain “open source” software covered by the GNU General Public License or other open source license agreements. To find-out which open source software is included in Brocade products, view the licensing terms applicable to the open source software, and obtain a copy of the programming source code, please visit http://www.brocade.com/support/oscd .

Brocade Communications Systems, Incorporated

Corporate and Latin American Headquarters

Brocade Communications Systems, Inc.

1745 Technology Drive

San Jose, CA 95110

Tel: 1-408-333-8000

Fax: 1-408-333-8101

Email: [email protected]

Asia-Pacific Headquarters

Brocade Communications Singapore Pte. Ltd.

30 Cecil Street

#19-01 Prudential Tower

Singapore 049712

Singapore

Tel: +65-6538-4700

Fax: +65-6538-0302

Email: [email protected]

European Headquarters

Brocade Communications Switzerland Sàrl

Centre Swissair

Tour B - 4ème étage

29, Route de l'Aéroport

Case Postale 105

CH-1215 Genève 15

Switzerland

Tel: +41 22 799 5640

Fax: +41 22 799 5641

Email: [email protected]

Document History

The following table lists all published versions of the DXC-4S Rack Mount Kit Installation Procdure .

Title

DXC-4S Rack Mount Kit Installation

Procdure

DXC-4S Rack Mount Kit Installation

Procdure

Publication number

53-1001249-01

53-1001249-02

Summary of changes

New document

Corrections made to document.

Date

November 2008

December 2008

2 of 10 DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

This document provides instructions to install a DCX-4S Backbone in a 19 in. EIA equipment cabinet with a rail-to-rail depth of 27-31 in.(68.58 to 78.74 cm). The document is organized as follows.

Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Installation guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Installing the DCX-4S in equipment cabinet. . . . . . . . . . . . . . . . . . . . . . . . . . 4

Safety

Observe the caution notice in this manual. The caution notice has an ID, which is displayed in parentheses (C015).

Use this ID to locate the translation of this caution notice in the Brocade Product Safety Notices .

CAUTION

Use safe lifting practices when moving the product. (C015)

NOTE

A fully populated Brocade DCX-4S weighs 103.50 kg (228.20 lb) with four FC8-48 port cards installed (192 ports) and requires a hydraulic or assisted lift to install it.

Installation guidelines

ATTENTION

To ensure adequate cooling, install the chassis with the air intake (nonport side) facing the cool-air aisle.

Follow these general installation guidelines:

• Provide a space that is 8 rack units (8U) high, 61.19 cm (24.09 in.) deep, and 43.74 cm (17.22 in.) wide. 1U is equal to 4.45 cm (1.75 in.).

• To allow the quick removal of all power from the chassis, use AC power sources that are easily accessible and located near the chassis.

• Verify that the additional weight of the chassis does not exceed the weight limits of the cabinet.

• Plan for cable management before installing the chassis. Cables can be managed in a variety of ways, such as by routing cables below the chassis, to either side of the chassis, through cable channels on the sides of the cabinet, or using patch panels. Refer to the product’s Hardware Reference Manual for specific information.

• Ensure that one or two dedicated electrical branch circuits with the following characteristics are available:

200-240 VAC, 50-60 Hz (refer to the corresponding Hardware Reference Manual for additional electrical specifications).

Protected by a circuit breaker in accordance with local electrical codes.

Supply circuit, line fusing, and wire size are adequate, according to the electrical rating on the chassis nameplate.

Grounded outlets are installed by a licensed electrician and compatible with the power cords.

Located close to the enterprise-class platform chassis and easily accessible.

DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

3 of 10

• To maximize fault tolerance, connect each power cord to a separate power source.

• Ensure that all equipment installed in the cabinet is grounded through a reliable branch circuit connection. Do not rely on a secondary connection to a branch circuit, such as a power strip.

• Ensure that the product fans have access to a total minimum airflow of 350 cubic ft (9.91 cubic meters) per minute. Do not block intake vents. Allow for a minimum of 14 in. (35.66 cm) clearance.

• Ensure that the air temperature on the air intake side is less than 104 operation.

o Fahrenheit (40 o Celsius) during

Installing the DCX-4S in equipment cabinet

Use the following instructions to install the DCX-4S in an equipment cabinet using the 27-31 in. (68.58 to 78.74 cm) rail kit.

Time required

Allow approximately one hour to unpack and install a chassis in a cabinet.

Tools required

The following tools are required when installing the rack mount kit:

• Torque wrench with #2 Phillips screwdriver tip

• Flathead screwdriver

• Hydraulic or assisted lift with a minimum raise of 55 in. (140 cm) and a minimum capacity of 250 lbs (113 kg).

Parts list

The following parts list refers to items illustrated in

Figure 1 .

B

C

D

TABLE 1

Item

Items supplied with the DCX-4S rack mount kit

Description

For all types of installations

A Left rail

E

Right rail

10-32 x .5 in. (1.27 cm) Phillips screw

10-32 x .63 in.(1.60 cm) Phillips screw. with square cone washer for cabinets that have rails with round holes.

Alignment washer for cabinets that have rails with square holes.

4 of 10 DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

FIGURE 1

DCX-4S 27 to 31 in. (68.58 to 78.74 cm) rail kit

A Adjusting

Screws

B

C

10-32 x .5"

D E

10-32 x .63" Alignment Washer

DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

5 of 10

Unpacking the Brocade DCX-4S

Use the following procedure to unpack the Brocade DCX-4S.

CAUTION

Use safe lifting practices when moving the product. (C015)

NOTE

A fully populated Brocade DCX-4S weighs 103.50 kg (228.20 lb) with four FC8-48 port cards installed (192 ports) and requires a hydraulic or assisted lift to install it.

1. Unpack the Brocade DCX-4S.

a. Cut the bands that encircle the packaging.

b. Remove the lid and the kits and foam from the top of the chassis.

c. Lift the cardboard box off the chassis and remove the plastic bag from around the chassis.

Save the packing materials for use when returning the old chassis.

d. Leave the chassis on top of the plastic shipping tray if the chassis must be transported to the installation location.

2. Use a pallet jack or other assisted lift to transport the new chassis to the installation area. Doorways must be wider than 36 in. (91 cm) to accommodate the chassis on the pallet.

3. Remove the rack-mount kit, accessory kit, packing foam, and antistatic plastic from the chassis and set aside.

Installing cabinet hardware

Use the following procedures to install the rail kit illustrated in

Figure 1 on page 5 into the equipment cabinet for

mounting the DCX-4S.

1. On each rail (A and B in

Figure 1 on page 5), loosen the four 10-32 screws on the adjustable brackets and

adjust the rails to the depth of your equipment cabinet. Tighten screws after adjustment.

2. Noting that the rails are designated “Left” and “Right,” install each rail in the cabinet using four 10-32 screws (C and D in

Figure 1 on page 5), two screws on each end of each rail. Refer to

Figure 2 on page 7 .

• Position the rails so that the adjustable ends are mounted on the intake aisle side of the cabinet.

• For rails with round holes.

Use two 10-32 screws with square-cone washers (D in Figure 1 on page 5) on each end of the rail assembly.

Tighten screws to 32 in.-lbs (36.86 cm-kg).

• For rails with square holes.

Use the two standard 10-32 screws with blue Loctite on the threads (C in

Figure 1 on page 5) and alignment

washers (E in

Figure 1 on page 5) on each end of the rail assembly. Tighten screws to 32 in.-lbs (36.86

cm-kg).

6 of 10 DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

FIGURE 2

DCX-4S rails installed in equipment cabinet

Install DCX-4S in cabinet

1. Ensure that the door is removed from the port side of the DCX-4S. For instructions, refer to the DCX-4S

Backbone Hardware Reference Manual .

2. Ensure the chassis can be oriented so that the nonport side has access to intake air (cool).

3. Use a lift to raise the chassis to the correct level.

CAUTION

Use safe lifting practices when moving the product. (C015)

4. If applicable, lock the wheels of the lift.

5. Gently slide the chassis onto the rack, ensuring that it remains supported during the transfer. Refer to Figure 3 on page 8

.

DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

7 of 10

FIGURE 3

Installing DCX-4S into equipment cabinet

6. Secure the DCX-4S to the equipment cabinet racks with six 10-32 screws with square-cone washers

(D in Figure 1 on page 5

), three screws on each side. Tighten screws to 32 in.-lbs (36.86 cm-kg).

NOTE

Screws, clip nuts, and retainer nuts for the DCS-4S are included in the DCX-4S hardware accessory kit.

8 of 10 DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

FIGURE 4

DCX-4S installed in equipment cabinet

NOTE

For rails with round holes, use the clip nuts on the cabinet rails for securing 10-32 screws. For rails with square

holes, use the retainer nuts. Refer to Figure 5 on page 10 .

DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

9 of 10

FIGURE 5

Using clip nuts and retainer nuts to secure screws to cabinet rails.

7. Install the DCX-4S door and required cable management system using instructions in the DCX-4S Backbone

Hardware Reference Manual .

10 of 10 DXC-4S Rack Mount Kit Installation Procdure

Publication Number: 53-1001249-02

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

advertisement