Advertisement
Advertisement
Filler (by others)
Installation Instructions
1.
Prepare frame header for filler or adapter plate.
Install filler or adapter plate and top bracket.
For RM70 and RM170, see Figures 1 and 2.
(Filler, filler mounting screws, and bracket mounting screws by others.)
For RM70A and RM170A, see Figures 3 and 4.
2.
Prepare floor and threshold for bottom bracket.
Install bottom bracket (Figures 5 and 6, other side).
3.
Cut mullion to length from top (Figures 7 and 8, other side).
4.
Slide mullion over top fitting and swing into position on bottom fitting (Figure 9, other side).
5.
Slide mullion clamp over top fitting and secure with three screws (Figure 10, other side).
6.
Install security clips on door (Figure 11, other side).
Door
Top bracket location
1-5/8"
Drill and tap header and filler for 10-32 screws, 3 places
Door doors
Door
View looking up
9/16"
1-11/16"
2-3/4"
Figure 1.
Header and filler preparation for top bracket (RM70 and RM170).
Filler (by others) flush with stop, centered on center line of doors
Adapter plate
Prepare header for #10 x 1"
FPHSMS, 4 places
1-1/2"
Door
Door
2-1/4" doors
1-1/8"
Adapter plate location
View looking up
Door
11/32"
1-27/32"
Figure 3.
Header preparation for adapter plate
(RM70A and RM 170A).
Adapter plate doors
10-32 x 1/2" FPHMS
(by others)
Figure 2.
Filler and top bracket installation (RM70 and RM170).
Customer Service
1-877-671-7011 www.allegion.com/us
RM70, RM70A, RM170, and RM170A
Removable Mullions
© Allegion 2016
Printed in U.S.A.
4270108237 Rev. 12/16-f
PAGE NO.
1 of 2
REVISION
F
#10 x 1" FPHMS
4 places
Install top bracket to adapter plate with three
10-32 x 1/2" FPHMS
Figure 4.
Adapter plate and top bracket installation (RM70A and RM170A).
4270108237
Door doors
1-5/8"
Prepare floor for #14 x 1" screw anchors, 3 places
Cut out threshold for bottom bracket
1"
Door
Door
View looking down
7/8"
1-11/16"
2-3/4"
Figure 5.
Floor and threshold preparation for bottom bracket.
#10 x 1" FPHSMS
3 places
Top bracket
3/4"
Cut mullion
1/16" less than this dimension
Bottom bracket
1/4"
Figure 7.
Required mullion length.
66"
Cut top end
CAUTION: There is a steel tube inside of the mullion
4-3/4" approx of latchbolt
11"
Figure 8.
Cut mullion to length.
1 Slide mullion over top bracket
2 Swing mullion into position on bottom bracket
Figure 9.
Install mullion.
10-32 x 3/8" slotted truss head MS
3 places
Header not shown for clarity
Door stabilizer clips
#14 x 1" screw anchors in floor, 3 places
Figure 6.
Bottom bracket installation.
Customer Service
1-877-671-7011 www.allegion.com/us
1/32" min.
1/32" min.
Frame stabilizer clips on mullion (mullion not shown for clarity)
10-32 x 1/2" FPHMS
4 places
Clamp
Figure 10.
Slide mullion clamp up over top bracket and secure with screws.
Figure 11.
Position door stabilizer clips as shown, drill and tap door 10-32, 4 places, and install door stabilizer clips.
RM70, RM70A, RM170, and RM170A
Removable Mullions
© Allegion 2016
Printed in U.S.A.
4270108237 Rev. 12/16-f
PAGE NO.
2 of 2
REVISION
F
4270108237

Public link updated
The public link to your chat has been updated.
Advertisement