Advertisement
Advertisement
*941036-00*
941036-00
Removable Mullion
9954
1.
Adjust ball plunger for top and bottom fitting.
Adjust ball plunger out until ball is compressed when fitting is engaged with mullion. Once adjusted properly, lock-tite in place. See Figure 1.
Lock-tite when adjusted
Ball plunger 2.
Line up and install bottom mullion fitting with center of door opening and flush with closed doors. If threshold is used, it must be cut to fit around the bottom fitting. See Figures 2 and 3.
5/16-18 x 1-1/4”
FPHMS (4 places)
L opening
Door
Door
Figure 1
Installation Instructions
Threshold 1-3/8”
Door
Figure 2
5/16” malleable iron expansion anchors (4 places)
3-1/2”
1-3/8”
2”
3”
Figure 3
1/2”
L opening
Customer Service
1-877-671-7011 www.allegion.com/us
© Allegion 2014
Printed in U.S.A.
941036-00 Rev. 01/14-b
3.
Line up and install top mullion fitting with center of door opening and flush with closed doors. If stop is less than 3-1/2” wide, a filler block must be provided by others. See Figure 4.
!
NOTE
Reinforcement for all sheet metal frames is to be supplied by frame manufacturer.
4.
Cut mullion body from the top to provide clearance as shown in Figure 4. Be sure mullion is seated on bottom fitting.
5/16-18 x 1-1/4”
FPHMS (4 places)
Reinforcement
1-1/4” clearance ref.
2-7/16”
Cut mullion
1-1/4” less than this dimension
5.
Remove top mullion fitting and insert in top of mullion body. Slide mullion into place and replace mounting screws. Install top mullion clamp. See Figure 5.
1/4-20 x 3/8”
PPHMS
(2 places)
Figure 4
Top clamp
Figure 5
Drop bottom end into place