Below you will find brief information for Parallel Compressor, Enviroguard. The document discusses the installation and servicing of these systems, including planning for mezzanine machine rooms, refrigeration piping, electrical supply locations, system charging requirements, start-up procedures, oil control systems, pressure regulator settings, defrost control strategies, and more.

PDF
Document
Tyler Refrigeration Parallel Compressor, Enviroguard Installation & Service Manual | Manualzz

Advertisement

Advertisement

/

Advertisement

Key features

  • Parallel compressors
  • Enviroguard systems
  • Mezzanine machine room planning
  • Refrigeration piping
  • Electrical supply
  • Start-up procedures
  • Oil control
  • Pressure regulator settings
  • Defrost control

Frequently asked questions

The ventilation requirements depend on the type of cooling system: Remote Air: 100 CFM/HP, Water Cooled: 100 CFM/HP, Air Cooled: 1,000 CFM/HP.

The maximum weights are: P67: 3,800#, P90: 4,400#, P120: 5,500#, P140: 6,100#, P160: 7,000#, P180: 7,900#.

Improper piping can lead to increased oil requirements, decreased operating efficiency, increased chances of fouling components, and even compressor failures.

Use only clean, dry sealed refrigeration grade copper tubing, support straight runs of piping at each end, support corners, and avoid over-supporting piping attached to the compressor rack. Don't use short radius elbows and check all piping after the system has been placed in operation.